Vertical Blinds IQ2-Motor Electrical planning

IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

  • Upload
    others

  • View
    19

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

Vertical BlindsIQ2-Motor Electrical planning

Page 2: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

2 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-001Contents – IQ2-Motor

Electrical documentation – Vertical Blinds

Components:

IQ2-100 ..........................Components - IQ2-Motor .........................................................................................– 4 –

IQ2-103 ..........................Components - Miscellaneous ...................................................................................– 5 –

IQ2-105 ..........................Components - Switching module 230 V ................................................................– 6 –

IQ2-106 ..........................Components - Top and bottom track module ......................................................– 7 –

Instructions:

IQ2-150 ..........................Operating instructions - Top and bottom track ...................................................– 8 –

IQ2-160 a, b ..................Program end positions ..........................................................................................– 9-10 –

IQ2-161 a, b ..................Configure options ..................................................................................................– 11-12 –

IQ2-170 ..........................Operation instruction ..............................................................................................– 13 –

IQ2-180 ..........................Programming instructions - Program/deprogram RTS - IQ2 Motor .................– 14 –

Control planning:

IQ2-200 ..........................General - Bus system ...............................................................................................– 15 –

IQ2-200 ..........................General - Standard ...................................................................................................– 16 –

Electrical planning and electrical connection diagrams:

IQ2-300 a .......................Individual control - IQ2-Motor .................................................................................– 17 –

IQ2-300 b ......................Wiring - Individual control - IQ2-Motor ..................................................................– 18 –

IQ2-300 c .......................Wiring - Individual control - IQ2-Motor ..................................................................– 19 –

IQ2-300 d ......................Wiring - Individual control - IQ2-Motor ..................................................................– 20 –

IQ2-301 a .......................Group control - IQ2-Motor .......................................................................................– 21 –

IQ2-301 b ......................Wiring - Group control - IQ2-Motor ........................................................................– 22 –

IQ2-301 c .......................Wiring - Group control - IQ2-Motor ........................................................................– 23 –

IQ2-302 a .......................Groups with individual control - IQ2-Motor ..........................................................– 24 –

IQ2-302 b ......................Wiring - Groups with individual control - IQ2-Motor ...........................................– 25 –

IQ2-302 c .......................Wiring - Groups with individual control - IQ2-Motor ...........................................– 26 –

IQ2-303 a .......................Central unit with group control - IQ2-Motor ........................................................– 27 –

IQ2-303 b ......................Wiring - Central unit with group control - IQ2-Motor .........................................– 28 –

IQ2-303 c .......................Wiring - Central unit with group control - IQ2-Motor .........................................– 29 –

IQ2-304 a .......................Central unit with group and individual control - IQ2-Motor ...............................– 30 –

IQ2-304 b ......................Wiring - Central unit with group and individual control - IQ2-Motor ................– 31 –

IQ2-305 a .......................Central unit with group and individual control - IQ2-Motor ...............................– 32 –

IQ2-305 b ......................Wiring - Central unit with group and individual control - IQ2-Motor ................– 33 –

Page 3: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

3 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-002Contents – IQ2-Motor

Electrical documentation – Vertical Blinds

SOMFY components – Electrical planning and electrical connection diagrams:

IQ2-400 ..........................Individual control - Centralis IB - IQ2-Motor .........................................................– 34 –

IQ2-401 ..........................Individual control - Modul DC RTS - IQ2-Motor ....................................................– 35 –

IQ2-402 ..........................Individual control - Soliris IB - IQ2-Motor ..............................................................– 36 –

IQ2-403 ..........................Individual control - Chronis IB - IQ2-Motor ...........................................................– 37 –

IQ2-404 ..........................Group control - Inis DC Rollo - IQ2-Motor..............................................................– 38 –

IQ2-405 ..........................Group control - Modul DC RTS - IQ2-Motor ..........................................................– 39 –

IQ2-406 ..........................Group control - Power 2,5 DC RTS - IQ2-Motor ....................................................– 40 –

IQ2-407 ..........................Group control - Centralis DC IB Rollo - IQ2-Motor ................................................– 41 –

IQ2-408 ..........................Group control - GPS 1020 - IQ2-Motor ..................................................................– 42 –

230 V – Electrical planning and electrical connection diagrams:

IQ2-500 ..........................Individual control - Taster - IQ2-Motor ..................................................................– 43 –

IQ2-501 ..........................Individual control - Inis Uno - IQ2-Motor ...............................................................– 44 –

IQ2-502 ..........................Individual control - Centralis Indoor RTS - IQ2-Motor .........................................– 45 –

IQ2-503 ..........................Individual control - Chronis Uno (L) - IQ2-Motor ..................................................– 46 –

IQ2-504 ..........................Group control - Taster - IQ2-Motor ........................................................................– 47 –

IQ2-505 ..........................Group control - Inis Uno - IQ2-Motor .....................................................................– 48 –

IQ2-506 ..........................Group control - Centralis Indoor RTS - IQ2-Motor................................................– 49 –

IQ2-507 ..........................Group control - Centralis Uno IB - IQ2-Motor .......................................................– 50 –

IQ2-508 ..........................Group control - Chronis Uno (L) - IQ2-Motor ........................................................– 51 –

Info:

IQ2-600 ..........................Legend - IQ2-Motor ..................................................................................................– 52 –

Page 4: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

4 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-100

Electrical documentation – Vertical BlindsComponents

Components – IQ2-Motor

X2

X3

X1

IQ2-Motor

The IQ2-Motor serves to move the louvres sideways and to tilt them.It is fitted with a “Mono function” so that control elements with 2 switching functions can be used.The IQ2-Motor is optionally available with an RTS module for controlling a drive using a Somfy RTS radio transmitter.Up to 16 transmitters can be programmed into an RTS module,enabling control as a single unit, in a group, or centrally.The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the left, or above the rail to the right.

- Voltage supply : 180-264 V AC 50/60 Hz- Power consumption : max. 0,35 A at 180 V AC- Starting current : <10 A- System of protective housing : IP 20- Index of protection : II - Type of current : Low-voltage- Control voltage : Low-voltage- Control current : 10 mA- Tractive power : 80 Ncm on the sprocket- Travel speed : 5 m/min- End position sensing : electronically through programming- Operating temperature : 0-70 °C- Continuous loading : approx. 10 % on the ON period capacity - Weight : 690 g- Dimensions : 53,5 x 27,4 x 400 mm incl. end caps and cover cap

X1 - Power voltageX2 - Control signals (CLOSE/OPEN)X3 - Multifunctional interface

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

RTS programming unit

Page 5: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

5 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-103

Electrical documentation – Vertical BlindsComponents

Components – IQ2-Motor

Interface module

The interface module is needed with the formation of groupand central control with more then 15 drive units.

- Voltage supply : 24 V DC (from the drive unit)- Type of current : Low-voltage- Control voltage : 24 V DC- Control current : 12 mA- Operating temperature : 0-70 °C- Dimensions : 42 x 42 x 12 mm

Mains cable with Euro flat plug

Power supply for the motor.

- Type of connection : Jack to motor; plug in socket- Cable : H03VVH2-F, 2 x 0,75 mm2

Mains cable without Euro flat plug

Power supply for the motor.

- Type of connection : Jack to motor- Cable : H03VVH2-F, 2 x 0,75 mm2

Control cable

Connection between the motor and the control switch with terminal strip.

- Cable : J-Y(ST)Y 2 x 2 x 0,8 (Ø9,0 mm)

Control switch (surface-mounted)

Control switch to operate one or several Vertical Systems.

- Functions : OPEN/CLOSE- Dimensions : 81 x 81 x 10 mm- Colour : white- Connections : 1 x 2 and 1 x 6 screw-type terminals- Connection data : solid 0,14-1,5 mm2

flexible 0,1-1,0 mm2

- Maximum load : 100 mA

▲ IMPORTANT!Max. 10 drive units per control switch.

Module for group control

For uncoupling group or central controls.

▲ IMPORTANT!The voltage supply (+/-) is not disconnected.

