  • Golden Steps to The Best

    Investor Relations’ Update for Analysts and Investors based on Q1 Results 2014

    PT SARANA KARYA

  • Golden Steps to The Best

    VISION To be One of The Best Integrated EPC and Investment Company in South East Asia

    MISSION Providing Excellent Integrated Product and Services on EPC and Investment for Infrastructure, High-Rise Building, Energy, Industrial Plant, Precast Industry & Property Accomplish Key Stakeholders Expectation Practicing Business Ethics to Promote Good Corporate Citizen and Company Sustainability Strategic Overseas Expansion Implementing “Best Practice” Integrated Management System

    2

  • 3

    WIKA’S BUSINESS PORTFOLIOINDUSTRY INFRASTRUCTURE & BUILDING

    ENERGY & INDUSTRIAL PLANT

    REALTY & PROPERTY INVESTMENT

    Precast Concrete : - Precast Concrete Product - Natural Resources

    Management

    Industrial Facilities : - Steel Fabrication - Aluminium Casting - Plastic Injection

    Bitumen : - Granular Asphalt - Extraction Asphalt

    Civil Construction : - Road and Bridge - Seaport, Jetty - Dam & Barrage

    Building Construction : - Residential & Commercial - Airport - Facility

    Steel Construction : - Erection - Equipment Installation

    EPC : - Oil and Gas Plant - Petrochemical Plant - Cement Plant, Power Plant - Mining, Biofuels, Fertilizer

    Operation & Maintenance : - Power Plant - Industrial Equipment

    Realty & Property : - Landed House - Highrise (Apartment, Condotel, Office Mixed Use) - Industrial Estate

    Property Management

    Energy Water & Environment Transportation Infrastructure

    Civil Work Department Regional Department Overseas Department Building Department

    Industrial Plant Department Power Construction Department Power Investment Department

    Building Department Power Investment Department

    SERV

    ICES

    /PRO

    DUCT

    SDE

    PART

    MEN

    T, SU

    BSID

    IARI

    ES, A

    SSOC

    IATE

    S

    PT SARANA KARYA

  • Golden Steps to The Best

    Jakarta MRT Underground and Elevated Section Design and built for civil work including 8 elevated stations and 13

    Underground Stations Estimated Time of Completion 2018

    Located in Jatigede district, West Java. With height more than 100m and 980 cubic mtr capacity, planned to

    have function to irrigate 90.000 acre area, providing fresh water for society .

    INFRASTRUCTURE & BUILDINGCivil Construction

    4

  • Golden Steps to The Best

    15 November 2013 The New Ngurah Rai International Airport was finished and handover to Angkasa Pura I.

    Terminal 3 Extension Soekarno-Hatta Airport , Jakarta Design and Built, including 380.000sqm showpieces

    facility and new 25mppa terminal, open for business in late 2015

    5

    INFRASTRUCTURE & BUILDINGBuilding Construction

  • Golden Steps to The Best

    WIKA’s 1st EPC of Coal Fired Power Plant Amurang 2 X 25 MW, North Sulawesi, WIKA become the pioneer of local company to finished EPC power plant outside Java

    Installation of Sucker Rod Oil Pump, located at NDD 13, Duri Pekanbaru

    6

    ENERGY & INDUSTRIAL PLANTEPC

  • Golden Steps to The Best

    Operation & Maintenance Diesel Engine PP Bali 3X18 MW

    Operation & Maintenance Diesel Engine PP Bali 3X18 MW

    7

    ENERGY & INDUSTRIAL PLANTOperating & Maintenance

  • Golden Steps to The Best

    Bogor Plant - The biggest plant with 8 line of production, produce piles and poles precastBogor Plant - The biggest plant with 8 line of production, produce piles and poles precastproduce piles and poles precast Operational Area

    8

    INDUSTRY Beton Precast

  • Golden Steps to The Best

    Clinker and Cement Additives Transport System

    Steel Fabrication

    9

    INDUSTRY Industrial Facilities

  • Golden Steps to The Best

    ASPHALT MININGASPHALT MINING

    10

    INDUSTRY Bitumen

  • Golden Steps to The Best

    NORTH SUMATERA EAST KALIMANTAN SULAWESI

    WEST JAVA & BANTEN

    JAKARTA

    CENTRAL JAVAEAST JAVA

    BALI

    Land Bank (as of September 2013)

