HUAWEI TECHNOLOGIES CO., LTD. Page 1
Configuring RTN 950 Series for Smart POC and FTK project
(Instruction Manual)
HUAWEI TECHNOLOGIES CO., LTD.
www.huawei.com
HUAWEI TECHNOLOGIES CO., LTD. Page 2
1. Setting of IP address on your Laptop
1.1 Right Click on icon of Local Area Connection (LAN)
1.2 Click on Properties
1.3 Go to Internet Protocol (TCP/IP) then click Properties
HUAWEI TECHNOLOGIES CO., LTD. Page 3
1.4 Type in IP Address then click on OK
ALWAYS USE THE FOLLOWING:IP Address: 129.9.0.99Subnet mask: 255.255.0.0
(No need to filed-up the Default gateway and DNS)
HUAWEI TECHNOLOGIES CO., LTD. Page 4
2. Open the U2000 Web LCT application (pre-installed) 3. Type in your user name and password to Login
User Name: admin
Password: admin
HUAWEI TECHNOLOGIES CO., LTD. Page 5
4. To Search for a NE (Network Element), click NE Search
4.1 Click on NE SEARCH first before you Add NE
HUAWEI TECHNOLOGIES CO., LTD. Page 6
4.2 Click on SEARCHNote: Domain is automatically set (no need to input
HUAWEI TECHNOLOGIES CO., LTD. Page 7
Web LCT will search and detect available NEs
4.3 Available NE will appear
4.4 Click Add NE
HUAWEI TECHNOLOGIES CO., LTD. Page 8
4.6 After pressing OK, all available NE will be added on the screen (Communication Status will be NORMAL)
4.5 Then click on OK
HUAWEI TECHNOLOGIES CO., LTD. Page 9
5. To Login into the NE
5.1 Highlight the NE you want to login
5.2 Click on NE Login
HUAWEI TECHNOLOGIES CO., LTD. Page 11
6. To configure the NE, check if the Login Status then click on NE Explorer
6.1 Highlight the NE you want to configure
Status will be already Logged in
6.2 Click on NE Explorer
HUAWEI TECHNOLOGIES CO., LTD. Page 12
7. Web LCT will automatically detect the available board/card on the Slot Layout (with color ) 8. To install the cards, right click on the board then pressed “ADD”
Note: PIU, FAN and CSH card will automatically running installed. Also slot 23 and 25 for ODU will not detect until you finished add the IFU2 boards.
8.1 Click add Physical Boards
HUAWEI TECHNOLOGIES CO., LTD. Page 13
8.2 After you add all the physical boards, slot 23 and 25 for ODU board will appear.
8.3 Right click the ODU board then click the add physical board
HUAWEI TECHNOLOGIES CO., LTD. Page 14
9. Configuring NE attribute Site Name and Modifying NE
9.1 Highlight NE name
9.2 Highlight NE attributes
9.3 Double click box under NAME and type SITE NAME. Then click apply and query.
HUAWEI TECHNOLOGIES CO., LTD. Page 15
9.4 Click Modify NE ID and a dialog box will appear.
9.5 Type Site ID based on plan assigned by TNP. Then click OKNOTE: ID is a unique number.
HUAWEI TECHNOLOGIES CO., LTD. Page 16
10. Configuring 1+1 Protection
10.1 Highlight NE name
10.2 Highlight Link Configuration
10.3 Click IF 1+1 Protection
10.4 Click New
HUAWEI TECHNOLOGIES CO., LTD. Page 17
Working Mode : HSB
Revertive Mode : Revertive
WTR : 300
Enable Reverse Switching : Disable
Working Board : 3-IFU2-1
Protection Board : 5-IFU2-1
10.5 Click ok
HUAWEI TECHNOLOGIES CO., LTD. Page 18
11. Configuring Hybrid/AM configuration
11.1 Highlight 3-IFU2
11.2 Highlight Hybrid/AM Configuration
11.3 Click Hybrid/AM Configuration
HUAWEI TECHNOLOGIES CO., LTD. Page 19
11.4 Double Click the box of IF Channel Band and change the band according to the plan
11.5 Double Click the box of Manually Specified Module and change the module according to the plan
11.6 Double Click the box of E1 Capacity and change the capacity according to the plan
11.7 Click Apply then Query
HUAWEI TECHNOLOGIES CO., LTD. Page 20
12. Configuring Transmit Frequency and Transmit Power
12.4 Click apply then query
12.3 Double click the box of transmit frequency and type the frequency according to link budget given by TNP
12.2 Highlight ODU interface
12. 1 Highlight 23-ODU
HUAWEI TECHNOLOGIES CO., LTD. Page 21
12.5 click the power attributes
12.6 Double click the box of transmit power and type the power according to link budget given by TNP 12.7 Click apply
and query
HUAWEI TECHNOLOGIES CO., LTD. Page 22
13. Configuring Cross-Connection
13.1 Highlight NE name
13.2 Highlight cross connection configuration
13.3 Click New