19
Initiatives for Japan’s Electricity Business and Nuclear Power Generation May 8th, 2018 The Federation of Electric Power Companies 1

Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Initiatives for Japan’s Electricity Business and

Nuclear Power Generation

May 8th, 2018

The Federation of Electric Power Companies

1

Page 2: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Content

1. Current Environment Surrounding Japan’s Electricity Business

2. Operation Status of Nuclear Power Stations

3. Operator Initiatives Regarding Nuclear Power Generation

2

Page 3: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

1. Current Environment Surrounding

Japan’s Electricity Business

3

Page 4: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Trend of the demand for electric power in Japan

○ Since the Great East Japan Earthquake, the demand for power distribution (total of 10 electric power companies + new power operators) has decreased.

○ The demand for power supply (total of 10 electric power companies) declined in FY 2016. Deregulation of electric power has contributed to this as well.

○ Taking the initiatives for power saving, decrease in population, and other factors into consideration, the demand is likely to continue to decline in the future as well.

▼東日本大震災

7,000

7,500

8,000

8,500

9,000

9,500

10,000

2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

(100 million

kWh) Trend of demand

for electric power

電源対応需要 流通対応需要Demand for power

supply

Demand for power

distribution

The Great East Japan Earthquake

4

Page 5: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Three viewpoints concerning investigation of Energy Mix

Only 6% at the time of earthquake

[Target] Approx. 25%, exceeding the pre-

quake level (about 20%)

(Expected to improve to about 24.3%)

Electricity rates have risen substantially

since the earthquake

(Industrial users = about 30%,

households = about 20%)

The renewable energy surcharge in FY

2015 was 1.3 trillion yen

(2.7 trillion yen if all of the approved

capacities start operation)

[Target] To bring it down from 9.7 trillion

JPY of FY 2013 by comparison of variable

expenses such as fuel cost and renewable

energy surcharge

(Fuel cost 9.2 + Renewable energy surcharge 0.5

trillion yen)

(Expected to be reduced by 2 to 5%)

<Self-sufficiency rate> = Stable energy supply

<Electricity cost> = Improvement of economic efficiency

Due to NPS shutdowns and the

increase of thermal power

generation, the CO2 emissions in

FY2013 were the worst ever (490

million tons)

[Target] Reduction target at par with

Europe and U.S.

(Amount of CO2 emission from energy

sources is expected to -25%)

<Greenhouse gas emissions> = Environment conservation

Ensu

ring sa

fety

(majo

r pre

mise

of

investig

atio

n)

※The status evaluation of the aforesaid 3 items shall be during the investigation of Energy Mix

FY2030

5

Page 6: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Energy Mix of FY2030

Electric power demand

Thorough energy efficiency and conservation 196.1 billion kWh

(-17% compared to prior to implementation of measures)

Oil About 3%

FY2030

CoalAbout 26%

LNGAbout 27%

966.6 billion kWh

980.8 billion kWh

About 1,065 billion kWh

(Total power generation)

Power source mix

Economic growth

1.7%/year

Nuclear powerAbout 20 to 22%

Renewable energyAbout 22 to 24%

FY2030FY2013

(Actual results)

Geothermal power: About 1.0 to 1.1%Biomass power: About 3.7 to 4.6%Wind power: About 1.7%Solar power: About 7.0%Hydroelectric power: About 8.8 to 9.2%

(Breakdown of renewable power source)

6

Page 7: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

2. Operation Status of Nuclear Power Stations

7

Page 8: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

• Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements, and only 7 units

have restarted so far. The utilities are facing difficulty in terms of power supply and financial situation.

• The nuclear power generation is important power source in Japan. We focus on restart of the plants as well as

improvements in availability after the restart with ensuring safety as indispensable condition. By achieving Safety,

Energy Security, Economic Efficiency and Environmental Suitability (S+3E), we will contribute to Japanese economy.

