Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
INDEX OF SHEETSSheet No. Description
TITLE SHEET
SPECIAL NOTES
SPECIFICATIONS
SPECIAL PROVISIONS
STANDARD DRAWINGS
4 Welding Steel Bridges
GENERAL NOTES
Bridges with current interims.
2002 AASHTO Standard Specifications for Highway
TRANSPORTATION CABINETDEPARTMENT OF HIGHWAYS
BRIDGE ID
004B00021N
R
I
P
E
E
N
TA C
K
N
E
O
S
EF
O
SCI
L
S
LA
RE
D
SN
ENI
GN
Y
F
TEO KE
TU
28354
DAVID EDWARD
RUST
DATE
P.E. 28354
DAVID EDWARD RUST
TITLE SHEET
LAYOUT - REPAIR LOCATIONS
PALMER ENGINEERING CO.
...\
DG
N\
S1_
Cair
o_
TIT
LE.dgn
2/21/
2020
2:27:26
PM
28288
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
OHIO RIVER
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
S1_
CAIR
O_
TIT
LE.
DG
NFIL
E
NA
ME:
BALLARD
US 51
FEBRUARY, 2020
FINGER DAMS - PHASE A
POURABLE JOINT REPLACEMENT
Edges for Concrete on Bridges
Replacing Pourable Joints and/or Installing Armored
Bearing Lubrication
Overlays
Bridge Restoration and Waterproofing with Concrete
Replacing Finger Joints with Modular Joints
Use of the Hydrodemolition Method
BGX-009-04
With Concrete Overlays
Bridge Restoration And Waterproofing
Construction with current Supplemental Specifications.
2019 Standard Specifications for Road and Bridge
S01
S01
S02
S03
S04
S08
S11
FINGER DAMS - PHASE BS05
FINGER DAM REPLACEMENTS06-S07
S09-S10
M01-M06 MOT ZONE 1 SIGNING
M07-M13 MOT ZONE 2 SIGNING
M14-M19 MOT ZONE 3 SIGNING
DECK OVERLAY & MOT TYPICAL SECTION
M20-M21
M22-M23
M24-M26
MOT PHASE 1A CONSTRUCTION
MOT PHASE 1B CONSTRUCTION
MOT PHASE 2A CONSTRUCTION
M27-M29 MOT PHASE 2B CONSTRUCTION
MOT PHASE 3A CONSTRUCTION
MOT PHASE 3B CONSTRUCTIONM32-M33
M30-M31
STEEL BRIDGE RAIL REPAIR
Steel Bridge Railing Repairs
D.E. RUST
R.M. DAMON
J.A. ROSE D.E. RUST
BJE-001-03 Neoprene Expansion Dams and Armored Edges
TTC-110-03 Lane Closure Using Traffic Signals
Painting Structural Steel Repairs
Traffic Control on Bridge Repair Contracts
REPAIR PLANSCAIRO OHIO RIVER BRIDGE
BALLARD CO., KY. / ALEXANDER CO., IL.DISTRICT 1
LONGITUDE: 89°08'41" WEST
LATITUDE: 36°59'41" NORTH
BRIDGE SITE
LOCATION MAP
Fe
bruary
21, 2020
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
Micro
Statio
n v8.11.9.536
02/21/2020
AND LABOR NECESSARY TO DO THE WORK FOR WHICH NO DIRECT PAYMENT WILL BE MADE.
DESIGNATED BY THE ENGINEER. THE CONTRACTOR SHALL FURNISH ALL PLANS, EQUIPMENT
SUB-CONTRACTOR SHALL BE IMPRINTED IN THE CONCRETE WITH 1" LETTERS AT A LOCATION
CONSTRUCTION IDENTIFICATION: THE NAMES OF THE PRIME CONTRACTOR AND THE
THICKER PART JOINED (IN.)
MATERIAL THICKNESS OF
OVER ƒ"
OVER •" TO ƒ"
OVER ‚" TO •"
TO ‚" INCLUSIVE
FILLET WELD (IN.)
MINIMUM SIZE OF
Š"
‚"
‰"
„"
GENERAL NOTES
J.A. ROSE
D.E. RUST R.M. DAMON
D.E. RUST
S02PALMER ENGINEERING CO.
...\
DG
N\
S2_
Cair
o_
GE
NO
TES01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:30
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
FROM THE RIGHT-OF-WAY.
OR APPROACHES SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED
DISPOSAL OF MATERIALS: ALL MATERIALS AND DEBRIS REMOVED FROM OR BENEATH THE BRIDGE
STORAGE OF MATERIAL ON THE BRIDGE IS PROHIBITED.
CONSTRUCTION LOAD: THE CONTRACTOR SHALL ABIDE BY THE BRIDGE POSTING LIMITS.
THE SPECIFICATIONS.
AND SITE SHALL BE LEFT IN A CONDITION THAT IS IN ACCORDANCE WITH SECTION 105.12 OF
FROM THE CONTRACTOR'S ACTIONS. AFTER COMPLETION OF ALL OPERATIONS, THE STRUCTURE
FOR REPAIR OF ANY AND ALL DAMAGES TO THE STRUCTURE, SHOULD SUCH DAMAGE RESULT
DAMAGE TO THE STRUCTURE: THE CONTRACTOR SHALL BEAR FULL RESPONSIBILITY AND EXPENSE
ACTIONS.
CONTRACTOR AT HIS EXPENSE, SHOULD SUCH DAMAGE RESULT FROM THE CONTRACTOR'S
OF THE CONSTRUCTION DURING THE LIFE OF THE PROJECT SHALL BE REPAIRED BY THE
DAMAGE OUTSIDE CONSTRUCTION LIMITS: ANY AREA THAT IS DISTURBED OUTSIDE THE LIMITS
CONTRACT.
BEEN REOPENED TO NORMAL TRAFFIC FOLLOWING COMPLETION OF ALL WORK REQUIRED IN THE
STABILITY OF THE STRUCTURE FROM THE TIME OF MOBILIZATION UNTIL AFTER THE BRIDGE HAS
STABILITY OF THE STRUCTURE: THE CONTRACTOR IS COMPLETELY RESPONSIBLE FOR THE
WELD SIZES: UNLESS SPECIFIED OTHERWISE, USE THE FOLLOWING FILLET WELD SIZES:
DIMENSIONS.
ALL PLAN DIMENSIONS ARE FOR A NORMAL TEMPERATURE OF 60°F. LAYOUT DIMENSIONS ARE HORIZONTAL
FASTENER SIZE/SPACING, WITH FIELD MEASUREMENTS PRIOR TO ORDERING MATERIALS OR FABRICATING STEELWORK.
INSTALLED. THE CONTRACTOR SHALL VERIFY ELEVATIONS AND DIMENSIONS, INCLUDING THICKNESS OF PARTS AND
PLANS AND DO NOT NECESSARILY REFLECT REVISIONS MADE DURING CONSTRUCTION OR REPAIRS PREVIOUSLY
DIMENSIONS: DIMENSIONS SHOWN ON THESE PLANS ARE TAKEN FROM THE ORIGINAL CONSTRUCTION CONTRACT SHALL BE INCIDENTAL TO THE REPAIR ITEM BEING COMPLETED.
EXISTING STEEL REINFORCEMENT: THE COST OF CUTTING, BENDING, AND CLEANING EXISTING STEEL REINFORCEMENT
BEVELED EDGES: BEVEL ALL EXPOSED EDGES ƒ", UNLESS OTHERWISE NOTED.
THE CONTRACT.
STRUCTURAL STEEL REPAIRS. THE COST OF THIS TOUCH-UP PAINTING IS TO BE INCIDENTAL TO
SATISFACTION OF THE ENGINEER AND IN ACCORDANCE WITH THE SPECIAL NOTE FOR PAINTING
PAINT HAS BEEN DAMAGED BY THE CONTRACTOR SHALL BE CLEANED AND SPOT PAINTED TO THE
PAINTING DAMAGED AREAS: ALL AREAS OF NEW OR EXISTING STRUCTURAL STEEL ON WHICH THE
REPAIRS.
CLEANING AND PAINTING: REFER TO THE SPECIAL NOTE FOR PAINTING STRUCTURAL STEEL
GENERAL NOTES
ACCORDANCE WITH SECTION 811.10 OF THE SPECIFICATIONS.
EPOXY COATED REINFORCING STEEL: ALL PROPOSED REINFORCING BARS IN THE PLANS SHALL BE EPOXY COATED IN
A BILL OF REINFORCEMENT.
CONCRETE IS 2" UNLESS OTHERWISE NOTED. USE STIRRUP BEND DIAMETERS FOR BARS DESIGNATED BY SUFFIX (S) IN
OTHERWISE SHOWN. SPACING OF BARS IS FROM CENTER TO CENTER OF BARS. CLEAR DISTANCE TO FACE OF
REINFORCEMENT: DIMENSIONS SHOWN FROM THE FACE OF CONCRETE TO BARS ARE TO CENTER OF BARS UNLESS
SUBMIT FINAL APPROVED SHOP DRAWINGS TO THE ENGINEER.
ARE PROPOSED BY THE FABRICATOR OR SUPPLIER, SUBMIT THOSE CHANGES TO THE CONSULTANT.
SHOP DRAWINGS: SUBMIT SHOP DRAWINGS DIRECTLY TO THE CONSULTANT. WHEN ANY CHANGES IN THE DESIGN PLANS
DETAILS OF THE DTI's SHALL BE SHOWN ON THE SHOP PLANS.
STANDARD SPECIFICATIONS AND ASTM F959. ALL DTI's SHALL BE MECHANICALLY ZINC COATED. INSTALLATION
BOLTED CONNECTIONS ARE TO BE INSTALLED USING "DIRECT TENSION INDICATORS" (DTI's) IN ACCORDANCE WITH THE
TYPE 1 MECHANICALLY GALVANIZED BOLTS SHALL BE USED AS DESCRIBED IN AASHTO M 164, ALL HIGH STRENGTH
FILLED WITH A HIGH STRENGTH BOLT THAT IS TENSIONED PER THE SPECIFICATIONS.
ANY HOLES IN STEEL MEMBERS THAT ARE NOT SPECIFIED TO RECEIVE ANY OTHER CONNECTED PART SHALL BE
LATERALS, AND CONNECTIONS RIVETED TO GIRDERS.
STRINGERS, FLOORBEAMS, BRACKETS, CROSSFRAMES, ETC. AND CONNECTIONS RIVETED TO SAME. 1" DIA. IN GIRDERS,
WITH HIGH STRENGTH BOLTS OF EQUAL SIZE. CONTRACTOR TO VERIFY PRIOR TO ORDERING MATERIALS. ‡" DIA. IN
DRAWING INFORMATION, THE EXISTING RIVET SIZES BELOW ARE ANTICIPATED AND SHALL BE REPLACED WHERE NOTED
THE SHEAR PLANE IN ALL BOLTED CONNECTIONS, UNLESS OTHERWISE NOTED. FROM AVAILABLE ORIGINAL DESIGN
ˆ INCH GREATER THAN THE BOLT DIAMETER, UNLESS OTHERWISE NOTED. BOLT THREADS SHALL BE EXCLUDED FROM
BE ASTM F3125 GRADE A325 HIGH STRENGTH BOLTS, A563DH NUTS, AND F436 FLAT WASHERS. OPEN HOLES SHALL BE
HIGH STRENGTH BOLT CONNECTIONS: UNLESS OTHERWISE SPECIFIED ON THE PLANS, ALL BOLTED CONNECTIONS SHALL
OTHER METHODS APPROVED BY THE ENGINEER. USE OF CUTTING TORCHES WILL NOT BE PERMITTED.
MANNER THAT DOES NOT DAMAGE ADJACENT STRUCTURAL STEEL. THIS MAY INCLUDE MECHANICAL REMOVAL OR
REMOVAL OF EXISTING RIVETS AND BOLTS: THE CONTRACTOR WILL BE PERMITTED TO REMOVE RIVETS IN ANY
ADDITION TO ANY REQUIREMENT SET FORTH IN SUBSECTION 107.01.01 OF THE SPECIFICATIONS.
FURNISHING AND REMOVING THE FLOORING AS INCIDENTAL TO THE CONTRACT. THIS ITEM MAY BE CONSIDERED IN
DESIGN ALONG WITH THE FALSEWORK DESIGN TO THE ENGINEER FOR APPROVAL. CONSIDER ALL PHASES OF
ALLOWED TO FALL DURING CONSTRUCTION OR DEMOLITION IN THE LIVE LOAD COMPUTATION. SUBMIT THE FLOORING
INCLUDE 50 PSF ON HORIZONTAL SURFACES AND THE WEIGHT OF ANY MATERIAL OR EQUIPMENT THAT IS PLACED OR
NECESSARY, THE FLOORING IS TO BE DESIGNED USING THE SUM OF DEAD LOAD AND LIVE VERTICAL LOADS.
COMPOUNDED BY TRAFFIC AND FOR PROTECTION TO RIVER TRAFFIC BELOW. IF TEMPORARY FLOORING IS
FALL PROTECTION: PROVIDE FLOORING FOR WORKERS IN SITUATIONS WHERE THE DANGER FROM A FALL IS
PHONE: 314-269-2378
ST. LOUIS, MISSOURI 63103
1222 SPRUCE STREET, SUITE 2, 102D
EIGHTH COAST GUARD DISTRICT
WESTERN RIVERS BRIDGE BRANCH
10 DAYS PRIOR TO THE COMMENCEMENT OF ANY FIELD OPERATIONS. THE NOTIFICATION SHALL BE ADDRESSED TO:
THE CONTRACTOR MUST ADVISE THE COAST GUARD OF THE CONTRACTOR'S PROPOSED SCHEDULE OF WORK AT LEAST
REMOVAL FROM STREAM, AND MAINTENANCE OF EXISTING NAVIGATIONAL TRAFFIC DURING CONSTRUCTION.
RIVER. THIS WORK PLAN SHALL INCLUDE BUT IS NOT LIMITED TO METHODS FOR CONTAINING DEBRIS, DEBRIS
THE DEPARTMENT (FOR SUBMITTAL TO THE COAST GUARD) A WORK PLAN FOR PERFORMING WORK OVER THE OHIO
AT LEAST 30 DAYS IN ADVANCE OF BEGINNING CONSTRUCTION, THE SUCCESSFUL CONTRACTOR SHALL SUBMIT TO
THIS WORK SHALL NOT RESUME UNTIL THE RIVER TRAFFIC IS CLEAR OF THE BRIDGE AREA.
