Upload
trinhhanh
View
212
Download
0
Embed Size (px)
Citation preview
IPSTC Strategic Plan 2012-2015
Page 3
TABLE OF CONTENTS
FOREWORD ..................................................................................................................................................... 5
LIST OF ACRONYMS ......................................................................................................................................... 6
1. INTRODUCTION ....................................................................................................................................... 7
1.1 PURPOSE OF THE STRATEGIC PLAN ................................................................................................................. 7
1.2 BACKGROUND ........................................................................................................................................... 7
1.2.1 Historical Overview of Kenya’s PSO Training Institutions ................................................................. 7
1.2.2 Mandate ........................................................................................................................................... 7
1.2.3 Core Functions .................................................................................................................................. 8
1.2.4 IPSTC Partners ................................................................................................................................... 8
1.3 ACHIEVEMENTS ......................................................................................................................................... 8
1.3.1 Strategic Engagements and Partnerships ......................................................................................... 8
1.3.2 Education and Training in PSO .......................................................................................................... 9
1.3.3 Applied Research and Curriculum Development ............................................................................... 9
1.3.4 Resource Management ..................................................................................................................... 9
1.3.5 Key Challenges ................................................................................................................................ 10
2. STRATEGIC ASSESSMENT ....................................................................................................................... 11
2.1 INTERNAL ............................................................................................................................................... 11
2.2 EXTERNAL ............................................................................................................................................... 11
2.2.1 Conflict Dynamics in East Africa ...................................................................................................... 11
2.2.2 Evolving Peace Operations .............................................................................................................. 11
2.2.3 Key Actors Analysis ......................................................................................................................... 12
2.3 SWOT ANALYSIS ..................................................................................................................................... 12
2.3.1 Strengths ......................................................................................................................................... 13
2.3.2 Weaknesses .................................................................................................................................... 14
2.3.3 Opportunities .................................................................................................................................. 16
2.3.4 Threats ............................................................................................................................................ 16
3. THE STRATEGY ....................................................................................................................................... 17
3.1 INTRODUCTION ........................................................................................................................................ 17
3.2 VISION STATEMENT .................................................................................................................................. 17
3.3 MISSION STATEMENT ................................................................................................................................ 17
3.4 CORE VALUES .......................................................................................................................................... 17
3.4.1 Integrity and Accountability ............................................................................................................ 17
3.4.2 Professionalism ............................................................................................................................... 17
3.4.3 Excellence ........................................................................................................................................ 17
3.4.4 Trust ................................................................................................................................................ 17
3.5 STRATEGIC ISSUES .................................................................................................................................... 17
3.5.1 Relevance ........................................................................................................................................ 17
3.5.2 Competitiveness .............................................................................................................................. 18
3.5.3 Sustainability................................................................................................................................... 18
3.6 STRATEGIC OBJECTIVES ............................................................................................................................. 18
3.6.1 Strategic Management and Development of Partnerships............................................................. 18
3.6.2 Training ........................................................................................................................................... 19
IPSTC Strategic Plan 2012-2015
Page 4
3.6.3 Research .......................................................................................................................................... 20
3.6.4 Resources management.................................................................................................................. 23
3.7 SUMMARY OF THE OBJECTIVES ACCORDING TO STRATEGIC ISSUES ....................................................................... 24
4. IMPLEMENTATION OF THE STRATEGIC PLAN ......................................................................................... 27
4.1 IMPLEMENTATION APPROACHES .................................................................................................................. 27
4.2 BUSINESS PLAN........................................................................................................................................ 27
4.3 WORK PLAN ........................................................................................................................................... 28
4.4 QUICK AND RESPONSIVE APPROACH ............................................................................................................ 28
4.5 IMPLEMENTATION MATRIX AND RESPONSIBILITIES .......................................................................................... 29
4.6 RESOURCE FLOW ..................................................................................................................................... 31
5. MONITORING, EVALUATION AND REPORTING: ..................................................................................... 32
5.1 MONITORING .......................................................................................................................................... 32
5.2 EVALUATION ........................................................................................................................................... 32
5.3 REPORTING ............................................................................................................................................. 32
5.4 METHODOLOGY ....................................................................................................................................... 32
5.5 EVALUATION MECHANISM .......................................................................................................................... 33
ANNEX – MANAGING SUSTAINABILITY .......................................................................................................... 34
IPSTC Strategic Plan 2012-2015
Page 5
FOREWORD
The International Peace Support Training Centre (IPSTC) was established to enhance
operational capacity for peacekeeping through training, education and research for the
benefit of military, police, and civilian staff.
At the regional level, the IPSTC is committed to offering integrated and multidimensional
training and education towards capacitating of the UN, AU, and regional institutions
engaged in Peace and Security.
The Centre has over the last four years fully developed structures and capabilities that now
place it as the key leader in Peace and Security in Eastern Africa. The Centre’s relevance is
predicated on the need to professionalize peacekeeping within the context of the
requirements for UN Peacekeeping and the development of APSA towards global peace
and stability.
The Strategic Plan running from 2012—2015 has been developed consistently with the ASF
Roadmap III whose objective is the development of the ASF to its full operational capability
by 2015. The Strategic Plan is therefore intended to contribute to the full operationalization of
ASF, focusing principally on the EASF.
The plan is anchored on the pragmatic assessment of Peace and Security in Eastern Africa
and as such, its focus is the development of capacities, tools, and skills to address the
challenges in the region.
It is hoped that all our partners will travel with the IPSTC along the duration of the Plan and
beyond as we steer the institution towards the attainment of its vision.
Brigadier Robert KibochI
DIRECTOR
IPSTC Strategic Plan 2012-2015
Page 6
LIST OF ACRONYMS
AMISOM African Union Mission in Somalia
APSA Africa Peace and Security Architecture
APSTA African Peace Support Trainers' Association
ASF Africa Standby Force
AU African Union
BPST (EA) British Peace Support Team (East Africa)
CIMIC Civil Military Coordination
COE Centre of Excellence
DMTC Directorate Military Training and Cooperation
DRC Democratic Republic of Congo
EAC East Africa Community
EASF Eastern Africa Standby Force
ECOWAS Economic Community of West African States
HPSS Humanitarian Peace Support School
IAPTC International Association of Peacekeeping Training Centres
ICGLR International Conference on the Great Lakes Region
IGAD Intergovernmental Authority on Development
IPSTC International Peace Support Training Centre
ITS Integrated Training Service
KMOSD Kenya Ministry of State for Defence
MOC Memorandum of Cooperation
MONUSCO United Nations Organization Stabilization Mission in the Democratic Republic of
the Congo
MOU Memorandum of Understanding
PCSS Peace and Conflict Studies School
PKO Peacekeeping Operations
PSO Peace Support Operations
PSRD Peace and Security Research Department
SAT Systems Approach to Training
SOP Standing Operations Procedure
SWOT Strength, Weaknesses, Opportunities, and Threats
UN United Nations
UNAMID African Union/United Nations Hybrid operation in Darfur
UNDP United Nations Development Programme
UNMISS United Nations Mission in South Sudan
IPSTC Strategic Plan 2012-2015
Page 7
1. INTRODUCTION
1.1 Purpose of the Strategic
Plan
This document outlines the IPSTC Strategic
Plan for the period 2012-2015 and it is
intended to provide a strategic roadmap
for an autonomous and independent
IPSTC with multinational staff. Internally the
Plan will be used to guide the
development of the institution for the next
four years; while externally it will provide
an indication as to potential investment
opportunities and areas where
cooperation and collaboration with other
institutions and partners may be
applicable. A concerted effort has been
made to ensure that any future
development of the institution is done in a
pragmatic and realistic manner.
Notwithstanding this effort, it is understood
that the aspirations of the institution are
influenced by external actors particularly
in regard to funding and in support of
capacity enhancement.
1.2 Background
1.2.1 Historical Overview of
Kenya’s PSO Training
Institutions
Since its birth in 1945, the United Nations
(UN) has proved to be a unique
organization for the world community of
nations. Born as an “embodiment of the
will of the peoples of the world”, the UN
has served as a repository of collective
wisdom and platform for joint action for a
better, safer, healthier and more
prosperous existence.
As a member of the UN, Kenya has been a
firm supporter of the purposes and
principles of the UN and has made
significant contributions to the furtherance
and implementation of these noble aims
as well as the evolution and functioning of
its various specialized programmes.
Kenya is also a strong supporter of the
African Union (AU) and its Peace and
Security Architecture. In line with its
commitment to the UN and AU peace
and security initiatives, Kenya has
contributed her soldiers, civilian and police
on UN and AU Peace Operations not for
any strategic gain, but in the service of the
ideal of global peace. This ideal remains
as it is fundamental to the strengthening of
the UN and its international peace and
security mandate.
