Integrated Strategic Asset Management System Targeting Excellence in Service Delivery Enabling Objective Delivery of the Council’s Plan and Strategic Objectives in a systematic, consistent, affordable and sustainable manner.

Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Integrated Strategic Asset Management System

Targeting Excellence in Service Delivery

Enabling Objective

Delivery of the Council’s Plan and Strategic Objectives in a

systematic, consistent, affordable and sustainable manner.

Page 2: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Infrastructure and Asset Management

Conference – June 7 and 8 - 2018

AGENDA Acknowledgement

Feedback from VAGO and MAV – Set Context

Benefits of Integrated Asset Management System

City Infrastructure Plan- Investment Optimisation - LTFP

Capital Works , Renewal Programs and Maintenance

Programs

Data and Information Management

Service Life Prediction and Life cycle costing

Asset Performance and Reporting

Questions

Page 3: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Acknowledgements

State Government – Rewrite of the Local Government Act

MAV – STEP Program

Local Government Victoria

Australian Centre for Excellence in Local Government (ACELG) - NAMAF

Victorian Auditor General (VAGO)

Institute of Public Works Engineering Australasia (IPWEA) – NAMS

Members of – International Infrastructure Management Manual

Individual Industry experts – Roger Burns, Dr Johann McDuling, Ashay

Prabhu, Pragnesh Shah

Maribyrnong City Council – EMT, CMT and Team Members

Civica, Assetic, CT Management

To all my colleagues and dedicated Asset Management practitioners here

today.

Page 4: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

VAGO’s MESSAGE TO GOVERNMENT

Victoria: The Staggering Statistics

Owns - Circa $95 billion of physical infrastructure assets.

Invests –Circa $2 billion annually to maintain, renew or

replace them.

Rate : That’s a staggering rate of 2% circa per annum

Page 5: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

VAGO’s Message- Renewal Gap

The continuing growth in councils’ asset renewal gaps

remains of considerable concern. $2B per annum risks

becoming $5B per annum

Poor asset management can lead to deteriorating or failing

assets, reduced levels of service, higher council rates and an

increased financial burden on future ratepayer generations.

Page 6: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

What is Infrastructure Gap

Source Assetic and Mckinsey – Giobal Infrastructure Initiative - Unlocking Hidden Capital

Page 7: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

VAGO – Recommended Improvements

• Practice - Optimise the Expenditure

for Renewal and Maintenance.

• AM Plan – Must Feed the Long

Term Financial Plan.

• Service Levels – Must Drive the

Required Spend.

• Tools - Technology Platforms that

enable data analytics to determine

better ways to spend monies

Public Accountability requires verification of

best value.

Page 8: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

MAV - Acknowledges

The NAMAF Results indicate that many

Councils will struggle to meet the new

requirements of the NEW LG Act.

Leadership

People skills and knowledge

Standards for Compliance

Long Term Financial Planning (LTFP)

Resource Planning

Page 9: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

What is Asset Management

Optimising the costs/benefits in

service delivery over the life of any

given Infrastructure.

Achieving Planned Service Outcomes

economically, socially responsible and

sustainable manner.

Authors View

Page 10: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Benefits of IAMS

Integrated Strategic Asset Planning(Full Picture);

Integrated Service Planning (Consistent Approach);

Centralised Data and Information System;

Centralised Modelling – LTFP, Capital, Renewal,

Maintenance (Risk Based Optimised);

Integrated Governance and Management;

Auditable processes including: Training, Review and

Audit;

Evidence Based Decision Making Processes;

Improved interoperability.

