INDUSTRIA E RESILIENZA GUIDA PRATICA PER L’ADATTAMENTO AI CAMBIAMENTI CLIMATICI DEI COMPARTI PRODUTTIVIModena, 22 Novembre 2019 Ing. Tommaso Musner
Context analysis/ CLIMATE IS CHANGING AND WE EXPERIENCE IT
Esondazione fluviale 2014
Tromba d’aria 2014
Context analysis / WHAT IS THE PERCEPTION OF COMPANIES?
Esondazione fluviale 2014
Tromba d’aria 2014
Ricerca C2ES (2012) basata sui dati del Carbon Disclosure Project
Esondazione fluviale 2014
Tromba d’aria 2014
Research C2ES (2012) on data of the Carbon Disclosure Project
Context analysis / WHAT IS THE PERCEPTION OF COMPANIES?
Esondazione fluviale 2014
Tromba d’aria 2014
Adapting for a Green Economy of WorldResources Institute (2012)
Context analysis / WHAT IS THE PERCEPTION OF COMPANIES?
Risk analysis/ VULNERABILITY
PRECIPITAZIONI
ESTREMEHEAT WAVE ONDATA DI
FREDDO TROMBAD'ARIA
SICCITA’
Vvulnerabilità
rispetto a REPUTAZIONE
Vvivibilità spazi
pubblici
Vvulnerabilità
rispetto a STRUMENTI DI LAVORO,CONTINUITÀ DELL'ATTIVITÀ
STABILITÀ FINANZIARIASICUREZZA E SALUTE DEI LAVORATORI
INFRASTRUTTURE
Climatic Events/ Effect on companies
Continuità del business Responsabilità legale Reputazione
Risposta del mercato Stabilità finanziariaSalute e sicurezza lavoratori
Infrastrutture
Integrità mezzi di
produzione
Context Analysis/ BOMPORTO: PUBLIC SPACES
Context Analysis/ BOMPORTO: PUBLIC SPACES
Context Analysis/ BOMPORTO: Perceived risks
Le mappe restituiscono il rischio percepito in funzione della collocazione della ditta e del processo produttivo
Context Analysis/ BOMPORTO: Perceived risks
Adaptation Plan / BOMPORTO
Tot n.13 ACTIONS> training seminars / awarness-raising activites for industries> technical services for industries> urban rigeneration actions
10 YEARS OF ACTUATION [January 2017 – December 2026]
> 2017-2019: n.6 actions with a defined preliminary feasibility study
> from 2020: n.7 actions to plan/define/finance
PLAN AND MONITORING INDICATORS> of ‘actuation’> of ‘effectiveness’
Spatial limits> Bomporto industrial site
01 - INFO POINT
> Dedicated technical office to answer the needs of Bomporto firms on climate adaptation measures
> Front office activites and organization of the initiatives scheduled in the Adaptation Plan;
> Unified portal for the activies addressed to local companies (info, training seminars, etc.)
02 – TRAINING SEMINARS FOR LOCAL COMPANIES
CAP Modena and S.I.P.R.O. Ferrara with AESS
Organization of TRAINING SEMINARS and WORKSHOPS:> thematic meetings on different climate events and their impacts on industrial areas;> presentation of local companies that produce/install ad hoc technical solutions;> presentation of subventions, fundings, incentive bonuses or tax deductions
to contribute to private expenses.
Active with 2 seminars per year from 2017 in sinergy with the other seminars organized in Ferrara by S.I.P.R.O.
02 – TRAINING SEMINARS FOR LOCAL COMPANIES
1^ meeting: 20th April 2017 in BomportoCool Materials> about 20 participants among firms and professionals
2^ meeting: 29th June 2017 in Ostellato• Regeneration with green
3^ meeting: 21st November 2017 in BomportoIntence precipitations and floods> about 40 participants among firms and professionals
4^ meeting: 18 th October in ModenaResilience and Adaptation in industry sector> participants among firms, professionals and other projects
03 – CLIMATE AGENCY
CAP Modena by the headoffices of the industries in Bomporto
SERVICE OF EVALUATION OF BUSINESS VULNERABILITY to climate events :> technical assistance to underline critical situations / threats and to propose adaptation/mitigation measures;> gathering information and fill-in check-list with data on the company;> site visit to the company with 2 technicians/experts;> editing of a final report with the evaluation and intervention proposals.
