Integration Management with
SAP ECC
Alexander Prosser
Overview
SEITE 2
1980-ies: Functional software
MM Sales PPC Acc.
Overview
SEITE 3
1990-ies: Process orientation:
Business Process
MM Sales PPC Acc.
Value for
the
customer
Overview
SEITE 4
Office automation
Cross-functional base applications
Functional applications
Reporting,
Analysis, Controlling
Decision
Support
Horizontal integration
EI
S
Reporting
Overview
SEITE 5
Office automation
Cross-functional base applications
Functional applications
Reporting,
Analysis, Controlling
Decision
Support
Office automation
Cross-functional base applications
Functional applications
Reporting,
Analysis, Controlling
Decision
Support
Organisation #1 Organisation #2
Cross-company integration (e.g., supply chain management)
SAP
SEITE 6 Source: sap.com
Organisational Structure
SEITE 7
Client
Contr.Area
Com-pany
CoCtrGroup
CoCtr
PlantPurch.Org.
Sales Org.
Stor.Area
Distr.Chnnl.
Division, sales office, sales group …
Overview
SEITE 8
Overview
SEITE 9
Overview
SEITE 10
Overview
SEITE 11
Planning
Implementation
Overview
SEITE 12
pricing, avblty. check
customer, material
ECC Supporting the Implementation
SEITE 13
• Master and operationaldata req. derived from chain
• According to implem. plan:
do we have all data
necessary along the chain?
• Plan for customizing and
data transfer from legacy
systems
Overview
SEITE 14
legacy data
parameter settings
Consider Project Interdependencies !
SEITE 15
transfercustomer
master
suppliermaster
customizingcredit limit
payment terms
incoterms
SEITE 16
• Org. units concerned
• Which module for whom?
ECC Supporting the Implementation
Cost Accounting
SEITE 17
Production order
OH surcharge
activity
allocations
all other
cost centers PP
Storage
Heating
MTN
Assembly Cutting QC
SEITE 18
Perf.-
depd.
OH
surch.
Alloc.
IS A
Activity
Work centers
Logistics
n m n
n
m
1
Cost
Centre
Cost
Element
prim.
cost
price attributed
Cost Accounting
SEITE 19
Cost Accounting
Perf.-
depd.
OH
surch.
Alloc.
n m Cost
Elementattributed
n
prim.
cost
uses
cycle
(1)
(1)
Ass.costelem.
m1
n
1
IS A
n
debits
n
m
con-
sumes
n
m
accordg.
to1/n
n
credits
n
Activityprice
Cost
Centre
stat.
key
SEITE 20
MRP
Material BOM
n
Semi-
finished
Raw
mat
m
Plant
has
stock
Storage
Area
n
1
n
m
Finished
SEITE 21
MRP
has
Cost
Centre
1
n
Contr.
Area
exists
_in
n
m
Activity
n
mprice
Period
Material BOM
n
Semi-
finished
Raw
mat
m
Plant
has
stock
Storage
Area
n
1
n
m
Finished
SEITE 22
MRP
has
Cost
Centre
1
n
Contr.
area
exists
_in
n
m
Activity
n
mprice
Period
Material BOM
n
Semi-
finished
Raw
mat
m
Plant
has
stock
Storage
Area
n
1
n
m
Finished
n
contains1
refers
_to
m
n
n
Work
Centre
SEITE 23
MRP
has
Cost
Centre
1
n
Contr.
area
exists
_in
n
m
Activity
n
mprice
Period
Material BOM
n
Semi-
finished
Raw
mat
m
Plant
has
stock
Storage
Area
n
1
n
m
Finished
n
1
n
contains1
refers
_to
m
n
Routing
produced_by1
uses
step
m
n
m n
Work
Centre
produced_by2
1
n
n
Cost Accounting
SEITE 24
Production order
OH surcharge
activity
allocations
all other
cost centers PP
Storage
Heating
MTN
Assembly Cutting QC
Project Integration
SEITE 25
Project
Costs
Costacct.
Staff
Materials (purchased, produced)
Work centres
MM
Sales
Master Data
SEITE 26
• Cost centres and activity prices
• Work centres
• Materials => BOM
• Vendor and info records
• Routings
• Sales order
• Persons
PSxx PLxx
Cost Accounting
SEITE 27
Production order
OH surcharge
activity
Storage
InSituAssembly
Engin-eering
PM
Pre-Assembly
Project
Project Tent
100
Constructtent
200 Procure/build
parts
300 Assembly and
QS400 Cert. 500 PM
PM
P-Engineerg.