    Landed House: 1.580.760 m2High rise: 25.297 m2

    included JO

    NORTH SUMATERA

    Debag TaTaTaTaTaaTTaTaaamanmmm sari ----- Medan LaLaLaLaLaLandennn d hd hhhousousousousousousouusuoo e: 11.754757575757 m2 Tanahahahahahhhhhh AcAcAAA eh eeh - AAAAAAcecececcccAAccLaLaLaLaLaLaLLaLLaaandendendendendendendededeeeed dd d d hd hhhd ddd hd d hhouso e: 8788787778788878877787877 m2m2m2m2mm2m2m2m2mm2mse: 8

    EAST KALIMANTAN

    Tamanma sari Bukit Mutiara - BalBalalalalalalaalalikpikpikkikpikpapaapaapaapaapaaaaaaaaaannnnnnnnnnn Landededededeed house: 19.543 m22222 Grand TaTaT mansari - SaSaSaSaSaSaSaS marmarmarmarmmamm inda Landed hhhousou e: 7707070707070007007 ..578 m2

    SULAWESI

    TaTammansari Metropolitanan - M- Manaannan do do Landed house: 27.0444 m22m2m The Lagoon Tamansarri AppA artrtmement t High rise: 2.488 m2 2AtAtanangngngggg MaMaM kaskassarsar -- MMakakMakkMakMakMakkMakkMakMaka asasar r LLaLaaLaLaaLaaaanndnndndndndedn ed d hd hhhhd hd hd housooususussuse:e:eeeeeeeee 15155555.115 695956956969955969 mm2 eee::e:eee:e:e: e 151515515115151TaTaTaTaTaTTaTaaamanmannnnnnsarri Ki Ki KKayaaaayaay gangan -n - KeKenddaririririiriri ayayaayyayaayaayaayayangngnngLaLaLaaaaLanden d hd hhhhd hd d hoousousousousousousoussouou e:e:e:e:eee:e::e: e 4024024444 .4.410 m22

    WEST JAVA & BANTENTamansari Maglayang Regency - Bandung nggg

    Landed housed: 88.183 m2Landed housed: 888 .183 m2Tamansari Puri Bali - Depok

    Landed house: 19.152 m2 Tamansari Pelabuhan ratu - Sukabumi

    Landed house: 242.338 m2 Tamansari Panoramic - Bandung

    High rise: 4.125 m2 La Grande Tamansari Merdeka - Bandung

    High rise: 4.393 m2 Taman Bukit Damai - Bandung

    Landed house: 829 m2 d house: 829 m2 ed house: 829 m2 d house: 829 m2 Tamansari Persada - Bogor nn

    Landed house: 1.757 m2edd

    JAKARTA

    CENTRAL JAVA Tamansari Majapahit - Semarang Landed house: 5.760 m2 The Hill Tamansari - Semarang Landed house: 16.480 m2

    EAST JAVA De Papilio Tamansari - Surabaya High rise: 5.384 m2

    BALI

    Jivva Resort @Tamansari - Lepang Landed house: 10.259 m2 Jineng Tamansari - Bali Landed house: 12.000 m2

    Tamansari SSemaemamamamamamammaamamme nggi i A AAAAAparparrararararara tettememen High rise: 82221 mm1 mmmm2 2 2 2 2222 222 The Hive @Tamanssaaaaaririri riri ri ririri ri ri rr High rise: 6.070 m2 2 Tamansari Pesona Balli -i Jakarrtatata ta tatatata tttataaa Landed house: 1.144 m2 Festival Fatmawati - Jakartaa Festival Fatmawati Jakarka taa

    Landed house: 129 m2

    Land Bank (as of September 2013)

    Landed House: 1.580.760 m2High rise: 25.297 m2

    included JO

    Ongoing Project

    11

    PROPERTY Realty

  • Golden Steps to The Best

    TURBINE GAS POWER PLANT BORANG 2 X 30MWTURBINE GAS POWER PLANT BORANG 2 X 30MW

    12

    INVESTMENTEnergy

  • Golden Steps to The Best 13

    1. SK Menteri BUMN No. SK-16/S.MBU/20122.Assessment by Indonesia Quality Award (IQA)3.Assessment by “Kriteria Penilaian Kinerja Unggul” (KPKU)4.Assessment by LPPM5.Assessment by AON Hewitt6. Assessment based Coso Framework 7. Assessment based ISO 31000

