INTRODUCTION : BACKGROUND INTRODUCTION : BACKGROUND Existing Army Public schools in Lucknow cantt Existing Army Public schools in Lucknow cantt - APS Nehru Road - APS Nehru Road - APS SP Marg - APS SP Marg Strength increased beyond their capacity Strength increased beyond their capacity Wards of serving personnel refused admission Wards of serving personnel refused admission Need felt to cater to the increased demand Need felt to cater to the increased demand

INTRODUCTION : BACKGROUND

  • Upload
    magda

  • View
    33

  • Download
    0

Embed Size (px)

DESCRIPTION

INTRODUCTION : BACKGROUND. Existing Army Public schools in Lucknow cantt - APS Nehru Road - APS SP Marg Strength increased beyond their capacity Wards of serving personnel refused admission Need felt to cater to the increased demand. OPENING OF THE SCHOOL. - PowerPoint PPT Presentation

Citation preview

Page 1: INTRODUCTION : BACKGROUND

INTRODUCTION : BACKGROUNDINTRODUCTION : BACKGROUND

Existing Army Public schools in Lucknow canttExisting Army Public schools in Lucknow cantt

- APS Nehru Road- APS Nehru Road

- APS SP Marg- APS SP Marg

Strength increased beyond their capacity Strength increased beyond their capacity

Wards of serving personnel refused admissionWards of serving personnel refused admission

Need felt to cater to the increased demand Need felt to cater to the increased demand

Page 2: INTRODUCTION : BACKGROUND

OPENING OF THE SCHOOL OPENING OF THE SCHOOL APS L. B.S. Marg est in Jul 2008.APS L. B.S. Marg est in Jul 2008.

Previously known as Chanakya Marg.Previously known as Chanakya Marg.

- appointment of staff 07-08 Jul 08- appointment of staff 07-08 Jul 08

- started functioning on 15 Jul 08- started functioning on 15 Jul 08

Initial strength – 15 studentsInitial strength – 15 students

Target for session end was 100 students as it started Target for session end was 100 students as it started

mid sessionmid session

Target achieved on 17 Sep 08Target achieved on 17 Sep 08

Present strength – 404.Present strength – 404.

Page 3: INTRODUCTION : BACKGROUND

SHIFTING OF NEW LOCATIONSHIFTING OF NEW LOCATION

Space constraint in old location.Space constraint in old location.

Strength of students increased. Strength of students increased.

Addition of new section in Class I & IIAddition of new section in Class I & II

Opening of Class VI.Opening of Class VI.

Location of New Site near Shaurya Army Pre- School and Location of New Site near Shaurya Army Pre- School and

AWWA Secretariat. AWWA Secretariat.

Page 4: INTRODUCTION : BACKGROUND

SATTELITE IMAGE OF NEW SATTELITE IMAGE OF NEW LOCATIONLOCATION

Page 5: INTRODUCTION : BACKGROUND

INITIAL VIEW OF NEW SITE INITIAL VIEW OF NEW SITE

Page 6: INTRODUCTION : BACKGROUND

PRESENT PRESENT VIEW OF LOCATIONVIEW OF LOCATION

Page 7: INTRODUCTION : BACKGROUND

PRESENT STAFFPRESENT STAFF Principal Principal - 01- 01 TeachersTeachers - 15- 15 Clerk Clerk - 01 (Retd JCO) - 01 (Retd JCO) Accountant Accountant - 01 (Retd OR)- 01 (Retd OR) Adm JCOAdm JCO - 01 (Retd JCO)- 01 (Retd JCO) Messenger Messenger - 01- 01 AyahAyah - 02- 02 Driver Driver - 01 (Retd OR)- 01 (Retd OR) Mali Mali - 01- 01 SafaiwalaSafaiwala - 02- 02

Page 8: INTRODUCTION : BACKGROUND

STRENGTH OF STUDENTS STRENGTH OF STUDENTS SR NO. CATEGORY STR

1 OFFICERS 24

2 JCO 46

3 OTHER RANKS 289

4 ESM 05

5 CIVs Defence 07

6 CIVILIANS 33

TOTAL 404

Page 9: INTRODUCTION : BACKGROUND

FEE STRUCTUREFEE STRUCTUREHEADHEAD OFFROFFR JCOJCO OROR CIVCIV

ONE TIMEONE TIME 15001500 900900 700700 53053000

ANNUALANNUAL 12751275 10751075 900900 20720755

MONTHLY UP MONTHLY UP TO CL I TO VTO CL I TO V

750750 750750 750750 11511500

MONTHLY MONTHLY CLASS VICLASS VI

850850 850850 850850 12512500

Page 10: INTRODUCTION : BACKGROUND

TOTAL INCOME

SER

NO

INCOME HEAD INCOME

1. INCOME FROM

MONTHLY FEE

Rs. 37,89,600

2. INCOME FROM ANNUAL

FEE

Rs. 4,20,775

3. INCOME FROM ONE

TIME CHARGES

Rs. 3,28,500

TOTAL INCOME Rs. 45,38,875

TOTAL INCOMETOTAL INCOME

Page 11: INTRODUCTION : BACKGROUND

FINANCIAL ASSISTANCE FINANCIAL ASSISTANCE

APS, Nehru Road - Rs 30,00,000/-

APS, SP Marg - Rs 20,00,000/-

HQ Central Command - Rs 20,00,000/-

HQ AWES - Rs 5,00,000/-

CAL - Rs 5,00,000/-

Other Deposits

Security Deposit - Rs 10,00,000/-

Page 12: INTRODUCTION : BACKGROUND

SALARY STRUCTURESALARY STRUCTURE

Category Category Total Total Principal Principal 18,14418,144TGTTGT 15,42915,429PRTPRT 14,98514,985Adm JCOAdm JCO 9,0009,000Head ClkHead Clk 8,0008,000Accountant Accountant 8,000 8,000 Msgr Msgr 5,0005,000Driver Driver 4,5004,500AyahAyah 4,000 4,000 Safaiwala Safaiwala 4,500 4,500

Page 13: INTRODUCTION : BACKGROUND

Glimpses of School Glimpses of School ActivitiesActivities

Page 14: INTRODUCTION : BACKGROUND

NKNK

CHRISTMAS CELEBRATIONCHRISTMAS CELEBRATION EID-EID-CELEBRATIONCELEBRATION

DUSSHERA CELEBRATION SPORTS WEEK

Page 15: INTRODUCTION : BACKGROUND

NKNK

RAKHI CELEBRATION JANMASHTAMI CEBRATION

TEACHER’S DAY CELEBRATIONINDEPENDENCE DAY CELEBRATION

Page 16: INTRODUCTION : BACKGROUND

NKNK

PLANTATION IN THE SCHOOL

PLANTATION BY MRS. PRATIBHA MOHANTY PLANTATION BY MRS. RIZWANA ALI

PLANTATION BY THE STUDENTS

Page 17: INTRODUCTION : BACKGROUND

NKNK

JOINT ENTERANCE FOR ARMY PUBLIC SCHOOLS

Page 18: INTRODUCTION : BACKGROUND

NKNK

STUDENTS PERFORMING DANCE ON THE FOOT TAPPING NUMBERS

Page 19: INTRODUCTION : BACKGROUND

FUTURE PLANS1. Construction of 10 Class Rooms.

2. Installation of CAL.

3. Setting up of Science Labs.

4. Maths Lab.

5. Language Lab.

6. Music & Dance Room.

7. Football Ground.

8. Herbal Ground.

9. Park for children.

10. Hard standing for cycle stand.

Page 20: INTRODUCTION : BACKGROUND