  • 8/8/2019 Industrial Plot Drainage Design

    1/6

    Drainage Design

    (HFP Industrial Plot Ibeju lekki)

  • 8/8/2019 Industrial Plot Drainage Design

    2/6

    General

    A hydrological analysis of the area to be drained is done to obtain information on run-off and

    stream flow characteristics required for the hydraulic design.

    The design flow is established by selecting proper combinations of rainfall and run-off

    characteristics that is expected to occur over a stipulated period. The design criteria is then the

    maximum flow in cubic meter per second carried by the drainage structure with no flooding or

    a limited amount of flooding to be exceeded on the average of once over the design period.

    Parameters

    Run-off estimates shall be based on the Lloyd-Davies method. In this method the run-offis related to the intensity of rainfall by the following formula:

    Q = C I A

    Where,

    Q = quantity of run-off in cubic feet per second (cfs)

    C = coefficient of run-off expressed as a percentage of impervious of the

    watershed surface.

    I = Intensity of rainfall expressed in inches per hour for the stipulated period of

    Concentration.

    A = Area of watershed in acres

  • 8/8/2019 Industrial Plot Drainage Design

    3/6

    Parameters Estimation

    1. Coefficient of run-off

    The use of average coefficients for various surface types is used. However C

    is takes to be 0.5 for our analysis.

    2. Rainfall Intensity:The value for the intensity of rainfall is calculated from:

    I = Kn

    (t + a)b

    Where,

    I = Rainfall intensity in inches per hour

    t = Duration of rainfall in hours

    a and b are stationconstants

    Kn = A . B Log 10n

    ;

    A and B are station constants

    a = 0.3 Ref: Meteorological notes 2 : British West Africab = 0.861 meteorological services Nigeria.

    A = 2.18

    B = 1.44

  • 8/8/2019 Industrial Plot Drainage Design

    4/6

    The storm design frequencies for gutters n = 10

    Rainfall duration t = 10 hours.

    Kn = 2.18 x 1.44 x Log 1010

    = 3.14

    Therefore,

    I = 3.14

    (10 + 0.3)0.861

    = 0.421

    Point 1: A = 2.47 acres

    Q = CIA

    Q = 0.52 cfs

    = 0.147 cubic meter per second; gutter section = 60 x 40; capacity = 0.24 cms.

    Point 2: A = 3.0 acres

    Q = 0.631 cfs

    = 0.18 cubic meter per second; gutter section = 60 x 40; capacity = 0.24 cms.

  • 8/8/2019 Industrial Plot Drainage Design

    5/6

    Point 3: A = 6.79 acres

    Q = 1.429 cfs

    = 0.404 cubic meter per second; gutter section = 2x 60 x 40; capacity = 0.48

    cms.

    Point 4: A = 7.12 acres

    Q = 1.5 cfs

    = 0.424 cubic meter per second; gutter section = 2 x 60 x 40; capacity = 0.48

    cms.

    Point 5: A = 2.41 acres

    Q = 0.51 cfs

    = 0.143 cubic meter per second; gutter section = 60 x 40; capacity = 0.24 cms.

    Point 6: A = 10.45 acres

    Q = 2.16 cfs

    = 0.61 cubic meter per second; gutter section = 2 x 60 x 60; capacity = 0.72 cms.

    Point 7: A = 5.93 acres

    Q = 1.24 cfs

    = 0.35 cubic meter per second; gutter section = 2 x 60 x 40; capacity = 0.48 cms.

    Point 8: A = 15.3 acres

    Q = 3.22 cfs

    = 0.911 cubic meter per second; gutter section = 120 x 80; capacity = 0.911 cms.

  • 8/8/2019 Industrial Plot Drainage Design

    6/6