STRUCTURAL ELEMENTS BENEATH THE BRIDGE DECK SHALL CEASE WHEN THERE IS APPROACHING RIVER TRAFFIC.
PROJECT SHALL BE A PRIME CONSIDERATION. ALL WORK INVOLVING THE INSTALLATION OR REMOVAL OF THE
RIVER NAVIGATION: CONTINUOUS MAINTENANCE AND SAFETY OF RIVER NAVIGATION THROUGHOUT THE TERM OF THE
DRAWINGS AND THE START OF THE FABRICATION.
COMPLETED BY THE CONTRACTOR AND APPROVED BY THE ENGINEER PRIOR TO THE FINAL APPROVAL OF THE SHOP
WELDING PROCEDURES: QUALIFICATION TEST OF ALL WELDING PROCEDURES, WHEN REQUIRED BY AWS, SHALL BE
IN THE UNIT PRICE BID FOR THE REPAIR BEING COMPLETED.
PAYMENT SHALL BE MADE FOR WELDING OR WELD MATERIAL, BUT THE COST OF THESE ITEMS SHALL BE INCLUDED
FOR WELDING REINFORCING STEEL", AMERICAN WELDING SOCIETY SPECIFICATIONS, CURRENT EDITION. NO DIRECT
WELDING REINFORCEMENT: THE WELDING AND WELD MATERIAL SHALL CONFORM TO THE "RECOMMENDED PRACTICES
AUTHORIZATION.
DIVISION OF BRIDGE MAINTENANCE, AND THEN ONLY IN THE MANNER AND AT THE LOCATIONS DESIGNATED IN THE
PERFORMED ON THE LOAD CARRYING MEMBERS OF THE BRIDGE WITHOUT THE WRITTEN CONSENT OF THE DIRECTOR,
PROHIBITED FIELD WELDING: EXCEPT WHERE SHOWN IN THE PLANS, NO WELDING OF ANY NATURE SHALL BE
STATED ON THE PLANS SHALL SUPERSEDE THE JOINT SPECIFICATIONS.
"JOINT SPECIFICATION ANSI/AASHTO/AWS D1.5-2015 BRIDGE WELDING CODE". MODIFICATION AND ADDITIONS AS
WELDING SPECIFICATIONS: ALL WELDING AND WELDING MATERIALS EXCEPT FOR REINFORCEMENT, SHALL CONFORM TO
SHOWING THAT ALL STRUCTURAL STEEL CONFORMS TO THE REQUIREMENTS OF THE SPECIFICATIONS.
MILL TEST REPORTS: NOTARIZED MILL TEST REPORTS SHALL BE FURNISHED IN TRIPLICATE TO THE DEPARTMENT
ACTIVITIES WITH THE UTILITY OWNER.
PLINTH AND ARE THE CONTRACTOR'S RESPONSIBILITY TO LOCATE, DEACTIVATE AND COORDINATE
UTILITIES: UTILITIES MAY BE ON THE BRIDGE OR IN THE EXISTING
STANDARDS ARE TO THE CURRENT EDITION OF THE ASTM STANDARD SPECIFICATIONS, WITH INTERIMS.
OF THE AASHTO STANDARD SPECIFICATIONS FOR HIGHWAY BRIDGES, WITH INTERIMS. ALL REFERENCES TO THE ASTM
SUPPLEMENTAL SPECIFICATIONS. ALL REFERENCES TO THE AASHTO SPECIFICATIONS ARE TO THE CURRENT EDITION
OF HIGHWAYS STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION INCLUDING ANY CURRENT
SPECIFICATIONS: REFERENCES TO THE SPECIFICATIONS ARE TO THE 2019 EDITION OF THE KENTUCKY DEPARTMENT
FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS".
MAINTAINING TRAFFIC: SEE MAINTENANCE OF TRAFFIC PLANS (SHEETS S11 AND M01-M33) AND THE "SPECIAL NOTE
OR ADJACENT PROJECTS SHALL COOPERATE WITH EACH OTHER.
THE PROJECT LIMITS PRIOR TO THE COMPLETION OF THIS PROJECT. CONTRACTORS WORKING ON THE SAME PROJECT
COOPERATION BY CONTRACTOR: THE CONTRACTOR IS ADVISED THAT ADDITIONAL CONTRACTS MAY BE LET WITHIN
104.02.02 OF THE STANDARD SPECIFICATIONS ARE SATISFIED.
UNDERRUN FORMULAS MAY BE APPLIED TO APPROPRIATE REPAIRS PROVIDED THAT THE REQUIREMENTS OF ARTICLE
QUANTITY ACTUALLY FURNISHED AT THE UNIT PRICE BID FOR THE WORK. IN ADDITION, THE OVERRUN AND
COMPENSATION FOR A CHANGE IN THE SCOPE OF THE WORK; HOWEVER THE CONTRACTOR WILL BE PAID FOR THE
CONSTRUCTION OR ORDERING OF MATERIALS. SUCH VARIATIONS SHALL NOT BE CAUSE FOR ADDITIONAL
SUCH DIMENSIONS AND DETAILS IN THE FIELD AND MAKE THE NECESSARY APPROVED ADJUSTMENTS PRIOR TO
SUBJECT TO NOMINAL CONSTRUCTION VARIATIONS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY
VERIFYING FIELD CONDITIONS: PLAN DIMENSIONS AND DETAILS RELATIVE TO THE EXISTING STRUCTURE ARE
FROM SITE CONDITIONS WILL NOT BE HONORED BY THE DEPARTMENT OF HIGHWAYS.
SUBMISSION OF A BID WILL BE CONSIDERED EVIDENCE OF THIS INSPECTION HAVING BEEN MADE. ANY CLAIMS
IS AWARDED. A SUITABLE METHOD OF PERFORMING THE WORK DESCRIBED HEREIN SHOULD BE INVESTIGATED.
FAMILIARIZED WITH EXISTING CONDITIONS SO THAT WORK CAN BE EXPEDITIOUSLY PERFORMED AFTER A CONTRACT
INSPECTION OF THE BRIDGE AND THE WORK SITE PRIOR TO SUBMITTING A BID AND SHALL BE THOROUGHLY
ON SITE INSPECTION: EACH CONTRACTOR SUBMITTING A BID FOR THIS WORK SHALL MAKE A THOROUGH
BIDDER UPON WRITTEN REQUEST.
BRIDGE PLANS: A COPY OF AVAILABLE EXISTING BRIDGE PLANS WILL BE MADE AVAILABLE TO THE SUCCESSFUL
(SPAN 20)
181'-0"
(SPANS 21 THRU 32)
827'-11"
(SPANS 13 THRU 19)
7 SPANS @ 182'-0" = 1274'-0"
(SPAN 12)
182'-6"
S03
J.A. ROSE
L.M. SALLEE D.E. RUST
K-9
K-8
K-7
K-6
K-5
K-4
K-3
K-2
K-1
F
A
I-1
IL-ABUT
PIER
2
4
4
4
4
4
4
4
4
2
2
2
2
NUMBER OF BEARINGS
BEARING LUBRICATION QUANTITIES
D.E. RUST
PALMER ENGINEERING CO.
...\
DG
N\
S3_
Cair
o_pla
n_ele
v.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:32 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
LAYOUT - REPAIR LOCATIONS
Po
wer In
Roads v8.11.9.397
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
S3_
CAIR
O_P
LA
N_
EL
EV.
DG
NFIL
E
NA
ME:
Fe
bruary
13, 2020
DA
TE P
LO
TT
ED:
david-r
US
ER:
(SPAN 11)
365'-1•"
(SPAN 10)
650'-0"
(SPAN 9)
650'-0"
(SPAN 8)
800'-0"
(SPAN 7)
365'-0"
PIE
R
A
PIE
R
B
PIE
R
C
PIE
R
D
PIE
R
E
PIE
R
F
E E F E E E E E EF F F
L0 L2 L4 L6 L8 L10 L12 L14 L16 L18 L20 L22 L24 L26 L28 L30 L32 L34 L36 L38 L40 L42 L44 L46 L48 L50 L52 L54 L56 L58 L60 L62 L64 L66 L68 L70 L72 L74 L76
APPROACH SPANS
SEE ILLINOIS
APPROACH SPANS
SEE KENTUCKY
ELEVATION
MAIN TRUSS SPANS
MAIN TRUSS SPANS
PLAN
F
E
NORMAL POOL
SHORELINE AT
APPROX.
NORMAL POOL
SHORELINE AT
APPROX.
PIE
R I-1
(SPAN 6)
181'-0‚"
C/
C
TR
US
S
27'-
6"
OHIO
RIV
ER
FL
OW
PIE
R
A
PIE
R
F
E E E E
L0 L2 L74 L76
ELEVATION
PLAN
PIE
R
K-1
PIE
R
K-2
PIE
R
K-3
PIE
R
K-4
PIE
R
K-5
PIE
R
K-6
PIE
R
K-7
PIE
R
K-8
PIE
R
K-9
PIE
R
K-10
PIE
R
K-11
PIE
R
K-12
PIE
R
K-13
PIE
R
K-14
PIE
R
K-15
PIE
R
K-16
PIE
R
K-17
PIE
R
K-18
PIE
R
K-19
PIE
R
K-20
PIE
R
K-14
PIE
R
K-15
PIE
R
K-16
PIE
R
K-17
PIE
R
K-18
PIE
R
K-19
PIE
R K-2
0
KY ABUT.
F E F E F E F E F E F E F E F E F
E E E E E E E E E E EF F F F F F F F F F F F
F
F
EFFEEFFEEF
NORMAL POOL
SHORELINE AT
APPROX.
IL
LIN
OIS
AB
UT.
PIE
R I-5
PIE
R I-4
PIE
R I-3
PIE
R I-2
PIE
R I-1
(SPAN 6)
181'-0‚"
(SPANS 1 THRU 5)
389'-6"
TO CAIRO, IL. TO WICKLIFFE, KY.
KE
NT
UC
KY
AB
UT.
TRUSS SPANS
SEE MAIN
ILLINOIS APPROACH SPANS
ILLINOIS APPROACH SPANS
ELEVATION
KENTUCKY APPROACH SPANS
PLAN
KENTUCKY APPROACH SPANS
1
1
1
11
1
2
2
22 2
2 2
2
2
2
2
2 2
22 2
2
2 2
5 5
5
5 5 5 5 5 5 5 5 5 5 5 5
3
4
5
BRIDGE RAILING REPAIRS
3 43 4 3 4
3 4
3 4
3 4
REPAIRS
REMOVE FINGER JOINTS AND INSTALL MODULAR JOINTS
REMOVE AND REPLACE EXPANSION JOINTS
CLEAN AND GREASE BEARINGS- SEE TABLE FOR QUANTITIES
LATEX CONCRETE DECK OVERLAY
J.A. ROSE
R.M. DAMON D.E. RUST
R.M. DAMON
S04
FINGER DAMS - PHASE A
PALMER ENGINEERING CO.
...\
S4_
Cair
o_
MO
T_
TY
PIC
AL_01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:33 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
S4_
CAIR
O_
MO
T_
TY
PIC
AL_01.
DG
NFIL
E
NA
ME:
Fe
bruary
13, 2020
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
Micro
Statio
n v8.11.9.536
! BRIDGE DECK
22'-6" (DECK WIDTH)
SIGNALIZED ONE LANE TRAFFIC
11'-3" 1'-6" 9'-6"3"
TEMPORARY BARRIER
PHASE A REMOVAL AT JOINT REPLACEMENT
SEE SHTS. S09 AND S10
RAIL POST DETAILS NOT SHOWN
CONSTRUCTION JOINT
! BRIDGE DECK
22'-6" (DECK WIDTH)
SIGNALIZED ONE LANE TRAFFIC
11'-3" 1'-6" 9'-6"3"
TEMPORARY BARRIER
SEE SHTS. S09 AND S10
RAIL POST DETAILS NOT SHOWN
CONSTRUCTION JOINT
PHASE A REMOVAL
PHASE A CONSTRUCTION
PER JOINT MANUFACTURER'S SPECIFICATIONS.
SHOWN ON SHTS. S06, S07, AND S11 AND
INSTALL JOINT HARDWARE AND OVERLAY AS
MINIMUM LAP SPLICES
#6 BAR - 3'-6"
#5 BAR - 2'-8"
PHASE A CONSTRUCTION AT JOINT REPLACEMENT
1
2
CONSTRUCTION JOINT NOT SHOWN FOR CLARITY
REINFORCEMENT THAT DOES NOT CROSS THE
1
2
INSTALL MECHANICAL COUPLERS FOR 5D02 BARS.
MECHANICAL COUPLERS.
CONCRETE. CONTRACTOR HAS THE OPTION TO USE
ONE LAP LENGTH FROM THE FACE OF THE PHASE "A"
EXTEND CONCRETE DIAPHRAGM REINFORCEMENT, 6D01,
SPECIFICATIONS.
AND S07 AND PER JOINT MANUFACTURER'S
AND / OR STEEL AS REQUIRED PER SHTS. S06
REMOVE EXISTING JOINT HARDWARE, CONCRETE,
(MOT ZONE 2)
(MOT ZONE 2)
ON SHTS. S06 AND S07.
INSTALL CONCRETE DIAPHRAGM AS SHOWN
J.A. ROSE
R.M. DAMON D.E. RUST
R.M. DAMON
S05
FINGER DAMS - PHASE B
PALMER ENGINEERING CO.
...\
S5_
Cair
o_
MO
T_
TY
PIC
AL_02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:34 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
S5_
CAIR
O_
MO
T_
TY
PIC
AL_02.