Kenyan Defence Forces’ participation in
UN and AU peace operations spans more
than two decades, covering over 28
peace operations in which over 18,000
Kenyan officers, men and women have
served to bring peace and hope to
victims of violence. Currently Kenya has
provided over 1000 peacekeepers and is
ranked as the world’s sixth largest troop
contributor to UN peace operations, and
the fourth largest in Africa. The overall
wide participation in peace operations
has given Kenya a sound foundation in
both experience and expertise that has
not only helped in the development of her
PSO capabilities but has also earned
Kenya international respect and
recognition.
At the time of publishing this Strategic
Plan, the IPSTC has undergone a series of
structural adjustments by the Kenyan
Ministry of State for Defence. More
specifically, the two training centres which
were concerned with the training and
education for peace operations in Kenya
(PSTC-Karen and the International Mine
Action Training Centre - Embakasi) have
been merged. In addition to this merger, a
Peace and Security Research Department
has been established in IPSTC with the
specific goal of providing a broad
intellectual input into the IPSTC system so
as to inform the delivery of training and
education products; and further
contribute to regional peace and security
policy making.
1.2.2 Mandate
The mandate of the IPSTC is to:
Carry out capacity building in
international peace support
IPSTC Strategic Plan 2012-2015
Page 8
operations and matters incidental
hereto, to military, police, other
uniformed and civilian personnel from
the Member States of the EASF as well
as other interested countries in Africa
and the rest of the World.
Within the framework of the APSTA and
the IAPTC promote the provision and
improvement of PSO training, support
the standardization of PSO training,
and facilitate collaborative research
on peacekeeping in Africa.
1.2.3 Core Functions
The Core Functions Include:
The provision of strategic and
operational level decision-making and
leadership training to enhance
planning and management of
multidimensional peace operations
The provision of mission focused pre-
deployment training at both tactical
and operational levels
The support to the development of
African peace operations capacity
focusing on the African Standby Force
(ASF) and targeting the Eastern Africa
Standby Force (EASF).
The contribution to the development
of an emerging Eastern Africa Peace
and Security Architecture.
The provision of a repository of data
across the entire spectrum of peace
operations.
The provision of peace operations
training and advice to all Kenya
Defence Forces and establishments.
1.2.4 IPSTC Partners
The key IPSTC Partners include signatories
to the Memorandum of Cooperation
(MOC)
The Government of Kenya, through the
Ministry of State for Defence (KMOSD)
The Government of the United
Kingdom, through the British Peace
Support Team Eastern Africa (BPSTEA),
The Government of the United States
of America,
The Government of Canada, through
the Directorate of Military Training
Cooperation (DMTC),
The Government of Japan,
The Government of Germany,
The United Nations Development
Program (UNDP).
1.3 Achievements
The major achievements and milestones
by the IPSTC over the last three years are
categorized in the following functional
areas:
1.3.1 Strategic Engagements and
Partnerships
In the past three years the IPSTC
progressively established linkages with
other PSO training institutions in the region
and beyond. Through the organization
and participation of IPSTC staff in
international workshops and conferences
there were regular interactions. To
maintain and improve this advantage, the
Centre’s focus is to prioritize a systematic
engagement with partners and
stakeholders such as the AU, UN,
EASFCOM, partners, INGOs, academic
institutions, peacekeepers and
researchers.
The IPSTC has successfully secured
membership in APSTA and the IAPTC. The
engagement in both associations has
given the IPSTC visibility which has allowed
it to expand its network. Partnerships with
Universities in Eastern Africa region have
been established, enabling the IPSTC to
organise research symposiums, symposium
on geostrategic issue and workshops with
academic and operational partners.
However, this partnership should be
enhanced and a post-grade training
program could be developed within
IPSTC, in partnership with regional
Universities.
The strategic engagements and
partnerships have resulted in:
The establishment of the IPSTC as
regional Centre of Excellence in PSO,
IPSTC Strategic Plan 2012-2015
Page 9
with two training platforms (PCSS and
HPSS) that focus on capacity building
from strategic through operational
and tactical levels of operations.
The signing of a Memorandum of
Cooperation (MOC) with partners to
include; Kenya, UK, Japan, Canada,
USA, UNDP and German to create
formal mechanism of engagement.
The establishment of a comprehensive
training and education framework that
addresses the issues that cut across the
entire Conflict Spectrum.
The Internationalization of the IPSTC
through the expansion of partnerships
and the establishment of a formal
governance structure that includes a
Joint Control Board and a Centre
Management Board.
The Institutionalization of the process of
Systems Approach to Training (SAT)
modelled to guide the development
and delivery of education and training
across the IPSTC system.
The establishment of a Research
Department that focuses on applied
research to inform policy on regional
peace and security and on curriculum
development towards the
maintenance of relevance on all
dimensions of PSO training.
The expansion of IPSTC partnership
from three to over ten in three years,
thereby increasing IPSTC Training and
Infrastructural development fivefold.
The establishment of an IPSTC fund
consistent with the Strategic Plan 2009-
2011 enabling the IPSTC to cover over
98% of its administrative costs.
1.3.2 Education and Training in
PSO
The Centre has increased its training
offering to cover not only the entire
conflict spectrum but also the three
military, civilian, and police dimensions.
There has been a remarkable increase in
the number of courses delivered and
overall training output averaging 2,000
participants per year. A sizeable
proportion of this training throughput has
fed into capacities in the various peace
missions within the Eastern African region
which include AMISOM, UNMISS, UNAMID
and MONUSCO.
Further, most of the trainees are employed
in regional organizations that are
engaged in peace and security and
include, IGAD, EAC, EASFCOM, ICGLR etc.
The IPSTC is hence in the forefront of
advocating for training for effect through
the promotion of the concept of linking
training, recruitment and employment.
1.3.3 Applied Research and
Curriculum Development
The IPSTC Research pillar plays a significant
role in the institutionalization of the IPSTC
System Approach to Training (SAT). The SAT
process has enabled the IPSTC develop
new programmes and enhancement of
the programmes through evaluation
process.
1.3.4 Resource Management
1.3.4.1 Financial Resources
The establishment of a fully functional
finance and administration department
contributed to prudent management of
financial resources. The establishment of
the department has been reinforced
through the development of Financial and
Procurement Policy manuals and a three-
year Business Plan that guides the
budgeting process and allocation of
financial resources amongst the various
platforms.
1.3.4.2 Human resources
The IPSTC has continued to augment its
human resource capacity over the last
three years after the approval of a new
establishment by the KMOSD in 2010. The
human resource capacity cuts across the
military and civilian dimensions that is
categorised as national, regional and
international. Whereas it has not been a
full integration of regional staff, efforts are
underway to implement this perspective in
2012.
IPSTC Strategic Plan 2012-2015
Page 10
1.3.4.3 Infrastructural Development
Administrative Infrastructure
Over the last three years and following the
merger of the Karen and Embakasi
campuses, there has been the
development of both the IPSTC and HPSS
headquarters buildings creating adequate
office spaces for augmented staff
consistent with the approved
establishment. Further there has been the
development of adequate storage
spaces commensurate with the growth of
student population. Further both Karen
and Embakasi campuses have gardens
have been elevated to higher standards
considerably raising the institutions profile.
Training Infrastructure
The training infrastructure has been
increased considerably through the
creation of additional syndicate rooms
and renovations. The key outdoor training
infrastructure that has set the IPSTC apart
from any other PSO training Centre is the
AMANI PSO Village located at the HPSS at
Embakasi. This model simulation village has
created an environment for the
enhancement of realism in training for
complex operations. The “village” provides
opportunity to virtually conduct any PSO
scenario and hence very useful for pre-
deployment training.
Information and Communication
Technology (ICT) Infrastructure
The IPSTC ICT infrastructure has developed
tremendously over the last three years. This
has been deliberate action towards
leveraging the use of technology in
improving training delivery. The
introduction of voice and internet
connectivity across the two training
platforms through a virtual network has
enabled the online inter campus
communication including the
interconnection of the QuickBooks
financial platform across the two
Campuses. This has had a major reduction
in communication related costs.
The introduction of wireless internet in the
two campuses has as well led to ease of
internet access by participants while on
training greatly improving training.
Coupled with this has been the revamping
of syndicate rooms with the introduction of
conferencing capabilities towards the
enhancement of content delivery.
Towards enhancing communication with
the outside world, the IPSTC reconfigured
its institutional Website by providing more
content and presentation. Further, the
IPSTC has been in the forefront of
leveraging information technology in
validation of its training through the
development and introduction of a
Training Management System whose
purpose is the archiving all training
undertaken at the Centre as well as
providing a tracking mechanism of its
alumni.
