Upload
thalia
View
85
Download
1
Tags:
Embed Size (px)
DESCRIPTION
Introduction to Protocol Manager Lanie Paquin, USBR PN-Region GIS June 20, 2006. I. Introduction. What is Protocol Manager? Relational database application Dynamic data dictionary Data management tool. I. Introduction. B. What does Protocol Manager do? - PowerPoint PPT Presentation
Citation preview
Introduction to Protocol ManagerLanie Paquin, USBR PN-Region GIS
June 20, 2006
I. Introduction
A. What is Protocol Manager?
1. Relational database application
2. Dynamic data dictionary
3. Data management tool
I. Introduction
B. What does Protocol Manager do?
1. Supports biological monitoring programs and projects
2. Fully documents data elements and their properties
3. Cites method reference documents
I. IntroductionC. Who is interested in Protocol Manager?
q U.S. Bureau of Reclamation – Spatial Dynamics
q National Park Service & USFS (Fire Ecology)
q NOAA Fisheries Northwest Fisheries Science Center (NWFSC)
q USGS National Biological Information Infrastructure (NBII)
q NED PNAMP Effectiveness Monitoring Group
q State of Washington
q Wenatchee Sub-basin RTT
q Streamnet
I. Introduction
D. Why use Protocol Manager?
1. Foster coordination and collaboration
2. Improve data quality & consistency
3. Enforce data standards
4. Provide data transparency
5. Facilitate data exchange and usage
6. Compare, improve, and develop protocols
I. Introduction
E. What’s next for Protocol Manager?
1. Support Pacific Northwest Aquatics Monitoring Partnership (PNAMP) Workgroup functions
a. Data analysis
b. Content management
c. Protocol standards
I. Introduction
E. What’s next for Protocol Manager?
2. Partner with National Resource Monitoring Partnership (USGS NBII, et al.) Protocol Library and Monitoring Locator National Project
a. Form regional consortium node
b. Leverage NBII Information Technology (IT) resources
c. Utilize national and international scientific expertise
II. RME Data Management Pilot Overview
A. Brief History
1. FCRPS 2000 BiOp - Research, Monitoring & Evaluation (RME) - Data Management Work Plan, May 2003
2. John Day Pilot, October 2003
a. Data Analyst
b. Data Dictionary
II. Pilot Overview
A. Brief History
3. Coordinate with Wenatchee Regional Technical Team (RTT) Pilot
a. Upper Columbia Monitoring Strategy, Hillman, February 2004
4. Publish John Day (& U.Columbia) Data Dictionary, June 2004
II. Pilot OverviewA. Brief History
5. Effectiveness monitoring host database design process, June 2004
a. ArcHydro geospatial data model concepts and relationships applied to monitoring data
b. NPS (Fire Ecology Assessment Tool) FEAT Protocol Manager DB (.vba) application replaces static data dictionary