DG
NFIL
E
NA
ME:
Fe
bruary
13, 2020
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
Micro
Statio
n v8.11.9.536
! BRIDGE DECK
22'-6" (DECK WIDTH)
SIGNALIZED ONE LANE TRAFFIC
11'-3"1'-6"9'-6" 3"
TEMPORARY BARRIER
SEE SHTS. S09 AND S10
RAIL POST DETAILS NOT SHOWN
MINIMUM LAP SPLICES
#6 BAR - 3'-6"
#5 BAR - 2'-8"
1
2
CONSTRUCTION JOINT
PHASE B REMOVAL AT JOINT REPLACEMENT
PHASE B REMOVAL
! BRIDGE DECK
22'-6" (DECK WIDTH)
SIGNALIZED ONE LANE TRAFFIC
11'-3"1'-6"9'-6" 3"
TEMPORARY BARRIER
SEE SHTS. S09 AND S10
RAIL POST DETAILS NOT SHOWN
3
4
CONSTRUCTION JOINT
6D01 EXTENDED LAP FROM PHASE A
5D02 EXTENDED LAP FROM PHASE A
1
PHASE B CONSTRUCTION AT JOINT REPLACEMENT
PHASE B CONSTRUCTION
3
3
6D01 SPLICE WITH PHASE A BARS
5D02 SPLICE WITH PHASE A BARS
1
2
SPECIFICATIONS
MANUFACTURER'S
AS REQUIRED PER THE
SPLICE JOINT HARDWARE
(MOT ZONE 2)
(MOT ZONE 2)
SPECIFICATIONS.
AND S07 AND PER JOINT MANUFACTURER'S
AND / OR STEEL AS REQUIRED PER SHTS. S06
REMOVE EXISTING JOINT HARDWARE, CONCRETE,
ON SHTS. S06 AND S07.
INSTALL CONCRETE DIAPHRAGM AS SHOWN
JOINT MANUFACTURER'S SPECIFICATIONS.
SHOWN ON SHTS. S06, AND S07 AND PER
INSTALL JOINT HARDWARE AND OVERLAY AS
NOT SHOWN FOR CLARITY
THAT CROSSES THE CONSTRUCTION JOINT
CONSTRUCTION JOINT OR LAP WITH REINFORCEMENT
REINFORCEMENT THAT DOES NOT CROSS THE
2'-4•"
A
TYPE 2
A
B
A
TYPE 5
A
B
J.A. ROSE
R.M. DAMON D.E. RUST
R.M. DAMON
S06
1'-6" 1'-6"
6"1'-0" 1'-0"6"
FINGER DAM REPLACEMENT8ƒ
"
8ƒ
"
PALMER ENGINEERING CO.
...\
S6_
Cair
o_
NE
WE
XP_FIN
GE
R01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:36
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
1'-9"
8ƒ
"1'-9"
8ƒ
"1
2
2B
3
4
REMOVE RIVETS ATTACHING ANGLE 2b TO STRINGER AND REMOVE ANGLE 2b
REMOVE CHANNELS BY REMOVING RIVETS ON CONNECTION ANGLE 2b
JOINT SUPPORT CHANNEL
2b
ANGLE
1
2
3
2B
2C REMOVE CONNECTION ANGLES AND SPACERS
4
2'-
4ƒ
"
A
A
(TYP)
2" CLR.
U.N.O.
B
C
D
E
F
ANCHOR BOLTS OVER STRINGER TOP FLANGES SHALL BE BOLTED TO TOP FLANGE
B
C C
E E
F
EXISTING SECTION FOR JOINT
AT L15, L44, L61
PROPOSED SECTION FOR JOINT
AT L15, L44, L61
2'-
4ƒ
"
F
E
SECTION "A"
STRINGER
INTERIOR
STRINGER
EXTERIOR
G
INSTALL PER MANUFACTURER'S SPECIFICATIONS
OR EQUIVALENT SYSTEM.
WABOFLEX SR-9
WATSON BOWMAN ACME
G
G
SEE JOINT SETTING TABLE
B
6D03 (6 PAIRS)6D05 (6 PAIRS)
BETWEEN STRINGERSOVERHANG
‚"
6"
6"
AND WELD
SHOP MITER
UPTURN JOINT IN CURB PER MANUFACTURER'S RECOMMENDATIONS.
DIMENSIONS SHOWN ARE APPROXIMATE.
CURB UPTURN DETAIL
DIAPHRAGM.
CLEAN RUST AT STRINGER ENDS WITHIN THE EXTENTS OF THE CONCRETE
1'-9" 1'-9"
LIMITS OF CONCRETE REMOVAL
MANUFACTURER'S RECOMMENDATION
JOINT BLOCKOUT PER
9"
3
1
2
3
INSTALL ANCHORS PER MANUFACTURER'S SPECIFICATIONS.
ANCHOR SPACING SHOWN IS APPROXIMATE.
BLOCKOUT PER MANUFACTURER'S RECOMMENDATIONS
22
H FIELD BEND EXISTING SLAB REINFORCEMENT AS REQ'D.
H
5D04 (PAIRS) @ 12" (MAX.)5D04 (PAIRS) @ 12" (MAX.)
MINIMUM LAP SPLICES
#5 BAR - 2'-8"
I
MANUFACTURER'S RECOMMENDATION
JOINT BLOCKOUT PER
NEW CONCRETE NEW CONCRETE
OVERLAY AT EXPANSION JOINTS
OVERLAY
PROPOSED
OVERLAY
PROPOSED
REMOVE AND REPLACE ONE BOLT AT A TIME.
HIGH STRENGTH BOLTS TENSIONED PER THE STANDARD SPECIFICATIONS.
REPLACE BOLTS IN-KIND, REPLACE RIVETS WITH EQUIVALENT DIAMETER
5
THE STRINGER PER DETAIL THIS SHEET.
AND TENSION PER THE STANDARD SPECIFICATIONS ON EACH FACE OF
REMOVE RIVETS AND REPLACE WITH ƒ"x 24" ALL THREAD WITH NUTS
6
AND LOCATION AS IN NOTE 5.
AS IN NOTE 5 OR INSTALL ƒ"x 6" HEADED STUDS AT SAME SPACING
CONTRACTOR'S OPTION, DRILL ‡" DIA. HOLES AND INSTALL ALL THREAD3
5
3
6
D
(MAX.)@ 12"5D04
(MAX.)@ 12"5D04
I
F
(TYP)
WITH ƒ" H.S. BOLTS
REPLACE EXISTING RIVETS
SHEAR STUD (TYP)
ƒ" DIA. ALL THREAD OR
NEW H.S. BOLTS TO REPLACE RIVETS (TYP)
PER THE STANDARD SPECIFICATIONS ON EACH FACE OF THE STRINGER.
REMOVE RIVETS AND REPLACE WITH ƒ"x 24" ALL THREAD WITH NUTS TENSIONED
6D03 OR 6D05 BETWEEN STRINGERS
AND LOCATION AS IN NOTE D.
AS IN NOTE D OR INSTALL ƒ"x 6" HEADED STUDS IN THE SAME SPACING
CONTRACTOR'S OPTION: DRILL ‡" DIA. HOLES AND INSTALL ALL THREAD
! STRINGER
1'-0"1'-0"
ƒ` ALL THREAD
HEX NUT
HEAVY
HEX NUT
HEAVY
STRINGER)
(EA. FA. OF
WITH WASHER
HEAVY HEX NUT
THREADED ROD DETAIL
FINGER JOINT REMOVAL AND STRINGER PREPARATION
SEE SHEETS S09 AND S10 FOR DETAILS.
GUARDRAIL ANCHORAGE NOT SHOWN.
JOINTS FOR PAINTING REQUIREMENTS AND ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR REPLACING FINGER JOINTS WITH MODULAR2.
OF THE ENGINEER AT THE CONTRACTOR'S EXPENSE.
TO REMAIN. ANY DAMAGE SHALL BE REPAIRED TO THE SATISFACTION
CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE ANY MEMBERS1.
NOTES:
DEBRIS AND RUST. REMOVE FINGER PLATES.
STEEL EXTENDING INTO BLOCKOUT SHALL REMAIN AND BE CLEANED FREE OF
SHEET AND SHTS. S04-S05. EDGES OF CONCRETE SHALL BE NEAT AND SQUARE.
REMOVE CONCRETE TO THE EXTENT OF THE BLOCKOUTS SHOWN ON THIS
1
5D02 s/w 5D02 SPACED AT 3" C/C.
12
2B
2B
2B
3
4
3
6
5
2'-4•"2'-4•"
TYPE 2
A
B
A
TYPE 5
A
B
J.A. ROSE
R.M. DAMON D.E. RUST
R.M. DAMON
S07
6"1'-0" 1'-0"6"
A
1'-6"1'-6"
B
FINGER DAM REPLACEMENT8ƒ
"
8ƒ
"
8ƒ
"
PALMER ENGINEERING CO.
...\
S7_
Cair
o_
NE
WE
XP_FIN
GE
R02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:38 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
1
2
2B
3
4
REMOVE CHANNELS BY REMOVING RIVETS ON CONNECTION ANGLE 2b.
1
2
2B
2C REMOVE CONNECTION ANGLES AND SPACERS
2C
2C
4
A
B
C
D
E
F
ANCHOR BOLTS OVER STRINGER TOP FLANGES SHALL BE BOLTED TO TOP FLANGE
EXISTING SECTION FOR JOINT
AT L0, L76
2'-
4ƒ
"
F
E
SECTION "B"
STRINGER
INTERIOR
STRINGER
EXTERIOR
G
INSTALL PER MANUFACTURER'S SPECIFICATIONS
OR EQUIVALENT SYSTEM.
WABOFLEX SR-9
WATSON BOWMAN ACME
G
SEE JOINT SETTING TABLE
6D03 (6 PAIRS)6D05 (6 PAIRS)
BETWEEN STRINGERSOVERHANG
‚"
6"
6"
AND WELD
SHOP MITER
UPTURN JOINT IN CURB PER MANUFACTURER'S RECOMMENDATIONS.
DIMENSIONS SHOWN ARE APPROXIMATE.
CURB UPTURN DETAIL
DIAPHRAGM.
CLEAN RUST AT STRINGER ENDS WITHIN THE EXTENTS OF THE CONCRETE
9"
3
1
2
3
INSTALL ANCHORS PER MANUFACTURER'S SPECIFICATIONS.
ANCHOR SPACING SHOWN IS APPROXIMATE.
BLOCKOUT PER MANUFACTURER'S RECOMMENDATIONS
2
H FIELD BEND EXISTING SLAB REINFORCEMENT AS REQ'D.
5D04 (PAIRS) @ 12" (MAX.)5D04 (PAIRS) @ 12" (MAX.)
MINIMUM LAP SPLICES
I
MANUFACTURER'S RECOMMENDATION
JOINT BLOCKOUT PER
NEW CONCRETE NEW CONCRETE
OVERLAY AT EXPANSION JOINTS
OVERLAY
PROPOSED
OVERLAY
PROPOSED
REMOVE AND REPLACE ONE BOLT AT A TIME.
HIGH STRENGTH BOLTS TENSIONED PER THE STANDARD SPECIFICATIONS.
REPLACE BOLTS IN-KIND, REPLACE RIVETS WITH EQUIVALENT DIAMETER
5
(TYP)
WITH ƒ" H.S. BOLTS
REPLACE EXISTING RIVETS
SHEAR STUD (TYP)
ƒ" DIA. ALL THREAD OR
NEW H.S. BOLTS TO REPLACE RIVETS (TYP)
6D03 OR 6D05 BETWEEN STRINGERS
FINGER JOINT REMOVAL AND STRINGER PREPARATION
3A
C C
PROPOSED SECTION FOR JOINT
AT L0, L76
LIMITS OF CONCRETE REMOVAL
MANUFACTURER'S RECOMMENDATION
JOINT BLOCKOUT PER
G
1'-9"1'-9"
H
2
2'-
4ƒ
"
D
E
(MAX.)@ 12"5D04
E
(MAX.)@ 12"5D04
F
(TYP)
2" CLR.
U.N.O.
B
I
ANGLE 2b
REMOVE RIVETS ATTACHING ANGLE 2b TO STRINGER AND REMOVE
ƒ" x 6" HEADED STUDS AS SHOWN IN JOINT SECTION.
AS SHOWN IN JOINT SECTION AND DETAIL ON SHEET S06 OR INSTALL
CONTRACTOR'S OPTION, DRILL ‡" DIA. HOLES AND INSTALL ALL THREAD
2'-
4ƒ
"
D
E
STRINGER
INTERIOR
STRINGER
EXTERIOR
G
6D01 (6 PAIRS)
BETWEEN STRINGERSOVERHANG
3
2
5D04 (PAIRS) @ 12" (MAX.)5D04 (PAIRS) @ 12" (MAX.)
SHEAR STUD (TYP)
ƒ" DIA. ALL THREAD OR
SECTION "A"
I
6D01 s/w 6D01 SPACED AT 3" C/C.
AT 3" C/C SPACING.
AS SHOWN IN DETAIL ON SHT. S06 OR INSTALL ƒ"x 6" HEADED STUDS
CONTRACTOR'S OPTION: DRILL ‡" DIA. HOLES AND INSTALL ALL THREAD
#6 BAR - 3'-6"
#5 BAR - 2'-8"
3"
@ 3"
3 SPA. 3"
@ 3"
3 SPA.
JOINTS FOR PAINTING REQUIREMENTS AND ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR REPLACING FINGER JOINTS WITH MODULAR2.
OF THE ENGINEER AT THE CONTRACTOR'S EXPENSE.
TO REMAIN. ANY DAMAGE SHALL BE REPAIRED TO THE SATISFACTION
CONTRACTOR SHALL TAKE CARE NOT TO DAMAGE ANY MEMBERS1.
NOTES:
CLEANED FREE OF DEBRIS AND RUST. REMOVE FINGER PLATES.
SQUARE. STEEL EXTENDING INTO BLOCKOUT SHALL REMAIN AND BE
SHEET AND SHTS. S04-S05. EDGES OF CONCRETE SHALL BE NEAT AND
REMOVE CONCRETE TO THE EXTENT OF THE BLOCKOUTS SHOWN ON THIS
SEE SHEETS S09 AND S10 FOR DETAILS.
GUARDRAIL ANCHORAGE NOT SHOWN.
2b
ANGLE
1
5D02 s/w 5D02 SPACED AT 3" C/C.
1
2
2B
2C 2C
3
4
5
5
3
POURABLE JOINT REPLACEMENT
J.A. ROSE
L.M. SALLEE D.E. RUST
S08
6" 6"
D.E. RUST
PALMER ENGINEERING CO.