1.3.5 Key Challenges
As highlighted, the achievements of the
past three years have not been attained
without some key challenges. Those
challenges that have stood out include:
Inadequate human resource to fully
cover training, research and
administrative domains. This has
contributed to reliance on external
Subject Matter Experts (SMEs) which is
counter to the objective of the
development of institutional capacity
capable of delivering training across
the dimensions, conduct of applied
research and provides the critical
administrative support.
Integration of regional staff into the
IPSTC system. This challenge has
tended to negate the aspirations of
the IPSTC to project as a regional
Centre of excellence.
IPSTC Strategic Plan 2012-2015
Page 11
2. STRATEGIC ASSESSMENT
2.1 Internal
Through the implementation of its 2009-
2011 Strategic Plan, the IPSTC has reached
its cruising altitude. The courses and
contributions provided by the Centre have
reached a good level of maturity and
have contributed to the solid reputation
the IPSTC has gained as a Centre of
Excellence in Africa. This has materialized
through the attraction of new partners
and new resources to the Centre.
The IPSTC’s challenge is to maintain the
same level of performance it has reached
so far. Continuity for personnel and
financial resources is the conditio sine qua
non for the Centre to retain its level of
excellence. The quality of the IPSTC’s
management and staff demonstrates
professionalism and dedication, and
constitutes the backbone of the Centre’s
success. However, solutions need to be
found to overcome the project-oriented
support pattern IPSTC relies on so far and
to move towards more regular flow of
resources. This optimization would not only
smooth management and contribute to
reduce costs, but would also improve
institutional memory and knowledge that
counts for IPSTC’s long-term level of
excellence.
Nature and quality of IPSTC’s infrastructure
has proved to be a major asset in
attracting partners from international,
governmental and non-governmental
entities. Further, the uniqueness of the
facilities offered by the HPSS provides a
clear edge to the IPSTC as to its ability to
cover a wide range of training courses,
thus putting the IPSTC in the front row to
address the multidimensional challenges
the peace operations are and will be
facing.
The IPSTC provides a solid and healthy
basis to address the variety of challenges
East Africa Community may face in the
future. Successes and achievements must
now be consolidated and reinforced
through institutionalization of processes
and structures and through sustainable
development, and improvement of
business continuity mechanisms.
2.2 External
2.2.1 Conflict Dynamics in East
Africa
At the crossroads between Africa and
Asia, between various religions, cultures
and ethnic groups, East Africa is marked
by diversity and economic dynamism. This
unique situation is a source of both
opportunities and challenges. East Africa
has a significant development potential,
but this could be threatened by
challenges outweighing the opportunities.
International concerns over maritime
piracy in the Horn of Africa zone reflect
the importance of stability in East Africa.
But maritime piracy is only a symptom of
more concerning issues. Somalia’s
instability tends to have a spill-over effect
in the region and beyond. Further, through
its inability to address organized criminality,
terrorism, piracy and various kinds of
trafficking, Somalia situation opens the
door to a ‘black economy’ that does not
benefit the region.
Further, the emergence of a new State in
South Sudan in a fragile interethnic
balance, with poor infrastructure and very
weak economic capacities is a challenge
for institution building and regional
stability. Recurring interethnic violence
hampers institutional and economic
development and threatens regional
stability through trans-border insecurity.
2.2.2 Evolving Peace Operations
Current deployed peace operations in
East Africa show the most diverse range of
mandates, mandating mechanisms, and
operation structures in Africa, providing a
unique environment for doctrinal and
training issues. In Darfur, the UN and the AU
operate jointly a one-of-its-kind hybrid
Mission; in Sudan, the UN conducts a fully
military security operation in Abyei; in
South Sudan, the UN conducts a peace
and security consolidation operation; in
Somalia, the AU conducts a peace
IPSTC Strategic Plan 2012-2015
Page 12
support operation under the provisions of
the Chapter VIII of the UN Charter; and in
Eastern DRC, the UN is involved in
operations jointly with national Congolese
armed forces.
The regular inclusion of provisions of the
Chapter VII of the Charter in UN
peacekeeping missions tends to narrow
down the doctrinal differences between
peacekeeping and peace support
operations. However, doctrinal differences
between UN and AU exist and the IPSTC is
in a good position to provide training
adjusted to the real needs of troop
contributing countries, thus allowing the
Centre to spearhead research and
doctrinal development in this matter.
2.2.3 Key Actors Analysis
2.2.3.1 Regional organizations
Regional organizations constitute the main
customers of the IPSTC and the training
dimension of their capability development
is therefore the main rationale for the mere
existence of the Centre. The development
of a training capability to address regional
concerns and institutions reflects a strong
and consistent awareness to respond to
current and futures challenges with a
multidimensional approach. The smooth
relationship between these regional
organisations and the Centre contributes
to the success of the IPSTC as a training
and doctrinal support institution.
Although communication between these
institutions and the IPSTC works well, a
need has emerged to have a more
systematic and better structured
interaction to define doctrinal and training
requirements based on experiences done
in the field and best practices. Beyond the
direct benefit to training design, capturing
best practices and ability to detect
malpractice is an important tool for
oversight and effective command and
control.
2.2.3.2 Regional Peacekeeping
Institutions
In several East African countries, national
initiatives to establish peace support
training capacities have emerged in a
recent past. They are part of growing
interest in the East African region to
enhance national capabilities in order to
respond to multinational challenges and
requests.
The multiplication of national training
institutions in the absence of established
national and multinational doctrinal base
may prove counterproductive in the mid-
and long-term. Further, this evolution may
lead to a dilution of international funding
and partnerships.
These developments are also an
opportunity for the IPSTC to confirm its role
as a Centre of Excellence. Using its
experience and expertise the IPSTC can
position itself as the reference point for
emerging national peace training
capacities. This trend is confirmed by
contacts established by several East
African countries with the IPSTC to seek
advice and expertise. Such development
could mitigate the risk of doctrinal
inconsistency in the region, while
enhancing return on investment done by
the IPSTC partners.
2.3 SWOT Analysis
The SWOT (Strengths, Weaknesses,
Opportunities, and Threats) analysis
provides essential elements to feed into
the IPSTC strategy blueprint. This SWOT has
been generated on the basis interactions
of the internal and external entities on the
host of items.
IPSTC Strategic Plan 2012-2015
Page 13
IPSTC SWOT Matrix
Strength Weaknesses
the IPSTC recognized as a Centre of
Excellence
Solid experience In curriculum design and
delivery
State of the art infrastructure with wide-
ranging capacities
Light and flexible organizational structure
Active support of regional organizations
and key donors
Project bound resources
Lack of standing human resources
capacity(researchers and trainers)
No established mechanisms and strategy
to address donors and sponsors in a
systematic way
No mechanism for long-term interaction
with customers
Opportunities Threats
Current geostrategic situation in Eastern
Africa highlights the importance of focal
points for consistent doctrinal and training
inputs for the regional actors
Window of opportunity for the IPSTC to
act as a think tank to address regional
challenges
Eagerness of IPSTC partners to support
enhancement of its regional impact
Multiplication of the African PKTIs leading
to
o Lack of strategic coherence
o Resource saturation and
fragmentation in the east Africa region
2.3.1 Strengths
2.3.1.1 The IPSTC recognized as a
Centre of Excellence
The IPSTC is widely recognized as a Centre
of Excellence for training development
and delivery. This is the result of a
combination of factors that culminate in
the very design of the Centre. The ability
not only to host courses or activities, but
also to generate and deliver outputs
based on an operational research
capability is key consideration.
This ability contributes to make the IPSTC
an institution which is not only highly
responsive, but also proactive in
addressing needs of peace actors in the
field.
It also allows the Centre to establish a
strong requirement as to the quality of the
products design and delivery.
Leveraging this strength
Expectations towards the IPSTC are high
but in the turn also reflect the level of
confidence the IPSTC enjoys. Maintaining
this level of confidence is the key to
attract and keep the interest from donors
and sponsors.
As a baseline the IPSTC strives to maintain
the level of expertise and the quality of
delivery. However based on assessment of
the last Strategic Plan 2009-2011, the
current Strategic Plan aims at improving
the Centre’s products by raising the
overall level of quality, by addressing the
identified gaps and enhancing the overall
IPSTC roles.
2.3.1.2 Solid experience in curriculum
design and delivery
In more than ten years of activity the IPSTC
can document significant expertise in the
design and delivery of training. The
constant and repeated interest from
partner countries and organizations in
IPSTC Strategic Plan 2012-2015
Page 14
supporting the IPSTC activities is the most
obvious indicator of experience and
successful outputs the IPSTC can be
credited for.