    GCG SCORE (Assessor: BPKP)

    CORPORATE RATING (Assessor: PEFINDO)

    PERFORMANCE EXCELLENCE

    ENGAGEMENT LEVELRISK MATURITY LEVEL

    CORPORATE ASSESSMENT

  • Golden Steps to The Best

    GCG SCORE ( BPKP

    BUMN BERSIH BUMN BERSIH Team

    CGPI INDEX

    ASEAN SCORECARD

    CORPORATE GOVERNANCE ASSESSMENT

    14

  • Golden Steps to The Best

    AWARDS & CERTIFICATIONS

    15

  • Golden Steps to The Best

    ORDER BOOK, NEW CONTRACT, SALES & NET INCOME 2010 - 2014F

    2010 2011 2012 2013 2014F

    14,09811,885

    9,9057,7426,023

    25,831

    17,73117,12513,568

    10,223

    49,972

    38,26733,718

    26,591

    20,839

    Order Book New Contract Sales Net Income

    CAGR Net In

    come

    19,02%CAGR Sales

    18,52%

    16

    285 354479

    570678

  • Golden Steps to The Best 17

    0

    1250

    2500

    3750

    5000

    Jan Feb Mar

    ORDER BOOK & SALES

    ••

  • Golden Steps to The Best 18

    GovernmentPrivate SOE* Included Private Project in Oil & Gas 2012 = Rp 1,73 trilion 2013 = Rp 859 trilion 2014 = Rp 2,4 trilion

    2012

    18,4% Rp 3.136

    30,6% Rp 5.249

    * 51,0%

    Rp 8.740

    33.0% Rp 3.302

    39.4% Rp 3.938

    27.6% Rp 2.754

    27,2% Rp 7.022

    34,2% Rp 8.842

    * 38,6%

    Rp 9.967

    25,4% Rp 4.809

    34,9% Rp 6.605

    39,7% Rp 7.516

    2014F

    24,3% Rp 4.312

    40,7% Rp 7.209

    * 35,0%

    Rp 6.210

    26,8% Rp 4.041

    30.8% Rp 4.649

    42,3% Rp 6.382

    2013

    SalesNew Contract SalesNew ContractSalesNew Contract

    (bilion Rp.)NEW CONTRACT & SALES

    SalesNew Contract SalesNew ContractSalesNew Contract

  • Golden Steps to The Best 19

    NEW CONTRACT

  • Golden Steps to The Best 20

    Description 2012 2013

    CONSOLIDATED OF COMPREHENSIVE INCOME 2013

  • Golden Steps to The Best 21

    Description 1Q13 1Q14

    CONSOLIDATED OF COMPREHENSIVE INCOME 1Q14

  • Golden Steps to The Best 22

    Description 2012 2013 Growth YoYTotal Current Assets 7.250,64 7.994,29 9,30%Total Non Current Assets 3.770,13 4.600,67 18,05%

    TOTAL ASSETS 11.020,77 12.594,96 12,50%Total Current Liabilities 6.580,33 7.298,47 9,84%Total Non Current Liabilities 1.606,14 2.069,53 22,39%

    TOTAL LIABILITIES 8.186,47 9.368,00 12,61%Share Capital 610,56 614,01 0,56%Treasury Stock 0 (10,27)Additional PIC 756,06 713,75 -5,93%Change of Equity in Subsidiaries 23,53 429,40 94,52%Retained Earning 1.204,22 1.202,09 -0,18%

    Sub TOTAL EQUITY 2.594,36 2.948,96 12,02%Non Controlling Interest 239,93 278,00 13,69%

    TOTAL EQUITY 2.834,30 3.226,96 12,17%TOTAL LIABILLITIES & EQUITY 11.020,77 12.594,96 12,50%

    CONSOLIDATED OF FINANCIAL POSITION 2013

  • Golden Steps to The Best 23

    Description 1Q13 1Q14 Growth YoYTotal Current Assets 7,994.29 7,892.37 -1.27%Total Non Current Assets 4,600.67 4,975.21 8.14%

    TOTAL ASSETS 12,594.96 12,867.58 2.16%Total Current Liabilities 7,298.47 7,417.69 1.63%Total Non Current Liabilities 2,069.53 2,039.83 -1.44%