II. Pilot Overview
A. Brief History
6. NOAAF NWFSC Status Trend Monitoring (STM) Database initiated, September 2004
a. Wenatchee 2004 physical and biological data loading completed, August 2005
b. EMAP (ODEQ & Wenatchee) & PIBO 2004 loading in progress at NWFSC
II. Pilot OverviewA. Brief History
7. National Resource Monitoring Partnership Protocol Library and Monitoring Locator Project initiated, November 2005.
a. USGS NBII, National Park Service (NPS), & International Association of Fish and Wildlife Agencies (IAFWA)
b. USGS NBII: $500K & Technical Resources
II. Pilot OverviewA. Brief History
8. Current Status
a. Version 0.7x (.Net)i. June 2006 release
ii. NPS National Interagency Fire Center (NIFC) (Nate Benson, et al.) cost share through contractor
iii. Protocol Manager User Documentation due August 2006
b. Desktop Installationsi. Multiple versions of database contents require
coordination
II. Pilot OverviewA. Brief History
8. Current Status
c. U.S. Government owns software code (public)
II. Pilot OverviewA. Brief History
9. Next Stepsa. Grow Protocol Manager Project Partnership
i. NED/PNAMP
ii. NRMP/USGS NBII
b. Develop Version 2.0i. Fully Functional Suite of Features
c. Plan Web Enabled Applicationi. Centralized Relational Database Management System
Host & Services Oriented Architecture
II. Pilot Overview
B. Key RME Data Management Pilot Findings
1. Protocols are integral to monitoring data
a. Protocols = Metadata
b. Metadata = Data
c. Protocols = Data
II. Pilot Overview
B. Key RME Data Management Pilot Findings
2. Protocols are defined by their data management functions
a. Prescribe data elements
b. Describe methods and procedures
i. Collect field data
ii. Process summary values
iii. Validate values
II. Pilot Overview
B. Key RME Data Management Pilot Findings3. “Data management systems must be designed from an end-to-end perspective (from data collection through data entry to database management, report generation and data sharing).” – Data Management for Field Collection, June 2004, Welches, OR Data Management Workshop
III. Monitoring Data Processes
Pose Scientific Questions
Design Experiments and monitoring protocols
Data needs
Display results
Collect and Analyze data
Data Dictionary(monitoring indicators and
protocols)
GDB
A. Analytical Framework Empirical Method
III. Monitoring Data ProcessesB. Field Data Processing Flow
Prep for field
Collect data
Record data
Capture data
Updaterepository
AnalyzeindicatorsTransfer data
SubjectMatterExpert
FieldWorker
DataAnalyst
Coordinator
DataSteward
Researcher
III. Monitoring Data ProcessesC. Interaction between Tabular Data and ArcHydro Geodatabase
RawData
GeneratedData
RepositoryDatabase
Field Data Tables
Data CollectionMethods
Field formsField formsOutput
files
Data ValidationMethods
EvaluateProtocols/Methods
FieldForms
Data SummaryMethods
ProtocolMetadataRecords
ProtocolMetadataRecords
MetadataRecords
(Protocols)
DocumentProtocols/Methods
DataAnalysis
ReviseProtocols/Methods
Protocol Manager
Protocol
Status Trend Monitoring Database
Monitoring Program
IV. Protocol Manager ConceptsA. Monitoring Programs & Protocols
B. Terms
C. Relationships of Terms
D. Protocol Manager
E. Comparing Protocols & Methods
Monitoring Programs & ProtocolsMonitoring Program Protocols Specified
PNAMP (w/ OWEB for Bank Stability)
PIBO
John Day AFG plus other protocols in development or undocumented
Upper ColumbiaMonitoring Strategy
EMAP EMAP (2001)
PIBO (2002)
EMAP (2001)
PIBO (2004)PIBO (2003)
EMAP (2001) PIBO (‘02-’04)
EMAP (2001) OPSW (1999) WFC (1998) WDFW (2000)
WFPB (1983) Zaroban (2000) Schuett-Hames (1999)
BURPTAC (1999) Hawkins et al. (1993)
Platts et al. (1983)
Reeves et al. (2001)
Overton et al. (2000)
Parmenter et al. (2003)
Dolloff et al. (1996) Reynolds et al. (1996)
Van Deventer and Platts (1989)
Anderson and Neumann (1996)
Strange (1996)
Borgerson et al. (1992)
Mosey and Murphy (1996)and more…
Terms
Biological Adults
Redds
Parr / Juveniles
Smolts
Macro invertebrates
Escapement/numberAge structureSizeSex ratioOrigin (hatchery or wild)GeneticsFecundity
TransportComposition
Number smoltsSize smoltsGenetics smolts
Abundance/distributionSize parr
Subject Area Indicator
AttributeNumberDistribution
Indicator Group
Protocol
Method
Protocol
Collection Method
Attribute Name
Collection Method
Attribute Name
Attribute Name
Attribute Name
Indicator
Summary Value
Indicator
Indicator
Summary Method
IndicatorGroup
Relationships of Terms
Relationship of Terms
EMAP, 2001
Dominant Substrate (EMAP, 2001)
Distance Left Bank
Large Wood Debris
Bankfull Depth
Size Class Code
DIST_LB
BF_DEPTH
SIZE_CLS
Embeddedness EMBED
Substrate Flag FLAG_SUB
Transect TRANSECT
Transect Position TRANSDIR
Habitat Event ID HAB_EVENT
CollectionAttributes
Dominate Substrate
Comments COMMENTS
Links to Site info:Site ID, Date, Stream ID, Visit No., Team ID, Location, etc.
