Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
1
Dr. R. Sardella Workshop on issues and trends arising from the European IRRS missions Brussels, 22-23 January 2014
IRRS Mission to Switzerland:
ENSI’s insights
Schweizerische Eidgenossenschaft
Confédération suisse
Condederazione Svizzera
Confederaziun svizra
Swiss Federal Nuclear Safety Inspectorate ENSI
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
2
IRRS Mission to Switzerland
Preparatory Meeting: May 2011
Mission: 21 Nov – 2 Dec 2011
Resulted in:
12 Recommendations (R)
18 Suggestions (S)
19 Good Practices (GP)
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
3
Resources and tools
Resource intensive process
8’200 working hours booked
1’500 questions answered
1’800 pages translated
ENSI extranet platform
Direct upload of documents
Availability guaranteed by ENSI IT
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
4
Logistics
Logistics for the 24 IRRS Team members
Scheduling the mission: site visits, social
events, etc.
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
5
Self-assessment
Self-assessment to begin far ahead
First self assessment (Jan-Aug 2010)
Analysis and derivation of improvement
measures action plan (Sep-Oct 2010)
Implementation of short term improvements
(Nov 2010-Jun 2011)
Second self assessment (Jan-Jun 2011)
Final action plan July 2011
Upper management to be involved
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
6
IAEA guidelines
Questionnaire
Repetitive
Not all requirements of GSR Part 1 referenced
ARM
Summary of results of the self-assessment pro
Module very useful, already adopted by IAEA
Check of national regulations against IAEA SSR-
2/1 and 2/2 to be formalized as part of ARM
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
7
IAEA template
Template for IRRS report
Focusing IRRS Team and helping assuring
adequate coverage
Very useful also for the host country (HC)
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
8
Scope
Original intention
Full scope mission covering all areas
Modules 1-12 + Module Fukushima
Thematic areas: transport, control of radioactive
discharges, occupational radiation protection,
waste management
Facilities
Nuclear power plants, waste facilities,
decommissioning, research reactors, sources
Not covered
Medical and industrial applications
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
9
Policy issues
Fukushima Issues
Long Term Operation
Interfaces with other authorities
Openness, transparency and stakeholders
involvement (including public
communication)
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
10
Mission process
Major challenge
For the IRRS Team: there are several, rather
different regulatory regimes (already in Europe)
For the HC: Presenting HC regulatory regime in
an understandable way
Possibility for the HC to understand R/S/GP
Comments on IRRS report draft
Discussion with whole Team and all HC
counterparts
Commitment of upper management as
mission HC counterparts is key
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
11
Relevance of the mission
findings
HC to identify main issues in self-
assessment
More difficult to implement R/S when
somehow not in line with Member State'
legal/governance principles
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
12
Others
Attribution of GPs should be made more
consistent
IAEA introducing a new category “commendable
performance”
Workshop on issues and trends arising from the European IRRS missions – ENSI’s Insights
Brussels, 22-23 January 2014 – R. Sardella (ENSI)
13
Thank you for listening!
Any questions