- Connections : 4 x 6 screw-type terminals- Connection data : solid 0,14-1,5 mm2

flexible 0,1-1,0 mm2

+ – + 24 V

- – GND

A – OPEN travel

Z – CLOSE travel

CLOSE – white

OPEN – yellow

GND – black

+ 24 V – red

2 – OPEN travel

4 – CLOSE travel

6 – GND

1 + – + 24 V

2 - – GND

3 A – OPEN travel

6 Z – CLOSE travel

7 A – OPEN travel

10 Z – CLOSE travel

– orange terminals

– black terminals

7-10 connection

terminals for

uncoupling motor

6 4 2

6 ZU

3 AUF

2 -1 +ZU 6

AUF 3

- 2+ 1

ZU 1

0

AU

F 7- 2

+ 1

10 Z

U

7 A

UF

2 -

1 +

Page 6: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

6 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsComponents

IQ2-105Components – IQ2-Motor

IQ2-motor switching module 230 V

The 230 V switching module serves to actuate a drive unit witha control voltage of 230 V AC.

- Voltage supply : 24 V DC (from the drive unit)- Type of current : Low-voltage- Control voltage : 230 V AC- Control current (230 V) : 5 mA- Control current (24 V) : 10 mA- Operating temperature : 0-70 °C- Dimensions : 53,5 x 27,4 x 93,4 mm

X2 - Control signal (CLOSE/OPEN)X4 - Top and bottom track interfaceX7 - Voltage supply / Control signal

X2

X7

X4

RTS programming unit

Cable

ca. 1,0

mX4

Pin Function Cable Comment

6 - -

7 + 5 V -

8 GND BK (black)

9 CAN L YE (yellow)

10 CAN H WH (white)

X7

Pin Function Cable Comment

L1 230 V BN (brown) VIN

N BU (blue) VIN

S1 CLOSE BK (black) Control signal

S2 OPEN GY (grey) Control signal

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

▲ ATTENTION! The switching module 230 V requires a permanent voltage supply!

Page 7: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

7 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsComponents

IQ2-106Components – IQ2-Motor

X2

X3

X1X4

IQ2-Motor top and bottom track module

The top and bottom track module serves the connect two drive unitsin the case of a top and bottom track unit.It is required once for each drive unit and permits the exchange of dataand thus synchronisation between the controls.The control signals CLOSE/OPEN are only routed to one drive unit!

- Voltage supply : 24 V DC (from the drive unit)- Type of current : Low-voltage- Control voltage : Low-voltage- Control current : 10 mA- Operating temperature : 0-70 °C- Weight : 110 g- Dimensions : 53,5 x 27,4 x 71,4 mm

X1 - Voltage supplyX2 - Control signal (CLOSE/OPEN)X3 - Multifunctional interfaceX4 - Top and bottom track interface

The control signals CLOSE/OPEN are only routed to one drive unit in thetop and bottom track unit. The second drive unit receives pits informa-tion via the communications line.

In combination with other control modules, the top and bottomtrack module is always the first module to be fitted onto the motor.

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

RTS programming unit

X4

Pin Function Cable Comment

6 - -

7 + 5 V -

8 GND BK (black)

9 CAN L YE (yellow)

10 CAN H WH (white)

Page 8: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

8 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsInstructions

IQ2-150Operating instructions – Top and bottom track – IQ2-Motor

X3

X2

X1

X4

General:

In top and bottom track systems, each track is fitted with a motor. A synchronisation facility ensures that the motors run at the same speed.So that an interchange of data can be carried out between the motors via a serial interface, the motors are fitted with a module and connected via a cable.The operating elements such as e. g. control switch, timer and remote control must be connected only to 1 motor.

Motor features:

– Guaranteed parallel running of the hanging– 180° tilt only possible when the hanging is closed– Automatic opening of the louvres on sideways travel– Instant stop of the motors: – on interruption of the power supply to a motor, – on interruption of the data cable, – on too great a difference between the tracks during sideways travel, – on stiff running caused by outside influences.

Terminal assignment:

Cable: J-Y(ST)Y 2 x 2 x 0,8 Ø9,0 mm

white

yellow

black

Page 9: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

9 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsInstructions

IQ2-160 aProgram end positions – IQ2-Motor

Plug in power cord

The drive must output a sequence of signals via the beeper as a start-up message.

Attach the programming keypad

The green LED must be illuminated (communication with drive).

There is no communication if the green LED is blinking (fault in the CAN).

If there is no response from the green LED, there is a problem with the power supply(+5V from the drive).

Press the Set & Mode keys together and hold for approximately 3 seconds

The drive confirms programming mode by a signal sequence (– – • •).The first red LED illuminates, and the first yellow LED blinks rapidly.

If no command (close/open) is executed, the drive issues a signal sequence every 10 seconds (– –).After 1 min. without a command, programming mode is exited automatically.

Move the traversing motor to the desired position (individual louvres)

Keep the Set button depressed for approximately 2 seconds

The "CLOSED" position is assumed and the drive issues a confirmation signal (•).

When the button is released, the first yellow LED illuminates, and the second yellow LED starts blinking rapidly.

The buttons –> and <– can be used to operate the traversing motor

Required components:

- Programming unit IQ2- IQ2-Motor- Mains cable

The –> and <– buttons can be used to operate the tilting motor

Page 10: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

10 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsInstructions

IQ2-160 bProgram end positions – IQ2-Motor

Move the tilting motor to the desired position (turn to 0°)

Keep the Set button depressed for approximately 2 seconds

The “0°” position is assumed and the drive issues a confirmation signal (••).

When the button is released, the second yellow LED illuminates,and the third yellow LED starts blinking rapidly.

Keep the Set button depressed for approximately 2 seconds

The “180°” position is assumed and the drive issues a signal to confirm (•••),the tilting motor rotates 30° back and the third yellow LED illuminates.

When the button is released, the fourth yellow LED starts blinking rapidly.

The buttons –> and <– can be used to operate the tilting motor

Move the tilting motor to the desired position (louvres in package)

The buttons –> and <– can be used to operate the traversing motor

Move the traversing motor to the desired position (louvres in package)

Keep the Set button depressed for approximately 2 seconds

The “open” position is assumed and the drive issues a signal to confirm (••••).

The first red LED and the yellow LEDs are turned back off.

Page 11: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

11 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsInstructions

IQ2-161 aConfigure options – IQ2-Motor

Keep the Mode button depressed for approximately 2 seconds

The red 2 LED will start blinking, and Options page 1 is displayed.

If no command is executed, the drive will issue a signal sequence (– –) every 10 secondsto remind you that you are in programming mode.

Plug in power cord

The drive must output a sequence of signals via the beeper as a start-up message.

Attach the programming keypad

The green LED must be illuminated (communication with drive).

There is no communication if the green LED is blinking (fault in the CAN).

If there is no response from the green LED, there is a problem with the power supply(+5V from the drive).

Keep the Set button depressed for approximately 2 seconds

The LEDs Red 2 and Yellow 1 to Yellow 4 are deactivated, and the configured options are saved in the drive.

The given option (1, 2, 3, 4) can be switched on or off by quickly pressing one of the buttons.

(Display via LEDs Yellow 1 to Yellow 4)

The given option (1, 2, 3, 4) can be switched on or off by quickly pressing one of the buttons.

(Display via LEDs Yellow 1 to Yellow 4)

Confirm and hold the Mode button for approximately 2 seconds

This brings up page 2 of the Options (it is possible to switch back in the same way).

The LED Red 2 begins double-blinking, and Options page 2 is displayed.

If no command is executed, the drive will issue a signal sequence (– –) every 10 secondsto remind you that you are in programming mode.