P-Engineerg. PM
Procurement
Production
In-Situ Assb.
SEITE 28
P-Engineerg.
Costing
SEITE 29
Cost Centre
Hours uptime p.a. Fixed cost p.h.
EUR
Variable cost p.h.
EUR
Engineering 1400 70 30
In-Situ-Assembly 1300 65 35
Project Management PM 1400 70 30
Pre-Assembly 1500 45 25
Materials, BOM, Routing
SEITE 30
Level Part Quantity Price EUR
0 Tent WU 1 pc 80,000*
1 Pole 24 pc 1,100/pc*
2 Raw pole 1 pc 400/pc
2 Screw incl. washers and nut 4 pc 5/pc
1 Crossbar 56 pc 105/pc*
2 Raw crossbar 1 pc 75/pc
2 Screw incl. washers and nut 4 pc 5/pc
1 Tent fabric (side covers and roof) 700 m2 20/m2
1 Metal bar 30 m 15/m
1 Electro engine 1 pc 850/pc
1 Chain for moving the side cover 60 m 20/m
1 Screw incl. washers and nut 48 pc 5/pc
Materials, BOM, Routing
SEITE 31
Pole
Step Work centre Work done Set-up time/processingtime
Components
10 Pre-assembly Drill holesand attachscrews
20min/5min Raw-pole,screws
20 QC (same as forthe umbrella)
QC - / 10s n/a
Crossbar
Step Work centre Work done Set-up time/processingtime
Components
10 Pre-assembly Drill holesand attachscrews
20min/5min Raw-crossbar,screws
20 QC (same as forthe umbrella)
QC - / 10s n/a
WBS – Work Packages/Milestones
SEITE 32
WP No.WP Start date Finish
date
100 Construction 7.11.2019 24.11.2019
200 Procurement and pre-assembly 25.11.2019 8.12.2019
300 In-Situ assembly and qualityassurance
9.12.2019 15.12.2019
400 Certification and customer approval 16.12.2019 23.12.2019
500 Project management 7.11.2019 23.12.2019
WBS - Elements
SEITE 33
• Project header and work packages
• Milestones
• Internal activities
• External activities (service master)
• Cost elements
• Materials (production or purchasing)
SEITE 34
WPNo.
WP Start date/ Work Finish date/Normal, min. duration
100 Construction 7.11.2019 24.11.2019
0010 Customer interaction Engineering: 16h 5/2 days
0020 Statics and production design Engineering: 12h 5/4 days
200 Procurement and pre-assembly
25.11.2019 8.12.2019
0010 Procurement PM: 8h 15/15 days
0020 Pre-assembly PM: 2h 3/1 days
300 In-Situ assembly and qualityassurance
9.12.2019 15.12.2019
0010 Transport to location In-Situ-Assembly:8h
1/1 day
0020 Assembly In-Situ-Assembly:40h
7/6 days
0030 Internal QA Engineering: 16h 3/2 days
400 Certification and customerapproval
16.12.2019 23.12.2019
0010 Certification and approvalprocessing
Engineering: 8h 2/2 days
0020 External certification n/a n/a
500 Project management 7.11.2019 23.12.2019
0010 Project management PM: 16h Entireproject
Order Costing
SEITE 35
Purchasing master dataProject planning
Material
Vendor
Info record
Project
Reference in
component view
MRP run
Requirement quantity
Purchase requ.
Purch. order
WBS – Cost Elements/Materials
SEITE 36
Work package (WBSelement)
Cost element Amount EUR
300 Transportation costs 2,000
300 Insurance for the time untilownership is transferred to WU
300
Level Part Quantity Price EUR
1 Tent fabric (side covers and roof) 700 m2 20/m2
1 Metal bar 30 m 15/m
1 Electro engine 1 pc 850/pc
1 Chain for moving the side cover 60 m 20/m
1 Screw incl. washers and nut 48 pc 5/pc
Project - Procurement
SEITE 37
Purchasing master dataProject planning
Material
Vendor
Info record
Project
Reference in
component view
MRP run
Requirement quantity
Purchase requ.
Purch. order