34
ISLANDING SCHEMES SOUTHERN REGION SRPC, Secretariat

Islanding schemes southern region

  • Upload
    asta

  • View
    67

  • Download
    0

Embed Size (px)

DESCRIPTION

Islanding schemes southern region. SRPC, Secretariat. Ramagundam & Hyderabad IC 2600 MW Load 1400-1800 MW. RTPS 600 MW. Simhadri TPS IC 5 00 MW. Kothagudem TPS. Jindal 100 MW on House Load. BTPS Gen 300 MW. Vijaywada TPS. KAIGA12 670 MW KAIGA34 315 MW. Rayalaseema TPS - PowerPoint PPT Presentation

Citation preview

Page 1: Islanding schemes   southern region

ISLANDING SCHEMES SOUTHERN REGION

SRPC, Secretariat

Page 2: Islanding schemes   southern region

Rayalaseema TPS IC 300-350MW

Simhadri TPSIC 500 MW

Vijaywada TPS

Kothagudem TPS

Ramagundam & HyderabadIC 2600 MW Load 1400-1800 MW

Kayamkulam, Sabarigiri , KakkadGen 300-600 MW Load 420-660 MW

Idukki, LPeriyar , ChalakudyTotal Gen 300-1200MWTotal Load 900-1100

KDPP KuttiadyTotal Gen-60-230 MWTotal Load 150-250 MW

Jindal 100 MW on House Load

BTPS Gen 300 MW

KAIGA12 670 MWKAIGA34 315 MW

VARAHI 230 MW

RTPS 600 MW

CHENNAI

NEYVELI

METTURKUNDAH

TUTICORIN

Page 3: Islanding schemes   southern region

KARNATAKA ISLANDING SCHEMES

Page 4: Islanding schemes   southern region

Jindal

JINDAL WILL GO ON HOUSE LOADBack

Page 5: Islanding schemes   southern region

BTPS

BTPS1 unit of 500 MW with reduced generation (300MW)

