32
Introduction to SPIRAL 2 Design goals of the baseline project Status of the construction Letters of Intent for SPIRAL 2 Status of SPIRAL 2 NuPECC meeting Bordeaux October 28th 2006 Marek Lewitowicz GANIL

Introduction to SPIRAL 2 Design goals of the baseline project Status of the construction Letters of Intent for SPIRAL 2 Status of SPIRAL 2 NuPECC meeting

Embed Size (px)

Citation preview

Introduction to SPIRAL 2Design goals of the baseline project

Status of the constructionLetters of Intent for SPIRAL 2

Status of SPIRAL 2 NuPECC meeting

Bordeaux October 28th 2006

Marek LewitowiczGANIL

04/18/23 M. Lewitowicz 2

The scientific case of SPIRAL 2

Spins&Shapes

Position ofdrip-lines

N=Z

rp-process

Heavy and Super Heavy Elements

r-process path

Haloes & Structures in the Continuum

Equation of StateRole of Isospin

Spins & Shapes

Shell structure far from stability

r-process path

Spins & Shapes

r-process path

Neutrons for scienceAtomic & solid state physicsRadiobiology & Isotope production

Neutrons for science

ISOSPIN DEGREES OF FREEDOM IN NUCLEAR FORCES

SPIRAL 2 White Book: www.ganil.fr

04/18/23 M. Lewitowicz 3

CIME Cyclotron Acceleration of RI Beams

E < 25 AMeV, 1 - 8 AMeV for FF

CIME Cyclotron Acceleration of RI Beams

E < 25 AMeV, 1 - 8 AMeV for FF

Production Caves:: RNB

C converter+UCx target

1014 fissions/sp- & n-rich RNB (transfer, fusion-evaporation, DIC)

Production Caves:: RNB

C converter+UCx target

1014 fissions/sp- & n-rich RNB (transfer, fusion-evaporation, DIC)

Superconducting LINAC: Stable-Ion beams

E ≤ 14.5 AMeV HI A/q=3, 1mAE ≤ 20 A MeV p,d, 4He (A/q=2 ions), 5mAPossible extension to A/q=6 ions

Superconducting LINAC: Stable-Ion beams

E ≤ 14.5 AMeV HI A/q=3, 1mAE ≤ 20 A MeV p,d, 4He (A/q=2 ions), 5mAPossible extension to A/q=6 ions

Heavy-Ion ECRHeavy-Ion ECR

p,d source p,d source RFQRFQ

LINAG Exp. HallLINAG Exp. Hall

Direct beam line CIME-G1/G2 caves

Direct beam line CIME-G1/G2 cavesExisting GANIL

Exp. Area

Existing GANIL Exp. Area

Existing GANIL AcceleratorsExisting GANIL Accelerators

Low energy RNB DESIR

Low energy RNB DESIR

04/18/23 M. Lewitowicz 4

SPIRAL 2 Layout

GA

NIL

RIB ProductionBuilding

DESIR facility Low energy RIB

LINAG Exp. AreaHigh Intensity stable beams

LINAG Building

04/18/23 M. Lewitowicz 5

Fusion reaction with n-rich beamsFusion reaction

with n-rich beams

Fission products (with converter)Fission products (with converter)

N=Z Isol+In-flightN=Z Isol+In-flight

Transfermiums In-flight Transfermiums In-flight

Fission products (without converter)Fission products (without converter)

High Intensity Light RIBHigh Intensity Light RIB

SHESHE

Deep Inelastic Reactions with RIBDeep Inelastic Reactions with RIB

Regions of the Chart of Nuclei Accessible with SPIRAL 2 Beams

Production of radioactive beams/targets: (n,), (p,n) etc.

Production of radioactive beams/targets: (n,), (p,n) etc.

light beamsheavy ionsRIB induced reactions

light beamsheavy ionsRIB induced reactions

04/18/23 M. Lewitowicz 6

SPIRAL 2 yields of fission fragment after acceleration compared to other RNB facilities (best numbers for all)

Today Today

04/18/23 M. Lewitowicz 7

SPIRAL 2 Budget in M€as stated in the financial agreement signed on Sept. 4th

2006

(manpower)

(additional cost)

Detectors are not included in the investment budget of SPIRAL 2 but France (CEA,CNRS, Region BN) contributes to all equipments constructed at GANIL typically at the level of 30 to 50%.

(Total cost)

04/18/23 M. Lewitowicz 8

SPIRAL 2 Schedule

2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

Buildingconstruction

ReferenceProject

Def.