Required components:

- Programming unit IQ2- IQ2-Motor- Mains cable

Page 12: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

12 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsInstructions

IQ2-161 bConfigure options – IQ2-Motor

Options Page 1

Off Self-retaining operation with short keystroke Yellow 1 On Self-retaining operation with long keystroke

Off Decoration position only adjustable using programming keypad Yellow 2 On Decoration position also adjustable using control button

Off Decoration position adjustable in the range 30° - 150° Yellow 3 On Decoration position adjustable in the range 0° - 180°

Off Intermediate stop only adjustable using programming button Yellow 4 On Intermediate stop also adjustable using control button

Options Page 2

Off Self-retaining operation deactivated Yellow 1 On Self-retaining operation activated (proceeds as configured in Option 1 / page 1)

Off Yellow 2 On

Off Yellow 3 On

OffYellow 4 On

Page 13: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

13 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsInstructions

IQ2-170Operation instruction – IQ2-Motor

The IQ2-motor is fitted with 4 functions.Open the hanging, close the hanging, tilt the louvres left (anti-clockwise) and tilt the louvres right (clockwise).These functions are controlled by two operating buttons.

Function:

„CLOSE travel” (▶◀)Short press on the button (half a second):The louvres rotate and then the louvre hanging closes, after which the tilting function closes.

„OPEN travel” (◀▶)Short press on the button (half a second):The louvres rotate and then the louvre hanging travels in the direction of the louvre pack.

„Tilting”Hold down the button:The louvres rotate into the desired position to the left or to right (0° - 180°).

Operation:

Run the louvre hanging to form a pack1. Completely close the louvre hanging: Short press on the “OPEN travel” button: The louvres rotate to 180° (louvres completely closed) then rotate back to the decor position, and then they travel in the direction of the louvre pack.2. The louvre hanging is not completely closed: Press short the “OPEN travel” button: The louvres rotate into the decor position and then they travel in the direction of the louvre pack.

Close the louvre hanging (singly)1. The louvre hanging is not completely closed: Short press on the “CLOSE travel” button: The louvres rotate into the decor position and then the louvre hanging closes, after which the tilting function closes.2. The louvre hanging is singly and in the decor position: Press short the “CLOSE travel” button: The louvres rotate anti-clockwise to 180° and the tilting movement stops automatically.

Tilting the louvres1. Louvre hanging closed: The louvres can be tilted from 0 - 180° with the aid of holding down the “OPEN travel” or “CLOSE travel” button.2. Louvre hanging failed to close: Within the two decorative effect positions the louvres can be tilted with the aid of the “OPEN travel” and “CLOSE travel” buttons. When one of the decorative effect positions has been reached, the louvres stop for a half second before they travel in the direction of the louvre pack or rather close the louvre hanging (singly).

Additional functions:

Standard decor positionIf the desired angle of the louvres has been set with the louvres closed, the user presses both buttons simultaneouslyfor 3 seconds. The drive unit accepts the current angle and indicates this with an audible signal (1 x short).If the set angle lies outside of the range from 30-150 degrees the setting will not be accepted.If the tilt angle lies within in the range from 85-95 degrees, the standard decor position is deleted and this isindicated by a signal (1 x short, 1 x long).

Intermediate stopOnce the desired position set between the end position (however at least 10 cm away from both end positions),the user presses both buttons simultaneously for 3 seconds.The drive unit accepts the current position and indicates this with an audible signal. If the position lies within aninvalid range, this is indicated to the user by an audible signal (1 x short).If the position is in a range within 10 cm far from on end position, the intermediate stop is deleted and this isindicated by a signal (3 x long).

Page 14: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

14 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsInstructions

IQ2-180Programming instructions – Program/depr. RTS – IQ2-Motor

Programming steps:

1. Start programming modePress the RTS programming keypad for 2 seconds to start programming mode, triggering the signal(1 x long - pause - 2 x short)If end positions have already been programmed, the louvres will move briefly.

OrPress the programming button on a recognised radio transmitter for 2 seconds, and the signal will be actuated(1 x long - pause - 2 x short)If end positions have already been programmed, the louvres will move briefly.

2. Programming an RTS radio transmitterOn a radio transmitter that is not yet recognised, hold the programming button for 0.5 seconds to trigger the signal(1 x long - pause - 1 x short - 1 x short).If end positions have already been programmed, the louvres will move briefly. Programming mode is exited.

3. Deprogramming a radio transmitterHold the programming button on a recognised radio transmitter (but not the one the programming mode was started with) for 0.5 seconds, and the signal will be triggered (1 x long - pause - 1 x long - 1 x short).If end positions have already been programmed, the louvres will move briefly.

In the event of faulty programming, programming mode will be exited, and the signal will be triggered(1 x long - pause - 2 x long).

4. Abort programming modePress the RTS programming button for 0.5 seconds to abort programming mode.The signal will be triggered (1 x long - pause - 2 x long).If end positions have already been programmed, the louvres will move briefly.

5. MY Position Hold the MY button for 5 seconds on a recognized RTS transmitter to either save or delete a position of the drive.If the drive is in a new position, it will be saved as MY position, and the signal will be triggered(1 x long - pause - 1 x short - 1 x long).If the drive is in the MY position (actuated via the MY function) the position will be deleted by the save procedure, and the signal will be triggered (1 x long - pause - 1 x long - 1 x short).Briefly press the MY button for 0.5 seconds to move automatically to the saved position.

6. Deletion of all the settings Press the RTS programming button for approx. 12 seconds to delete all settings.The signal will be triggered (1 x long - pause - 2 x short - pause - 1 x long - pause - 1 x long - 1 x short - pause - 1 x long - pause - 1 x long - 1 x short).

Page 15: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

15 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-200General – Bus system

Electrical documentation – Vertical BlindsSteuerungsplanung

The motor system can be integrated into all commonly used bus or central controls.Make sure that the corresponding switched actuators or binary outputs are used as well as the applicable bus couplers or binary inputs.A combination via the large number of control possibilities is shown in schematic form in the diagram below.

Heating

Lighting

Ventilation

etc.

Central bus panel

Roller blind

Vertical system

Universal sun protectionLarge-area sun protectionCurtain track

Binary output

Binary output

Actuator

Binary input

other controlcomponents

Bus coupler

Bus line

Control switch

Actuator

Actuator

Actuator

Page 16: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

16 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-201General – Standard

Electrical documentation – Vertical BlindsControl planning

Below is an overview showing what possible variations can be achieved with our motor system.The combination of Roller Blinds and Vertical Systems can be seen clearly from this diagram.With the large number of control possibilities as well as individual, group or central controls it is possible to set up all individual circuitry variants.

Central

Central line

Central line

Central line

Individual line Individual line

Group line Group line

Individual line

Group lineGroup line

Central line

Individual line Individual line Individual line

Page 17: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

17 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-300 a

Electrical documentation – Vertical BlindsElectrical planning

MOT – IQ2-Motor

TAS – Control switch (surface-mounted)

a – J-Y(ST)Y 2 x 2 x 0,8

h – Power feed line 230 V AC

Individual control – IQ2-Motor

ah

MOT

TAS

Page 18: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

18 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-300 b

X2

X3

X2

12345

*

Wiring – Individual control – IQ2-Motor

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

ACTUATORor

SWITCH

X1Power feed

line 230 V AC

RTS programming unit

Power consumption per drive: 10 mA

Page 19: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

19 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-300 cWiring – Individual control – IQ2-Motor

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Ground as control signal (Potential-free)

X2

54321

X2

X2

54321

X2

6 4 2

X1Power feed

line 230 V AC

X1Power feed

line 230 V AC

Power consumption per drive: 10 mA

Power consumption per drive: 10 mA

ACTUATORor

SWITCH

Page 20: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

20 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-300 dWiring – Individual control – IQ2-Motor

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Pole reversal principle (control)

X2

54321

X2

24 V+ (-)- (+)

X1Power feed

line 230 V AC

Power consumption per drive: 10 mA

close

open

X2

54321

X2I

I

MO

T

24

V +-Module DC RTS

X1Power feed

line 230 V AC

Power consumption per drive: 10 mA

X2

54321

X2

X1Power feed

line 230 V AC

Power consumption per drive: 10 mA

Polarity

Radio control receiver - module DC RTS

Pole reversal switch (sample)