Page 11: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Strategic Integrated Planning Process

R

E

V

I

E

W

A

U

D

I

T

Page 13: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

INTEGRATED STRATEGIC ASSET PLANNING-

Keep it simple in a complex Council

Requirements

What we need – 10

years and above

LTFP

Services –

Quality

Functionality

Compliance

Control Loop

Decision Tree

Page 14: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

CITY INFRASTRUCTURE PLAN

Capital Expenditure – 20 Years +

Page 15: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

REQUIREMENTS

CIP Preparation Methodology

Phase 1 - Develop Project List to 2040

Phase 2 - Upload Project Information into CAPEX Tool

Phase 3 - Run CAPEX Model

Phase 4 - Prepare 10 Year Plan

Phase 5 - Prepare 2018/19 Plan

Phase 6 - Prepare/Confirm Scope & Cost Estimate of Projects

Phase 7 - Rerun CAPEX Model

Phase 8 - Prepare City Infrastructure Plan Master Document

Page 16: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Asset Classes & Criteria

Category Percentage

Financial 25%

Council plan objectives 25%

Risk and criticality 25%

Community benefit 25%

CategoryMaintenance

ratio

Operating

ratio

Land --% --%

Land improvements --% --%

Buildings 1.06% 4.13%

Computers and telecommunications 10.00% 6.00%

Roads 0.76% 0.12%

Bridges 0.76% 0.12%

Drainage 0.44% 0.17%

Rec, leisure and community facilities 1.75% 1.92%

Parks, open spaces and streetscape 8.69% 5.59%

Off street car parks 0.76% 0.12%

Other infrastructure 0.19% 0.01%

Page 17: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

CAPITAL EXPENDITURE BY

ASSET CLASS

--

5,000,000

10,000,000

15,000,000

20,000,000

25,000,000

30,000,000

35,000,000

40,000,000

45,000,000

20

17

/1

8

20

18

/1

9

20

19

/2

0

20

20

/2

1

20

21

/2

2

20

22

/2

3

20

23

/2

4

20

24

/2

5

20

25

/2

6

20

26

/2

7

20

27

/2

8

20

28

/2

9

20

29

/3

0

20

30

/3

1

20

31

/3

2

20

32

/3

3

20

33

/3

4

20

34

/3

5

20

35

/3

6

20

36

/3

7

20

37

/3

8

20

38

/3

9

20

39

/4

0

20

40

/4

1

20

41

/4

2

20

42

/4

3

20

43

/4

4

20

44

/4

5

20

45

/4

6

20

46

/4

7

20

47

/4

8

20

48

/4

9

20

49

/5

0

20

50

/5

1

20

51

/5

2

20

52

/5

3

20

53

/5

4

20

54

/5

5

20

54

/5

5

20

55

/5

6

Capital expenditure by Year and Asset ClassLandfill cells Spare 3 Spare 2 Portable Toilets Other infrastructureOff street car parks Aerodromes Parks, open spaces and streetscape Waste management Rec, leisure and community facilitiesDrainage Footpaths and cycle ways Bridges Roads Library booksHeritage plant and equipment Computers and telecommunications Fixtures, fittings and furniture Plant, machinery and equipment Heritage buildingsLeasehold improvements Building improvements Buildings Land improvements Land

Page 18: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Recommended 20 Years- Linked to LoS

Bridges 1% Buildings

20%

Computers and telecommunications

8%

Drainage 7%

Land 8%

Land improvements 15%

Other infrastructure 1%

Parks, open spaces and streetscape

11%

Rec, leisure and community facilities

5%

Roads 24%

Page 19: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Prediction Modeling - Optimise Renewal and

Maintenance – Assetic Predictor

Based on VAGO Direction:

1. Service Level Focus – We can trade off.

2. Analytics: Each Asset Class has Asset Life Profiles.

3. Financial Sustainability: We can Optimise expenditure for Renewals

and Maintenance

Page 20: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Asset Genetic Data

Assetic Decision Making Platform

Analytic Platform

Seeded Algorithms

Decision Making Platform

In Field Validation

Enhances Pattern

Generation

Page 21: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

MCC Decision Platform- Assetic

All Asset Classes

Service Level

Planning

Page 22: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Assetic at MCC

15 Degradation Patterns

Page 23: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Asset Renewal - Intervention

Page 24: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Degradation Pattern & Curves

Page 25: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

12/11/2008 25

0 5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

10

0

10

5

11

0

11

5

12

0

12

5

Age (Years)

No Maintenance

Avera

ge C

on

dit

ion

5

4

3

Very Good

Good

Fair

Bad

Very Bad

Preventative Maintenance

Condition-based Maintenance

Repairs

Rehabilitation

Replacement

$1

$5

+

$2

5 +

X 5

X 5

De Sitter’s “Law of Fives”