...\
S8_
Cair
o_
EX
PJ
OIN
TS_P
OU
RA
BL
E.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:41
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
ILLINOIS ABUTMENT
EXISTING SECTION AT POURABLE JOINT
1†"
JOINT OPENING
! JOINT
SAW CUT SAW CUT2'-0"2'-0"
MATERIAL.
EDGES, AND POURABLE JOINT
CONCRETE, EXISTING ARMORED
REMOVED HATCHED AREAS OF
1 1
1
MAIN TRUSS SPANS
SAW CUT
2'-0"2'-0"
11
1†"
JOINT OPENING
SAW CUT
! JOINT
EXISTING SECTION AT POURABLE JOINT
NORTH END OF SPANS 22 AND 24
1
JOINT OPENING
1†"
! JOINT
2'-0"
EXISTING SECTION AT POURABLE JOINT
ILLINOIS ABUTMENT
1†"
JOINT OPENING
! JOINT
PROPOSED SECTION AT POURABLE JOINT
NORTH END OF SPANS 22 AND 24
1†"
! JOINT
PROPOSED SECTION AT POURABLE JOINTPROPOSED SECTION AT POURABLE JOINT
! JOINT
MAIN TRUSS SPANS
A ARMORED EDGE, SEE STD. DWG. BJE-001, c.e.
B
B
1'-0"BA
OPENING
JOINT
1'-0"
MIN.
CL
R.
2•
"
CLR.
2"
C
D D
D
1†"
JOINT OPENING
1'-0"1'-0"A
B
D D
(TYP)
OVERLAY
PROPOSED
(TYP)
OVERLAY
PROPOSED
(TYP)
OVERLAY
PROPOSED
NEW CLASS "M" CONCRETE NEW CLASS "M" CONCRETE
USE CORNER TRANSITIONS PER THE MANUFACTURER'S SPECIFICATIONS
THE JOINT OPENING IS 1†" AT 60° F.
USE EMSEAL BEJS OR EQUIVALENT SYSTEM
TO BE REMOVED
2'-
0"
AS SHOWN.
WITH THE TOP OF THE BACKWALL
ABUTMENT BACKWALL ALONG
ANCHORAGE HARDWARE IN
REMOVE ARMORED EDGE AND
2'-
0"
NEW CLASS "M" CONCRETE
TRUSS PANEL POINTS - 4, 8, 12, 17, 23, 30, 34, 37, 40, 47, 51, 54, 64, 68, 72
CONCRETE
NEW CLASS "M"
(TYP)
5A02
GROUT)
(DRILL &
1'-0" MAX.
SPA. @
5A01
BAR BILL - ILLINOIS ABUTMENT JOINT REPLACEMENT
NOTE: FIELD VERIFY ALL BAR DIMENSIONS PRIOR TO PLACING REINFORCEMENT ORDER
2ƒ
"
REMOVAL LINE (TYP)
AND STRAPS TO CONCRETE
CUT AND REMOVE ARMORED EDGE
2ƒ
"
SEAL IS PLACED.
THE JOINT UNTIL NEW
FROM FALLING THROUGH
PREVENT LOOSE DEBRIS
BLOCK IN OPEN JT. TO
PLACE TEMPORARY FOAM
D CLEAN AND LEAVE EXISTING DECK REINFORCEMENT IN PLACE
EMCRETE ELASTOMERIC NOSING OR APPROVED EQUAL
C C
TRUSS PANEL POINTS - 4, 8, 12, 17, 23, 30, 34, 37, 40, 47, 51, 54, 64, 68, 72
SEAL IS PLACED.
THE JOINT UNTIL NEW
FROM FALLING THROUGH
PREVENT LOOSE DEBRIS
BLOCK IN OPEN JT. TO
PLACE TEMPORARY FOAM
2" DEEP 2" DEEP2" DEEP2" DEEP
5A02(E)
5A01 (E)
BACKWALL
BACKWALL
STR.
5
16
46
#5
#5
11
4
3
8 2'-10" 0'-8"
A B
FT./IN. FT./IN.
LOCATIONLENGTH
FT INMARK TYPE NUMBER SIZE
#5 MECHANICAL COUPLERS REQUIRED = 16
SAW CUT2" DEEP
EXPANSION JOINT REPLACEMENT
PAY LIMITS FOR
EXPANSION JOINT REPLACEMENT
PAY LIMITS FOR
EXPANSION JOINT REPLACEMENT
PAY LIMITS FOR
ARMORED EDGES FOR CONCRETE ON BRIDGES" FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR REPLACING POURABLE JOINTS AND/OR INSTALLING
ARMORED EDGE FOR CONCRETE
PAY LIMITS FOR
A
6"
3"
ˆ"
ˆ"
ˆ"ˆ"
B
20'-0"
HSS 6 x3 x‰
HSS 6 x3 x‰
DOWEL (TYP)
! EXIST. ANCHOR
J.A. ROSE
L.M. SALLEE D.H. DEITZ
L.M. SALLEE
S09
EXISTING HANDRAIL LENGTH VARIES
(TYP. POST SPACING)
6'-0"
C
POST ASSEMBLY
EXISTING RAIL
EXISTING TS 6x 3x ‰ RAIL
REPLACEMENT RAIL
PROPOSED HSS 6x 3x ‰
POST ASSEMBLY
EXISTING RAIL
REPLACEMENT RAIL
PROPOSED HSS 6x 3x ‰
REPLACEMENT POSTS
USE EXISTING ANCHOR DOWELS TO CONNECT
D
POST ASSEMBLY
REPLACEMENT RAIL
POST ASSEMBLY
REPLACEMENT RAIL EXISTING TS 6x 3x ‰ RAIL
(TYP)
EXISTING TS 6x 3x ‰ RAIL
‚" PLATES ‚" PLATES
‚" PLATES
MAY BE USED
EQUIVALENT ROLLED SECTION
STEEL BRIDGE RAIL REPAIR
FOR ADDITIONAL INFORMATION
SEE "SPECIAL NOTE FOR STEEL BRIDGE RAILING REPAIRS"
INCIDENTAL TO THE STEEL REPAIR.
LABOR AND MATERIALS FOR THIS WORK ARE CONSIDERED
AS DIRECTED BY THE ENGINEER. ALL ASSOCIATED
REPAIRED IN-KIND AND ATTACHED TO THE RAIL POST
AND/OR DAMAGED DURING CONSTRUCTION SHALL BE
NOTE: ANY RAIL POST UTILITY CONNECTIONS MOVED
WITH CORROSION HOLE
REPLACE ANY RAIL
PALMER ENGINEERING CO.
...\
DG
N\
S9_
Cair
o_Steel_
Railin
g.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:42 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
1'-6"6"
2'-0"
‰"
SECTION A
2'-
4"
2'-
4"
6"
9"
1"
‚"
‰"
PL 1"x 1'-0"x 1'-2"
DRAIN HOLE
•"x•" 1'-2"
1•"
11"
1•"
1'-0"
1•" 9" 1•"
3"
8"
3"
3" 6" 3"
1‚" ` HOLES
SECTION B
1'-6" 6"
2'-0"
REPLACEMENT RAIL DETAIL
‰"
REPLACEMENT
RAIL POST DETAIL
HSS 8 x6 x ‚
TYPICAL EXISTING HANDRAIL - ELEVATION
TS 8x6x ‚
(TYP EXIST. COLUMN)
TYP CORROSION HOLE
11'-0"11'-0"
CUT EXIST. RAIL CUT EXIST. RAIL
CORROSION HOLE.
REPLACE ANY RAIL POST WITH A
SEE REPLACEMENT RAIL POST DETAIL
20'-0"‰" ‰"
6" 6"
1'-0"
6" 6"
1'-0"
1
2
20'-0" LONG HSS 6x 3x ‰
REPLACEMENT RAIL SECTION
12 2
TYPICAL HANDRAIL REPAIR - ELEVATION
TYP CORROSION HOLE
‰"
‰"
‰"
‰"
SECTION C
(TYP)
PL 1"x 1'-0"x 1'-2"
(TYP EXIST. RAIL)
TS 6x 3x ‰
EXISTING RAIL POST CONNECTION DETAIL
COVER PL
7†x 5†x ‰"
‰"
‰"
REPLACEMENT RAIL POST CONNECTION DETAIL
‰"
‰"
‰"
‰"
SECTION D
RAIL IS IN PLACE)
(FIELD WELD ONCE REPLACEMENT
2'-0" LONG SEE SECTION A.
ADJUSTABLE RAIL CONNECTION
‰"TYP FOR PLATES
J.A. ROSE
L.M. SALLEE D.H. DEITZ
L.M. SALLEE
S10
C1 (TYP)
CONNECTION ANGLE
EXISTING RAIL
REPLACEMENT RAIL
PROPOSED HSS 6x 3x ‰
TYPICAL
E
REPLACEMENT RAIL
PROPOSED HSS 6x 3x ‰
MEMBER
TRUSS
EXISTING
ANGLE C1
NEW REPLACEMENT4"
4"
2"2"
1•"
2•
"
9"
L 9x 4x †
! •` HOLE
RAIL SUPPORT
TS 8x 6x ‰
EXISTING
RAIL SUPPORT
TS 8x 6x ‰
EXISTING
RAIL SUPPORT
TS 8x 6x ‰
EXISTING
RAIL SUPPORT
TS 8x 6x ‰
EXISTING
(TYP)
EXISTING TS 6x 3x ‰
(TYP)
IN-KIND AS PART OF RAIL REPLACEMENT.
REPLACE EXISTING RAIL CONNECTION ANGLE C1
(TYP)
EXISTING TRUSS MEMBER
(TYP)
TS 6x 3x ‰
EXISTING
REMOVAL LIMITS
14'-0"
CUT LINE(TYP)
TS 6x 3x ‰
EXISTING
CUT LINE
REMOVAL LIMITS
14'-0"
REPLACEMENT RAIL
10'-0"
(TYP)
TS 6x 3x ‰
EXISTING
(TYP)
TS 6x 3x ‰
EXISTING
(PANEL POINTS - 0, 19, 27, 44, 61, 76) (PANEL POINTS - 0, 19, 27, 44, 61, 76)
(PANEL POINTS - 0, 19, 27, 44, 61, 76)
(PANEL POINTS - 0, 19, 27, 44, 61, 76)
RAIL POST DETAIL
SEE REPLACEMENT
AND DIRECTED BY THE ENGINEER.
RAIL POST PER THESE DETAILS IF DAMAGED
PREVIOUSLY BEEN REPLACED. ONLY REPLACE
NOTE: JOINT AT PANEL POINT 27 HAS
MODULAR JOINT
NEWLY INSTALLED
STEEL BRIDGE RAIL REPAIR
FOR ADDITIONAL INFORMATION
SEE "SPECIAL NOTE FOR STEEL BRIDGE RAILING REPAIRS"
WITH MODULAR JOINT HARDWARE
1" THREADED RODS WILL NOT INTERFERE
CONTRACTOR SHALL VERIFY THAT
PALMER ENGINEERING CO.
...\
S10
_Cair
o_Steel_
Railin
g.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:43 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
‰"
‰"
TYPICAL TRUSS MEMBER CONNECTION DETAIL
‰"
SECTION E
‰"
CONNECTION ANGLE C1
FINGER DAM
EXISTING
FINGER DAM
EXISTING
END OF CONCRETE8•"
8•"TOP OF CURB
8•"TOP OF CURB
PLAN - EXISTING RAIL SUPPORT
REMOVAL
2'-0…"2'-0…"
2'-0…"2'-0…"
TOP OF DECK
1'-9" 1'-9"
1'-4†
"
6"
3"
4" 10•"
EM
BE
D.
1'-0"
1'-6" LONG
1"` THREADED ROD
NEW RAIL SUPPORT
HSS 8x 6x ‰CONN. ANGLE C2
6x 4x …
6"
4" 1‡
"1ƒ
"
6"
4"
1•"3"1•"
! 1„"` HOLES
CONNECTION ANGLE - C2
NEW RAIL SUPPORT
HSS 8x 6x ‰
CONN. ANGLE C2
6x 4x …
1'-6" LONG
1"` THREADED ROD
10•"
8"
‰"
‰"
NEW RAIL SUPPORT
HSS 8x 6x ‰
‰"‰"
4"6"4"
6"
(TYP)
1"` ANCHOR RODS
1„"` HOLES FOR
SEE DETAIL "A"
SEE DETAIL "B"
DETAIL "B"DETAIL "A"
‰" ‰"
‰" ‰"
JOINT REPLACEMENT
CONCRETE REMOVAL AS PART OF
PLAN - EXISTING RAIL AND SUPPORT REMOVAL
6" 6"
1'-0"
2‰"
6" 6"
1'-0"
1 2
‰"
4'-
6"
2'-
5"
ELEVATION ELEVATION
PLAN - NEW RAIL POST ANCHORAGE
1
2TOP OF CURB
‰"
‰"
COVER PLATE
5†x 7†x …
‰"
NEW RAIL SUPPORT
HSS 8x 6x ‰
(TYP)
REPLACEMENT RAIL
HSS 6x 3x ‰
REPLACEMENT RAIL POST
22
2 2
22
1
ELEVATION - NEW RAIL POST AND RAIL REPLACEMENT
1
1
10'-0" LONG HSS 6x 3x ‰ (TYP)
REPLACEMENT RAIL SECTION
SHOWN.
RAIL SECTION AT THE RAIL POST AS
ARE TYPICAL FOR EACH REPLACEMENT
NOTE: DIMENSIONS AND WELDS SHOWN
4'-
6"
(TYP)
2'-0"
RAIL SUPPORT.
OF THE RAIL CONNECTION TO THE
DETERMINING THE PROPER LOCATION
CONTRACTOR IS RESPONSIBLE FOR
CAN BE FIELD OR SHOP WELDED.
NOTE: WELDS ON THE RAIL CONNECTION
MIN.
RAIL IS IN PLACE) (TYP)
(FIELD WELD ONCE REPLACEMENT
SHEET S07 FOR DETAILS.
2'-0" LONG SEE SECTION A ON
ADJUSTABLE RAIL CONNECTION
J.A. ROSE
D.E. RUST
D.E. RUST
S11
DECK OVERLAY & MOT TYPICAL
A.C. THOMAS
PALMER ENGINEERING CO.