Loads =290 MW

BTPS UNIT 2 ON HOUSE LOAD

Back

Page 6: Islanding schemes   southern region

Lingasugur

RTPS

Kushtagi

LingapurHarthiGadag

Sindhanur

BTPS

Gooty

Alipur

JSW

Hiriyur PGCIL

Munirabad

BMM ISPAT Guddadahalli PGCIL

100 MW

65 MW

70 MW

55 MW

Guttur

The total load is about 290 MW

Back

BTPS

Page 7: Islanding schemes   southern region

LOAD MW DISTRICTKUSHTAGI 100 KOPPALSINDANUR 70 RAICHUR

MUNIRABAD 65 KOPPALALIPUR 55 BELLARY

GENERATIONBELLARY TPS 1 500/300 BELLARY

BELLARY TPS 2* 500/HOUSE LOAD BELLARY

BTPS

Back

Page 8: Islanding schemes   southern region

KAIGA12

Back

Page 9: Islanding schemes   southern region

KAIGA 12

KaigaUnit-1 & 2

Nagjari

Kadra

Mahalingapur

Soundatti

Bidnal

Belgaum

Sirsi

KS Hally

Kanabargi

Hubli

Narendra

Chikkodi

Ambewadi

The total load is about 670 MW

Athani

Kuduchi

SGS

Harti

Kollapur

Karwar

Vajramatti

Tadas

Supa 110kV

Kaiga ICTs

Ponda

Bagalkot

65 MW

65 MW

55 MW

55 MW 25 MW

90 MW

55 MW

50 MW

70 MW

52 MW

40 MW

33 MW

-55 MW

4 MW

Back

Page 10: Islanding schemes   southern region

LOAD MW DISTRICTHUBLI 65 HUBLI BIDNAL 55 DHARWAD

NARENDRA 140 DHARWADSOUNDATHI 25 BELAGAUM

MAHALINGAPUR 140 BAGALKOTBELGAUM 55 BELAGAUMCHIKKODI 65 BELAGAUMKARWAR 50 UTTARA KANNADA

PONDA 70 GOA

GENERATION MW DISTRICTKAIGA 1 & 2 440 UTTARA KANNADANAGHJARI UTTARA KANNADAKADRA UTTARA KANNADAKODSALLI UTTARA KANNADA

KAIGA 12

Back

Page 11: Islanding schemes   southern region

KAIGA34

Back

Page 12: Islanding schemes   southern region

KAIGA34

Back

Page 13: Islanding schemes   southern region

LOAD MW DISTRICT

DAVANAGERE 75 DAVANAGEREMK HUBLI 40 DAVANAGERE

GHATPRABHA 40 DAVANAGEREHAVERI 40 HAVERI

RANIBENNUR 35 HAVERIITTAGI 85 BELLARY

GENERATION MW DISTRICT

KAIGA 3 & 4 440UTTARA

KANNADA

KAIGA 3 & 4

Back

Page 14: Islanding schemes   southern region

VARAHI

Back

Page 15: Islanding schemes   southern region

Shanthigrama PGCIL

MRS Shimoga

Kemar

Puttur

KudremukhKavoor

UPCLVarahi

90 MW

90 MW

50 MW

Total Load is about 230MW

VARAHI

Back

Page 16: Islanding schemes   southern region

LOAD MW DISTRICT

KAVOOR 90 DAKSHIN KANNADAKEMAR 90 DAKSHIN KANNADA

KUDREMUKH CHIKKAMAGALURPUTTUR 50 DAKSHIN KANNADA

GENERATION MW DISTRICTVARAHI 230 UDUPI

VARAHI

Back

Page 17: Islanding schemes   southern region

RTPS

Back

Page 18: Islanding schemes   southern region

RTPS

Back

Page 19: Islanding schemes   southern region

LOAD MW DISTRICT

RAICHUR 80 RAICHURSEDAM 25 GULBARGA

HUMNABAD 90 BIDARSHAHPUR 60 YADGIRSHAHBAD 50 GULBARGA

INDI 50 BIJAPURBIJAPUR 55 BIJAPUR

BASAVANABAGEWADI 80 GADAG

LINGASUGUR 30 RAICHURGULBARGA 80 GULBARGA

GENERATION MW DISTRICT

RTPS 600 RAICHUR

RTPS

Back

Page 20: Islanding schemes   southern region

Rayalaseema TPS

BackDetails

Page 21: Islanding schemes   southern region

Ramagundam & Hyderabad

BackDetails

Page 22: Islanding schemes   southern region

Simhadri

BackDetails

Page 23: Islanding schemes   southern region

Kothagudem TPS

BackDetails

Page 24: Islanding schemes   southern region

KERALA ISLANDING

Page 25: Islanding schemes   southern region

Kayamkulam, Sabarigiri and Kakkad

Total Generation 300-600MWTotal Load 420-660 MW

BackDetails

Page 26: Islanding schemes   southern region

Kayamkulam, Sabarigiri and Kakkad

LOAD MW DISTRICT

POTHENKODE 200-300 TRIVENDRUMEDAMON 30-70 KOLLAM

KUNDARA 90-140 KOLLAMEDAPAN 70-100 ALLAPUZHA

SABARIGIRI 15-25 PATHANAMTHITA

GENERATION MW DISTRICT

KAYAMKULAM 250-330 ALLAPUZHASABARIGIRI 50-220 PATHANAMTHITA

KAKKAD 25-40 PATHANAMTHITAMINI HYDRO 0-20 PATHANAMTHITA

LOAD SHEDDING FROM 10-130 MW REQUIREDBack

Page 27: Islanding schemes   southern region

Idukki, Lower Periyar and ChalakudyTotal Gen 320-1200 MW Total Load 900-1110 MW

BackDetails

Page 28: Islanding schemes   southern region
Page 29: Islanding schemes   southern region
Page 30: Islanding schemes   southern region
Page 31: Islanding schemes   southern region
Page 32: Islanding schemes   southern region

LOAD MW DISTRICTBRAHMAPURAM 70-100 ERNAMKULLAM

KALAMASSERY 330-450 ERNAMKULLAMMADAKATHARA 280-330 TRICHURCHALAKUDDY 45-70 TRICHUR

PALLOM 130-230 KOTTAYAM

GENERATION MW DISTRICTIDUKKI 60-750 IDUKKI

LOWER PERIYER 0-110 IDUKKIIDUKKI HYDRO 130-450 IDUKKI

Idukki, L Periyar , Chalakudy

LOAD SHEDDING FROM (-)50-600 MW REQUIRED

Back

Page 33: Islanding schemes   southern region

KDPP and KuttiadyTotal Gen 20-90 MW Total Load 150-250 MW

BackDetails

Page 34: Islanding schemes   southern region

LOAD MW DISTRICT

NALLALAM 85-130 KOZHIKODE

KANHIRODE 65-130 KANNUR

GENERATION MWDISTRICT

KUTTIYADI 65-160 KOZHIKODEKDPP 0-75 KOZHIKODE

KDPP Kuttiady

Back LOAD SHEDDING FROM (-)20-100 MW REQUIRED