Safetyauthorizations

Constructionof LINAG

Under discussion

Reference Planning

Stable ion beams from LINAG

RIB

04/18/23 M. Lewitowicz 9

Project Organisation

Sections:

Labs:

CEA /DSM CNRS/IN2P3

Project direction Scientific

Community

Accelerator

RIB production Infrastructure

GANIL

Scientific Advisory

Committee

Project management

STEERING COMMITTEE

Int. Labs & Partners

National & international Partners

Technical Advisory

Committee

International Agreements Physics & technique

• ISOLDE - Letter of agreement signed in 2005• Romania - MoU signed on 28/02/06• Dubna - MoU signed 14/03/06 • SARAF (Israël) MoU signed in May 2006 • Grant request from the UK community

Direct beam line CIME-G1/G2

• BARC – TIFR (Bombay) MoU in preparation (draft) RF system, software

• LEA* with LNL Legnaro (Italy) in preparation (second draft) MoU (mainly on d->n converter) to be signed in the coming months

• LIA* with RIKEN in preparation (draft)• Poland - LEA in preparation• Triumf - MoU in preparation (first draft)• Argonne MoU in preparation (first draft)• Oak Ridge MoU under discussion• Technical meetings SPIRAL 2 - FAIR

*LEA = Lab. Europ. Associé SPIRAL 2 on the ESFRI list*LIA = Lab. Int. Associé

Introduction to SPIRAL 2Design goals of the baseline project

Status of the constructionLetters of Intent for SPIRAL 2

Status of SPIRAL 2 NuPECC meeting

Bordeaux October 28th 2006

Marek LewitowiczGANIL

04/18/23 M. Lewitowicz 12

Roa

d

DESIRLINAG

Exp. Area

Number of fissions/sNumber and type of

production caves1+ Ion Sources

Parallel-beams operation CIME-G1/G2 direct beam line

Choice of the HI source and injector

GA

NIL

Choice of the baseline project

04/18/23 M. Lewitowicz 13

LINAG Accelerator & Exp. Area

Priorities- Construction of the injector

A/q=3 - Second injector A/q=6

(extension) should be designed as soon as possible

04/18/23 M. Lewitowicz 14

LINAGExperimental Area

PriorityConstruction of 3 hallsand at least S3 hall fullyequipped

S3

n-tof

InterdisciplinaryResearch

LINAGbeam

04/18/23 M. Lewitowicz 15

1+ Ion Sources

Priorities: Selective ion sources- Surface ionisation - Laser (collaborations!)- ECR

RIB productionBuilding Two RIB production caves

1 “red zone” + 1 “yellow zone”

Preserve the possibility to deliver in the future two simultaneous RIB for (DESIR & CIME)

Reserve space for an RFQ cooler and HRS (High Resolution Mass Separator)

04/18/23 M. Lewitowicz 16

Base-line projectSummary of priorities

Choice of the HI source and injector for LINAG Phoenix V2 source - for the beginning of operation + development of metallic

beams Second injector q/A=1/6 should be designed as soon as possible

• LINAG Experimental Area Construction of 3 experimental halls. S3 hall fully equipped

Design goal for number of fiss./second As close as possible to 1014 fiss./s (safety and building cost limitations)

• RIB Production Building Priority for Selective 1+ Ion Sources (IS, laser, ECR) RIB production caves: 1 “red zone” & 1 “yellow zone” Preserve a possibility to deliver in the future two simultaneous RIB for (DESIR

& CIME) Reserve space for the RFQ cooler and HRS (High Resolution Mass Separator)

• DESIR DESIR building included in the SPIRAL 2 buildings construction phase

• CIME-GI/G2 Direct beam line To be constructed before the SPIRAL 2 buildings

Discussed by SC, SAC & TAC

Introduction to SPIRAL 2Design goals of the baseline project

Status of the constructionLetters of Intent for SPIRAL 2

Status of SPIRAL 2 NuPECC meeting

Bordeaux October 28th 2006

Marek LewitowiczGANIL

RFQ prototype

20 kW

38 kW

displacements are < 60µm, (max. allowed ± 100µm)

Vane tip displacements at 20 and 38 kW

CEA / DAPNIA Saclay

CNRS - IPN Orsay: Prototype cavity (beta 0.12)

1,0E+08

1,0E+09

1,0E+10

1,0E+11

0 1 2 3 4 5 6 7 8 9 10 11 12

Eacc (MV/m)

Qo

Spiral-2 operating gradient

6,5

E max = 11 MV/m (Bpeak = 110 mT) (Epeak = 60 MV/m)

acc

Multipacting

Light Field Emission

CEA/DSM/DAPNIA: Prototype cavity (beta 0.07)

SC Cavities

Injector(LEBT lines)

Review06/09/06

Preparation of ContractsDipoles & Q-poles

2006 / 2007

Injector(RFQ)

Review17/10/06

AnnouncementSept 2006

Call for tendersOct/Nov 2006

ContractDec/Jan.