Leveraging this strength
The IPSTC recognized experience can be
leveraged by using the current level of
expertise as a benchmark to identify
potential and future gaps. Achievements
of the previous Strategic Plan allow the
IPSTC to start from a solid and healthy
fundament.
2.3.1.3 State of the art infrastructure
with wide-ranging capacities
With this support of several partner
countries, the IPSTC has achieved the
establishment of significant- and even
unique- training infrastructure, suitable for
a wide range of actors. Such facilities,
beyond their size and growth potential,
are designed to host a variety of training
curricula matching the complexity of
today’s operational challenges related to
peace support.
Leveraging this strength
The IPSTC unique ability in Africa to
provide training in a variety of formats
ranging from classroom to full-scale
battalion size exercise is a very decisive
competitive advantage versus other
training institutions.
These assets can be advertised and
exploited a) to enhance existing
partnerships by widening the IPSTC training
offer and b) to create opportunities for the
civilian, police, and military actors. This
work has already been initiated and can
be further developed in partnerships with
other training institutions thus highlighting a
lead function of the IPSTC in African
capability development.
2.3.1.4 Light and flexible
organizational structure
Despite its extensive range of activities
and its substantial training capacity, the
IPSTC features a relatively light and flexible
organizational structure. This can be
achieved through the availability of
experienced and multi-talented staff, thus
providing the IPSTC with the ability to run
with limited overhead costs, without
sacrificing professionalism and expertise.
Leveraging this strength
Flexible structures combined with flexible
professional management makes the
IPSTC attractive to potential partners and
more responsive to our customers. Funds
will not be spent on high overhead costs
but will be channelled into the very
expected output.
2.3.1.5 Active support of regional
organizations and key donors
The IPSTC enjoys the institutional support
from the government of Kenya and from
others key entities involved in Eastern
Africa and in the various aspects of peace
activities. This support is supported by the
achievements and successes during the
previous Strategic Plan period. However
this support should not be considered as
granted and needs to be won in an
everyday battle
Leveraging this strength
The IPSTC should strive to keep those key
partners and donors, in order to benefit
from a spill-over effect to attract further
partners. This will require a proactive
communication strategy that promotes
IPSTC achievements while providing
information of potential niches for further
support.
2.3.2 Weaknesses
2.3.2.1 Project bound resources
The IPSTC enjoys the support of solid and
reliable partners both in terms of financial
support and of support-in-kind.
Understandably, donors strive to link their
contributions with concrete outputs for
accountability purposes. The financing
pattern tends to generate an uneven level
of activities in the Centre and even gaps
as it comes to personnel recruited for
specific projects.
Further it hampers the ability of the IPSTC
to develop consistent long term planning
IPSTC Strategic Plan 2012-2015
Page 15
for infrastructure and personnel
development.
Overcoming this weakness
In order to achieve smooth transition
between projects, long-term continuity in
personnel management, and constant
level of activities, the IPSTC will proceed
with a consistent strategy to engage
donors so that IPSTC’s portfolio is
permanently funded and can engage
donors, who support the overall impact of
the Centre rather than individual projects.
2.3.2.2 Lack of standing human
resources capacity
(researchers and trainers)
The wealth of the IPSTC is its human
resources. However in the initial phase of
the Centre personnel were essentially
project bound. The consequence of
ending a project was not only a reduction
in personnel that could not be kept
between two projects, but more
importantly meant a loss of know-how and
of institutional memory.
As to trainers the Centre still lacks a solid
base layer of trainers that can not only
deliver training, but who can also
contribute to maintain an up to date
training portfolio and to deliver good
quality training, but fails to address long
term capabilities of the Centre.
Overcoming this weakness
Recruitment of core permanent staff
should contribute to enhance the ability of
the IPSTC to engage long range
development and even more consistent
planning.
2.3.2.3 No established mechanisms
and strategy to address
donors and sponsors in a
systematic way
In its early years, the IPSTC enjoyed solid
and consistent support from several
partners. However, with success demand
has evolved, both in terms of new issues to
be addressed and of more courses.
Further training needs for the operators in
the field must match the funding profile of
the Centre.
Overcoming this weakness
The IPSTC can engage potential donors in
a proactive way by establishing a yearly
portfolio of future and /or desired projects
to be financed or supported by potential
partners. Such a portfolio would be
accessible openly and provide possibility
to multiple sponsors to support projects.
This portfolio should be integrated in the
communication strategy of the Centre
and can be regularly updated
2.3.2.4 No mechanism for long term
interaction
In its first place the IPSTC could easily
identify issues that require training and
training capabilities. However, the long-
term impact of the training that is
provided by the IPSTC, as well as the
emergence of new requirements for
actors on the ground requires consistent
interaction with the customers.
Mechanisms to identify training needs
based on lessons learned on the ground
needs to be in place at our customer level
and integrated into a regular interaction
mechanism with the IPSTC, aiming at
improving delivery on the ground
Overcoming this weakness
In cooperation with its main customers, the
IPSTC can help them to install interaction
mechanisms that would help them to
identify their gaps and training needs,
while providing the IPSTC a solid basis for
developing relevant training curricula.
IPSTC Strategic Plan 2012-2015
Page 16
2.3.3 Opportunities
2.3.3.1 Current geostrategic situation
in Eastern Africa highlights the
importance of focal points for
consistent doctrinal and
training inputs for the regional
actors
The concurrence of the several peace
keeping and peace support operations in
the Eastern Africa has generated
considerable demand for training for both
peace keeping and peacebuilding
activities. Further, the requirement of
having training tailored to the situation on
the ground provides a significant window
of opportunity for the IPSTC, whose
vocation is to address regional issues.
Engaging this opportunity
The IPSTC is already well engaged with
civilian, police and military partners
involved in operations in Eastern Africa.
However, the IPSTC could improve its
overall relevance through its ability to
address the very concerns of its customers.
2.3.3.2 Window of opportunity for the
IPSTC to act as a think tank to
address regional challenges
The current situation in Eastern Africa and
the Horn of Africa is at crossroads of
international concerns. The emergence of
new state in South Sudan with
considerable societal and institutional
challenges, the spill-over of middle-eastern
conflict to the Horn of Africa, and the
emergence of new economic prospective
in the Indian Ocean area some of the few
issues that will affect regional peace and
security. With its research capacity, the
IPSTC is equipped to play a role in
developing solutions and providing inputs
for policy development related to Eastern
Africa geo-strategic challenges.
Engaging this opportunity
The IPSTC can develop a sustainable
regional research capacity that will
address operational and strategic peace
and security challenges through a
coherent research strategy and consistent
exchange of view with regional
organizations and institutions.
2.3.3.3 Eagerness of IPSTC partners to
support enhancement of its
regional impact
The convergence of a multiplicity of
complex challenges in the Eastern Africa
region combined with the recognition, the
IPSTC has won as a Centre of Excellence
has a catalytic effect on expectations
toward the Centre. Further, several
partners have demonstrated their trust in
the ability of the IPSTC to provide sound
responses to regional challenges and
pledged their support to the development
of its capabilities.
Engaging this opportunity
The IPSTC can maintain interest of
potential partners by providing relevant
products with tangible results. This will
require a robust ability to tailor products to
the expectations of resource providers.
This can be achieved not only by
establishing a dynamic interaction with
the IPSTC` s customers but also with the
ability to assess the quality of its products
and adjust them to customers’ needs.
2.3.4 Threats
2.3.4.1 Multiplication of African PKTIs
The multiplication of national training
centres in Eastern Africa may affect
peace and security training in the region,
by encouraging a lack of doctrinal
coherence and dilution of regional
capabilities. Further, the competition for
external resources may lead to saturation
of partnerships and a fragmentation of
international effort in support to Eastern
Africa peace and security.
Mitigating this threat
The IPSTC can address this threat by positioning itself
as a leading institution that can provide doctrinal
support to other emerging institutions, and whose
know-how is key in developing regional and
national capabilities.
IPSTC Strategic Plan 2012-2015
Page 17
3. THE STRATEGY
3.1 Introduction
The IPSTC is grounded on a clear vision
and mission which provide the desired
status for the Centre and its reason for
existence. The vision and mission are
complemented by five key values which
are central to the implementation of the
set objectives and strategies.
3.2 Vision statement
The IPSTC’s Vision is
“To be an independent Eastern African
research and training and education
Centre that is responsive to peace
operations training and education
requirements of the African Peace and
Security Architecture.”
3.3 Mission statement
The IPSTC’s Mission Statement is
“To conduct applied research into and
the training and education of military,
police and civilian personnel in all aspects
of peace operations in order to help
improve the effectiveness of the
international response to complex
emergencies.”