1

2

Page 26: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Current Road Surface Condition

26

54% Condition 1

21% Condition 2

11% Condition 3

6% Condition 4

8% Condition 5

Page 27: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Funding Options-50 year Renewal Program

Page 28: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

50 Year Renewal Funding Strategy – Staged Approach

$24,000,000

$27,000,000

$31,000,000

$34,000,000

$38,000,000

$31,000,000

$0

$5,000,000

$10,000,000

$15,000,000

$20,000,000

$25,000,000

$30,000,000

$35,000,000

$40,000,000

Years 1-10 Years 11-20 Years 21-30 Years 31-40 Years 41-50 Average

50 year Renewal Funding Strategy - Staged Funding Approach

Page 29: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Scenario Modelling - Roads

Year 20 - $31 Million Using Optimisation Year 20 - $24 Million Using Optimisation

Year 20 - $20- Million Using Optimisation Year 20 - $16 Million Using Optimisation

Page 30: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

LTFP Projections

$-

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

$35.00

$40.00

$45.00

$50.00

2017/18 2018/19 2019/20 2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27 2027/28

$ M

ILLI

ON

S

AXIS TITLE

Renewal Backlog for 10 years

Depreciation & Amortisation - SRP Renewal Expenditure - SRP Backlog

Page 31: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Asset Management System

Page 32: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

The Success Pillars

Page 33: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

SERVICE DELIVERY OPTIONS

STRATEGIES

COUNCIL

POLICY

PROJECT MANAGEMENT FRAMEWORK

LONG TERM FINANCIAL PLAN

SERVICE PLANS

STRATEGIC RESOURCE PLAN

ASSET MANAGEMENT PLAN

10 YEAR CAPITAL PLAN

20 YEAR RENEWAL PLAN

BUDGET OPERATIONAL PLAN

COMMUNITY

CITY INFRASTRUCTURE PLAN

PLANS

Page 34: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Asset Register

IA or Condition

Assessments

Prioritisation &

Scheduling

The six "What's" of asset management:

1. What do you own?

2. What is it worth?

3. What is its condition?

4. What is the backlog maintenance?

5. What is the remaining service life?

6. What do you fix first? – Optimised Decision Making

7. Functional Suitability ?

8. Compliance status?

9. What is it’s criticality?

10. What is the level of service to meet ? - Specification

Our Platform Answers Hard Questions

Page 35: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Data

Mining

T

o

o

l

s

Condition

Functionality

Performance

Capital Renewal Maintenance

Fully Integrated Data and Information Management

Gap

Page 36: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Asset Performance and

Evaluation

Asset

Integrated

Performance

Report

Physical

Condition

Functionality

Utilisation

Financial

Performance

Page 37: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum
Page 38: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Summary

Through a systematic and coordinated practice we can

enhance customer satisfaction, improve reputation, optimise

return on investment and minimise risk by integrating:

• Service Planning – We can link future plans to future service

levels – not last year plus or minus 5%.

• Options Costs: The ability of Councils to demonstrate multiple

future options is the only real platform for community

consultation.

• Demonstrate commitment – LTFP linked to the service level

that have been measured for affordability and demonstrate

best value.

• Needs vs Wants: Enable selection of projects based on

community current needs and future demand.

• Platform of Decision Making: With good data, robust

platforms and skilled resources, we can progressively make

this a way of life.

Page 39: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Questions ?

Page 40: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum
Page 41: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Service Level Example

0.00

1.00

2.00

3.00

4.00

5.00

BS - ASSESSED CONDITION 5. Excellent

4. Good

3. Fair

2. Poor

1. Very Poor

Page 42: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Service Level Example

0.00

1.00

2.00

3.00

4.00

5.00

Building Fabric Sub Structure(Foundations);

Roof External Walls &Windows

External Doors Internal

BF - ASSESSED CONDITION 5. Excellent

4. Good

3. Fair

2. Poor

1. Very Poor

Page 43: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

High Priority Programs

• Modelling Renewal Program (3 – 50 Years)

• Finalising Level Of Services

• Finalising Optimisation Program for Asset Life

Cycle

• Identifying the FY 18/19 Renewal Program

• Supporting Service Managers

Page 44: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

ASSET MANAGEMENT ANETOMY

Positive Attitude V Behaviour = Progress

Information processing in humans

resembles that in computers, and is

based on transforming information,

storing information and retrieving

information from memory.