2007

SC Linac(Niobium)

AnnouncementJuly 2006

Call for tenders

Sept/Oct 2006

ContractNov. 2006

SC Linac(QWR A+B)

Review25-26/09/06

QWR A :Announcement

1st Qr 2007

Call for tenders2007

Contract2007

QWR B :Announcement

Sept. 2006

Call for tenders

Sept/Oct 2006

ContractNov. 2006

SC Linac(RF Amplifiers)

(Two qualifyingAmplifiers 10 -

20 KW)

AnnouncementMay 2006

Call for Tenders

July/Sept 2006

ContractOct. 2006

The Driver Accelerator construction has started …

Production Modules (d->n converter + UCx target + ion source

systems)

Recent solution proposed by Thales

Target &ion source

Ganil design

Recent design (under study)

Ganil design

Introduction to SPIRAL 2Design goals of the baseline project

Status of the constructionLetters of Intent for SPIRAL 2

Status of SPIRAL 2 NuPECC meeting

Bordeaux October 28th 2006

Marek LewitowiczGANIL

04/18/23 M. Lewitowicz 23

SPIRAL 2 - Letters of intent (LoI)Towards new detectors for SPIRAL 2

Procedure and schedule:

1. Call for LoI - May 26th 2006 (just after the SP2 SAC meeting on May 17, 2006)

2. Dead-line for LoI: October 2nd, 2006

3. Evaluation of LoI by SAC - October 19&20th 2006

1. Results of the evaluation will be communicated to the proponents by the beginning of November 2006.

§ Call for proposals launched in 2007

§ Signature of MoU by collaborations proposing the construction of new

equipment in 2007-2008

04/18/23 M. Lewitowicz 24

SPIRAL 2 - Letters of intent (LoI)Resume

SPIRAL 2 Letters of Intent in numbers:

19 LoIs submitted

25 oral presentations of the LoIs at the Open session of SAC on October

19th 2006

LoIs signed by 595 physicists (without double counting) (190 from

France, 492 from NuPECC member countries) from 34 countries

Spokespersons: 50% France, 50% foreigners

Written documents of in total 341 pages

04/18/23 M. Lewitowicz 25

List of LoI for SPIRAL 2

1. The DESIR facility (Decay, Excitation and Storage of Radioactive Ions) (B. Blank)2. Decay properties of neutron-rich nuclei (Yu. Penionzhkevich, F. Ibrahim)3. S3: The Super Separator Spectrometer for LINAG Beams (A. Villari, A. Drouart, J. Nolen)4. From actinides to super-heavy elements with SPIRAL 2: reaction dynamics and structure (Paul Greenlees)5. Fusion reactions: A probe of multidimensional tunnelling (A. Navin, R. Raabe, A. Shrivastava)6. Nucleon correlations probed via multiple particle transfer and their influence on sub-barrier fusion (L. Corradi) 7. High-resolution Gamma-ray Spectroscopy at SPIRAL2 (AGATA-EXOGAM II) (W.Korten, B. Wadsworth)

・ Proton drip-line studies and N=Z nuclei (D. Rudolph) ・ Neutron-rich nuclei (A. Gadea) ・ Nuclear shapes and high-spin spectroscopy (A. Görgen)・ Collective modes in the continuum (S. Leoni)・ Nuclear electromagnetic moments (G. Georgiev)・ Spectroscopy of the heaviest elements (P. Greenlees)

8. High-energy -rays as a probe of hot nuclei and reaction mechanisms (J.A. Scarpaci, A. Maj, D. Jenkins)9. Studying the r process nucleosynthesis with direct reactions (O. Sorlin, K. L. Kratz)10. α-capture reactions in inverse kinematics relevant to stellar nucleosynthesis (S. Harissopulos F. De Oliveira)11. Production of radioactive samples for astrophysical interest by (n,p), (n,3He), (n, a) reactions (F. Hammache, M. Heil)12. Production targets of light radioisotopes for nuclear astrophysics and basic nuclear science studies (M. Hass, D. Berkovits, T.Y. Hirsh)13. Improving effective forces, mean field based methods, and predictions: dedicated measurements (M. Bender, K. Bennaceur, S. Péru)14. Direct Reaction Studies of Exotic Nuclear Structure (GASPARD) (D. Beaumel, R. Lemmon, I. Martel )15. Direct and Resonant Reactions with an Active Target (M. Chartier, D. Cortina, P. Roussel-Chomaz )16. Unbound states of neutron-rich isotopes via direct reactions (V. Lapoux)17. Neutrons For Science (X. Ledoux)18. Dynamics & Thermodynamics of exotic nuclear systems (F. Gulminelli, G. Poggi, G. Verde)19. Isospin non-conservation in nuclear states and its implication for the physics beyond the Standard Model (N. Smirnova)