Fields from data collections
+
Bank Measurements
ProcedureAttribute
Attribute
Attribute
Attribute
Procedure
Procedure
Procedure
Short Name: EMAP, 2003
Large Woody Debris
ProcedureAttribute
Attribute
Attribute
Attribute
Procedure
Procedure
Procedure
Name: EMAP West Surface Water Wadeable Streams
Torrent Evidence
ProcedureAttribute
Attribute
Attribute
Attribute
Procedure
Procedure
Procedure
Stream Flow - NBO
ProcedureAttribute
Attribute
Attribute
Attribute
Procedure
Procedure
Procedure
Contact: Phil KaufmanDoc Ref: Peck, et al., 2003, EMAP West Surface Water Wadeable Streams, EPA, Corvallis,OR
- Library Protocols
- EMAP Surface Waters – Wadeable Streams, 2003
+++
Bank MeasurementsLarge Woody DebrisTorrent Evidence
Protocol ManagerProtocol
Methods
Stream Flow - NBO
Merritt, 2004
Bankfull Diameter 0.1-0.3m Length 1.5-5m WETSDSLBankfull Diameter 0.3-0.6cm Length 1.5-5m WETMDSLBankfull Diameter 0.6-0.8m Length 1.5-5m WETLDSLBankfull Diameter >0.8m Length 1.5-5m WETXDSL
Bankfull Diameter 10-15cm Length 1-3m 10_SHTBankfull Diameter 10-15cm Length >3-6m 10_MEDBankfull Diameter 10-15cm Length >6m 10_LONBankfull Diameter >15-30cm Length 1-3m 15_SHTBankfull Diameter >15-30cm Length >3-6m 15_MEDBankfull Diameter >15-30cm Length >6m 15_LONBankfull Diameter >30cm Length 1-3m 30_SHTBankfull Diameter >30cm Length >3-6m 30_MEDBankfull Diameter >30cm Length >6m 30_LON
Large Woody Debris
Attribute Name Field Name
Attribute Name Field Name
Bankfull Diameter >10cm Length >1m LODAttribute Name Field Name
Bankfull Diameter 0.1-0.3m Length 5-15m WETSDMLBankfull Diameter 0.3-0.6cm Length 5-15m WETMDMLBankfull Diameter 0.6-0.8m Length 5-15m WETLDMLBankfull Diameter >0.8m Length 5-15m WETXDMLBankfull Diameter 0.1-0.3m Length >15m WETSDLLBankfull Diameter 0.3-0.6cm Length >15m WETMDLLBankfull Diameter 0.6-0.8m Length >15m WETLDLLBankfull Diameter >0.8m Length >15m WETXDLLAbove Bankfull Diameter 0.1-0.3m Length 1.5-5m DRYSDSLAbove Bankfull Diameter 0.3-0.6cm Length 1.5-5m DRYMDSLAbove Bankfull Diameter 0.6-0.8m Length 1.5-5m DRYLDSLAbove Bankfull Diameter >0.8m Length 1.5-5m DRYXDSLAbove Bankfull Diameter 0.1-0.3m Length 5-15m DRYSDMLAbove Bankfull Diameter 0.3-0.6cm Length 5-15m DRYMDMLAbove Bankfull Diameter 0.6-0.8m Length 5-15m DRYLDMLAbove Bankfull Diameter >0.8m Length 5-15m DRYXDMLAbove Bankfull Diameter 0.1-0.3m Length >15m DRYSDLLAbove Bankfull Diameter 0.3-0.6cm Length >15m DRYMDLLAbove Bankfull Diameter 0.6-0.8m Length >15m DRYLDLLAbove Bankfull Diameter >0.8m Length >15m DRYXDLL
Comparing Protocols & Methods
EMAP, 2001
BURPTAC, 1999
Large Woody Debris (Merritt, 2004)
Large Woody Debris (EMAP, 2001)
Large Woody Debris (BURPTAC, 1999)
IV. Protocol Manager Demo