Restart of Nuclear Power Stations(1)

Kashiwazaki-Kariwa➊➋➌➍➎➏➐

Tomari ➊➋➌ Higashidori

(Tohoku) ➊

Onagawa

➊➋➌

Fukushima Daiichi

①②③④⑤⑥

Fukushima Daini

➊➋➌➍

Tokai Daini ●Hamaoka ①②➌➍➎

Ikata

①②➌

Sendai

➊➋

Shika ➊➋

Tsuruga ①➋

Mihama ①②➌

Takahama ➊➋➌➍

Ohi ①②➌➍

Shimane ①➋➌

Genkai ①➋➌➍

● PWR

● BWRUnder review

Higashidori

(TEPCO) ➊

Ohma ●

Review status

under new

regulatory

requirements

PWR

( )BWR

( )Total

Approved ( )

Under review ( ) 4 8 12

Not filed 1 15 16

Total 18 25 42

Status of

decommissioned

units

PWR BWR Total

Decommissioned

(○)7 10 17

12

The above includes plants (3 units)

under construction.

142

To be decommissioned

Approved

8

Page 9: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Restart(reactor start-up)

Applic

atio

n

① Review ofReactor Installation Permit

② Review of Construction Plan

③ Review of Operational Safety Program

Pre

para

tion fo

r sta

rtup

Pre-service Inspection

①Perm

ission

③A

ppro

val

Review of earthquakes and tsunami

[Design basis earthquake ground motion (Ss)]

Review of plant facilities

Public

com

ments

Gaining the local community’s consent

②A

ppro

val

Applic

atio

n

Tom

ari

1,2

,3To

kai D

ain

Onagaw

a2

Sendai 1

,2

Tsu

ruga

2

Takaham

a3,4

Oth

er B

WR

s

Genkai4

Ohi4

Ikata

3

KK

6,7

Takaham

a1,2

Mih

am

a 3

Restart of Nuclear Power Stations(2)O

hi

3G

enkai

39

Page 10: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

0

1000

2000

3000

4000

5000

6000

1970 1980 1990 2000 2010 2020 2030 2040 2050 2060 2070

Tota

l pow

er

genera

ted (

100 G

Wh)

Earthquake2011

Now2017

:Total power generated: Total power generated (40 years of operation, capacity factor 80%)

20-22%

: Total power generated (60 years of operation, capacity factor 80%)

Restart, operation extension beyond its 40 years and replacement are essential to achieve and maintain nuclear power’s share of 20 to 22% in Energy Mix as national policy.

Restart of Nuclear Power Stations(3)10

Page 11: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

3. Operator Initiatives Regarding

Nuclear Power Generation

11

Page 12: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Securing the power source

Deployment of power supply cars

Securing cooling

methods

Deployment of portable pumps and hoses

Flooding countermeasures

Installation of a water stop seal to the penetrations

Deployment of air cooled emergency power generators

Deployment of portable large capacity pumps

Switch to watertight doors

Establishment of a tide embankment

Installment of a sea water pump in the watertight building

Deployment of reserve sea water pump motors

Seismic evacuation center Water canon

Additional safety improvement measures

Countermeasures implemented immediately after the accident

Still continually being implemented(examples of countermeasures)

Emergency Safety Measures

Promotion of Safety Improvement Initiatives by Nuclear Operators (1/2)

12

Page 13: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Tsunami measures (examples)

Tornado measures (examples)

Strengthening of fire control measures (examples)

①Establishment of a tide embankment

③Installment of emergency sea water intake equipment

(Installment of a sea water pump in the watertight building)

Earthquake measures (examples)

Addition of seismic support

①Example of seismic reinforcement of piping support ②Stabilization of surrounding slopes

Amount of excavated gravelMountain top : 60,200m3

Mountain side : 34,000m3

【Intake side】

②Establishment of a tide gate

①Installment of sprinklers, etc.

Installment of sprinklers(approx. 1,600 sprinklers/2 units)

②Installment of fire spread inhibitor walls ①Prevention measures

against flying objects

<Top>Absorbs the impact of the flying

objects with a steel net

<Side>Prevents intrusion with a

steel plate

Additional Safety Improvement Measures – Natural events countermeasures

Promotion of Safety Improvement Initiatives by Nuclear Operators (2/2)

13

Page 14: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Functions of the Nuclear Emergency Support Organization

Off-site facility of the Mihama Nuclear Emergency Support Center and equipment for

responding to an emergency

Administrative building Training facility Heliport (air transport of equipment)

Panoramic view of the off-site facility for the

Mihama Nuclear Emergency Support Center

(Mihama, Fukui Prefecture)

Outdoor training field

Reserve outdoor training field

Equipment storage/garage

facility

Wireless helicopter (information gathering from a height)

Robot controlling vehicles

Small and large wireless heavy machinery

(removal of outdoor rubble, etc.)