Page 21: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

21 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-301 a

Electrical documentation – Vertical BlindsElectrical planning

a

MOT

a a

h

MOT

h

MOT

h

a

TAS

a

KMa

MOT

a a

h

MOT

h

MOT

ha

KMa

MOT

a a

h

MOT

h

MOT

ha

KM

a

a

a

KM – Interface module

MOT – IQ2-Motor

TAS – Control switch (surface-mounted)

a – J-Y(ST)Y 2 x 2 x 0,8

h – Power feed line 230 V AC

Group control – IQ2-Motor

max. 10 drive units

max. 100 drive units

max. 100 drive units

Page 22: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

22 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-301 bWiring – Group control – IQ2-Motor

BED

+ - ZA

-

Z

A

X2

MOT

230 V

X1

2

MOT

230 V

2

X1

X2 X2

X1

MOT

2

230 V 230 V

2

MOT

X1

X2

230 V

2

MOT

X1

X2++ AA-- ZZ ++ AA-- ZZ ++ AA-- ZZ ++ AA-- ZZ ++ AA-- ZZ

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

BED – Operation

MOT – IQ2-Motor

+ – + 24 V

- – GND

A – OPEN travel

Z – CLOSE travel

max. 10 drive units

----

+ I

t is

only

allo

wed t

o c

onnect

the lin

e if

infr

are

d r

em

ote

contr

ol and a

sola

r dete

ctor

are

fit

ted!

X2X1 X2

54321

AZ

-+

*

Page 23: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

23 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-301 cWiring – Group control – IQ2-Motor

BED

+ - ZA

-

Z

A

X2

MOT

230 V

X1

2

MOT

230 V

2

X1

X2 X2

X1

MOT

2

230 V 230 V

2

MOT

X1

X2

230 V

2

MOT

X1

X2

-

230 V230 V

MOT

2

X1

X2

++ ZZ-- AA

2

MOT

X1

X2

230 V

MOT

X2

X1

MOT

230 V

2 2

X1

X2

230 V

2

MOT

X1

X2

X1

X2

-

230 V230 V

2

X1 X1

2

MOT

X2 X2

MOT

230 V230 V

X1

2 2

X1

230 V

X1

2

MOTMOT

X2 X2 X2

MOT

X2

X1

X2

X1

+ AA-- ZZ

++ AA-- ZZ ++ AA-- ZZ ++ AA-- ZZ ++ AA-- ZZ ++ AA-- ZZ

++ AA-- ZZ --++ AA ZZ ++ -- AA ZZ ++ -- AA ZZ --++ AA ZZ

++ AA-- ZZ --++ AA ZZ ++ -- AA ZZ ++ -- AA ZZ --++ AA ZZ

++ AA-- ZZ

+ AA-- ZZ

++ AA-- ZZ

+ AA-- ZZ

Z

A

Z

A

KM

KM

KM

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

BED – Operation

KM – Interface module

MOT – IQ2-Motor

+ – + 24 V

- – GND

A – OPEN travel

Z – CLOSE travel

max. 10 drive units

max. 100 drive units

----

+ I

t is

only

allo

wed t

o c

onnect

the lin

e if

infr

are

d r

em

ote

contr

ol and a

sola

r dete

ctor

are

fit

ted!

X2X1 X2

54321

AZ

-+

*

Page 24: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

24 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-302 a

Electrical documentation – Vertical BlindsElectrical planning

a aGMGM

a a

a a a

GM

a

a

a

a a

MOT

h

MOT

ah

MOT

ah

h

MOT

h

MOT

TAS TAS

TAS TAS TAS TAS

a ah

MOT

TAS

a

KM

a aGMGM

a a

a a a

GM

a

a

a a

MOT

h

MOT

ah

MOT

ah

h

MOT

h

MOT

TAS TAS

TAS TAS TAS

a ah

MOT

TAS

a

KM

KM

KM

a

a

a

a

GM – Module for group control

KM – Interface module

MOT – IQ2-Motor

TAS – Control switch (surface-mounted)

a – J-Y(ST)Y 2 x 2 x 0,8

h – Power feed line 230 V AC

Groups with individual control – IQ2-Motor

Group with max. 10 drive units

Group

max. 2 motors permodule for group control

Individual Individual Individual

Individual Individual Individual

max. 2 motors permodule for group control

Individual Individual Individual

Individual Individual Individual

Group with max. 100 drive units

Page 25: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

25 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-302 bWiring – Groups with individual control – IQ2-Motor

BED

+ - ZA

X2

X1

MOT

2

230 V

++ AA-- ZZ

1 2

3456

78910

12

12

6

43

5

BED

A-+ Z

230 V

-

BED

+ A Z

2

MOT

X2

X1

AA++ --

ZZ

230 V

MOTBED

-

-

BED

+

+

A Z

--

MOT

X2

X1

++

2

ZZAA

A Z --X2++ZZAA

230 V

X1

2

230 V

BEDMOT

--

MOT

--

BED

-+ A Z

++

-+ A Z ++

2

X1

X2

AA ZZ

AA

X2ZZ

230 V2

X1

1

107

2

98 8

6

1 2 7

10

1

3

54

2

89 7

1

109

2 1

6

3

2

54

8

6

1 2 7

10

1

3

54

2

89 7

1

109

2 1

6

3

2

54

GM GM GM

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

BED – Operation

GM – Module for group control

MOT – IQ2-Motor

+ – + 24 V

- – GND

A – OPEN travel

Z – CLOSE travel

– orange terminals

– black terminals

max. 10 drive units

Group

▲ IMPORTANT!

▲ I

MPO

RT

AN

T!

Only

1 m

oto

r m

ay

supply

pow

er

to t

he c

ontr

ol of

the g

roup a

nd/o

r to

an inte

rface

module

.-

---

+ I

t is

only

allo

wed t

o c

onnect

the lin

e if

infr

are

d r

em

ote

contr

ol and a

sola

r dete

ctor

are

fit

ted!

X2X1 X2

54321

AZ

-+

*

Page 26: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

26 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-302 cWiring – Groups with individual control – IQ2-Motor

BED

+ - ZA

X2

X1

MOT

2

230 V

++ AA-- ZZ

1 2

3456

78910

12

12

6

43

5

BED

A-+ Z

230 V

-

BED

+ A Z

2

MOT

X2

X1

AA++ --

ZZ

230 V

MOTBED

-

-

BED

+

+

A Z

--

MOT

X2

X1

++

2

ZZAA

A Z --X2++ZZAA

230 V

X1

2

230 V

BEDMOT

--

MOT

--

BED

-+ A Z

++

-+ A Z ++

2

X1

X2

AA ZZ

AA

X2ZZ

230 V2

X1

++ AA ZZ

+ AA-- ZZX2

X1--

1

107

2

98 8

6

1 2 7

10

1

3

54

2

89 7

1

109

2 1

6

3

2

54

8

6

1 2 7

10

1

3

54

2

89 7

1

109

2 1

6

3

2

54

GM

+

++

AAX2-- ZZ

AA

X1-- ZZ

KM

GM GM

KM

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

BED – Operation

GM – Module for group control

KM – Interface module

MOT – IQ2-Motor

+ – + 24 V

- – GND

A – OPEN travel

Z – CLOSE travel

– orange terminals

– black terminals

max. 10 drive units

Group

▲ IMPORTANT! ▲ IMPORTANT!

▲ I

MPO

RT

AN

T!

Only

1 m

oto

r m

ay

supply

pow

er

to t

he c

ontr

ol of

the g

roup a

nd/o

r to

an inte

rface

module

.

----

+ I

t is

only

allo

wed t

o c

onnect

the lin

e if

infr

are

d r

em

ote

contr

ol and a

sola

r dete

ctor

are

fit

ted!