    TOTAL LIABILITIES 9,368.00 9,457.52 0.96%Share Capital 614.00 614.00 0.00%Treasury Stock -10 (10.27) 0.00%Additional PIC 713.75 713.75 0.00%Change of Equity in Subsidiaries 429.40 429.40 0.00%Retained Earning 1,202.09 1,369.61 13.94%

    Sub TOTAL EQUITY 2,948.96 3,116.48 5.68%Non Controlling Interest 278.00 293.58 5.61%

    TOTAL EQUITY 3,226.96 3,410.06 5.67%TOTAL LIABILLITIES & EQUITY 12,594.96 12,867.58 2.16%

    CONSOLIDATED OF FINANCIAL POSITION 1Q14

  • Golden Steps to The Best 24

    DescriptionReceived from Customers 9.680,39 11.253,37Payment to Suppliers (8.828,93) (10.381,93

    Payment for Directors and Employees (162,98) (233,39)Payment for Operating Expenses and Others (89,24) (124,53)Deposit Interest Receipt 36,49 24,11Payment of Interest (44,58) (64,03)Payment of Taxes (112,99) (184,49)CASH FLOW FROM OPERATING ACTIVITIES 478,15 289,11CASH FLOW FROM INVESTING ACTIVITIES (1.072,56) (619,87)CASH FLOW FROM FINANCING ACTIVITIES 871,06 185,31INCREASE (DECREASE) OF NET CASH & CASH

    Q276,65 (145,45)

    BEGINNING BALANCE OF CASH & CASH EQUIVALENT 1.255,50 1.532,15ENDING BALANCE OF CASH & CASH EQUIVALENT 1.532,15 1.386,71

    CONSOLIDATED STATEMENT OF CASH FLOW 2013

  • Golden Steps to The Best 25

    DescriptionReceived from Customers 2,300.66 2,221.67Payment to Suppliers (2,256.44) (2,276.28)Payment for Directors and Employees (48.12) (61.46)Payment for Operating Expenses and Others (34.98) (27.46)Deposit Interest Receipt 13.50 8.75Payment of Interest (1.15) (10.51)Payment of Taxes (97.52) (75.68)CASH FLOW FROM OPERATING ACTIVITIES (124.06) (220.97)CASH FLOW FROM INVESTING ACTIVITIES (298.14) (156.15)CASH FLOW FROM FINANCING ACTIVITIES 294.29 133.52INCREASE (DECREASE) OF NET CASH & CASH

    Q(127.91) (243.60)

    BEGINNING BALANCE OF CASH & CASH EQUIVALENT 1,499.14 1,386.71ENDING BALANCE OF CASH & CASH EQUIVALENT 1,371.23 1,143.10

    CONSOLIDATED STATEMENT OF CASH FLOW 1Q14

  • Golden Steps to The Best 26

    CAPITAL EXPENDITURE 2013

  • Golden Steps to The Best 27

    CAPITAL EXPENDITURE 2014F

  • Golden Steps to The Best 28

    SHAREHOLDER’S STRUCTURE

    • Over 600 institutional investors• Approximately 8,391 individual shareholder• 669 Employees and former employees are shareholders

    h ld

  • Golden Steps to The Best

    Year Net Income (IDR Bio)

    EPS (IDR)

    Dividend Payout Ratio

    2008 156.03 26.75 30%2009 189.22 33.37 30%2010 284.92 50.15 35%2011 354.5 60.59 30%2012 457.86 76.01 30%2013 569.94 92.93 30% 29

    STOCK PRICE PERFORMANCE

  • Golden Steps to The Best

    Additional Information is available upon request. For further Information please contact:

    Natal Argawan Pardede, Corporate SecretaryPhone (021) 8192808 or Facsimile (021) 8191235

    Visit us: www.wika.co.id

    DisclaimerThis material is for Information only, and we are not soliciting any action based upon it. This report is not to be construed as an offer to sell or the solicitation of an offer to buy any security in any jurisdiction where such an offer or solicitation would be illegal. The Information herein has been obtained from sources believed to be reliable, but we do not warrant that it is accurate or complete, and it should not be relied upon as such. Opinion expressed is our current opinion as of the date appearing on this material only, and subject to change without notice. It is intended for the use by recipient only and may not be reproduced or copied/photocopied or duplicated or made available in any form, by any means, or redistributed to others without written permission of PT Wijaya Karya (Persero) Tbk.