3.4 Core values
3.4.1 Integrity and Accountability
The IPSTC will aspire to have the highest
level of integrity in its administrative and
training activities; and will be accountable
through the maintenance and accurate
reporting on all its activities.
3.4.2 Professionalism
The success of the IPSTC will depend on
maintaining a highly skilled, diverse and
self-driven workforce.
3.4.3 Excellence
The IPSTC will aspire to perform at the
highest level of competence in the
delivery of peace support operations
training in keeping with its status as an
international Centre of Excellence.
3.4.4 Trust
Mutual trust amongst diverse composition
of actors’ in the ‘IPSTC System’ will
underpin success of the institution. As the
IPSTC moves forward with its development,
this set of institutional values will become
increasingly significant. More specifically,
as the organization grows in terms of both
structure and curriculum, the staffing of
the IPSTC will continue to be multinational,
multicultural, multidimensional, and
multilingual.
3.5 Strategic Issues
The IPSTC has identified the following areas
of focus, which will enhance its
competitiveness and enable it deliver
quality and relevant training and
education in peace operations.
3.5.1 Relevance
Prerequisite for the IPSTC to maintain its
edge and to attract partners is to provide
relevant outputs that match the needs
and requirements of its customers and the
international community at large. This
requires adequate mechanisms to
capture the needs of the actors on the
ground and to track the impact of training
in the field.
A framework to collate and discuss
lessons-learnt on the ground together with
a validation process designed to assess
training effectiveness, will have to be
established in cooperation with the IPSTC’s
main partners. The challenge is to design a
IPSTC Strategic Plan 2012-2015
Page 18
system effective enough to feed training
design without being intrusive.
3.5.2 Competitiveness
As to peace support training,
competitiveness is the result of efficient
and effective training delivery.
Efficiency in training delivery relates to the
capacity of the IPSTC to deliver courses
with the appropriate resources. This
includes establishing a good working
environment, enhancing human
resources, strengthening capacity for
training and research, and acquiring
modern working equipment.
Effectiveness is the result of carefully
designed courses and training curricula. In
that respect, the IPSTC’s research
capability is a key element to keep on top
of current issues and challenges to peace
support activities. The ability to translate
issues on the ground into training
programmes, as well as to exploit various
multilateral doctrinal frameworks to cross-
fertilize training programs is a competitive
advantage the IPSTC needs to maintain.
3.5.3 Sustainability
IPSTC’s partners are the key to its long term
effectiveness not only in terms of
resources, but also, and significantly in
terms of political support. As the IPSTC
crystallizes the interest and support of the
international community to peace
support, strategic partnerships with
institutional actors are the cornerstone of
sustainable development.
Results of the previous Strategic Plan need
to be strengthened and brought into a
long term prospective. This requires some
attention to the funding structure of the
Centre. It must depart from a project-
driven funding to reach a more regular
resources flow, both in terms of financial
and human resources.
Sustainable funding patterns need to be
developed and implemented with
strategic partners, may be requiring long
term commitments of the Centre.
3.6 Strategic Objectives
Based on the detailed strategic issues the
IPSTC will work towards the achievement
of the following strategic objectives over
the next 4 years.
3.6.1 Strategic Management and
Development of Partnerships
3.6.1.1 Strategic Objective: To
establish sustainable resource
mobilization mechanisms.
Key Objective: To develop an
expanded partnership
Some International institutions such as
World Bank, UNICEF and others are not
directly involved in Peace Support but are
involved in peacebuilding at large and
have a strong interest in Peace and
Stability. Partnerships with such institutions
are built on converging interests and
objectives while securing long term
support and cooperation. Informed about
the IPSTC activities or associated to the
IPSTC programmes, these institutions could
contribute to research, to the
enhancement of some curriculums, to the
delivery of some courses (for instance
about Child soldiers) or see value to
support financially the IPSTC.
Key Objective: To develop a project
portfolio for sponsors
In order to address potential partners and
sponsors, the IPSTC will establish a portfolio
of projects and courses to be financed by
external partners or sponsors. This is not
only a tool for communicating with
potential donors and sponsors but is also a
way to foster transparency,
IPSTC Strategic Plan 2012-2015
Page 19
3.6.1.2 Strategic Objective: To
develop active collaborative
mechanisms with relevant
actors/partners
Key Objective: To enhance interaction
mechanisms with our partners
The IPSTC needs dynamic ability to
interact with partners in order to better
involve them in training definition
processes, in support and in funding.
Further, the IPSTC needs to develop its
ability to engage new partners.
Improved interactive mechanisms with
partners to identify their needs and fulfil
their expectations while improving their
support to the Centre, by allowing them to
better identify IPSTC’s needs and
expectations.
Key Objective: To maintain solid,
transparent and accountable
governance
IPSTC’s responsible and accountable
governance is a key tool to build
confidence and to attract support from
partners. Maintaining and strengthening
the level of governance the IPSTC has
acquired so far is of strategic importance
for the sustainability of the Centre.
3.6.2 Training
3.6.2.1 Strategic Objective: To
broaden and optimize the use
of training infrastructure
Key Objective: To establish training
partnerships with other schools in the
region in the use of IPSTC facilities
The AMANI PSO Village is a unique field
training facility that brings realism in
training for all Mission components. In
order to better exploit this asset, the IPSTC
is engaged in the process of designing
and developing scenario-based training
to address current issues, such as the
protection of civilians and civil-military
coordination.
In order to optimize the use of its facilities,
the IPSTC will develop partnerships with
other training institutions sharing the same
values and objectives. sustainability and
ensure that the IPSTC remains relevant in
PSO training and research, the IPSTC will
reach out to partners and other actors in
peace and security to support staff
exchanges and linkages with emerging
PSO training institutions for regional
cohesion.
Key Objective: To expand partnership
with actors involved in Peace Support
or Humanitarian Assistance.
The IPSTC traditional focus on training
military, police, and civilian personnel from
international organisations such as the UN
and AU is complemented by training
activities for non-governmental
organisations. Initiated in 2011, this
expanded audience for training opens
new opportunities for the IPSTC. It provides
not only new opportunities for the IPSTC to
deliver training and thus contributing to
optimise the use of infrastructure, but it
provides new opportunities for supporting
partners.
The complexity of emerging post-conflict
situations in South Sudan and Somalia
provides the IPSTC the opportunity to
expand its offer to new partners. The IPSTC
will pursue its current strategy to engage
humanitarian and non-governmental
actors to enlarge its supporting basis.
3.6.2.2 Strategic Objective: To
establish a long term training
plan
Key Objective: To establish
relationship with emerging training
actors
The IPSTC, as a Centre of Excellence, has a
unique opportunity to develop
relationships with a wide range of entities
involved in training activities. The peace
and security challenges emerging in
Eastern Africa will require a wide spectrum
of training capabilities, ranging from
academic level to operational activities.
Capacity-building will gain strategic
IPSTC Strategic Plan 2012-2015
Page 20
importance in the region, involving
extensive training capacities.
As seasoned training Centre, the IPSTC
can provide not only direct support to
institutions involved in peace operations,
but can also engage emerging training
institutions in sharing expertise and
methods, in order to achieve better “unite
de doctrine” in addressing peace issues at
regional level.
Such endeavour will require engaging the
full spectrum of training capacities and will
require the IPSTC to develop relationships
with academic institutions, as well as with
other private actors, who will contribute to
the Centre’s sustainable development
approach.
Key Objective: To establish a feasibility
study for postgraduate training
program
In the spirit of future development of the
IPSTC, the opportunity for the Centre to
constitute a focal point for postgraduate
training in matters related to peace and
security must be studied. It will require
evaluating options for the IPSTC to
develop various levels of post-graduate
courses.
3.6.3 Research
3.6.3.1 Strategic Objective: To
develop an efficient and
effective institutional research
capacity
Key Objective: To attain sustainable
human resources capacity for
research
In order to provide long-term support to
the IPSTC, and its commitment to
excellence, the PSRD needs to establish a
sustainable research capacity that will
provide both substantive consistency and
business continuity. Human resources
management will need to be embedded
into a comprehensive strategy to address
sustainability.
In a first step one Head of Applied
Research and two regional researchers will
be recruited to reach an initial operational
research capability. Current status of
pledges would allow reaching objectives
set for research in the Strategic Plan
period.
Key Objective: To develop a fully
functional Simulation and Research
Complex
The IPSTC Training portfolio will be
enhanced through addition of a
simulation capacity located in a stand-
alone building. In order to integrate this
new capacity into existing curricula, the
PSRD will have to follow a threefold path:
To establish personnel profile and
training requirements for simulation
exercises developers and operators.