X2X1 X2

54321

AZ

-+

*

max. 100 drive units per section

Page 27: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

27 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-303 a

Electrical documentation – Vertical BlindsElectrical planning

a

G M

a

aMOT

a

MOTMOT

a aTAS

TAS

MOT

a

MOTMOT

h

a

KM

KM

a

G M

a

aMOT

a

MOTMOT

a a

TAS

KM

KM

KM

a

a

a

h h h

h h

hhh

a

a

a

a

GM – Module for group control

KM – Interface module

MOT – IQ2-Motor

TAS – Control switch (surface-mounted)

a – J-Y(ST)Y 2 x 2 x 0,8

h – Power feed line 230 V AC

Central unit with group control – IQ2-Motor

max. 10 drive units per section

Group 1

Group 2

Centralunit

max. 10 drive units per section

max. 10 drive units

max. 100 drive units

Page 28: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

28 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-303 bWiring – Central unit with group control – IQ2-Motor

BED

+ - ZA

X2

X1

MOT

2

230 V 230 V

2

MOT

X1

X2

230 V

2

MOT

X1

X2

++ ZZ-- AA

X1

X2+ AA-- ZZ

++ AA-- ZZ ++ AA-- ZZ ++ AA-- ZZ

1 2 3 4 5 6

78910

12

126 4 35

BED

A-+ Z

2

230 V

MOT

X1

--++X2

AA ZZ

-

BEDX2--+ AA ZZ

--X1

++ AA ZZ

1 2 3 4 5 6

+

21

87

910

X1

230 V

2

A Z

--X2

MOT

++ ZZAA

6 5 4 3 2 1

2

230 V

MOT

230 V

X1

2

X1

++

MOT

AA

X2-- ZZ --++

X2

AA

X1

230 V

2

X2

MOT

ZZ ++ -- ZZAA

KM

KM

GM

GM

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

BED – Operation

GM – Module for group control

KM – Interface module

MOT – IQ2-Motor

+ – + 24 V

- – GND

A – OPEN travel

Z – CLOSE travel

– orange terminals

– black terminals

max. 10 drive units per section

max. 10 drive units per section

Centralunit

▲ IM

PO

RT

AN

T!

▲ IM

PO

RT

AN

T!

▲ I

MPO

RT

AN

T!

Only

1 m

oto

r m

ay

supply

pow

er

to t

he c

ontr

ol of

the g

roup a

nd/o

r to

an inte

rface

module

.

----

+ I

t is

only

allo

wed t

o c

onnect

the lin

e if

infr

are

d r

em

ote

contr

ol and a

sola

r dete

ctor

are

fit

ted!

X2X1 X2

54321

AZ

-+

*

Page 29: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

29 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-303 cWiring – Central unit with group control – IQ2-Motor

BED

+ - ZA

X2

X1

MOT

2

230 V 230 V

2

MOT

X1

X2

230 V

2

MOT

X1

X2++ ZZ-- AA

X1

X2+ AA-- ZZ

++ AA-- ZZ ++ AA-- ZZ ++ AA-- ZZ

1 2 3 4 5 6

78910

12

126 4 35

BED

A-+ Z

X2--+ AA ZZ

--X1

++ AA ZZ

2

230 V

MOT

X1

--++X2

AA ZZ

2

230 V

MOT

230 V

X1

2

X1

++

MOT

AA

X2-- ZZ --++

X2

AA

X1

230 V

2

X2

MOT

ZZ ++ -- ZZAA

X1

230 V

2

--X2

MOT

++ ZZAA

X2+ -- ZZAA

X1++ -- ZZAA

-

BED

X2--+ AA ZZ

--X1

++ AA ZZ

1 2 3 4 5 6

+

21

87

910

X1

230 V

2

A Z

--X2

MOT

++ ZZAA

6 5 4 3 2 1

2

230 V

MOT

230 V

X1

2

X1

++

MOT

AA

X2-- ZZ --++

X2

AA

X1

230 V

2

X2

MOT

ZZ ++ -- ZZAA

X2+ -- ZZAA

X1++ -- ZZAA

KM

KM

KM

KM

KM

GM

GM

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

BED – Operation

GM – Module for group control

KM – Interface module

MOT – IQ2-Motor

+ – + 24 V

- – GND

A – OPEN travel

Z – CLOSE travel

– orange terminals

– black terminals

max. 10 drive units per section

Centralunit

▲ IM

PO

RT

AN

T!

▲ IM

PO

RT

AN

T!

▲ IM

PO

RT

AN

T!

▲ IM

PO

RT

AN

T!

▲ I

MPO

RT

AN

T!

Only

1 m

oto

r m

ay

supply

pow

er

to t

he c

ontr

ol of

the g

roup a

nd/o

r to

an inte

rface

module

.

----

+ I

t is

only

allo

wed t

o c

onnect

the lin

e if

infr

are

d r

em

ote

contr

ol and a

sola

r dete

ctor

are

fit

ted!

X2X1 X2

54321

AZ

-+

*

max. 10 drive units per section

max. 100 drive units

Page 30: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

30 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-304 a

Electrical documentation – Vertical BlindsElectrical planning

a

GM

a

GM

a

MOT

h

a

MOT

TAS

TASTAS

TAS

GM

a

GM

a

MOT

h

aTAS

TAS

c.1*

a

c.2*

h

MOT

ha

a

GM – Module for group control

KM – Interface module

MOT – IQ2-Motor

TAS – Control switch (surface-mounted)

a – J-Y(ST)Y 2 x 2 x 0,8

c – J-Y(ST)Y 3 x 2 x 0,8

h – Power feed line 230 V AC

* 1 line

Central unit with group and individual control – IQ2-Motor

max.

10

dri

ve u

nit

s

Group

Individual

Individual

Individual

Individual

Centralunit

Page 31: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

31 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-304 bWiring – Central with group and individual control – IQ2-Motor

BED

+ - ZA

1 2

3456

78910

12

12

6

43

5

230 V

-

BED

+ A Z

--

MOT

X2

X1

++

2

ZZAA

1

107

2

98 8

6

1 2 7

10

1

3

54

2

89 7

1

109

2 1

6

3

2

54

-

BED

+ A Z

BED

+-AZ

230 V

AA ++ZZ

X1

X2

MOT

--

2

BED

8

+ - A

1 2 7

10

9 8 7

56

34

12

Z

109

2 1

4

21

3

65

56

43

12

BED

Z A +-

230 V

AA++ ZZ

X1

X2

MOT

--

2

721 98 10

1279 810

AAZZ -- ++

4

21

3

65

230 V

X2

MOT

X1

2

GM GM

GM GM

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

BED – Operation

GM – Module for group control

MOT – IQ2-Motor

+ – + 24 V

- – GND

A – OPEN travel

Z – CLOSE travel

– orange terminals

– black terminals

max.

10

dri

ve u

nit

s

Group

▲ IM

PO

RT

AN

T!

▲ IMPORTANT!

▲ I

MPO

RT

AN

T!

Only

1 m

oto

r m

ay

supply

pow

er

to t

he c

ontr

ol of

the g

roup a

nd/o

r to

an inte

rface

module

.

----

+ I

t is

only

allo

wed t

o c

onnect

the lin

e if

infr

are

d r

em

ote

contr

ol and a

sola

r dete

ctor

are

fit

ted!

Max. 10 drive units

X2X1 X2

54321

AZ

-+

*

Page 32: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

32 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-305 a

Electrical documentation – Vertical BlindsElectrical planning

a

GM

a

GM

a

MOT

h

a

MOT

TAS

TASTAS

TAS

KM

aGM

a

GM

a

MOT

h

aTAS

TAS

a

c.1*

a

KM

a

c.2*

h

MOT

ha

a

a

GM – Module for group control

KM – Interface module

MOT – IQ2-Motor

TAS – Control switch (surface-mounted)

a – J-Y(ST)Y 2 x 2 x 0,8

c – J-Y(ST)Y 3 x 2 x 0,8

h – Power feed line 230 V AC

* 1 line

Central unit with group and individual control – IQ2-Motor

max.

