11
Test smart – Build right In In In In-Place Strength Place Strength Place Strength Place Strength Evaluation of in-place strength Testing cores Rebound hammer Pullout test Case study Pull-off test Maturity method Test smart – Build right Pull Pull Pull Pull-off Test off Test off Test off Test ASTM C1583/C1583M ASTM C1583/C1583M ASTM C1583/C1583M ASTM C1583/C1583M Measure force required to pull off a metal disc bonded to concrete surface.

InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Test smart – Build right

InInInIn----Place StrengthPlace StrengthPlace StrengthPlace Strength

• Evaluation of in-place strength� Testing cores

� Rebound hammer

� Pullout test

� Case study

� Pull-off test

�Maturity method

Test smart – Build right

PullPullPullPull----off Testoff Testoff Testoff TestASTM C1583/C1583M ASTM C1583/C1583M ASTM C1583/C1583M ASTM C1583/C1583M

Measure force required to pull off a metal disc bonded to concrete

surface.

Page 2: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Test smart – Build right

PullPullPullPull----off Testoff Testoff Testoff Test

• Direct tensile strength test

• Evaluate condition of concrete surface before application of overlay or repair material

• Measure bond strength of overlay or surface repair materials

ft (MPa)

fc (MPa)

Worthers, 1994

Lab testing between Lab testing between Lab testing between Lab testing between compressive and tensile strengthcompressive and tensile strengthcompressive and tensile strengthcompressive and tensile strength

Page 3: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Test smart – Build right

PullPullPullPull----off Test Procedureoff Test Procedureoff Test Procedureoff Test Procedure

• Use planing tool to prepare a flat surface

• Bond metal disc to surface

• Drill partial core

• Apply tensile force

Overlay

≥10 mm

50 mm

Test smart – Build right

Surface PlaningSurface PlaningSurface PlaningSurface Planing

Page 4: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Test smart – Build right

Grind “Button” & Brush SurfaceGrind “Button” & Brush SurfaceGrind “Button” & Brush SurfaceGrind “Button” & Brush Surface

Test smart – Build right

Prepare and Apply AdhesivePrepare and Apply AdhesivePrepare and Apply AdhesivePrepare and Apply Adhesive

Page 5: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Test smart – Build right

Press Disc To SurfacePress Disc To SurfacePress Disc To SurfacePress Disc To Surface& Clean Up& Clean Up& Clean Up& Clean Up

Test smart – Build right

Cut Partial Depth CoreCut Partial Depth CoreCut Partial Depth CoreCut Partial Depth Core

Page 6: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Test smart – Build right

Partial coring w. Suction PlatePartial coring w. Suction PlatePartial coring w. Suction PlatePartial coring w. Suction Plate

Test smart – Build right

PullPullPullPull----off Test Procedureoff Test Procedureoff Test Procedureoff Test Procedure

Fufpo =

Fu

A

• Bond metal disc to surface

• Drill partial core

• Apply tensile force

Page 7: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Schematic of ApparatusSchematic of ApparatusSchematic of ApparatusSchematic of ApparatusASTM C1583/C1583MASTM C1583/C1583MASTM C1583/C1583MASTM C1583/C1583M

Steel disc

Tensile loading device with slow loading rate

Swivel joint

Must eliminate bending on disc

Ring as counterpressure

Test smart – Build right

PullPullPullPull----off Test Apparatusoff Test Apparatusoff Test Apparatusoff Test Apparatus

Adhesion testing of overlayAdhesion testing of tiles

Page 8: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Test smart – Build right

Successful Test!Successful Test!Successful Test!Successful Test!

Test smart – Build right

PullPullPullPull----off Test Failure Locationsoff Test Failure Locationsoff Test Failure Locationsoff Test Failure Locations

• Interfacial bond failure (bond strength)

Page 9: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Test smart – Build right

PullPullPullPull----off Test Failure Locationsoff Test Failure Locationsoff Test Failure Locationsoff Test Failure Locations

• Cohesive failure in the existing concrete (substrate strength)

Test smart – Build right

PullPullPullPull----off Test Failure Locationsoff Test Failure Locationsoff Test Failure Locationsoff Test Failure Locations

• Cohesive failure in the repair material

• Can not predict failure location• Average the results for same failure locations

Page 10: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Test smart – Build right

PullPullPullPull----off Test Failure Locationsoff Test Failure Locationsoff Test Failure Locationsoff Test Failure Locations

• Bond failure at the epoxy

• Inconclusive test

Test smart – Build right

Evaluation of Surface Evaluation of Surface Evaluation of Surface Evaluation of Surface Preparation MethodsPreparation MethodsPreparation MethodsPreparation Methods

• Surfaces to receive overlay or repair material are usually prepared to ensure good bonding

• Some repair methods can damage concrete and reduce the “apparent” bond strength

Page 11: InIInnIn----Place StrengthPlace Strength Pulloff.pdfASTM C1583/C1583M Steel disc Tensile loading device with slow loading rate Swivel joint Must eliminate bending on disc Ring as counterpressure

Test smart – Build right

Evaluation of Surface Evaluation of Surface Evaluation of Surface Evaluation of Surface Preparation MethodsPreparation MethodsPreparation MethodsPreparation Methods

• Test substrate before applying overlay

� ACI 503R (Use of Epoxy Compounds with Concrete) recommends substrate pull-off strength > 175 psi (1.2 MPa)

Test smart – Build right

SummarySummarySummarySummary

• Pull-off test can be used to evaluate surface before applying repair materials or overlays

• Evaluate bond strength of repair materials

• Need to eliminate bending on the disk when it is being pulled off

• Good adhesive needed to provide strong bond and allow rapid testing

• Failure will occur in “weakest link”