Main Collaborations:

DESIRS3

AGATA & EXOGAM 2-ray CalorimeterGASPARDn-tofFAZIA

04/18/23 M. Lewitowicz 26

SPIRAL 2 Scientific CommunityOrganisation

Steering Committee

Project management- Project Leader- Scientific Coordinator..

SPIRAL 2 France Phys.SPIRAL 2 Scientific Coordinators

in the IN2P3 & CEA Labs

SPIRAL 2Scientific Advisory Committee

Int. Collaborations SP2-DESIR-S3

-GASPARD-…

Existing International Collaborations- NUSTAR - AGATA- EXOGAM- EURONS- EURISOL- FAZIA-…

SP2-NUSTAR WG-Electr. & DAQ-Calorimeter-Tracking detectors-Neutron detectors ?-…

Coordination Committee

04/18/23 M. Lewitowicz 27

SPIRAL 2 on the ESFRI list

Brussels, 19 October 2006

European Research Infrastructures – 35 projects identified

•The ESFRI roadmap (see IP/06/1431) identifies 35 large-scale infrastructure projects at various stages of development. This Memo gives brief details of the projects concerned. The full text of the roadmap, which contains longer descriptions of the projects can be found at: http://cordis.europa.eu/esfri/home.html

• …Isotope beams with SPIRAL 2The project aims at delivering rare (radioactive) isotope beams with intensities not yet available with present machines. SPIRAL 2 will reinforce European leadership in the field of nuclear physics based on exotic nuclei.

Introduction to SPIRAL 2Design goals of the baseline project

Status of the constructionLetters of Intent for SPIRAL 2

Status of SPIRAL 2 NuPECC meeting

Bordeaux October 28th 2006

Marek LewitowiczGANIL

04/18/23 M. Lewitowicz 29

LoI SPIRAL 2 - Participants

LoI SP2: Number of participants/Country

1 39

12

41 3 1 2

10

34

814

34

3

82

2 16

3

36

1

16

2

16

2

24

8 61

35

24

2

190

0

10

20

30

40

50

60

70

80

90

100

AlgeriaAustraliaBelgium

BrasilBulgaria

ChinaCroatia

Czech

DenmarkFinlandFrance

GermanyGreece

Hungary

IndiaIsraelItalyJapanMexico

NetherlaNorwayPolandPortugalRomania

RSARussiaSerbiaSpain

SwedenSwitzerla

Turkey

UKUSA

Vietnam

Country

Number of participants

Total: 595

04/18/23 M. Lewitowicz 30

Priorities1. Phoenix V2 source - for the

beginning of operation + development of metallic beams

2. In 2-3 years a choice of the best next-generation HI source (extension)

0,01

0,1

1

10

100

1000

0 20 40 60 80 100 120 140

A

A-PHENIX A/q=6

A-PHENIX A/q=3

GANIL Today

PHENIX-V2 A/q=3

RIKEN Today

RIKEN RIBF

Choice of the HI source and injector

04/18/23 M. Lewitowicz 31

DESIR, RFQ Cooler & HRS

Cooling/BunchingCooling/Bunching

Spectroscopy Spectroscopy of trapped of trapped

beamsbeamsLaser Laser

SpectroscopySpectroscopy

Decay studiesDecay studies

Other Other purposespurposes

Fundamental Fundamental InteractionsInteractions

1500 m2

Priorities:DESIR building included in the SPIRAL 2 building design phase

DESIR building and equipment as well as RFQ et HRS to be financed by international collaborations (not included in the current construction budget)

DESIR Facility for experiments with low energy RIBs

Production Modules

d->n Converter -> vertical wheel

Bearings under study, toreduce friction Several solutions to be tested

Oven -> measurements with a Tantalum oven and a Carbon target at 1500°C

Next measurements at 2000°Cbefore the end of this year

IPNOrsay-Ganil

UCx target: calculation to reducethe size and weight of UCxSolutions for the waste management under study

162193

1217

15121181 882

797

235

céramique

417

148

235

céramique

417

148