10

dri

ve u

nit

s per

sect

ion/i

nte

rface

module

Group

Individual

Individual

Individual

Individual

Centralunit

Page 33: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

33 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Electrical documentation – Vertical BlindsElectrical connection diagrams

IQ2-305 bWiring – Central with group and individual control – IQ2-Motor

BED

+ - ZA

1 2

3456

78910

12

12

6

43

5

230 V

-

BED

+ A Z

--

MOT

X2

X1

++

2

ZZAA

1

107

2

98 8

6

1 2 710

1

3

54

2

89 7

1

109

2 1

6

3

2

54

+

++

AAX2-- ZZ

AA

X1-- ZZ

-

BED

+ A Z

BED

+-AZ

230 V

AA ++ZZ

X1

X2

MOT

--

2

BED

8

+ - A

1 2 7

10

9 8 7

56

34

12

Z

109

2 1

4

21

3

65

56

43

12

BED

Z A +-

230 V

AA++ ZZ

X1

X2

MOT

--

2

721 98 10

1279 810

AAZZ -- ++

4

21

3

65

230 V

X2

MOT

X1

2

+

++X1

AAX2-- ZZ

AA-- ZZ

GM GM

GM GM

KM KM

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

BED – Operation

GM – Module for group control

KM – Interface module

MOT – IQ2-Motor

+ – + 24 V

- – GND

A – OPEN travel

Z – CLOSE travel

– orange terminals

– black terminals

max.

10

dri

ve u

nit

s per

sect

ion/i

nte

rface

module

Group ▲ IM

PO

RT

AN

T!

▲ IMPORTANT!

▲ IM

PO

RT

AN

T!

▲ IMPORTANT!

▲ I

MPO

RT

AN

T!

Only

1 m

oto

r m

ay

supply

pow

er

to t

he c

ontr

ol of

the g

roup a

nd/o

r to

an inte

rface

module

.

----

+ I

t is

only

allo

wed t

o c

onnect

the lin

e if

infr

are

d r

em

ote

contr

ol and a

sola

r dete

ctor

are

fit

ted!

From 10 drive units

X2X1 X2

54321

AZ

-+

*

Centralunit

Page 34: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

34 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-400

Electrical documentation – Vertical BlindsSOMFY components

ah

1

MOT

C

Centralis IB

GN

YE

BN

X2

12345

*

Individual control - Centralis IB – IQ2-Motor

Electrical planning

Electrical connection diagrams

Voltage supply from motor

X1

Pin Function

L 230 V

N 230 V

1 – Centralis IB, push button central control

MOT – IQ2-Motor

a – J-Y(ST)Y 2 x 2 x 0,8

h – Power feed line 230 V AC

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Page 35: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

35 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-401

Electrical documentation – Vertical BlindsSOMFY components

ah

1

2

3

4

MOT

5

X2

12345

II

MO

T

24

V

BN

WH

GN

YE

+-Modul DC RTS

Individual control - Modul DC RTS – IQ2-Motor

Electrical planning

Electrical connection diagrams

Voltage supply from motor

X1

Pin Function

L 230 V

N 230 V

1 – Modul DC RTS, wireless receiver

2 – Telis 1 RTS, 1-chan wireless hand transmitter

3 – Telis 4 RTS, 4-chan wireless hand transmitter

4 – Centralis RTS, wireless wall transmitter, 1-chan

5 – Chronis RTS, wireless program time control

5 – Chronis RTS L, wireless program time control with solar automatic

MOT – IQ2-Motor

a – J-Y(ST)Y 2 x 2 x 0,8

h – Power feed line 230 V AC

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Hinweis: Keine Sonderfunktion (z.B. Modulis oder MY Funktion) möglich.

Page 36: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

36 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-402

Electrical documentation – Vertical BlindsSOMFY components

ah

1

MOT

230 V/50 Hz

Soliris IB Sonne

GN

YE

BN

X2

12345

*

C

LN 230 V/50 Hz

Individual control - Soliris IB – IQ2-Motor

Electrical planning

Electrical connection diagrams

Voltage supply from motor

X1

Pin Function

L 230 V

N 230 V

1 – Soliris IB Sonne, solar automatic with window sensor (inside)

MOT – IQ2-Motor

a – J-Y(ST)Y 2 x 2 x 0,8

h – Power feed line 230 V AC

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Power supply

Power supply

Page 37: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

37 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-403

Electrical documentation – Vertical BlindsSOMFY Components

ah

1

MOT

230 V/50 Hz

Chronis IB

GN

YE

BN

X2

12345

*

C

LN 230 V/50 Hz

Individual control - Chronis IB – IQ2-Motor

Electrical planning

Electrical connection diagrams

X1

Pin Function

L 230 V

N 230 V

1 – Chronis IB, program time control

1 – Chronis IB L, program time control with solar automatic

MOT – IQ2-Motor

a – J-Y(ST)Y 2 x 2 x 0,8

h – Power feed line 230 V AC

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Power supply

Power supply

Page 38: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

38 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-404

Electrical documentation – Vertical BlindsSOMFY Components

1

h

MOT

h

MOT

h

MOT

h

MOT

2 2 2 2 22

230 V/50 Hz

Inis DC Rollo

L N M M

230 V/50 Hz

12345 12345 12345 12345

X2 X2 X2 X2

Group control - Inis DC Rollo – IQ2-Motor

Electrical planning

Electrical connection diagrams

X1

Pin Function

L 230 V

N 230 V

1 – Inis DC Rollo,

switch with integrated power pack

MOT – IQ2-Motor

a – J-Y(ST)Y 2 x 2 x 0,8

h – Power feed line 230 V AC

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Power supply

furtherdrives

furtherdrives

Power supply

Page 39: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

39 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-405

Electrical documentation – Vertical BlindsSOMFY Components

h

MOT

h

MOT

h

MOT

h

MOT

2 2 2 2 2

24 V DC

2

1

2

3

4 5

230 V/50 Hz

12345 12345 12345 12345

X2 X2 X2 X2

I IMOT

24 V

+ -

Modul D

C R

TS

24 V DC

230 V/50 Hz

+-

Group control - Modul DC RTS – IQ2-Motor

Electrical planning

Electrical connection diagrams

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Voltage supply from power pack

Power supply

Power supply

1 – Module DC RTS, wireless receiver

2 – Telis 1 RTS, 1-chan wireless hand transmitter

3 – Telis 4 RTS, 4-chan wireless hand transmitter

4 – Centralis RTS, wireless wall transmitter, 1-chan

5 – Chronis RTS, wireless program time control

5 – Chronis RTS L, wireless program time

control w/ solar automatic

MOT – IQ2-Motor

h – Power feed line 230 V AC

Somfy power packs – UPS 10

Transformer

with plug

GPS 30

GPS 100

Power 2,5 DC

General power packs – 24 V DC

Ripple <48%

furtherdrives

furtherdrives

Page 40: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

40 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-406

Electrical documentation – Vertical BlindsSOMFY Components

h

MOT

h

MOT

h

MOT

h

MOT

2 2 2 2 2

2

1

2

3

4 5

230 V/50 Hz

Power 2,5 CD RTS

L N M1M2

230 V/50 Hz

12345 12345 12345 12345

X2 X2 X2 X2

Group control - Power 2,5 DC RTS – IQ2-Motor

Electrical planning

Electrical connection diagrams

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Power supply

Power supply

1 – Power 2,5 DC RTS, group remote control

2 – Telis 1 RTS, 1-chan wireless hand transmitter

3 – Telis 4 RTS, 4-chan wireless hand transmitter

4 – Centralis RTS, wireless wall transmitter, 1-chan

5 – Chronis RTS, wireless program time control

5 – Chronis RTS L, wireless program time control with solar automatic

MOT – IQ2-Motor

h – Power feed line 230 V AC

furtherdrives

furtherdrives

Page 41: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

41 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-407

Electrical documentation – Vertical BlindsSOMFY Components

h

MOT

h

MOT

h

MOT

2 2 2 2

24 V DC

2

1

2 3 4

230 V/50 Hz

3333

12345 12345 12345

X2 X2 X224 V DC

230 V/50 Hz

+-

Centralis IB Soliris IB Sonne Chronis IB- + M M

+ + C N L C N LCentr

alis

DC IB

Rollo

230 V/50 Hz 230 V/50 Hz

Group control - Centralis DC IB Rollo – IQ2-Motor

Electrical planning

Electrical connection diagrams

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Power supply

Power supply Power supply

Voltage supply from power pack

Somfy power packs – UPS 10

Transformer w/ plug GPS 30 GPS 100 Power 2,5 DC

General power packs – 24 V DC Ripple <48%

1 – Centralis DC IB Rollo, motor control device

2 – Centralis IB, push button central control

3 – Soliris IB Sonne, solar automatic with window sensor (inside)