Over the past 16 Years have we

evolved or copied what was

provided?

Page 45: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

WASTE MANAGEMENT – Cancellation Kerbside (KS) Bin

(CRM system)

Authority

(Contractors)

Remondis

(Recipient)

Customer Service/ MCC staffWaste Management Team Rates Officer

(Subcontractor)

The Bin Guy (TBG)

Ph

ase

Cancellation KS Bin request

Request is generated by:

Landlords

Owners

Agents

via the following mediums:

Telephone

Correspondence

Customer Service

Smartphone App (Form)

MCC Website (Form)

Email

Request Allocation

The system automatically

allocates the request

from the category to the

recipient i.e. Remondis

Verification

Has the KS bin been collected

and request closed in authority?

Turnaround 72hrs?

(Check Bin Task checklist

complete)

Are request details accurate?

I.e. Correct category – Additiona KS Bin,

Correct details code i.e. work type,

stream and size (refer sub process

below)

E.g. C,GW240L

Generate Customer Request in

Authority

Recipient creates a customer

request in Authority which

includes:

Source of request

Category

Contact Info

(Ensure all mandatory drop

down boxes are completed and

no duplicate request from

customer/contractor)

TASK 2ACK

Action collect KS bin:

TBG to collect KS Bin

from customer and

advise Remondis when

the job is completed

TASK BINP

Investigation Follow up

Check request

TASK 2CC

NO

Bin Register (listing)

The bin register updated from

the CRM checklist by the

contractor (includes serial#,

assessment#, stock used and

address). This then updates

the inventory register (refer to

inventory process)

TASK URE

YES

Have 2 or more

knockback notices

been issued?

Close customer KS bin

request in Authority

(Ensure Bin Task

checklist is completed)

Rates Module

The rates officer

notified via authority to

update the customer s

rates to remove

additional bin charges

TASK 3RTC

Ensure the following info is obtained at the time of

exchange with the customer.

Categories:

E.g. Damaged KS Bin, New KS Bin, Additional KS

Bin, KS Bin Retrieval

Remondis Work type:

New (N)

Cancellation ( c)

Retrieve and Replace (R&R)

Stolen (S)

Repair ( R )

Downsize (D/S)

Upsize (U/S)

Retrievals (RET)

SIZE:

120L

240L

360L

660L

1100L

Stream:

Waste( W)

Recycle ( R )

GW (GW)

Street Bin (SB)

Type of Service

Residential

Commercial

Is Bin accessible to

collect bin?

NO

Knockback notice issued to advise

customer:

Can t access property to

collect bin

Customer to rectify situation to

allow access by a certain date

The request will be closed

after 2 knockbacks

Customer will continue to be

charged (if paid bin) until bin is

collected

Customer required to make

another request after 2nd

knockback notice issued

Rates Authorisation to be included as part

of electronic form

Customer to complete and submit Rates

Authorisation for cancellation of green KS

bin or additional KS bins.

Action prepare run sheet:

Remondis to prepare

daily run sheet:

Jobs before 2pm - action

same day

Jobs after 2pm - action

next day

Monthly Report

Rates team to send

waste team monthly

report of new bin

charges

QA

Waste Officer to check

charges against CRM

Has a new

customer request

been made ?

YES

NO

Have 2 or

more knockback

notices been issued

for this request?

(TASK 3INF)

YES

NO

YES

Verification Triggers

Customer complaint

WMT oversight

function

YES

NO

NO

Page 46: Integrated Strategic Asset Management System · The continuing growth in councils’ asset renewal gaps remains of considerable concern. $2B per annum risks becoming $5B per annum

Asset Register ?

IA or Condition

Assessments ?

Prioritisation &

Scheduling ?

Hard Questions