Main equipment

14

Page 15: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Engaging in Dialogue with the Community/Information

Dissemination (ex. Chubu Electric)

Dialogue through VisitsTo continuously exchange opinions with various organizations, plan

and hold opinion exchange meetings with local resident groups

around the power station and with women’s groups among others, as

well as participate in opinion exchange meetings held by the

government.

Station caravan

Station tours

Opinion exchange meetings Shaberiba

Opinion exchanges

Sponsored by the

government Held together with local resident groups

Omaezaki

CityHeld 2 times

(1st round) Held in 7 districts out of 8

(2nd round) Held in 6 districts out of 8

Makinohara

City

Held once (a series of4

meetings) Held in 1 district out of 10

Kakegawa City - Held in 8 districts out of 32

Kikugawa

City-

(1st round) Held in all 11 districts

(2nd round) Held in 4 districts out of 11

Visited homes to engage in dialogue targeting

residents of Omaezaki City and the three

surrounding cities.

(Visited approx. 84,000 homes <one round in

approx. a year and a half> )

Set up a booth at regional events, shopping centers

and such as Omaezaki City and the three

surrounding cities to engage residents in dialogue.

Have residents view power station safety

improvement measures on site first hand.

From October 2015 to the end of August 2017

2nd round finished in March 2017. 3rd round started in May 2017. Dialogue success rate: approx. 55% (at the end of the 2nd

round)

Held at 19 locations in FY2016Held at 10 locations in FY2017 (as of the end of August)

Cumulative number of visitors: 164,756 people(from FY2012 to the end of August 2017 )

・Participation/hosting of opinion exchange meetings

・Opinion exchanges with women “Shaberiba”

Conducted opinion exchanges, providing information about energy

during activities popular with women (aromatherapy, yoga, etc.)

Number of Shaberibas held:18 times (January 2016 - end of August 2017)

●Communication between the community and the society at large is fostered through initiatives such as “opinion exchanges,” “dialogue through visits,” “station caravan,” and “station tours.”

15

Page 16: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

New Organization that the Nuclear Industry will be Participating in(1/2)

• There are discussions of establishing a new organization to draft effective safety measures and to strengthen efforts that will encourage nuclear operators to introduce such measures in the field. The nuclear industry as a whole will effectively use knowledge and resources as well as engage in dialogue with, among others, the regulatory authority.

• Nuclear operators will continuously strive to reduce risk by implementing the measures decided on by the new organization.

<Main activities of the new organization>

• Identify issues to tackle as the nuclear industry as a whole regarding nuclear safety based on the latest knowledge domestic and abroad.

• Coordinate activities among the nuclear industry to jointly discuss issues.

• Discuss issues with the participation of experts that represent the nuclear industry. Engage in dialogue with the regulatory authority regarding the results, and compile and publish a technical report on it.

16

Page 17: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

17Image of nuclear industry’s roles inimproving nuclear safety in the future

Regulate

DialogueDomestic

and international

specialists

Socie

ty

NRA

Nuclear power station

Nuclear power station

Nuclear power station

・・

JANSI

Participate

New organization

CRIEPI

Manufacturer JAIFJEMA

FEPC

Improvement of nuclear safety

Evaluate and support

Nuclear industry

Collaborate

Licensees

Interactive communication

Exchange opinions

Participate

JANSI: Japan Nuclear Safety InstituteJEMA: The Japan Electrical Manufacturers' AssociationJAIF: Japan Atomic Industrial ForumFEPC: Federation of Electric Power Companies of JapanCRIEPI: Central Research Institute of Electric Power Industry

Page 18: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Summary

In the future as well, we will continue to improve the performance

of power plants through self-disciplinary power plant management

efforts without being limited to the existing safety improvement

measures which are already implemented, and contribute to the

economy of Japan by gaining the trust from society by improving

safety and availability, and by achieving S+3E.

18

Page 19: Initiatives for Japan’s Electricity Business and …...2018/05/09  · • Many Japanese nuclear power stations are still in the course to comply with new regulatory requirements,

Thank you for your attention.

19