5
Ironing Station. Spec Sheet

Ironing Station. - Five At Heart › wp-content › uploads › 2019 › 07 › ...Ironing Station Warranty and Technical Data Warranty Information Five At Heart products come with

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Ironing Station. - Five At Heart › wp-content › uploads › 2019 › 07 › ...Ironing Station Warranty and Technical Data Warranty Information Five At Heart products come with

Ironing Station.

Spec Sheet

Page 2: Ironing Station. - Five At Heart › wp-content › uploads › 2019 › 07 › ...Ironing Station Warranty and Technical Data Warranty Information Five At Heart products come with

Keeps riders looking fresh and increases the usability of the space.

Page 3: Ironing Station. - Five At Heart › wp-content › uploads › 2019 › 07 › ...Ironing Station Warranty and Technical Data Warranty Information Five At Heart products come with

Ironing Station F

ive At Heart

IroningStation.

Features

Built in light

Utility shelf for laundry product storage

Magnetic door catch hinged to the left orright side of cabinet

Brushed steel handles

Specification

Cabinet – 0.7mm galvanized sheet metal,powder coated

(X) In fill panel required on door side forpower supply

TOP VIEW FRONT VIEWSIDE VIEW

1300mm(4’3")(AISLE

CLEARANCE)

1258mm(4’2”)

680mm(2’3”)

1248mm(4’1”)

IRONSTATION

FLOOR

100mm(4”)

85mm(3”)

822mm(2’8”)

409mm(1’4”)

FLOOR

WALL

WALL

X

Page 4: Ironing Station. - Five At Heart › wp-content › uploads › 2019 › 07 › ...Ironing Station Warranty and Technical Data Warranty Information Five At Heart products come with

Ironing Station F

ive At Heart

Ironing Station Warranty and Technical DataWarranty Information

Five At Heart products come with a standard 2 year warranty, effective from the handover date.

For the warranty period, we warrant that the equipment (and any materials) we supply will comply with the relevant standards at the date of installation.

This warranty is limited and may be excluded in part or in full in light of user damage or failure to install to Five At Heart specification.

We recommend a monthly visual inspection for signs of damage or need for cleaning.

Contact Five At Heart in the event of product damage.

Installation

Follow manufacturer instructions for installation.

Power Requirements

Standard AC power supply required, with 10 minute timer switch for iron.

Side Mounted Orientation

This figure shows the dimensions and clearances needed for the ironing station to be fitted at a side on orientation.

Maintenance Requirements

If any moving parts appear to be malfunctioning, discontinue use and contact Five At Heart.

Cleaning

For general care and maintenance, simply wipe away most spills or marks with a damp cloth, or wipe clean with non abrasive household cleaner.

Do not submerge product at any point.

Avoid scourers and abrasives as they will damage the surface.

Do not use waxes or polishing products as they dull the natural shine.

Please do not wash the cover.

FLOOR

1258mm(4’2")

680mm(2’3")

1315mm(4’4")

100mm(4")

85mm(3")

1300mm(4’3")(AISLECLEARANCE)

LOCKERS

1500mm(4’11")

Side Mounted Orientation

Page 5: Ironing Station. - Five At Heart › wp-content › uploads › 2019 › 07 › ...Ironing Station Warranty and Technical Data Warranty Information Five At Heart products come with

Creating spaces for however you Roll...

fiveatheart.com

Australia 1300 769 332 or [email protected] America 1888 218 3433 or [email protected] (+44) 20313 71966 or [email protected]