4 – Chronis IB, program time control

5 – Chronis IB L, program time control with solar automatic

MOT – IQ2-Motor

h – Power feed line 230 V AC

furtherdrives

furtherdrives

furtherCentralis DC IBorControl elements

furtherCentralis DC IBorControl elements

Page 42: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

42 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-408

Electrical documentation – Vertical BlindsSOMFY Components

h

MOT

h

MOT

h

MOT

2 2 2 2

1

5 6 7

230 V/50 Hz

3333

7 7

333

GPS1020

®

2

3

4

12345 12345 12345

X2 X2 X2

Centralis IB

+

Centralis IB

+

Centralis IB

+

Soliris IB Sonne

C N L

Chronis IB

C N L

23

0 V

/50

Hz

230 V/50 Hz 230 V/50 Hz

C MOTDC

NL

GPS 1020

IR 3Sensor

BU

WH

YE

Group control - GPS 1020 – IQ2-Motor

Electrical planning

Electrical connection diagrams

X1

Pin Function

L 230 V

N 230 V

X2

Pin Function LIYY 4 x 0,14 mm2 J-Y(ST)Y 2 x 2 x 0,8 Comment

1 + 24 V (max. 80 mA) WH (white) RD (red) VOUT

2 GND BN (brown) BK (black) VOUT

3 Coding *

4 UNSTACK (><) GN (green) WH (white) Control signal

5 STACK (<>) YE (yellow) YE (yellow) Control signal

* Pin 3 : Connection X2/1 zu X2/3 = Ground as control signal No connection = Pole reversal principle (control)

Power supply

Power supply Power supply

1 – GPS 1020, group control

2 – IR 3 Sensor, receiver for GPS 1020

3 – IRT 103, IR-transmitter, 1-channel

4 – IRT 108, IR-transmitter, 8-channel

5 – Soliris IB Sonne, solar automatic with window sensor (inside)

6 – Chronis IB, program time control

7 – Centralis IB, push button central control

MOT – IQ2-Motor

h – Power feed line 230 V AC

BU (blue)

furtherdrives

furtherGPS 1020

furtherCentralis IB

Pow

er

supply

furtherCentralis IB

furtherGPS 1020

furtherdrives

CE

NT

RA

L

UN

ITG

RO

UP

Page 43: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

43 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-500

Electrical documentation – Vertical Blinds230 V

3

2

4

1

230 V/50 Hz

MOTSM

Individual control - Push button – IQ2-Motor

Electrical planning

Electrical connection diagrams

1 – Push button/switch

SM – 230 V switching module

MOT – IQ2-Motor

230 VModul

Power supply

X7

Pin Function Cable Comment

L1 230 V BN (brown) VIN

N BU (blue) VIN

S1 CLOSE BK (black) Control signal

S2 OPEN GY (grey) Control signal

X2

X7

X4

RTS programming unit

Cable

ca. 1,0

m

X7

Control current per drive unit/function: 5 mA

ATTENTION!The drive unit requires a permanent voltage supply!

Switches (push button) with a mutual interlock must be used!

If a push button (switch) without a mutual interlock is used, programming of the drive is possible.

Power supply

X7S1S2

NPE

L BNBU

BKGY

LN

X7

230 V/50 Hz

Page 44: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

44 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-501

Electrical documentation – Vertical Blinds230 V

1

3

2

4

230 V/50 Hz

MOTSM

34

21 BN

BUBKGY

X7

Inis Uno

L

LN230 V/50 Hz

Individual control - Inis Uno – IQ2-Motor

Electrical planning

Electrical connection diagrams

1 – Inis Uno, switch

SM – 230 V switching module

MOT – IQ2-Motor

230 VModul

Power supply

X7

Pin Function Cable Comment

L1 230 V BN (brown) VIN

N BU (blue) VIN

S1 CLOSE BK (black) Control signal

S2 OPEN GY (grey) Control signal

X2

X7

X4

RTSprogramming unit

Cable

ca. 1,0

m

X7

Control current per drive unit/function: 5 mA

ATTENTION!The drive unit requires a permanent voltage supply!

Switches (push button) with a mutual interlock must be used!

If a push button (switch) without a mutual interlock is used, programming of the drive is possible.

Power supply

Page 45: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

45 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-502

Electrical documentation – Vertical Blinds230 V

2 4

1

230 V/50 Hz

MOTSM

2 3

4 5

BNBU

BKGY

X7

N N L

CentralisIndoor RTS

LN230 V/50 Hz

Individual control - Centralis Indoor RTS – IQ2-Motor

Electrical planning

Electrical connection diagrams

1 – Centralis Indoor RTS, wireless receiver

2 – Telis 1 RTS, 1-chan wireless hand transmitter

3 – Telis 4 RTS, 4-chan wireless hand transmitter

4 – Centralis RTS, wireless wall transmitter, 1-chan

5 – Chronis RTS, wireless program time control

5 – Chronis RTS L, wireless program time control with solar automatic

SM – 230 V switching module

MOT – IQ2-Motor

230 VModul

Power supply

X7

Pin Function Cable Comment

L1 230 V BN (brown) VIN

N BU (blue) VIN

S1 CLOSE BK (black) Control signal

S2 OPEN GY (grey) Control signal

X2

X7

X4

RTSprogramming unit

Cable

ca. 1,0

m

X7

Control current per drive unit/function: 5 mA

ATTENTION!The drive unit requires a permanent voltage supply!

Switches (push button) with a mutual interlock must be used!

If a push button (switch) without a mutual interlock is used, programming of the drive is possible.

Power supply

Page 46: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

46 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-503

Electrical documentation – Vertical Blinds230 V

4

1 MOTSM

2

230 V/50 Hz

BN

BU

BKGY

X7

N NL

Chronis UnoChronis Uno L

L N230 V/50 Hz

Individual control - Chronis Uno (L) – IQ2-Motor

Electrical planning

Electrical connection diagrams

1 – Chronis Uno, program time control

1 – Chronis Uno L, program time control with solar automatic

SM – 230 V switching module

MOT – IQ2-Motor

230 VModul

Power supply

X7

Pin Function Cable Comment

L1 230 V BN (brown) VIN

N BU (blue) VIN

S1 CLOSE BK (black) Control signal

S2 OPEN GY (grey) Control signal

X2

X7

X4

RTSprogramming unit

Cable

ca. 1,0

m

X7

Control current per drive unit/function: 5 mA

ATTENTION!The drive unit requires a permanent voltage supply!

Switches (push button) with a mutual interlock must be used!

If a push button (switch) without a mutual interlock is used, programming of the drive is possible.

Power supply

Page 47: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

47 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-504

Electrical documentation – Vertical Blinds230 V

3

2

4

4

4

4

4

4

4

4

1

230 V/50 Hz

MOTSM

MOTSM

MOTSM

MOTSM

X7 X7 X7

BN

BU

BK

GY

X7

BN

BU

BK

GY

BN

BU

BK

GY

BN

BU

BK

GY

L N230 V/50 Hz

Group control - Push button – IQ2-Motor

Electrical planning

Electrical connection diagrams

1 – Push button/switch

SM – 230 V switching module

MOT – IQ2-Motor

230 VModul

Power supply

X7

Pin Function Cable Comment

L1 230 V BN (brown) VIN

N BU (blue) VIN

S1 CLOSE BK (black) Control signal

S2 OPEN GY (grey) Control signal

X2

X7

X4

RTSprogramming unit

Cable

ca. 1,0

m

X7

Control current per drive unit/function: 5 mA

ATTENTION!The drive unit requires a permanent voltage supply!