This will be done in cooperation with
our main partner in this simulation
project. (1st quarter 2012)
To define products relevant to the
IPSTC and adjust existing exercises for
simulation. The establishment of a
simulation capacity may require the
development of new training scenarios
and/or the translation of current
training material (e.g. CARANA
exercises) into digitized material. Future
developments may include distributed
command post exercises (CPX), linking
operational units with the simulation
centre located in the IPSTC.
To finalize the construction of a building for
Simulation and Research building that will
eventually harbour the full range of PSRD
activities.
Key Objective: To develop a
comprehensive knowledge
management system
Knowledge Management is about
keeping track of existing knowledge;
make it accessible to those who need to
access it, to identify knowledge gaps and
to provide input to Applied Research. A
significant step has been done with the
development of the Training Management
System (TMS) that helps to keep track of
IPSTC courses and output.
IPSTC Strategic Plan 2012-2015
Page 21
The process to achieve this objective in
this Strategic Plan period is twofold:
i. The development of the TMS as a
platform for knowledge sharing
between the IPSTC and the
students/participants, though the
development of what could be called
a “IPSTC Facebook” with domains for
each student/participant allowing
access to:
Reading and Course material (e.g.
PowerPoint presentations or
templates, abstracts, curricula,
etc.)
Best practices and lessons learned
reports (creation of a community
of practice)
Reference material for operational
purposes (e.g. policies, guidelines,
field manuals, etc.)
Exchange of and access to best
practices and lessons learned
reports and creation of a
community of practice (e.g. for SSR
experts, Early Warning experts,
etc.)
ii. The integration of the library and the
IPSTC IT into a comprehensive and
cohesive system to access knowledge
for IPSTC members and for students.
The IPSTC library is a solid resource for
students, course participants and
scholars. A significant amount of work
has been done to put together a
useful and relevant collection of books
and documents. In order to include
ISPTC knowledge resources into a
more comprehensive tool, it is
proposed to establish the library as a
part of a broader concept for
knowledge management that will
ease access to ISPTC products and to
reference material for students.
Eventually this will provide:
1. To the IPSTC management:
Database of experts and scholars
to support research and training
delivery.
2. To students and participants:
Downloadable reference material
for operational purposes (e.g.
policies, guidelines, field manuals,
etc.) accessible to IPSTC students;
Downloadable reading material
for IPSTC students and scholars
(e.g. IPSTC publications,
presentations, etc.);
Online catalogue of available
literature in the IPSTC Library
Online access to course material
(e.g. PowerPoint presentations or
templates, abstracts, curricula,
etc.)
3. To general public:
Downloadable IPSTC products for
general audience (e.g. Newsletter,
Course Prospectus, etc.)
3.6.3.2 Strategic Objective: To
enhance consistency with
customer needs.
Research should be directed primarily at
issues that affect core activities of peace
actors on the ground with the aim of
supporting them better delivering their
main products.
Through identification of the operational
consequences of the current conflicts and
related challenges for Peace
Supporters/Keepers, several issues have
already been identified by the
international community and need to be
addressed. Consultation with academic
institutions, as well as with major
stakeholders should help to clarify how to
respond to the needs of Peace
Supporters/Keepers on the ground while
addressing some controversial aspects
(e.g. use of force). This will enhance the
function of the IPSTC as a Think Tank
capacity in support to the APSA.
Domains that may require attention of
Research in the next Strategic Plan will
have to be defined with customers, and
could be:
Use of force in PKO (and PSO);
IPSTC Strategic Plan 2012-2015
Page 22
Intelligence and situational awareness
in multinational environment;
Integration of new technologies for
information sharing and awareness;
Operational consequences of
contributing to UN vs. non-UN peace
operations.
Key Objective: To have a mechanism
to ensure consistency between
research activities and customer
needs
Ambitions of the IPSTC as a Centre of
Excellence in training and as a Think Tank
in East Africa will rely on solid and
consistent staffing of the Research Wing of
PSRD, as well as on active exchange of
information with IPSTC main partners.
Customer-oriented approach requires
dynamic interaction with the IPSTC (PSRD)
to capture the needs and requirements of
customers. Establishment of consistent and
effective BP/LL mechanisms can only work
with the full commitment of IPSTC partners
in institutionalizing collection capacity and
maintaining close relations with the IPSTC
for analysis and solutions design.
Key Objective: To have a Research
Agenda
Key issue for the Research Department is
the identification of research areas in
support to peace operations. This
objective will be reached through an
interactive process with IPSTC main
customers.
However, analysis of current operations
allows outlining possible areas of interest
for research:
Implications of protection of civilians
mandates in Operational Planning;
Conflict mapping in South Sudan;
Reintegration models for former militia
fighters in South Sudan;
Minimizing international footprint in
PKO/PSO deployment areas;
Use of new technologies as early-
warning tools for protection of civilians.
3.6.3.3 Strategic Objective: To
develop updated and relevant
curricula
Key Objective: To have an updated
and relevant set of curricula suited for
personnel deployed in UN and AU
missions
For the 2012-2015 Strategic Plan Period,
Curriculum Management will review,
strengthen and customize existing
products (including establishment of
evaluation and validation procedures).
Considerable work has been done in the
IPSTC within the framework of the 2009-
2011 Strategic Plan in designing curricula
and developing facilitator manuals. This
work will be pursued and improved, in
order to better adjust Curriculum Design to
needs and requirements of field missions.
For instance, EAC contributions to peace
may be provided to a several international
or regional organizations, which may have
different doctrines (e.g. PSO in AU vs. PKO
in UN, or CIMIC vs. UN CIMIC) with direct
operational implications (e.g. the use of
force).
Curriculum Evaluation and Validation has
strategic importance for the IPSTC as it
formalizes the excellence of the Centre.
To this aim, the Curriculum Wing will
develop evaluation and validation
procedures for IPSTC training courses. In
this respect, PSRD will strengthen its ties
with UN Integrated Training Section (ITS) in
order to better integrate UN standards for
training and to facilitate UN validation and
certification of courses.
Key Objective: To establish new
Facilitators and Participants Guides
Review of current facilitators’ guides,
together with identification of new
requirements for training will contribute to
identify gaps in training capacity. The
Facilitator Guides will be available to
trainers in soft format and broken-down
into “lessons format” in order to make
them even more user-friendly. This will
IPSTC Strategic Plan 2012-2015
Page 23
contribute to reduce costs and to
facilitate use.
In order to enhance capabilities of
Participants once deployed in the field,
guides will be established. They will be
“aide-mémoires” and will allow quick
access to regulations and to reference
documentation related to the course
substance.
3.6.4 Resources management
3.6.4.1 Strategic Objective: To
optimize human resources
management
Key Objective: To ensure institutional
knowledge and business continuity
The IPSTC should ensure that personnel
recruited through partner support are
sustained beyond the programme period
(UNDP, EU); in order to facilitate smooth
transition from one project to another, the
IPSTC will engage and negotiate early with
the partners for continuation of the
program and especially retention of staff.
Further to this IPSTC staff augmentation
requires close liaison with KMOSD to post in
staff as per the approved establishment so
as to enhance the institutional capacity.
Key Objective: To implement the
Human Resource Management System
The implementation of HR management
system will mean the Centre taking on &
contracting staff in its own person. It will be
able to use the manuals prepared to carry
out activities concerning the same staff
e.g. recruitment, appraisals, discipline,
termination etc that are meant to benefit
the Centre and ensure it has and
maintains the best persons for the positions
available.
3.6.4.2 Strategic Objective: To
enhance financial resources
management
Key Objective: To publish 1st Audited
Financial Report
These audited reports are to be presented
annually within the first quarter of each
year. This will give credibility to the
Centre’s financial management as an
independent party has authenticated the
reports.
Key Objective: To establish additional
sources of income
To identify tools to value IPSTC’s products
(i.e. research products) and training
services to address functioning costs and
thus reducing the burden on the Centre’s
reserve.
3.6.4.3 Strategic Objective: To
optimize the functioning of
IPSTC’s structures
Key Objective: To establish transport
management procedures
New procedures for using transportation
will provide logistical efficiency in terms of
course delivery, fuel consumption,
accountability, and administration.
Key Objective: To establish facilities
management procedures
These are meant to ensure the Centre’s
premises remain in pristine conditions that
meet international standards meant for an
institution of IPSTC’s calibre. It will involve
coming up with policies concerning
allocation to facility renovations, periods
for conducting renovations & procedures
that determine what takes priority & how
to request for facility works.