Service active from December 2017 (8 companies interviewed)
03 – CLIMATE AGENCY
1 Caratteristiche del capannone/degli spazi esterni
1 Sono disponibili dati di temperatura interna? NO 1
2Quanto vale l'indice wet bulbe globe temperature (WBGT, Norma UNI EN 27243:1996)?
Definire una scala/ valore soglia
3 Qual è l'uso del suolo delle superfici esposte al sole??Definire una scala/ valore soglia
4 Qual è l'orientamernto del sito produttivo?Definire una scala/ valore soglia
5Sono presenti superfici schermanti naturali (piante, siepi) o artificiali (teli ombreggianti, impianti solari termici)
NO 1
6 Sono presenti superfici riflettenti? NO 17 Sono presenti superfici con inerzia termica alta?? SI 18 Le superfici del fabbricato sono isolate?? SI 0
9Sono presenti altri edifici che schermano l'edificio dall'irraggiamento solare?
NO 1
10Sono presenti superfici vetrate di grandi dimensioni?(effetto serra)
SI 1
SITE VISIT AUDIT CHECKLIST REPORT
Analysis of the company scale/ METHODOLOGICAL APPROACH
> Hot
Wave
> Cold
Wave
> Droughts and
Heavy Rains
➢ Whirl-
wind
AChoose the climatic event, you want to consider• Based on: events already occured, future scenarios in the industrial area
B
Collect information on the climatic event and on the company• Climatic event: Variability in space and time (mathematical models)
• Company: production process, sector, area covered by the plant, revenues, number of workers..
C
Build a model of the company• Create a conceptual model of the company and expose it to the effect of the event driven
by the climate change
• The model should be simple (verifiable) but representative of the company
• You can create in this way a specific checklist for each event to evaluate the company risk
D
Visit the company (field inspection)• Through the field inspection it is possible to identify risks and gives the opportunity to
choose a first set of adaptation measures
• The interview with the company owners let you check the representativeness of the cheklist
Analysis of the company scale/ HEAVY RAINS
A
C
EXTERNAL STRUCTURE
• Maintenance of the drainage network notcontinuous
• The ground floor is positioned belo the averageground level or is exposed to floodings
• Acces to the company is protected/not protectedby gates or draining devices
• Presence of auxiliary electric generators in case of black-out
• Presence of non-return valves or accumulationtanks
• Presence of impermeable surfaces
Potential
criticalities
> Heavy Rains /
Droughts
Analysis of the company scale/ HEAVY RAINS
INTERNAL STRUCTURE
• Position of the electrical devices and systems
• Presence of entry points (water entering from outside)
• Positioning of the machinery and of the goods
• Presence of basement spaces
• Access to the company in case of flooding: possible/impossible
A
C Potential
criticalities
> Heavy Rains /
Droughts
Analysis of the company scale/ HEAVY RAINS
Fixed gates
Mobile gatesInflatable
gates
Transient storage
Non-return
valves
early-warning
systems
Sealing of
entry points
A
D Potential
criticalities
> Heavy Rains /
Droughts
Valutazione del rischio aziendale / TEMI
Valutazione del rischio aziendale / TEMI
04 – EMERGENCY AND ALERT PLAN
CAP ModenA with Municipality of BomportoRegione Emilia-Romagna, ARPA and Protezione Civile (civil defence)
COORDINATION of information among the different alert plans managed by various territorial entities:> recollection of existing emergency systems and plans;> coordination of information among public entities and private companies;> update of municipality database to send alert messagges.