...\
S11_
Cair
o_
OV
ER
LA
Y_
MO
T_
TY
PIC
AL.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:44 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
! BRIDGE DECK
22'-6" (DECK WIDTH)
SIGNALIZED ONE LANE TRAFFIC
PHASE B CONSTRUCTION
9'-6" 1'-6" 11'-3"3"
TEMPORARY BARRIER
! BRIDGE DECK
22'-6" (DECK WIDTH)
SIGNALIZED ONE LANE TRAFFIC
PHASE A CONSTRUCTION
9'-6"1'-6"11'-3" 3"
TEMPORARY BARRIER
MAINTENANCE OF TRAFFIC NOTESOVERLAY NOTES
1.
2.
3.
4.
ADJACENT TO EXISTING DECK DRAINS
TREATMENT AND OVERLAY DETAILS
FOR LIMITS OF EPOXY SLURRY
SEE STD. DWG. BGX-009-04
ADJACENT TO EXISTING DECK DRAINS
TREATMENT AND OVERLAY DETAILS
FOR LIMITS OF EPOXY SLURRY
SEE STD. DWG. BGX-009-04
WITH 1•" LATEX OVERLAY
REPLACE EXISTING OVERLAY
EXISTING 6ƒ" CLASS "AA" CONC. DECK SLAB
WITH 1•" LATEX OVERLAY
REPLACE EXISTING OVERLAY
EXISTING 6ƒ" CLASS "AA" CONC. DECK SLAB
PHASE A CONSTRUCTION
PHASE B CONSTRUCTION
THE SPECIFICATIONS.
LONGITUDINAL CONSTRUCTION JOINTS SHALL COMPLY WITH SECTION 606.03.08 OF
THE CONTRACTOR SHALL PROTECT EXPANSION JOINTS DURING OVERLAY REPLACEMENT.
SEE SHEETS S06-S09 FOR DETAILS OF OVERLAY PLACEMENT AT NEW JOINTS.
METHOD" FOR ADDITIONAL INFORMATION.
CONCRETE OVERLAYS" AND "SPECIAL NOTE FOR USE OF THE HYDRODEMOLITION
SEE "SPECIAL NOTE FOR BRIDGE RESTORATION AND WATERPROOFING WITH
ABUTMENT TO END OF BRIDGE AT KENTUCKY ABUTMENT.
LIMITS OF OVERLAY REPLACEMENT ARE FROM BEGINNING OF BRIDGE AT ILLINOIS
5.
(MOT ZONES 1-3 SHOWING OVERLAY LIMITS)
(MOT ZONES 1-3 SHOWING OVERLAY LIMITS)
INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS" FOR ADDITIONAL3.
PHASED CONSTRUCTION TRAFFIC CONTROL.
SEE SHEETS M01-M19 FOR MAINTENANCE OF TRAFFIC SIGNING PLANS AND SHEETS M20-M33 FOR2.
AND THE 9'-6" MINIMUM LANE WIDTH IS MAINTAINED.
ALTERNATE BARRIER SYSTEMS MAY BE USED PROVIDED THEY MEET MASH TL-2 TESTING CRITERIA
THE MOT TYPICAL SECTION SHOWN UTILIZES ArmorZone PORTABLE WATER FILLED BARRIERS. 1.
CONSTRUCTION JOINT
CONSTRUCTION JOINT
J.A. ROSE
D.E. RUST
D.E. RUST
M01
MOT ZONE 1 SIGNING
MA
TC
HLIN
E S
HE
ET
M02
(SEE SHEETS M20-M21 FOR PHASE A AND SHEETS M22-M23 FOR PHASE B)
MOT ZONE 1 CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E S
HE
ET
M04
J.J. COBURN
L72 L74 L76
KENTUCKY
Pier
F
Pier
K-1
Pier
K-2
Pier
K-3
Pier
K-4
Pier
K-5
Pier
K-6
Pier
K-7
PIE
R
F
PIE
R
K-1
(SPAN 12)
182'-6"
PIE
R
K-2
PIE
R
K-3
PIE
R
K-4
PIE
R
K-5
PIE
R
K-6
PIE
R
K-7
(SPAN 13 - 19)
1274'-0"
500 ft
(SPAN 11)
365'-1•"
ST
OP
HE
RE O
N
RE
D
WHEN IN USE
FLAGGER
A WIDTH OF 24"
STOP BAR SHALL HAVE
ARE NOT IN USE
WHEN SIGNALS
COVER SIGN
TAPER
250 ft
100 ft
40 ft
36x36
W20-7
24x36
R10-6
PALMER ENGINEERING CO.
...\
M01_
Cair
o_
MO
T_
ZN1_
BR-03.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:45 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
THROUGH TRUSS SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M02
MOT ZONE 1 SIGNING
MA
TC
HLIN
E S
HE
ET
M01
MA
TC
HLIN
E S
HE
ET
M03
J.J. COBURN
L32 L34
PIE
R
C
L36 L38 L40 L42 L44 L46 L48 L50 L52 L54 L56 L58 L60 L62 L64 L66 L68 L70
PIE
R
D
PIE
R
E
(SPAN 11)
365'-1•"
Pier
E
OHIO
RIV
ER
RO
AD
WO
RK
EN
D
500 ft
500 F
T
ONE L
ANE
BRID
GE
MP
H
30
250 ft250 ft250 ft
1000 F
T
ONE L
ANE
BRID
GE
MP
H
30
500 ft 500 ft
ARE NOT IN USE
WHEN SIGNALS
COVER SIGN
ARE NOT IN USE
WHEN FLAGGERS
COVER SIGN
(SPAN 9)
650'-0"
(SPAN 10)
650'-0"
(SPAN 8)
800'-0"
ARE NOT IN USE
WHEN SIGNALS
COVER SIGN
Pier
D
Pier
C
24x24
W13-1P
24x24
W13-1P
36x36
W20-7
36x18
G20-2
36x36
W3-3
36x36
W5-3
36x36
W5-3
PALMER ENGINEERING CO.
...\
M02_
Cair
o_
MO
T_
ZN1_
BR-02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:46
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
THROUGH TRUSS SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M03
MOT ZONE 1 SIGNING
MA
TC
HLIN
E S
HE
ET
M02
MA
TC
HLIN
E
J.J. COBURN
PIE
R I-4
PIE
R I-3
PIE
R I-2
PIE
R I-1
(SPANS 1-6)
570'-6‚"
L0 L2 L4 L6 L8 L10 L12 L14 L16 L18 L20 L22 L24 L26 L28 L30
ILLINOIS
PIE
R
A
PIE
R
B
OHIO
RIV
ER
KENTUCKY
TO WICKLIFFE
AR
E
NO
T IN
US
E
CO
VE
R
SIG
N
WH
EN
SIG
NA
LS
WO
RK
1500 F
T
RO
AD
WO
RK
AHE
AD
RO
AD
MP
H
30
500 ft 500 ft
(SPAN 7)
365'-0"
(SPAN 8)
800'-0"
Pier
B
Pier
A
PIE
R I-1
PIE
R I-2
PIE
R I-3
PIE
R I-4
PIE
R I-4
36x36
W20-1
24x24
W13-1P
36x36
W20-1
36x18
G20-2
PALMER ENGINEERING CO.
...\
M03_
Cair
o_
MO
T_
ZN1_
BR-01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:46
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
THROUGH TRUSS SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M04
MOT ZONE 1 SIGNING
MATCHLI
NE SHEET
M05
(SEE SHEETS M20-M21 FOR PHASE A AND SHEETS M22-M23 FOR PHASE B)
MOT ZONE 1 CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E S
HE
ET
M01
WHEN IN USE
FLAGGER
J.J. COBURN
P.T.
P.C.
KY ABUT
Pier
K-8
Pier
K-9
Pier
K-10
Pier
K-11
Pier
K-12
Pier
K-13
Pier
K-14
Pier
K-15
Pier
K-16
PIE
R
K-8
PIE
R
K-9
(SPAN 20)181'-0"
(DEVELOPED LENGTH)827'-11" (SPAN 21 -
32)
KENTUCKYTO WICKLIFFE
AB
UT
ME
NT
KE
NT
UC
KY
PIE
R
K-10
PIE
R
K-11
PIE
R
K-12
PIE
R
K-13
PIE
R
K-14
PIE
R
K-15
PIE
R
K-16
PIE
R
K-17
PIE
R
K-18
PIE
R
K-19
PIE
R
K-20
ONE LA
NE
BRID
GE
250 ft
13 - 19)
(SPANS1274'-0
"
E. CAIRO-HOLLOWAY RD.
36x36W5-3
PALMER ENGINEERING CO.
...\
M04_
Cair
o_
MO
T_
ZN1_
BR-04.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:47 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
KENTUCKY APPROACH SIGNING
Pier
K-17
Pier
K-18
Pier
K-19
Pier
K-20
50'
J.A. ROSE
D.E. RUST
D.E. RUST
M05
MOT ZONE 1 SIGNING
MA
TC
HLIN
E S
HE
ET
M04
MA
TC
HLIN
E S
HE
ET
M06
50'
SIGNAL HEAD
SHOULDER MOUNTED
J.J. COBURN
500 F
T
ONE L
ANE
BRID
GE
MP
H
30
ST
OP
HE
RE O
N
RE
D
250 ft 500 ft250 ft
ARE NOT IN USE
COVER SIGN WHEN SIGNALSARE NOT IN USE
COVER SIGN WHEN FLAGGERS
250 ft 250 ft
ARE NOT IN USE
COVER SIGN WHEN SIGNALS
A WIDTH OF 24"
STOP BAR SHALL HAVE TEMPORARY PAVEMENT MARKING
24x24
W13-1P
36x36
W5-3
36x36
W3-3
36x36
W20-7
24x36
R10-6
PALMER ENGINEERING CO.
...\
M05_
Cair
o_
MO
T_
ZN1_
KY-01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:48 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
KENTUCKY APPROACH SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M06
MOT ZONE 1 SIGNING
MA
TC
HLIN
E S
HE
ET
M05
J.J. COBURN
WO
RK
1500 F
T
RO
AD
WO
RK
AHE
AD
RO
AD
1000 F
T
ONE L
ANE
BRID
GE
MP
H
30
MP
H
30
RO
AD W
OR
K
END
500 ft
NARR
OW B
RID
GE
9'-6"
250 ft250 ft
TEMPORARY PAVEMENT MARKING
NO
PASSIN
G
ZO
NE
250 ft250 ft
ZONE 3 CONSTRUCTION
FOR MOT ZONE 2 AND MOT
LEAVE THIS SIGN IN PLACE
36x36
W20-1
60x30
24x24
W13-1P
24x24
W13-1P
36x36
W20-1
36x18
G20-2
48x48x36
W14-3
36x36
W5-3
PALMER ENGINEERING CO.
...\
M06_
Cair
o_
MO
T_
ZN1_
KY-02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:49 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
KENTUCKY APPROACH SIGNING
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
M07
MOT ZONE 2 SIGNING
(SEE SHEETS M24-M26 FOR PHASE A AND SHEETS M27-M29 FOR PHASE B)
MOT ZONE 2 CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E S
HE
ET
M08
J.J. COBURN
PIE
R I-4
PIE
R I-3
PIE
R I-2
PIE
R I-1
(SPANS 1-6)
570'-6‚"
L0 L2 L4 L6 L8 L10 L12 L14 L16 L18 L20 L22 L24 L26 L28 L30
ILLINOIS
PIE
R
A
PIE
R
B
KENTUCKY
TO WICKLIFFE
(SPAN 7)
365'-0"
(SPAN 8)
800'-0"
OHIO
RIV
ER
Pier
B
Pier
A
PIE
R I-1
PIE
R I-2
PIE
R I-3
PIE
R I-4
PIE
R I-4
TAPER
100 ft
40 ft
WHEN IN USE
FLAGGER
A WIDTH OF 24"
STOP BAR SHALL HAVE
ST
OP
HE
RE O
N
RE
D
ARE NOT IN USE
WHEN SIGNALS
COVER SIGN
50 ft
BUFFER
36x18
G20-2
24x36
R10-6
PALMER ENGINEERING CO.
...\
M07_
Cair
o_
MO
T_
ZN2_
BR-01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:50
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
ILLINOIS APPROACH SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M08
MOT ZONE 2 SIGNING
MATCHLINE SHEET M07M
AT
CH
LIN
E S
HE
ET
M09
MA
TC
HLIN
E S
HE
ET
M10
J.J. COBURN
18x24
W16-6pL
PIER I-5
PIER I-4
IL
LIN
OIS
TO
CAIR
O
ABUTMENT
ILLINOIS
500 F
T
ONE LA
NE
BRID
GE
MP
H
30
250 ft
250 ft
250 ftRO
AD W
ORK
END
250 ft
250 ft
500 ft
51 OUTH
S
KE
NT
UC
KY
TO
WIC
KLIFF
E
ARE NOT IN USE
COVER SIGN WHEN SIGNALS
ARE NOT IN USE
COVER SIGN WHEN FLAGGERS
ARE NOT IN USE
COVER SIGN WHEN FLAGGERS(SP
AN
S 1-
6)
570'-
6‚
"
PIER I-4
PIER I-4
PIER I-5
ABUTMENT
ILLINOIS
24x24
W13-1P
24x24
M1-4
24x12
M3-3
36x18
G20-2
36x36
W20-7
36x36
W20-7
36x36
W3-3
36x36
W5-3
PALMER ENGINEERING CO.
...\
M08_
Cair
o_
MO
T_
ZN2_IL-02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:51
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
ILLINOIS APPROACH SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M09
MOT ZONE 2 SIGNING
MA
TC
HLIN
E S
HE
ET
M08
J.J. COBURN
18x24W16-6pL
WO
RK
AHE
AD
RO
AD
1000 F
T
ONE LA
NE
BRID
GE
WO
RK
1500 F
T
RO
AD
MP
H
30
MP
H
30
500 ft
500 ft
NARR
OW B
RID
GE
9'-6"
250 ft
250 ft
51
OUTH
S
51
OUTH
S24x24W13-1P
24x24W13-1P
36x36W20-1
36x36W20-1
60x30
24x24
M1-4
24x24
M1-4
24x12
M3-3
24x12
M3-3
36x36W5-3
PALMER ENGINEERING CO.
