Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
MC-21-300www. irkut.comprogramme status
МС-21-300 MEDIUM-RANGE AIRCRAFT• Capacity of 163–211 seats• Range up to 6,000 km• Maximum take-off weight (MTOW) 79 ,250 kg• The higher level of comfort due to the increased width of the fuselage — 4.06 m
MC-21-300 — programme status
2www. irkut.com
3www. irkut.com
21st CENTURY TECHNOLOGIES
The high-aspect-ratio composite wing provides high aerodynamic quality
4www. irkut.com
21st CENTURY TECHNOLOGIES
Pratt & Whitney PW1400G-JM and UEC PD-14 engines (at customer’s choice) are characterized by low fuel consumption, reduced noise level and emission
5www. irkut.com
• Advanced aircraft systems developed by leading Russian and global manufacturers
• The latest technologies provide a reduction in operating costs by 5–7% relative to competitors
21st CENTURY TECHNOLOGIES
6www. irkut.com
CERTIFICATION
• MC-21 program is at the certification testing stage
• MC-21-300 aircraft is certified according to Russian standards with subsequent validation according to European standards
• The Federal Air Transport Agency and EASA working groups are taking part in the certification program. In January and June 2019 EASA testers held two flight sessions
Flights are performed at the Ramenskoye airfield of the Gromov Flight Research Institute (city of Zhukovsky, Moscow Region)
7www. irkut.com
Three MC-21-300 aircraft equipped with PW1400G-JM engines take part in flight tests
FLIGHT TESTS
8www. irkut.com
FLIGHT TESTS
During tests, the maximum values of the indicators were achieved:- height 12,500 m- M = 0.89- true speed 949 km / h- flight duration — 6.2 hours
Performance efficiency of all systems was confirmed in a wide range of speeds and altitudes. Corrections for the air signal system were obtained.
Aircraft performed flights at altitudes and speeds similar to the main operating conditions
9www. irkut.com
FLIGHT TESTS
Tests on limiting angles of attack and flutter are completed
In-flight launches of the main engines and auxiliary power unit were performed
Take-off and landing characteristics with imitation of engine failure were evaluated
Efficiency of the instrumental landing system, as well as navigation, landing equipment and external lighting equipment during flight at night, has been confirmed
Flights to determine the minimum take-off speed were performed
10www. irkut.com
Flight tests confirm the correctness of the basic design and technological solutions
FLIGHT TESTS
11www. irkut.com
HIGH-TECH TEST BASE
New system for collecting, processing and analyzing flight information is involved in the tests
Telemetry equipment provides real-time control and measurement results of tests
New processing technologies provide high informational content of each flight (on-board measurement system registers up to 40,000 parameters)
12www. irkut.com
Since 2017, TsAGI has conducted static tests of the MC-21-300 airframe. According to the results of the work, the main restrictions on flight modes have been removed
From the materials of Russian suppliers, large-sized composite power structures were produced: a wing box and a center section panel.They are being tested
GROUND TESTS
13www. irkut.com
The airframe for the life tests is being assembled at TsAGI
GROUND TESTS
14www. irkut.com
On the fourth flight tests aircraft systems are being installed to join the flight tests in 2019. The aircraft will be equipped with PW1400G-JM engines and a passenger cabin
MC-21-300, being built according to the production technologies, will undergo fly tests equipped with PW1400G-JM engines
Enterprises participating in cooperation under the MC-21 program are manufacturing parts and assemblies of aircraft for customer’s delivery
NEW AIRCRAFT PRODUCTION
15www. irkut.com
PREPARATION FOR MASS PRODUCTION
The third aircraft participating in flight tests is equipped with a passenger cabin and has been painted according to the production technologies
The capabilities of industrial cooperation participants are being increased. New stations for automated assembly lines are being commissioned. Logistics center is commissioned. Construction of airfield testing and customization buildings is underway
16www. irkut.com
The production capacity of Irkutsk Aviation Plant will be phased to the level of 72 aircraft per year
The number of firm orders for which advance payments were received — 175 aircraft
The number of orders under agreements of intent is about 150 aircraft
PREPARATION FOR MASS PRODUCTION
17www. irkut.com
INTERNATIONAL PRESENTATIONAt the International Aviation and Space Salon MAKS2019 three MC-21-300 aircraft will be presented
18www. irkut.com 18www. irkut.com
VIDEOMC-21-300 DAY BY DAY (clickable text)
https://youtu.be/cGna5_RjSRkhttps://youtu.be/cGna5_RjSRk
www. irkut.com
THANK YOU FOR YOUR ATTENTION!