IPSTC Strategic Plan 2012-2015
Page 24
3.7 Summary of the objectives according to strategic issues
STRATEGIC ISSUE 1: RELEVANCE
Strategic Objective 1: To develop active collaborative mechanisms with relevant
actors/partners
Key Objectives Key Performance Indicators Key results/Outputs
To enhance interaction mechanisms with partners
Establishment of annual partners forums Increase in training and infrastructural development income
Secondment of new staff;
Establishment of new training courses
To maintain solid, transparent and accountable management system
Publication of audited financial reports
Financial and procurement controls
Quarterly reporting against budgeted figures
Adoption by management.
Publish Resource management report
Annual budget plans
Strategic Objective 2: To establish a long term training plan
Key Objectives Key Performance Indicators Key results/Outputs
To establish relationship with emerging training actors
Identification of potential areas and scope for cooperation
Develop joint training programmes with regional institutions
Development of “ready-to-use” training packages for regional training institutions and international entities
To conduct a feasibility study on postgraduate training program
Identification of academic partners
Establishment of a model MOU/MOC with academic institutions
Definition of a Master program
Establishment of a Report to the JCB including financial and personnel resources implications
Strategic Objective 3: To enhance consistency with customer needs
Key Objectives Key Performance Indicators Key results/Outputs
To develop a Research Agenda covering the Strategic Plan period.
Definition of thematic areas of research Initiate research activities on in: conflict prevention, conflict management and post-conflict recovery.
To develop a mechanism for determining consistency between research activities and customer needs.
The design and establishment of Best Practices and Lessons Learnt (BP/LL).
Definition of validation mechanisms
Establishment of a policy defining roles in collecting and exploiting data from the field.
Establishment of a model SOP for establishment and implementation of a BP/LL mechanism.
IPSTC Strategic Plan 2012-2015
Page 25
Strategic Objective 4: To develop updated and relevant curricula
Key Objectives Key Performance Indicators Key results/Outputs
To have an updated and relevant set of curricula suited for personnel deployed in UN and AU missions
Distribution of soft versions of the facilitators’ guides (for internal use)
Lessons offered as separate files for AU and UN missions.
To establish new Facilitators and Participants Guides
New publication available to trainers and facilitators in soft version.
Lessons available as separate files for ease of use.
STRATEGIC ISSUE 2: COMPETITIVENESS
Strategic Objectives 5: To broaden and optimize the use of training infrastructure
Key Objectives Key Performance Indicators Key results/Outputs
To establish training partnerships with other schools in the region in the use of IPSTC facilities
Provision of service or facility to other peacekeeping training institution (PKTI)
Establishment of a policy for sharing curricula with other PKTIs
Joint curricula development
Establishment of MOU/MOC with PKTIs
To expand partnership with actors involved in Peace Support or Humanitarian Assistance
Increased in number of new partners (PKTI, IO, INGO, NGO)
Delivery of new courses
Additional sources of funding
Strategic Objective 6: To optimize the functioning of IPSTC’s structures
Key Objectives Key Performance Indicators Key results/Outputs
To establish transport management procedures
Establish a Standard Operation Procedure for the use and management of transportation assets in the IPSTC.
Dissemination of the SOP to the IPSTC’s Schools and the HQ.
To establish facilities management procedures
Establish a policy for the use and the exploitation of facilities by guest organisations.
Establish a SOP for the management of the IPSTC facilities.
Publication of a facilities user’s guide.
Dissemination of the SOP to the IPSTC’s Schools and the HQ
IPSTC Strategic Plan 2012-2015
Page 26
STRATEGIC ISSUE 3: SUSTAINABILITY
Strategic Objective 7: To optimize human resources management
Key Objectives Key Performance Indicators Key results/Outputs
To ensure institutional knowledge and business continuity
Establishment of a retention policy to reduce staff turnover
Establishment of mechanisms to negotiate early with the partners for continuation of the program Establishment of a business continuity policy
Retention of staff through the transition period
To implement the Human Resource Management System
Finalize and adopt Human Resource Manual.
Implement Human Resource Management System
Employ a Human Resource Manager
Strategic Objective 8: To develop an efficient and effective institutional research
capacity
Key Objectives Key Performance Indicators Key results/Outputs
To attain sustainable human resources capacity for research
Recruitment of:
Head Applied Research
regional researchers
senior researchers
international researcher
International researchers
Fully operational research capacity
To develop fully functional Simulation and Research Complex
Identification of human resources needs Definition of personnel profiles and training and requirements
Products definition Catalogue of simulation training products
Finalization of structural work Transfer of PSRD activities in the new building
To develop a comprehensive knowledge management tool
Finalization of TMS phase 2 IPSTC website configured as a portal (‘IPSTC Facebook’) with domains for students / participants to access:
Reading and Course material
Best practices and lessons learned reports (creation of a community of practice)
Reference material for operational purposes
Integration of the IPSTC website into a comprehensive knowledge management system.
Improve the design of the IPSTC website to:
Download publications
Access the IPSTC Library catalogue.
IPSTC Strategic Plan 2012-2015
Page 27
4. IMPLEMENTATION OF THE
STRATEGIC PLAN
4.1 Implementation
approaches
Based on the guidance of the Joint
Control Board through the Centre
Management Board, the implementation
of above mentioned objectives will require
various steps and timelines described in
the tables described hereunder. This will
then lead to the operationalization of both
the research and training agendas that
have been identified and agreed on in
both the business plan and the annualized
departmental work plans. These will be
complemented with routine monitoring to
ensure that there are linkages between
and among the Strategic Plan, business
plans and work plans at both the
departmental level and the governance.
4.2 Business Plan
While the IPSTC Strategic Plan is
formulated to provide the strategic
direction and overall road map for the
institution, The Business Plan sets out the
detailed timeline and resources to
implement its strategies and for achieving
outcomes. The business plan is a living
document based on the Strategic Plan
that sets bases for implementation,
management and monitoring of the
Strategic Plan. It is instrumental for
resources allocation and program
controlling and will be regularly reviewed
and adjusted as necessary to ensure
adequacy between available resources
and the objectives set in the Strategic
Plan.
The Business Plan links strategic and key
objectives to resources planning and
availability. It will guide the fund raising
Strategic Objective 9: To enhance financial resource management
Key Objectives Key Performance Indicators Key results/Outputs
Publish Audited Financial Reports
Financial and procurement controls in place
Quarterly reporting against budgeted
Management’s approval
Publish Resource management report
Yearly budget plans
Establish additional sources of income
Publish IPSTC material for marketing
Increase training income through a broadened partnership.
Production of IPSTC memorabilia?
Ability of the IPSTC to meet its administrative requirements.
Strategic Objective 10: To establish sustainable resource mobilization mechanisms.
Key Objectives Key Performance Indicators Key results/Outputs
To develop an expanded partnership
Approach a wide range of international organisations (i.e. UNICEF, World Bank, ICRC) to include them in our partner network.
Publication of resource management reports and yearly budget plans
Joint Financial Arrangement with development partners
To develop a project portfolio for sponsors
Establishment of a modular portfolio arranged along functional lines of the Centre (Strategic Management, Training, Research, Finance & Administration)
Dissemination of the portfolio to major and potential partners
IPSTC Strategic Plan 2012-2015
Page 28
strategy as well as IPSTC’s human
resources policy, with the aim of ensuring
business continuity and operational
sustainability.
4.3 Work Plan
Work Plan is designed at
department/school level and outlines
activities and timeline to be performed in
pursuance of the objectives set in the
Strategic Plan. Further, it allows proper
sequencing of activities and to allocate
adequate resources to achieve
objectives. It is a key instrument for
monitoring and controlling activities at
department/school level and in
implementing accountability processes.
Work plans are reviewed and updated
regularly at Department/School level, as
they will serve as basis for the review of the
Business Plan.
The implementation of the plan will also
embrace performance management
concept which entails the setting up of
standards and targets, measuring actual
performance against set targets, and
reporting on the results. This approach
aligns this plan with the strategic goals
and issues that requires that the key
departments improvement on its provision
of services to attain competitiveness.
4.4 Quick and Responsive
Approach
To ensure that momentum is maintained,
the plan will also focus on
programs/activities relevant and
responsive to the regional issues in peace
and security. The quick responsive
approach is prudent as it produces rapid
results which motivate people and keep
them enthusiastic to support the rest of the
activities.