...\
M09_
Cair
o_
MO
T_
ZN2_IL-01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:52 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
ILLINOIS APPROACH SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M10
MOT ZONE 2 SIGNING
MA
TC
HLIN
E S
HE
ET
M08
MA
TC
HLIN
E S
HE
ET
M11
J.J. COBURN
18x24W16-6p
R
RO
AD W
ORK
END
250 ft
500 F
T
ONE L
ANE
BRID
GE
MP
H
30
500 ft
1000 F
T
ONE L
ANE
BRID
GE
500 ft
WO
RK
1500 F
T
RO
AD
MP
H
30
250 ft
ARE NOT IN USE
COVER SIGN WHEN SIGNALS
51
OUTH
S MP
H
3051
OUTH
S
250 ft
24x24
W13-1P24x24
W13-1P24x24
W13-1P
36x36
W20-1
24x24
M1-424x24
M1-4
24x12
M3-3
24x12
M3-3
36x18
G20-2
36x36
W3-3
36x36
W5-3
36x36
W5-3
PALMER ENGINEERING CO.
...\
M10
_Cair
o_
MO
T_
ZN2_IL-03.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:53 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
ILLINOIS APPROACH SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M11
MOT ZONE 2 SIGNING
MA
TC
HLIN
E S
HE
ET
M10
J.J. COBURN
18x24
W16-6pR
WO
RK
AHE
AD
RO
AD
NARR
OW B
RID
GE
9'-6"
51
OUTH
S
250 ft250 ft
36x36
W20-160x30
24x24
M1-4
24x12
M3-3
PALMER ENGINEERING CO.
...\
M11_
Cair
o_
MO
T_
ZN2_IL-04.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:54 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
ILLINOIS APPROACH SIGNING
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
M12
MOT ZONE 2 SIGNING
AND TRAFFIC CONTROL
MOT ZONE 2 CONSTRUCTION
M27-M29 FOR PHASE B)
PHASE A AND SHEETS
(SEE SHEETS M24-M26 FOR
MA
TC
HLIN
E S
HE
ET
M13
J.J. COBURN
L72 L74 L76
KENTUCKY
(SPAN 11)
365'-1•"
Pier
F
Pier
K-1
Pier
K-2
Pier
K-3
Pier
K-4
Pier
K-5
Pier
K-6
Pier
K-7
PIE
R
F
PIE
R
K-1
(SPAN 12)
182'-6"
PIE
R
K-2
PIE
R
K-3
PIE
R
K-4
PIE
R
K-5
PIE
R
K-6
PIE
R
K-7
(SPAN 13 - 19)
1274'-0"
250 ft 250 ft 250 ft 500 ft
MP
H
30
500 F
T
ON
E L
AN
E
BRID
GE
ARE NOT IN USE
WHEN SIGNALS
COVER SIGN
ARE NOT IN USE
WHEN FLAGGERS
COVER SIGNS
TO
PH
ER
E
ON
RE
D
WHEN IN USE
FLAGGER
RO
AD W
OR
K
END
A WIDTH OF 24"
STOP BAR SHALL HAVE
ARE NOT IN USE
WHEN SIGNALS
COVER SIGN
50 ft
BUFFER TAPER
100 ft
40 ft
24x24
W13-1P
24x36
R10-6
36x36
W20-7
36x36
W3-3
36x36
W5-3
36x18
G20-2
PALMER ENGINEERING CO.
...\
M12
_Cair
o_
MO
T_
ZN2_
BR-03.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:54 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
KENTUCKY APPROACH SIGNING
MATCHLI
NE J.A. ROSE
D.E. RUST
D.E. RUST
M13
MOT ZONE 2 SIGNING
MA
TC
HLIN
E S
HE
ET
M12
J.J. COBURN
P.T.
P.C.
KY ABUT
Pier
K-8
Pier
K-9
Pier
K-10
Pier
K-11
Pier
K-12
Pier
K-13
Pier
K-14
Pier
K-15
Pier
K-16
Pier
K-17
Pier
K-18
Pier
K-19
Pier
K-20
PIE
R
K-8
PIE
R
K-9
(SPAN 20)181'-0"
(DEVELOPED LENGTH)827'-11" (SPAN 21 -
32)
KENTUCKYTO WICKLIFFE
AB
UT
ME
NT
KE
NT
UC
KY
PIE
R
K-10
PIE
R
K-11
PIE
R
K-12
PIE
R
K-13
PIE
R
K-14
PIE
R
K-15
PIE
R
K-16
PIE
R
K-17
PIE
R
K-18
PIE
R
K-19
PIE
R
K-20
500 ft
500 ft
WORK
AHEAD
RO
AD
MP
H30
WO
RK
1500 F
T
RO
AD
MP
H30
1000 F
T
ONE L
ANE
BRID
GE
500 ft
13 - 19)
(SPANS1274'-0
"
24x24W13-1P
24x24W13-1P
36x36
W20-1
36x36W20-1
36x36W5-3
PALMER ENGINEERING CO.
...\
M13
_Cair
o_
MO
T_
ZN2_
BR-04.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:55 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
KENTUCKY APPROACH SIGNING
MATCHLINE
J.A. ROSE
D.E. RUST
D.E. RUST
M14
MOT ZONE 3 SIGNING
MA
TC
HLIN
E S
HE
ET
M15
MA
TC
HLIN
E S
HE
ET
M16
TR
AFFIC
CO
NT
RO
L
CO
NS
TR
UC
TIO
N
AN
D
MO
T
ZO
NE 3
PH
AS
E
B)
SH
EE
TS
M32-
M33 F
OR
FO
R
PH
AS
E
A
AN
D
(SE
E S
HE
ET
S
M30-
M31
J.J. COBURN
18x24
W16-6pL
PIER I-5
PIER I-4
IL
LIN
OIS
TO
CAIR
O
ABUTMENT
ILLINOIS
500 F
T
ONE LA
NE
BRID
GE
MP
H
30
250 ft
250 ft
RO
AD W
ORK
END
STOPHERE ON
RED
250 ft
250 ft
500 ft
51 OUTH
S
KE
NT
UC
KY
TO
WIC
KLIFF
E
ARE NOT IN USE
COVER SIGN WHEN SIGNALS
ARE NOT IN USE
COVER SIGN WHEN FLAGGERS
WHEN IN USE
FLAGGER
ARE NOT IN USE
COVER SIGN WHEN SIGNALS
ARE NOT IN USE
COVER SIGN WHEN FLAGGERS
(SP
AN
S 1-
6)
570'-
6‚
"
50'
TA
PE
R
A WIDTH OF 24"
STOP BAR SHALL HAVE
PIER I-4
PIER I-5
ABUTMENT
ILLINOIS
25'
BU
FF
ER
50 ft
200 ft
INTE
RSE
CTIO
N
DO N
OT
BLO
CK
24x36
R10-6
36x36
W20-7
36x18
G20-2
36x36
W20-7
36x36
W3-3
36x36
W5-3
24x12
M3-3
24x24
M1-4
24x24
W13-1P
24x30
R10-7
PALMER ENGINEERING CO.
...\
M14
_Cair
o_
MO
T_
ZN3_IL-02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:56
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
ILLINOIS APPROACH SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M15
MOT ZONE 3 SIGNING
MA
TC
HLIN
E S
HE
ET
M14
J.J. COBURN
18x24W16-6pL
WO
RK
AHE
AD
RO
AD
1000 F
T
ONE LA
NE
BRID
GE
WO
RK
1500 F
T
RO
AD
MP
H
30
MP
H
30
500 ft
500 ft
NARR
OW B
RID
GE
9'-6"
250 ft
250 ft
51
OUTH
S
51
OUTH
S
60x30
24x24W13-1P
36x36W20-1
24x24W13-1P 24x12
M3-3
24x24
M1-4
36x36W5-3
24x12
M3-3
24x24
M1-4
36x36W20-1
PALMER ENGINEERING CO.
...\
M15
_Cair
o_
MO
T_
ZN3_IL-01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:57 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
ILLINOIS APPROACH SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M16
MOT ZONE 3 SIGNING
MA
TC
HLIN
E S
HE
ET
M14
MA
TC
HLIN
E S
HE
ET
M17
J.J. COBURN
18x24W16-6p
R
RO
AD W
ORK
END
250 ft
500 F
T
ONE L
ANE
BRID
GE
MP
H
30
500 ft
1000 F
T
ONE L
ANE
BRID
GE
500 ft
WO
RK
1500 F
T
RO
AD
MP
H
30
250 ft
ARE NOT IN USE
COVER SIGN WHEN SIGNALS
51
OUTH
S MP
H
3051
OUTH
S
250 ft
36x36
W3-3
36x36
W5-3
24x12
M3-3
24x24
M1-4
24x24
W13-1P
36x36
W5-3
24x12
M3-3
24x24
M1-4
24x24
W13-1P
36x36
W20-1
24x24
W13-1P
36x18
G20-2
PALMER ENGINEERING CO.
...\
M16
_Cair
o_
MO
T_
ZN3_IL-03.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:58 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
ILLINOIS APPROACH SIGNING
J.A. ROSE
D.E. RUST
D.E. RUST
M17
MOT ZONE 3 SIGNING
MA
TC
HLIN
E S
HE
ET
M16
J.J. COBURN
18x24
W16-6pR
WO
RK
AHE
AD
RO
AD
NARR
OW B
RID
GE
9'-6"
51
OUTH
S
250 ft250 ft
60x30
24x12
M3-3
24x24
M1-4
36x36
W20-1
PALMER ENGINEERING CO.
...\
M17
_Cair
o_
MO
T_
ZN3_IL-04.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:27:59 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
ILLINOIS APPROACH SIGNING
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
M18
MOT ZONE 3 SIGNING
MA
TC
HLIN
E S
HE
ET
M19
MOT ZONE 3 CONSTRUCTION AND TRAFFIC CONTROL
AND SHEETS M32-M33 FOR PHASE B)
(SEE SHEETS M30-M31 FOR PHASE A
J.J. COBURN
PIE
R I-4
PIE
R I-3
PIE
R I-2
PIE
R I-1
(SPANS 1-6)
570'-6‚"
L0 L2 L4 L6 L8 L10 L12 L14 L16 L18 L20 L22 L24 L26 L28 L30
ILLINOIS
PIE
R
A
PIE
R
B
OHIO
RIV
ER
KENTUCKY
TO WICKLIFFE
AR
E
NO
T IN
US
E
CO
VE
R
SIG
N
WH
EN
SIG
NA
LS
(SPAN 7)
365'-0"
(SPAN 8)
800'-0"
PIE
R I-4
50 ft
BUFFER TAPER
100 ft
40 ft
WHEN IN USE
FLAGGER
A WIDTH OF 24"
STOP BAR SHALL HAVE
250 ft
ST
OP
HE
RE
ON
RE
D
ARE NOT IN USE
WHEN SIGNALS
COVER SIGN
RO
AD W
OR
K
END
250 ft
ARE NOT IN USE
WHEN FLAGGERS
COVER SIGN
ARE NOT IN USE
WHEN SIGNALS
COVER SIGN
250 ft
500 F
T
ON
E L
AN
E
BRID
GE
MP
H
30
500 ft
36x18
G20-2
24x36
R10-6
36x36
W20-7
36x36
W3-336x36
W5-3
24x24
W13-1P
36x18
G20-2
PALMER ENGINEERING CO.
...\
M18
_Cair
o_
MO
T_
ZN3_
BR-01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:00
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
THROUGH TRUSS SIGNING
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
M19
MOT ZONE 3 SIGNING
MA
TC
HLIN
E S
HE
ET
M18
J.J. COBURN
L32 L34
PIE
R
C
L36 L38 L40 L42 L44 L46 L48 L50 L52 L54 L56 L58 L60 L62 L64 L66 L68 L70
PIE
R
D
PIE
R
E
(SPAN 11)
365'-1•"
Pier
E
OHIO
RIV
ER
WO
RK
1500 F
T
RO
AD
WO
RK
AH
EA
D
RO
AD
1000 F
T
ON
E L
AN
E
BRID
GE
MP
H
30
MP
H
30
500 ft 500 ft
(SPAN 9)
650'-0"
(SPAN 10)
650'-0"
(SPAN 8)
800'-0"
500 ft
36x36
W5-324x24
W13-1P
24x24
W13-1P
36x36
W20-1
36x36
W20-1
PALMER ENGINEERING CO.
...\
M19
_Cair
o_
MO
T_
ZN3_
BR-02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:01
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
THROUGH TRUSS SIGNING
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 1A CONSTRUCTION
M20
PHASE A TRAFFIC
PHASE A CONSTRUCTION
PHASE A TRAFFIC
L72 L74 L76
KENTUCKY
Pier
F
Pier
K-1
Pier
K-2
Pier
K-3
Pier
K-4
Pier
K-5
Pier
K-6
Pier
K-7
PIE
R
F
PIE
R
K-1
(SPAN 12)
182'-6"
PIE
R
K-2
PIE
R
K-3
PIE
R
K-4
PIE
R
K-5
PIE
R
K-6
PIE
R
K-7
(SPAN 13 - 19)
1274'-0"
(SPAN 11)
365'-1•"
A WIDTH OF 24"
STOP BAR SHALL HAVE
TAPER
100 ft
40 ft
SEE SHEETS M01-M03
FOR SIGNING
OVER THE ROADWAY
SIGNAL HEAD MOUNTED
MA
TC
HLIN
E S
HE
ET
M21
100 ft
CHANNELIZING
DEVICES
END TREATMENTEND TREATMENT
779 ft TL-2 WATER FILLED BARRIER 751 ft TL-2 WATER FILLED BARRIER
PALMER ENGINEERING CO.
...\
M20_
Cair
o_
MO
TP
H1A
_B
R-03.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:02 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
J.J. COBURN
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
Po
wer In
Roads v8.11.9.397
Fe
bruary
11, 2020
DA
TE P
LO
TT
ED:
david-r
US
ER:
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M20_
CAIR
O_
MO
TP
H1A
_B
R-03.
DG
NFIL
E
NA
ME:
TYPE III BARRICADE
WHEN IN USEFLAGGER
(PAY ITEM: WATER-FILLED BARRIERS) (PAY ITEM: WATER-FILLED BARRIERS)
ZONE 1 PHASE A CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
MATCHLI
NE J.A. ROSE
D.E. RUST
D.E. RUST
M21
MOT PHASE 1A CONSTRUCTION
MA
TC
HLIN
E
MATCHLI
NE
P.T.
P.C.
KY ABUT
Pier
K-8
Pier
K-9
Pier
K-10
Pier
K-11
Pier
K-12
Pier
K-13
Pier
K-15
Pier
K-16
Pier
K-17
Pier
K-18
Pier
K-19
Pier
K-20
PIE
R
K-8
PIE
R
K-9
(SPAN 20)181'-0"
(DEVELOPED LENGTH)827'-11" (SPAN 21 -
32)
KENTUCKYTO WICKLIFFE
AB
UT
ME
NT
KE
NT
UC
KY
PIE
R
K-10
PIE
R
K-11
PIE
R
K-12
PIE
R
K-13
PIE
R
K-14
PIE
R
K-15
PIE
R
K-16
PIE
R
K-17
PIE
R
K-18
PIE
R
K-19
PIE
R
K-20
PHASE A TRAFFIC
PHASE ATRAFFIC
PHASE A CONSTRUCTION
13 - 19)
(SPANS1274'-0
"
E. CAIRO-HOLLOWAY RD.
MA
TC
HLIN
E
MATCHLI
NE
MATCHLI
NE
P.T.
P.C.
KY ABUT
Pier
K-8
Pier
K-9
Pier
K-10
Pier
K-11
Pier
K-12
Pier
K-13
Pier
K-15
Pier
K-16
Pier
K-17
Pier
K-18
Pier
K-19
Pier
K-20
PIE
R
K-8
PIE
R
K-9
(SPAN 20)181'-0"
(DEVELOPED LENGTH)827'-11" (SPAN 21 -
32)
KENTUCKYTO WICKLIFFE
AB
UT
ME
NT
KE
NT
UC
KY
PIE
R
K-10
PIE
R
K-11
PIE
R
K-12
PIE
R
K-13
PIE
R
K-14
PIE
R
K-15
PIE
R
K-16
PIE
R
K-17
PIE
R
K-18
PIE
R
K-19
PIE
R
K-20
PHASE A TRAFFIC
PHASE ATRAFFIC
PHASE A CONSTRUCTION
13 - 19)
(SPANS1274'-0
"
E. CAIRO-HOLLOWAY RD.
P.T.
P.C.
KY ABUT
Pier
K-8
Pier
K-9
Pier
K-10
Pier
K-11
Pier
K-12
Pier
K-13
Pier
K-14
Pier
K-15
Pier
K-16
Pier
K-17
Pier
K-18
Pier
K-19
Pier
K-20
PIE
R
K-8
PIE
R
K-9
(SPAN 20)181'-0"
(DEVELOPED LENGTH)827'-11" (SPAN 21 -
32)
KENTUCKYTO WICKLIFFE
AB
UT
ME
NT
KE
NT
UC
KY
PIE
R
K-10
PIE
R
K-11
PIE
R
K-12
PIE
R
K-13
PIE
R
K-14
PIE
R
K-15
PIE
R
K-16
PIE
R
K-17
PIE
R
K-18
PIE
R
K-19
PIE
R
K-20
PHASE A TRAFFIC
PHASE ATRAFFIC
PHASE A CONSTRUCTION
13 - 19)
(SPANS1274'-0
"
E. CAIRO-HOLLOWAY RD.
100 ft
CHANNELIZING
DEVICES751 ft TL-2 WATER FILLED BARRIER
115 ft
TAPER
MA
TC
HLIN
E S
HE
ET
M20
END TREATMENT
END TREATMENT
SEE S
HEETS
M04-
M06
AN
D SIG
NAL
FO
R SIG
NIN
G
736 ft TL-2 WATER FILLED BARRIER
PALMER ENGINEERING CO.
...\
M21_
Cair
o_
MO
TP
H1A
_B
R-04.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:03 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
J.J. COBURN
TYPE III BARRICADE
(PAY ITEM: WATER-FILLED BARRIERS)
(PAY ITEM: WATER-FILLED BARRIERS)
Po
wer In
Roads v8.11.9.397
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M21_
CAIR
O_
MO
TP
H1A
_B
R-04.
DG
NFIL
E
NA
ME:
January
24, 2020
DA
TE P
LO
TT
ED:
josh-c
US
ER:
ZONE 1 PHASE A CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 1B CONSTRUCTION
M22
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
PHASE B TRAFFIC
PHASE A CONSTRUCTION
PHASE B TRAFFIC
L72 L74 L76
KENTUCKY
Pier
F
Pier
K-1
Pier
K-2
Pier
K-3
Pier
K-4
Pier
K-5
Pier
K-6
Pier
K-7
PIE
R
F
PIE
R
K-1
(SPAN 12)
182'-6"
PIE
R
K-2
PIE
R
K-3
PIE
R
K-4
PIE
R
K-5
PIE
R
K-6
PIE
R
K-7
(SPAN 13 - 19)
1274'-0"
(SPAN 11)
365'-1•"
WHEN IN USE
FLAGGER
A WIDTH OF 24"
STOP BAR SHALL HAVE
TAPER
100 ft
40 ft
SEE SHEETS M01-M03
FOR SIGNING
100 ft
CHANNELIZING
DEVICES
END TREATMENT
779 ft TL-2 WATER FILLED BARRIER 751 ft TL-2 WATER FILLED BARRIER
MA
TC
HLIN
E S
HE
ET
M23
END TREATMENT
(PAY ITEM: RELOCATE WATER-FILLED BARRIERS) (PAY ITEM: RELOCATE WATER-FILLED BARRIERS)
PALMER ENGINEERING CO.
...\
M22_
Cair
o_
MO
TP
H1B
_B
R-03.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:04 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
J.J. COBURN
Po
wer In
Roads v8.11.9.397
January
24, 2020
DA
TE P
LO
TT
ED:
david-r
US
ER:
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M22_
CAIR
O_
MO
TP
H1B
_B
R-03.
DG
NFIL
E
NA
ME:
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
TYPE III BARRICADE
LANE MOUNTED SIGNAL
ZONE 1 PHASE B CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
MATCHLI
NE J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 1B CONSTRUCTION
M23
MA
TC
HLIN
E
MATCHLI
NE J.A. ROSE
D.E. RUST
D.E. RUST
MA
TC
HLIN
E
MATCHLI
NE
P.T.
P.C.
KY ABUT
Pier
K-8
Pier
K-9
Pier
K-10
Pier
K-11
Pier
K-12
Pier
K-13
Pier
K-15
Pier
K-16
Pier
K-17
Pier
K-18
Pier
K-19
Pier
K-20
PIE
R
K-8
PIE
R
K-9
(SPAN 20)181'-0"
(DEVELOPED LENGTH)827'-11" (SPAN 21 -
32)
KENTUCKYTO WICKLIFFE
AB
UT
ME
NT
KE
NT
UC
KY
PIE
R
K-10
PIE
R
K-11
PIE
R
K-12
PIE
R
K-13
PIE
R
K-14
PIE
R
K-15
PIE
R
K-16
PIE
R
K-17
PIE
R
K-18
PIE
R
K-19
PIE
R
K-20
PHASE A TRAFFIC
PHASE A CONSTRUCTION
13 - 19)
(SPANS1274'-0
"
E. CAIRO-HOLLOWAY RD.
MA
TC
HLIN
E
MATCHLI
NE
MATCHLI
NE
P.T.
P.C.
KY ABUT
Pier
K-8
Pier
K-9
Pier
K-10
Pier
K-11
Pier
K-12
Pier
K-13
Pier
K-15
Pier
K-16
Pier
K-17
Pier
K-18
Pier
K-19
Pier
K-20
PIE
R
K-8
PIE
R
K-9
(SPAN 20)181'-0"
(DEVELOPED LENGTH)827'-11" (SPAN 21 -
32)
KENTUCKYTO WICKLIFFE
AB
UT
ME
NT
KE
NT
UC
KY
PIE
R
K-10
PIE
R
K-11
PIE
R
K-12
PIE
R
K-13
PIE
R
K-14
PIE
R
K-15
PIE
R
K-16
PIE
R
K-17
PIE
R
K-18
PIE
R
K-19
PIE
R
K-20
PHASE A TRAFFIC
PHASE A CONSTRUCTION
13 - 19)
(SPANS1274'-0
"
E. CAIRO-HOLLOWAY RD.
P.T.
P.C.
KY ABUT
Pier
K-8
Pier
K-9
Pier
K-10
Pier
K-11
Pier
K-12
Pier
K-13
Pier
K-14
Pier
K-15
Pier
K-16
Pier
K-17
Pier
K-18
Pier
K-19
Pier
K-20
PIE
R
K-8
PIE
R
K-9
(SPAN 20)181'-0"
(DEVELOPED LENGTH)827'-11" (SPAN 21 -
32)
KENTUCKYTO WICKLIFFE
AB
UT
ME
NT
KE
NT
UC
KY
PIE
R
K-10
PIE
R
K-11
PIE
R
K-12
PIE
R
K-13
PIE
R
K-14
PIE
R
K-15
PIE
R
K-16
PIE
R
K-17
PIE
R
K-18
PIE
R
K-19
PIE
R
K-20
PHASE B TRAFFIC
PHASE BTRAFFIC
13 - 19)
(SPANS1274'-0
"
E. CAIRO-HOLLOWAY RD.
100 ft
CHANNELIZING
DEVICES751 ft TL-2 WATER FILLED BARRIER
115 ft
TAPER
END TREATMENT
END TREATMENT
SEE S
HEETS
M04-
M06
AN
D SIG
NAL
FO
R SIG
NIN
G
736 ft TL-2 WATER FILLED BARRIER
MA
TC
HLIN
E S
HE
ET
M22
PHASE B CONSTRUCTION
PALMER ENGINEERING CO.
...\
M23_
Cair
o_
MO
TP
H1B
_B
R-04.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:05 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
J.J. COBURN
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
TYPE III BARRICADE
WATER-FILLED BARRIERS)(PAY ITEM: RELOCATE
(PAY ITEM: RELOCATE WATER-FILLED BARRIERS)
Po
wer In
Roads v8.11.9.397
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M23_
CAIR
O_
MO
TP
H1B
_B
R-04.
DG
NFIL
E
NA
ME:
January
24, 2020
DA
TE P
LO
TT
ED:
josh-c
US
ER:
ZONE 1 PHASE B CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 2A CONSTRUCTION
M24
PHASE A TRAFFIC PHASE A TRAFFIC
PIE
R I-4
PIE
R I-3
PIE
R I-2
PIE
R I-1
ILLINOIS
TO CAIRO
(SPANS 1-6)
570'-6‚"
L0 L2 L4 L6 L8 L10 L12 L14 L16 L18 L20 L22 L24 L26 L28 L30
ILLINOIS
PIE
R
A
PIE
R
B
(SPAN 7)
365'-0"
(SPAN 8)
800'-0"
OHIO
RIV
ER
Pier
B
Pier
A
PIE
R I-1
PIE
R I-2
PIE
R I-3
PIE
R I-4
TAPER
100 ft
40 ft
WHEN IN USE
FLAGGER
A WIDTH OF 24"
STOP BAR SHALL HAVE
50 ft
BUFFER
OVER THE ROADWAY
SIGNAL HEAD MOUNTED
END TREATMENT
100 ft
CHANNELIZING
DEVICES
END TREATMENT
SEE SHEETS M07-M11 FOR SIGNING
MA
TC
HLIN
E S
HE
ET
M25
722 ft TL-2 WATER FILLED BARRIER
(PAY ITEM: RELOCATE WATER-FILLED BARRIERS) (PAY ITEM: RELOCATE WATER-FILLED BARRIERS)
PHASE A CONSTRUCTION
609 ft TL-2 WATER FILLED BARRIER
PALMER ENGINEERING CO.
...\
M24_
Cair
o_
MO
TP
H2
A_
BR-01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:06
PM
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
J.J. COBURN
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
T.M.A.
Po
wer In
Roads v8.11.9.397
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M24_
CAIR
O_
MO
TP
H2
A_
BR-01.
DG
NFIL
E
NA
ME:
January
24, 2020
DA
TE P
LO
TT
ED:
josh-c
US
ER:
ZONE 2 PHASE A CONSTRUCTION AND TRAFFIC CONTROL
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 2A CONSTRUCTION
M25
PHASE A CONSTRUCTION PHASE A CONSTRUCTION
PHASE A TRAFFICPHASE A TRAFFIC
L32 L34
PIE
R
C
L36 L38 L40 L42 L44 L46 L48 L50 L52 L54 L56 L58 L60 L62 L64 L66 L68 L70
PIE
R
D
PIE
R
EPier
E
(SPAN 9)
650'-0"
(SPAN 10)
650'-0"
(SPAN 8)
800'-0"
(SPAN 11)
365'-1•"
OHIO
RIV
ER
Pier
D
Pier
C
END TREATMENT
FILLED BARRIER
609 ft TL-2 WATER
WATER-FILLED BARRIERS)
(PAY ITEM: RELOCATE
MA
TC
HLIN
E S
HE
ET
M24
MA
TC
HLIN
E S
HE
ET
M26CHANNELIZING
DEVICES
60 ft 100 ft
CHANNELIZING
DEVICES
END TREATMENT
(PAY ITEM: RELOCATE WATER-FILLED BARRIERS) (PAY ITEM: RELOCATE WATER-FILLED BARRIERS)
595 ft TL-2 WATER FILLED BARRIER 340 ft TL-2 WATER FILLED BARRIER FILLED BARRIER
404 ft TL-2 WATER
FILLED BARRIERS)
(PAY ITEM: WATER-
PALMER ENGINEERING CO.
...\
M25_
Cair
o_
MO
TP
H2
A_
BR-02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:07 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
J.J. COBURN
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
Po
wer In
Roads v8.11.9.397
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M25_
CAIR
O_
MO
TP
H2
A_
BR-02.
DG
NFIL
E
NA
ME:
January
24, 2020
DA
TE P
LO
TT
ED:
josh-c
US
ER:
ZONE 2 PHASE A CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 2A CONSTRUCTION
M26
PHASE A TRAFFIC
MA
TC
HLIN
E S
HE
ET
M25
L72 L74 L76
KENTUCKY
(SPAN 11)
365'-1•"
Pier
F
Pier
K-1
Pier
K-2
Pier
K-3
Pier
K-4
Pier
K-5
Pier
K-6
Pier
K-7
PIE
R
F
PIE
R
K-1
(SPAN 12)
182'-6"
PIE
R
K-2
PIE
R
K-3
PIE
R
K-4
PIE
R
K-5
PIE
R
K-6
PIE
R
K-7
(SPAN 13 - 19)
1274'-0"
WHEN IN USE
FLAGGER
A WIDTH OF 24"
STOP BAR SHALL HAVE
50 ft
BUFFER TAPER
100 ft
40 ft
FILLED BARRIER
404 ft TL-2 WATER
FILLED BARRIERS)
(PAY ITEM: WATER-
SEE SHEETS M12-M13 FOR SIGNING
PHASE A CONSTRUCTION
END TREATMENT
PALMER ENGINEERING CO.
...\
M26_
Cair
o_
MO
TP
H2
A_
BR-03.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:08 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
J.J. COBURN
LANE MOUNTED SIGNAL
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
T.M.A.
Po
wer In
Roads v8.11.9.397
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M26_
CAIR
O_
MO
TP
H2
A_
BR-03.
DG
NFIL
E
NA
ME:
January
24, 2020
DA
TE P
LO
TT
ED:
josh-c
US
ER:
ZONE 2 PHASE A CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 2B CONSTRUCTION
M27
MA
TC
HLIN
E
PHASE B TRAFFIC PHASE B TRAFFIC
PIE
R I-4
PIE
R I-3
PIE
R I-2
PIE
R I-1
ILLINOIS
TO CAIRO
(SPANS 1-6)
570'-6‚"
L0 L2 L4 L6 L8 L10 L12 L14 L16 L18 L20 L22 L24 L26 L28 L30
ILLINOIS
PIE
R
A
PIE
R
B
(SPAN 7)
365'-0"
(SPAN 8)
800'-0"
OHIO
RIV
ER
Pier
B
Pier
A
PIE
R I-1
PIE
R I-2
PIE
R I-3
PIE
R I-4
TAPER
100 ft
40 ft
WHEN IN USE
FLAGGER
A WIDTH OF 24"
STOP BAR SHALL HAVE
50 ft
BUFFER
END TREATMENT
100 ft
CHANNELIZING
DEVICES
END TREATMENT
SEE SHEETS M07-M11 FOR SIGNING 722 ft TL-2 WATER FILLED BARRIER
(PAY ITEM: RELOCATE WATER-FILLED BARRIERS) (PAY ITEM: RELOCATE WATER-FILLED BARRIERS)
609 ft TL-2 WATER FILLED BARRIER
PHASE B CONSTRUCTION
MA
TC
HLIN
E S
HE
ET
M28
PALMER ENGINEERING CO.
...\
M27_
Cair
o_
MO
TP
H2
B_
BR-01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:09 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
January
24, 2020
DA
TE P
LO
TT
ED:
david-r
US
ER:
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M27_
CAIR
O_
MO
TP
H2
B_
BR-01.
DG
NFIL
E
NA
ME:
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
T.M.A.
LANE MOUNTED SIGNAL
J.J. COBURN
ZONE 2 PHASE B CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 2B CONSTRUCTION
M28
PHASE B TRAFFICPHASE B TRAFFIC
L32 L34
PIE
R
C
L36 L38 L40 L42 L44 L46 L48 L50 L52 L54 L56 L58 L60 L62 L64 L66 L68 L70
PIE
R
D
PIE
R
EPier
E
(SPAN 9)
650'-0"
(SPAN 10)
650'-0"
(SPAN 8)
800'-0"
(SPAN 11)
365'-1•"
OHIO
RIV
ER
Pier
D
Pier
C
END TREATMENT
FILLED BARRIER
609 ft TL-2 WATER
WATER-FILLED BARRIERS)
(PAY ITEM: RELOCATE
CHANNELIZING
DEVICES
60 ft 100 ft
CHANNELIZING
DEVICES
END TREATMENT
(PAY ITEM: RELOCATE WATER-FILLED BARRIERS) (PAY ITEM: RELOCATE WATER-FILLED BARRIERS)
595 ft TL-2 WATER FILLED BARRIER
MA
TC
HLIN
E S
HE
ET
M27
MA
TC
HLIN
E S
HE
ET
M29
744 ft TL-2 WATER FILLED BARRIER
PHASE B CONSTRUCTIONPHASE B CONSTRUCTION
J.J. COBURN
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
PALMER ENGINEERING CO.
...\
M28_
Cair
o_
MO
TP
H2
B_
BR-02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:10
PM
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
DETAIL TITLES
ZONE 2 PHASE B CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 2B CONSTRUCTION
M29
MA
TC
HLIN
E
PHASE B TRAFFIC
L72 L74 L76
KENTUCKY
(SPAN 11)
365'-1•"
Pier
F
Pier
K-1
Pier
K-2
Pier
K-3
Pier
K-4
Pier
K-5
Pier
K-6
Pier
K-7
PIE
R
F
PIE
R
K-1
(SPAN 12)
182'-6"
PIE
R
K-2
PIE
R
K-3
PIE
R
K-4
PIE
R
K-5
PIE
R
K-6
PIE
R
K-7
(SPAN 13 - 19)
1274'-0"
WHEN IN USE
FLAGGER
A WIDTH OF 24"
STOP BAR SHALL HAVE
50 ft
BUFFER TAPER
100 ft
40 ft
SEE SHEETS M12-M13 FOR SIGNING
END TREATMENT
PHASE B CONSTRUCTION
FILLED BARRIER
744 ft TL-2 WATER
WATER-FILLED BARRIERS)
(PAY ITEM: RELOCATE
OVER THE ROADWAY
SIGNAL HEAD MOUNTED
MA
TC
HLIN
E S
HE
ET
M28
J.J. COBURN
PALMER ENGINEERING CO.
...\
M29_
Cair
o_
MO
TP
H2
B_
BR-03.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:11 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
January
24, 2020
DA
TE P
LO
TT
ED:
david-r
US
ER:
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M29_
CAIR
O_
MO
TP
H2
B_
BR-03.
DG
NFIL
E
NA
ME:
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
T.M.A.
ZONE 2 PHASE B CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 3A CONSTRUCTION
M30
MATCHLINE SHEET M31
PIER I-5
PIER I-4
IL
LIN
OIS
TO
CAIR
O
ABUTMENT
ILLINOIS
KE
NT
UC
KY
TO
WIC
KLIFF
E
WHEN IN USE
FLAGGER
(SP
AN
S 1-
6)
570'-
6‚
"
50'
TA
PE
R
40'
A WIDTH OF 24"
STOP BAR SHALL HAVE
PIER I-4
PIER I-5
ABUTMENT
ILLINOIS
25'
BU
FF
ER
PH
AS
E
A
TR
AFFIC
PHASE A CONSTRUCTION
SEE SHEETS M14-M15 FOR SIGNING
SEE SHEETS M14, M16, & M17 FOR SIGNING
FIL
LE
D
BA
RRIE
R
645 ft
TL-2
WA
TE
R
BA
RRIE
RS)
WA
TE
R-FIL
LE
D
(PA
Y IT
EM: R
EL
OC
AT
E
SHOULDER MOUNTED SIGNAL
J.J. COBURN
PALMER ENGINEERING CO.
...\
M30_
Cair
o_
MO
TP
H3
A_IL-02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:12 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
TYPE III BARRICADE
END TREATMENT
Po
wer In
Roads v8.11.9.397
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M30_
CAIR
O_
MO
TP
H3
A_IL-02.
DG
NFIL
E
NA
ME:
January
24, 2020
DA
TE P
LO
TT
ED:
josh-c
US
ER:
ZONE 3 PHASE A CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
PIE
R I-3
PIE
R I-2
PIE
R I-1
(SPANS 1-6)
570'-6‚"
L0 L2 L4 L6 L8 L10 L12 L14 L16 L18 L20 L22 L24 L26 L28 L30
ILLINOIS
PIE
R
A
PIE
R
B
OHIO
RIV
ER
KENTUCKY
TO WICKLIFFE
(SPAN 7)
365'-0"
(SPAN 8)
800'-0"
50 ft
BUFFER TAPER
100 ft
40 ft
WHEN IN USE
FLAGGER
A WIDTH OF 24"
STOP BAR SHALL HAVE
645 ft TL-2 WATER FILLED BARRIER
(PAY ITEM: RELOCATE WATER-FILLED BARRIERS)
SEE SHEETS M18-M19 FOR SIGNING
M31
D.E. RUST J.A. ROSE
D.E. RUST
END TREATMENT
PHASE A TRAFFIC
PHASE A CONSTRUCTION
J.J. COBURN
MA
TC
HLIN
E S
HE
ET
M30
TYPE III BARRICADE
LANE MOUNTED SIGNAL
MOT PHASE 3A CONSTRUCTION
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
PALMER ENGINEERING CO.
...\
M31_
Cair
o_
MO
TP
H3
A_
BR-01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:13 P
M
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
CAIR
O_S
FB
OR
DE
R.
DG
NFIL
E
NA
ME:
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288Po
wer In
Roads v8.11.9.397
Se
pte
mber 18, 2012
DA
TE P
LO
TT
ED:
jeff-r
US
ER:
ZONE 3 PHASE A CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
MATCHLINEM
AT
CH
LIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 3B CONSTRUCTION
M32
MA
TC
HLIN
E
MA
TC
HLIN
E
PIER I-5
PIER I-4
IL
LIN
OIS
TO
CAIR
O
ABUTMENT
ILLINOIS
KE
NT
UC
KY
TO
WIC
KLIFF
E
WHEN IN USE
FLAGGER
(SP
AN
S 1-
6)
570'-
6‚
"
50'
TA
PE
R
40'
A WIDTH OF 24"
STOP BAR SHALL HAVE
PIER I-4
PIER I-5
ABUTMENT
ILLINOIS
25'
BU
FF
ER
PH
AS
E
B
TR
AFFIC
SEE SHEETS M14-M15 FOR SIGNING
SEE SHEETS M14, M16, & M17 FOR SIGNING
FIL
LE
D
BA
RRIE
R
645 ft
TL-2
WA
TE
R
BA
RRIE
RS)
WA
TE
R-FIL
LE
D
(PA
Y IT
EM: R
EL
OC
AT
E
SHOULDER MOUNTED SIGNAL
MATCHLINE SHEET M33
PHASE B CONSTRUCTION
J.J. COBURN
PALMER ENGINEERING CO.
...\
M32_
Cair
o_
MO
TP
H3
B_IL-02.dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:14 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
TYPE III BARRICADE
END TREATMENT
Po
wer In
Roads v8.11.9.397
January
24, 2020
DA
TE P
LO
TT
ED:
david-r
US
ER:
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M32_
CAIR
O_
MO
TP
H3
B_IL-02.
DG
NFIL
E
NA
ME:
ZONE 3 PHASE B CONSTRUCTION AND TRAFFIC CONTROLZONE 3 PHASE B CONSTRUCTION AND TRAFFIC CONTROL
MA
TC
HLIN
E
MA
TC
HLIN
E
J.A. ROSE
D.E. RUST
D.E. RUST
MOT PHASE 3B CONSTRUCTION
M33
MA
TC
HLIN
E
PIE
R I-3
PIE
R I-2
PIE
R I-1
(SPANS 1-6)
570'-6‚"
L0 L2 L4 L6 L8 L10 L12 L14 L16 L18 L20 L22 L24 L26 L28 L30
ILLINOIS
PIE
R
A
PIE
R
B
OHIO
RIV
ER
KENTUCKY
TO WICKLIFFE
(SPAN 7)
365'-0"
(SPAN 8)
800'-0"
50 ft
BUFFER TAPER
100 ft
40 ft
WHEN IN USE
FLAGGER
A WIDTH OF 24"
STOP BAR SHALL HAVE
645 ft TL-2 WATER FILLED BARRIER
(PAY ITEM: RELOCATE WATER-FILLED BARRIERS)
SEE SHEETS M18-M19 FOR SIGNING
END TREATMENT
PHASE B TRAFFIC
PHASE B CONSTRUCTION
OVER THE ROADWAY
SIGNAL HEAD MOUNTED
PALMER ENGINEERING CO.
...\
M33_
Cair
o_
MO
TP
H3
B_
BR-01.
dgn
2/21/
2020
E-S
HE
ET
NA
ME:
DRAWING NO.
SHEET NO.
Commonwealth of Kentucky
DEPARTMENT OF HIGHWAYSCOUNTY
ROUTE CROSSING
PREPARED BY
DETAILED BY:
DESIGNED BY:
DATE: CHECKED BY
REVISION DATE
004B00021N
US 51
2:28:15 P
M
BRIDGE NUMBER
BALLARD
OHIO RIVER
FEBRUARY, 2020
28288
TYPE III BARRICADE
PLANS UNLESS OTHERWISE APPROVED BY THE ENGINEER.
CHANNELIZING DEVICES SHALL ONLY BE USED AT LOCATIONS SHOWN IN THESE4.
ADDITIONAL DETAILS.
SEE STD. DWG. TTC-110, RBE-100, RBM-115, AND RBM-120 FOR NOTES AND3.
FOR ADDITIONAL INFORMATION.
SEE "SPECIAL NOTE FOR TRAFFIC CONTROL ON BRIDGE REPAIR CONTRACTS"2.
MOT TYPICAL SECTION IS SHOWN ON SHEET S11.1.
NOTES:
MA
TC
HLIN
E S
HE
ET
M32
J.J. COBURN
Po
wer In
Roads v8.11.9.397
J:\
KD
OT\
OHIO
RIV
ER
BRID
GE IN
SP
EC
TIO
NS 18-19\2. C
AIR
O\
REP
AIR
PL
AN
S\
DG
N\
M33_
CAIR
O_
MO
TP
H3
B_
BR-01.
DG
NFIL
E
NA
ME:
Fe
bruary
12, 2020
DA
TE P
LO
TT
ED:
david-r
US
ER:
ZONE 3 PHASE B CONSTRUCTION AND TRAFFIC CONTROL