INTERNATIONAL AIRPORT MONGOMEYEN Facts Project Description Runway, apron, taxiway, service roads, surface drainage, access road (2 lanes), parking, fence, outside lighting. Project Data: Length of runway 3,000 m Exchange of soil and swamp 1,492,000 m³ Total area 6.19 million m² Earthworks 10.61 million m³ Concrete apron 138,000 m² Technical buildings (9 pieces) 6,160 m² Base course existing of crushed gravel for roads and runway 172,200 m³ City/Country Mongomeyen / Equatorial Guinea Client Gouvernement de la République de Guinée Equatoriale, Malabo Architect ASECNA Contract Value € 238,85 Mio. Construction Period 2/2006 - 3/2011 (40 months) .

INTERNATIONAL AIRPORT · PDF fileINTERNATIONAL AIRPORT MONGOMEYEN Facts Project Description Runway, apron, taxiway, service roads, ... ASECNA Contract Value € 238,85 Mio. Construction

Embed Size (px)

Citation preview

INTERNATIONAL AIRPORTMONGOMEYEN

Facts Project DescriptionRunway, apron, taxiway, service roads, surface drainage, access road(2 lanes), parking, fence, outside lighting.

Project Data:Length of runway 3,000 mExchange of soil and swamp 1,492,000 m³Total area 6.19 million m²Earthworks 10.61 million m³Concrete apron 138,000 m²Technical buildings (9 pieces) 6,160 m²Base course existing of crushed gravelfor roads and runway 172,200 m³

City/Country

Mongomeyen / Equatorial Guinea

Client

Gouvernement de la République de GuinéeEquatoriale, Malabo

Architect

ASECNA

Contract Value

€ 238,85 Mio.

Construction Period

2/2006 - 3/2011 (40 months)

.