IPSTC Strategic Plan 2012-2015
Page 29
4.5 Implementation Matrix and Responsibilities
K
ey
Ob
jec
tiv
e
Tim
elin
e
2012
2013
2014
2015
1
To
dev
elo
p a
ctiv
e co
llab
ora
tive
m
ech
anis
ms
wit
h r
elev
ant
acto
rs/p
artn
ers
(H
Q)
On
-go
ing
act
ivit
y
Yea
rly
Act
ivit
y R
epo
rt
(No
v 20
12)
Yea
rly
Act
ivit
y R
epo
rt
(No
v 20
13)
Yea
rly
Act
ivit
y R
epo
rt
(No
v 20
14)
Yea
rly
Act
ivit
y R
epo
rt
(No
v 20
15)
2
To
est
ablis
h a
pla
n f
or
trai
nin
g
futu
re d
evel
op
men
t (P
CS
S/H
PS
S)
Fu
ture
Dev
elo
pm
ent
Pla
n
(Mar
201
3)
Po
st G
rad
uat
e P
rog
ram
Fea
sib
ility
Stu
dy
(D
ec 2
014)
3
To
en
han
ce c
on
sist
ency
wit
h
cust
om
er n
eed
s (P
SR
D)
Yea
rly
Ag
end
a (0
3.20
12)
Yea
rly
Ag
end
a (0
9.20
13)
Yea
rly
Ag
end
a (0
9.20
14)
Yea
rly
Ag
end
a (0
9.20
15)
Est
ablis
h P
olic
y &
SO
P f
or
LL
/BP
(0
6.20
13)
4
To
hav
e u
pd
ated
an
d r
elev
ant
curr
icu
la
(PS
RD
)
Up
dat
e/Im
pro
ve c
urr
ent
curr
icu
la
(06.
2013
)
Est
ablis
h n
ew f
acili
tato
rs g
uid
es
(09.
2013
)
5
To
bro
aden
an
d o
pti
miz
e th
e u
se o
f in
fras
tru
ctu
res
(P
CS
S/H
PS
S)
Est
ablis
h p
artn
ersh
ips
wit
h o
ther
PK
TI
(on
-go
ing
)
Exp
and
par
tner
ship
s w
/ pea
ce s
up
po
rt a
nd
hu
man
itar
ian
ass
ista
nce
inst
itu
tio
ns
(on
-go
ing
)
6
To
op
tim
ize
fun
ctio
nin
g o
f IP
ST
C’s
str
uct
ure
s (
HQ
, F&
A)
Tra
nsp
ort
atio
n
SO
P (
09.2
012)
Fac
ility
mg
mt
Po
licy
(09.
2012
)
7
To
op
tim
ize
hu
man
res
ou
rces
m
anag
emen
t (H
Q, F
&A
)
Bu
sin
ess
con
tin
uit
y p
olic
y (1
2.20
12)
Est
ablis
hm
ent
of
a h
um
an
reso
urc
e p
olic
y (0
3.20
13)
IPSTC Strategic Plan 2012-2015
Page 30
8
To
dev
elo
p a
n e
ffic
ien
t an
d
effe
ctiv
e in
stit
uti
on
al r
esea
rch
ca
pac
ity
(PS
RD
)
Rec
ruit
men
t o
f re
sear
cher
s (1
2.20
12)
S
imu
lati
on
Co
mp
lex
(09.
2013
TM
S2
(04.
2012
)
Kn
ow
led
ge
Man
agem
ent
Sys
tem
(0
6.20
13)
9
To
en
han
ce f
inan
cial
res
ou
rce
man
agem
ent
(HQ
, F&
A)
IPS
TC
Dev
elo
pm
ent
Pla
n
(12.
2012
)
Mem
ora
bili
a st
rate
gy
(09.
2012
)
10
To
est
ablis
h s
ust
ain
able
fu
nd
-ra
isin
g m
ech
anis
ms
(HQ
)
Yea
rly
Fin
anci
al R
epo
rt
(No
v 20
12)
Yea
rly
Fin
anci
al R
epo
rt
(No
v 20
13)
Yea
rly
Fin
anci
al R
epo
rt
(No
v 20
14)
Yea
rly
Fin
anci
al R
epo
rt
(No
v 20
15)
Po
rtfo
lio
(09.
2012
)
IPSTC Strategic Plan 2012-2015
Page 31
4.6 Resource Flow
The resource required for implementing this plan is tabulated in the following implementation
matrix:
Strategic Objective 2012
[$]
2013
[$]
2014
[$]
2015
[$]
Funding
Gap
To develop active collaborative mechanisms with relevant actors/partners
24,600 39,100 39,100 39,100 141,900
To adjust for future challenges 23,400 28,040 28,040 28,040 107,520
To enhance consistency with customer needs
135,800 163,200 163,200 163,200 625,400
To have updated and relevant curricula
74,000 81,400 81,400 81,400 318,200
To broaden and optimize the use of infrastructures
10,000 10,000 10,000 10,000 40,000
To optimize functioning of IPSTC’s structures
394,900 166,380 78,880 78,880 719,040
To optimize human resources management
24,000 25,000 26,000 27,000 102,000
To develop an efficient and effective institutional research capacity
637,652 237,000 239,000 241,000 1,354,652
To enhance financial resource management
32,000 38,000 38,000 38,000 146,000
To establish sustainable fund-raising mechanisms
90,000 102,840 102,840 102,840 398,520
IPSTC Strategic Plan 2012-2015
Page 32
5. MONITORING,
EVALUATION AND
REPORTING:
The IPSTC does not have a sound
planning, monitoring and evaluation
system that compares the outputs to the
planned activities. It however uses the
progress reports for evaluation of
performance.
5.1 Monitoring
Monitoring is an important management
tool that helps management to, among
others; make decisions aimed at
improving performance, allowing
managers to determine whether the
programme is on course and if it is likely to
achieve the intended objectives, ensuring
accountability to all parties involved in the
programme, to assess the use and delivery
of the resources in accordance with the
implementation plan and to monitor the
achievement of the intended outputs on a
timely manner. The main purpose is to
enable managers to verify progress based
on evidence-based decisions about any
corrections needed in implementation.
5.2 Evaluation
Evaluation of the plan will serve two main
purposes; first, to inquire into the feasibility
of the plan and second, to assess the
overall impact. Evaluation of the Strategic
Plan will be useful in several ways; first, to
avoid the possibility of wasting money by
aiding the selection of the most effective
options. Second, it will help the Centre to
continue with a plan that is likely to
produce the intended results and lastly, it
will detect and correct some of the factors
that may reduce the positive impact of
the Strategic Plan.
5.3 Reporting
The IPSTC prepares quarterly progress
reports to the donors and partners that
provide details of the progress made in
implementing planned activities.
Explanations are provided by the
coordinator for any exceptions in activity
implementation. The reports enable the
assessment of progress and achievements
and help focus the implementation of the
plan to the results of activities, enabling
the improvement of subsequent work
plans.
Reporting will therefore form the basis for
decision-making and learning at the
program level. Reporting will
communicate how effectively and
efficiently the Centre is meeting its
objectives.
5.4 Methodology
Monitoring will involve routine data
collection and analysis on the success of
the implementation of this Strategic Plan.
The results from the analysis will then be
used to inform decision making at all
levels. The objectives of the Strategic Plan
will be reinforced through corrective
measures when and if necessary. This will
be achieved by:
Developing of monitoring and
evaluation indicators at all levels of
implementation
Carrying out continuous data
collection, analysis and monthly
reporting to the Joint Control Board
and Centre Management Board
Carrying out random inspections and
making objective observations
Conducting specially designed surveys
and rapid assessments to assess
progress
Carrying out participatory M&E
(Stakeholders fora)
Establishing of Work Improvement
Teams in the respective departments
Linking the Centres M&E framework to
the international M&E System
Facilitating independent assessment
and reviews of the programmes under
Implementation in the schools and
departments.
IPSTC Strategic Plan 2012-2015
Page 33
5.5 Evaluation mechanism
The Strategic Plan will be evaluated during
and after implementation to ensure that it
produces the intended results. The plan will
inherently be subjected to independent
evaluation to remove any element of bias.
The evaluation will be carried out using
relevance, efficiency, effectiveness,
sustainability and impact measures.
IPSTC Strategic Plan 2012-2015
Page 34
6. ANNEX – MANAGING SUSTAINABILITY
Sustainability has to be considered as a critical element of a system that will be effective only
if all parts of the chain are solidly anchored in a whole. Sustainability is not only linked to the
capacity of marinating long term relationships with partners, but also with the ability to
evolve in order to respond to emerging issues and challenges.
Sustainability management
Leadership
•Clear strategy to address identified challenges and objectives
•Controlling processes to identify new challenges and assess them.
•Decision-making to address challenges and keep the strategy implementation on track.
•Effectiveness and efficiency
Financial Adaptability
•Identify funding needs and communicate them to partners
•Establish long term fund-raising strategy and strive to depart from project-oriented funding
•Accountability and transparency as a confidence-building measure for contributors
•Strive for regional involvement and investment
Programme Capacity
•Develop solid relationship with customers in order to address their needs
•Develop a solid research capacity for to support training design
•Ability to adjust the products to a changing environment and to the developing requirements of customers
•Good training delivery expertise