Started in December 2017 (gathering data from companies)
04 – EMERGENCY AND ALERT PLAN
Misure / SPAZI PUBBLICI
06 – URBAN FORESTATION
07 – POCKET GARDEN
08 – PERMEABLE PAVING
09 – RAIN GARDENS
06 – URBAN FORESTATION
Municipality of Bomporto with CAP Modena
PLANTING OF NEW TREES:> summer comfort / cooling;> directiong/channeling of summer breezes;> protection from dominant winds in winter.
Regenaretion of a green area in the Bomporto’s industrial site
06 – URBAN FORESTATION
07 – POCKET GARDENMunicipality of Bomporto with CAP Modena
TRANSFORMATION OF A BROWN FIELD IN VIA FERMO CORNI:> urban regeneration and cleaning of an unused area;> equipped/high quality area for the workers of the industrial site;> improvement of environmental comfort of the entire area;
> integration of the industrial site with the green corridor along the cavo Fiumicello
Because of its multifunctionality, the action as an ecosistemic approach.
Ongoing / preparation of the terrein carried on in collaboration with Municipality / commission for final design and working plan
07 – POCKET GARDEN
07 – POCKET GARDEN
07 – POCKET GARDEN
08 – PERMEABLE PAVINGS
Municipality of Bomporto with CAP Modena
DE-SEALING AND DE-PAVING ACTION:> improving soil permeability;> increase thermal comfort;> improvement of environmental comfort of the entire site.
From 2019 (according to technical-economical feasibility plan)
08 – PERMEABLE PAVINGS
09 – RAIN GARDENS
Municipality of Bomporto with CAP Modena
REALIZATION OF PLANTED DEPRESSIONS ALONG THE STREETS TO ABSORBE RAINWATER FROM ROOFS, DRIVEWAYS, WALKWAYS, PARKING LOTS:> reducing run-off filtering rainwater more slowly;> reducing water flow;> reducing floods in case of intense rainstorms.
From 2019 (according to technical-economical feasibility plan)
09 – RAIN GARDENS
10 – WATER BASIN
Municipality of Bomporto with CAP Modena
REALIZATION OF A BASIN FOR THE STORAGE, FILTERING/CLEANING AND/OR INFILTRATION OF RAINWATERS:> diminishing the water stream in the cavo Fiumicello during extreme rainfalls;> water storage in summer to be used for irrigation;> improvement of quality of water thanks to constructed wetlands;
From 2019 (according to technical-economical feasibility plan)
10 – WATER BASIN
11 – COOL MATERIALS
Private companies with public subsidy / tax bonus / funding
TAX REDUCTION FOR PRIVATE COMPANIES THAT REPLACE EXTERNAL SURFA WITH COOL MATERIALS WITH A HIGH SOLAR REFLEX INDEX:> ordinary maintainace of roofs/facedes;> limited costs but great benefits to contrast inner overheating;> diminishing the costs for summer cooling.
From 2019 (according to technical-economical feasibility plan)
11 – COOL MATERIALS
12 – PLANNING RULES AND REGULATIONS
Municipality of Bomporto with CAP Modena
UPDATE PLANNING TOOLS WITH THE INTEGRATION/IMPLEMENTATION OF OBJECTIVES AND RULES FOR MICRO-CLIMATIC AND ENVIRONMENTAL IMPROVEMNTS AND BIODIVERSITY CONSERVATION:> update PSC+RUE from 2015 (water-works study);> integrations measure to contrast heat/cold waves, whirlwinds or droughts.
From 2019 (according to technical-economical feasibility plan)
13 – LED LIGHTS
Municipality of Bomporto with CAP Modena
REPLACEMENT OF LAMP POSTS WITH POLES USING LED TECHNOLOGY:> better light quality, longer duration and higher power;> more efficiency (‘smart poles’ and systems for the movement control)> integration with monitoring sensor
(consumptions, weather/climate data, pollution, wifi, etc..)
From 2019 (according to technical-economical feasibility plan)
Consorzio Attività Produttive Aree e ServiziStrada S. Anna n. 210 (c/o Palazzina SETA)41122 ModenaTel.: +39 059.454.608Fax: +39 059.312.109
E-mail: [email protected]: [email protected]: www.capmodena.it/fondi-ue-progetto-life