Switches (push button) with a mutual interlock must be used!

If a push button (switch) without a mutual interlock is used, programming of the drive is possible.

Power supply

Page 48: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

48 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-505

Electrical documentation – Vertical Blinds230 V

1

3

2

4

4

4

4

4

4

4

4

230 V/50 Hz

MOTSM

MOTSM

MOTSM

MOTSM

Inis Uno

L

X7 X7 X7

BN

BU

BK

GY

X7

BN

BU

BK

GY

BN

BU

BK

GY

BN

BU

BK

GY

L N230 V/50 Hz

Group control - Inis Uno – IQ2-Motor

Electrical planning

Electrical connection diagrams

1 – Inis Uno, switch

SM – 230 V switching module

MOT – IQ2-Motor

230 VModul

Power supply

X7

Pin Function Cable Comment

L1 230 V BN (brown) VIN

N BU (blue) VIN

S1 CLOSE BK (black) Control signal

S2 OPEN GY (grey) Control signal

X2

X7

X4

RTSprogramming unit

Cable

ca. 1,0

m

X7

Control current per drive unit/function: 5 mA

ATTENTION!The drive unit requires a permanent voltage supply!

Switches (push button) with a mutual interlock must be used!

If a push button (switch) without a mutual interlock is used, programming of the drive is possible.

Power supply

Page 49: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

49 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-506

Electrical documentation – Vertical Blinds230 V

4

4

4

4

4

4

4

4

4

1 MOTSM

MOTSM

MOTSM

MOTSM

2

230 V/50 Hz

2 3

4 5

X7 X7 X7

BN

BU

BK

GY

X7

BN

BU

BK

GY

BN

BU

BK

GY

BN

BU

BK

GY

N N L

CentralisIndoor RTS

LN230 V/50 Hz

Group control - Centralis Indoor RTS – IQ2-Motor

Electrical planning

Electrical connection diagrams

230 VModul

Power supply

X7

Pin Function Cable Comment

L1 230 V BN (brown) VIN

N BU (blue) VIN

S1 CLOSE BK (black) Control signal

S2 GY (grey) Control signal

X2

X7

X4

RTSprogramming unit

Cable

ca. 1,0

m

X7

Control current per drive unit/function: 5 mA

ATTENTION!The drive unit requires a permanent voltage supply!

Switches (push button) with a mutual interlock must be used!

If a push button (switch) without a mutual interlock is used, programming of the drive is possible.

Power supply

1 – Centralis Indoor RTS, Wireless receiver

2 – Telis 1 RTS, 1-chan wireless hand transmitter

3 – Telis 4 RTS, 4-chan wireless hand transmitter

4 – Centralis RTS, wireless wall transmitter, 1-chan

5 – Chronis RTS, wireless program time control

5 – Chronis RTS L, wireless program time control with solar automatic

SM – 230 V switching module

MOT – IQ2-Motor

Page 50: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

50 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-507

Electrical documentation – Vertical Blinds230 V

4

4

4

4

4

4

4

4

4

2 3 4

1

MOTSM

MOTSM

MOTSM

MOTSM

2

230 V/50 Hz

X7 X7 X7

BN

BU

BK

GY

X7

L N

+

Centr

alis

Uno IB

N

Centralis IB Chronis IB Chronis IB L

+ CNL

BN

BU

BK

GY

BN

BU

BK

GY

BN

BU

BK

GY

CNL

L N

230 V/50 Hz

Group control - Centralis Uno IB – IQ2-Motor

Electrical planning

Electrical connection diagrams

230 VModul

Power supply

X7

Pin Function Cable Comment

L1 230 V BN (brown) VIN

N BU (blue) VIN

S1 CLOSE BK (black) Control signal

S2 OPEN GY (grey) Control signal

X2

X7

X4

RTSprogramming unit

Cable

ca. 1,0

m

X7

Control current per drive unit/function: 5 mA

ATTENTION!The drive unit requires a permanent voltage supply!

Switches (push button) with a mutual interlock must be used!

If a push button (switch) without a mutual interlock is used, programming of the drive is possible.

Power supply

1 – Centralis Uno IB, motor control device

2 – Centralis IB, push button central control

3 – Chronis IB, program time control

4 – Chronis IB L, program time control with solar automatic

SM – 230 V switching module

MOT – IQ2-Motor

Page 51: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

51 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

IQ2-508

Electrical documentation – Vertical Blinds230 V

4

4

4

4

4

4

4

4

4

1 MOTSM

MOTSM

MOTSM

MOTSM

2

230 V/50 Hz

X7 X7 X7

BN

BU

BK

GY

X7

BN

BU

BK

GY

BN

BU

BK

GY

BN

BU

BK

GY

N NL

Chronis UnoChronis Uno L

L N230 V/50 Hz

Group control - Chronis Uno (L) – IQ2-Motor

Electrical planning

Electrical connection diagrams

230 VModul

Power supply

X7

Pin Function Cable Comment

L1 230 V BN (brown) VIN

N BU (blue) VIN

S1 CLOSE BK (black) Control signal

S2 OPEN GY (grey) Control signal

X2

X7

X4

RTSprogramming unit

Cable

ca. 1,0

m

X7

Control current per drive unit/function: 5 mA

ATTENTION!The drive unit requires a permanent voltage supply!

Switches (push button) with a mutual interlock must be used!

If a push button (switch) without a mutual interlock is used, programming of the drive is possible.

Power supply

1 – Chronis Uno, program time control

1 – Chronis Uno L, program time control

with solar automatic

SM – 230 V switching module

MOT – IQ2-Motor

Page 52: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

52 Version 23-06-2015© 2015 Benthin® . Misprints, errors and changes excepted

Individual control

Small group control

Group control

Central control

Remote control

Solar automatic

Program time control

Switching module 230 V

Electrical documentation – Vertical Blinds

IQ2-600Legend – IQ2-Motor

230 VModul

Customer’s need: A blind should be controlled separate.Solution: Just 1 motor is mounted on the control spot.

Customer’s need: Several blinds should be controlled in common as a small group. E. g. 3 blinds in a bay window.Solution: Several blinds are mounted directly on the controlspot. Thereby note the max. number of motors per control spot.

Customer’s need: More than 4 blinds should be controlled as a group. Single control is not required.Solution: Application of the group control GPS 1020 where all the motors are mounted to. The control happens overconnected push button or automatic device.

Customer’s need: All blinds should be controlled by the control spot. This could happen via push button or automatic device. Central control happens if neccessary additional to the single-, small group-, or group control.Solution: The appropriated control devices are triggered bya central control spot.

Customer’s need: The blinds should be triggered by a hand transmitter.Solution: Application of a IR-receiver and transmitter.

Customer’s need: It should also be possible to open and close the systems automatically when nobody is there depending on the incident sunshine or depending on shadow or twilight.Solution: Application of the solar automatic.

Customer’s need: It should also be possible to open and close the systems automatically according to a weekly programme or depending on the times of sunrise and sunset.Solution: Application of the program time control.

The 230 V switching module serves to actuate a drive unit with a control voltage of 230 V AC.

Page 53: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the
Page 54: IQ2-Motor Electrical planning - Microsoft...The motor can be installed using a variety of fasteners behind the rail to the left, behind the rail to the right, above the rail to the

Benthin GmbH

Osterstader Str. 16

D-27572 Bremerhaven

T +49 471 79 84 0

F +49 471 79 84 111

[email protected]

Benthin

Pondwood House

Pondwood Close

Moulton Park Ind. Estate

Northampton NN3 6RT

T +44 1604 490580

F +44 1604 648446

[email protected]

Benthin Systèmes E.U.R.L

27, Avenue de Montboulon

FR-77165 St. Soupplets

T +33 1 60 61 56 56

F +33 1 60 01 57 11

[email protected]

www.benthin.com