9
IEEE 802-15-12-0052- 00 Submiss ion January 2012 Jon Adams, Lilee Systems Slide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Networks (WPANs) Submission Title: [Overview of Positive Train Control and Request to Approve PAR/5C] Date Submitted: [18 January, 2012] Source: [Jon Adams] Company [Lilee Systems] Address [2905 Stender Way, Suite 78, Santa Clara, CA 95054 USA ] Voice:[+1 480.628.6686], FAX: [Add FAX number], E-Mail: [[email protected]] Re: [If this is a proposed revision, cite the original document.] [If this is a response to a Call for Contributions, cite the name and date of the Call for Contributions to which this document responds, as well as the relevant item number in the Call for Contributions.] [Note: Contributions that are not responsive to this section of the template, and contributions which do not address the topic under which they are submitted, may be refused or consigned to the “General Contributions” area.] Abstract: [Overview material to educate 802.15 WG on Positive Train Control purpose, fit to 802.15, Study Group progress to date, and request to approve PAR and 5C documents. ] Purpose: [Background material to help group decide to approve PAR and 5C documents.] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the

IEEE 802-15-12-0052-00 Submission January 2012 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks

Embed Size (px)

DESCRIPTION

IEEE Submission Where IEEE Work Fits In Communications between –Train and Wayside –Train and Network Infrastructure –Wayside and Network Infrastructure January 2012 Jon Adams, Lilee SystemsSlide 3 Network Control Center

Citation preview

Page 1: IEEE 802-15-12-0052-00 Submission January 2012 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks

IEEE 802-15-12-0052-00

Submission

January 2012

Jon Adams, Lilee SystemsSlide 1

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Submission Title: [Overview of Positive Train Control and Request to Approve PAR/5C]Date Submitted: [18 January, 2012]Source: [Jon Adams] Company [Lilee Systems]Address [2905 Stender Way, Suite 78, Santa Clara, CA 95054 USA]Voice:[+1 480.628.6686], FAX: [Add FAX number], E-Mail:[[email protected]]Re: [If this is a proposed revision, cite the original document.][If this is a response to a Call for Contributions, cite the name and date of the Call for Contributions to which this document responds, as well as the relevant item number in the Call for Contributions.][Note: Contributions that are not responsive to this section of the template, and contributions which donot address the topic under which they are submitted, may be refused or consigned to the “General Contributions” area.]

Abstract: [Overview material to educate 802.15 WG on Positive Train Control purpose, fit to 802.15, Study Group progress to date, and request to approve PAR and 5C documents.]

Purpose: [Background material to help group decide to approve PAR and 5C documents.]Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein.Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15.

Page 2: IEEE 802-15-12-0052-00 Submission January 2012 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks

IEEE 802-15-12-0052-00

Submission

About Positive Train ControlJanuary 2012

Jon Adams, Lilee SystemsSlide 2

Positive Train Control systems designed to prevent: Train-to-train collisions Overspeed derailments Incursions into work zones Movement through improperly

configured switch PTC systems are designed to

override mistakes by human operators

Comprised of four subsystems Locomotive segment Wayside segment Communications segment Back office segment

Communications Segment

Locomotive Wayside

Office

Page 3: IEEE 802-15-12-0052-00 Submission January 2012 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks

IEEE 802-15-12-0052-00

Submission

Where IEEE Work Fits In• Communications between

– Train and Wayside– Train and Network Infrastructure– