7
lw puk izkS |ks fxdh foHkkx Hkkjr ljdkj D ep t. o f IT G ov t. o f In dia lw pukiz kS |ks fxdhfoHkkx e/;izns 'kljdkj D ept. ofIT G ovt. ofM .P. State D esignated A gency: Im plem entation A gency: ¼Hkkjr ljdkj ,oa e/; izns 'k ljdkj dhla ;q Dr ifj;ks tuk½ dkW eu lfoZl ls a Vj Implementation Status

Implementation Status

  • Upload
    ilana

  • View
    38

  • Download
    2

Embed Size (px)

DESCRIPTION

Implementation Status. Services. Revenue Generation. - PowerPoint PPT Presentation

Citation preview

Page 1: Implementation Status

l wp uk i zkS| ksfxd h foHkkx Hkkj r l j d kjD e p t. o f IT G o v t. o f In d ia

l wpuk izkS|ksfxdh foHkkx e/;izns'k l jdkjDept. of IT Govt. of M.P.

State Designated Agency:Implementation Agency:

¼Hkkj r l jdkj , oa e/; i zns'k l jdkj dh l a; qDr i fj ; kst uk½dkWeu l foZl l saVj

Implementation Status

Page 2: Implementation Status

ServicesB2C Services

Banking SBI, HDFCTelecom BSNL, IDEA, Air Tel, Reliance

(GSM), Reliance (CDMA)

Entertainment Dish –TV, TATA-Sky

Education Play School, e-Shaksharta, Microsoft

Agriculture Excel Crop, Bio Fuel, NAFFAD, Mycorrhiza Majestic

New India Insurance

Tata AIG

FMCG Products

Vaddi

G2C ServicesMPOnline

Services in PipelineElectricity Bill Payment, IFFCO Tieup,

Openschool

Page 3: Implementation Status

Revenue GenerationOur emphasis is on sustainable income generation model rather than thrusting on the number game, we have past learning's and want to ensure sustainable revenue generation business for which we have made tie-up for B2C services and all kiosk rolled out are having average income of 1500 to 2000, in certain cases like Bicholi hapsi, Simrol, Barmandal Kiosk operator are making turnover of more than 10000/-.

Service PatternPeriod - 3 Months

Telecom Entertainment Banking Insurance Education FMCG Agriculture

Page 4: Implementation Status

Rollout

Total No.of Kiosk

Location Identified

VLE Identified for Capcity Building

VLE Trained and Kiosk Under Installation

VSAT Installed and Commisioned

2158 790 602 325 125

Location is primarily at Gram Panchayat Building alternatively mandi

The Priority is to first do capacity building and provide strong business proposition instead of opening huge number of kiosk without services.

That is the reason the no. of commissioned kiosk are initially low, still Service Range is of only B2C service broadly whereas few G2C service are available through MPonline portal.

Now with B2C services the commissioning at identified location will boost up in another 2-3 months.

Page 5: Implementation Status

Connectivity

V-SAT in association from Hughes

Page 6: Implementation Status

Infrastructure S.No Item Quantity   S.No Item Quantity

1 Computers     9 Hub/Switch 1

  Server 1   10 Networking 1

  Thin-Client 1   11 Furniture  

  Celeron 1     Kiosk Counter 1

2 Printers       Operator Table 1

  Printers All in One 1     Computer Table 2

  Photo Printer 1     Chairs 5

  Dot Matrix Printer 1   12 Earting & electrification 1

3 VSAT 1   13 Fan 1

4 UPS 1   14 Light 1

5 Genset 1   15 Sign Boards 1

6 Softwares 1   16 Flex 4

7 Digital Camera 1   17 Play School Indoor 1

8 Web Camera 1   18 Play School Outdoor 1

Page 7: Implementation Status

Inauguration of CSC Kiosk

Mr. Mukesh Hajela CEO NICT Providing Information to Chief Minister and IT Minister of Madhya Pradesh on 11-10-2008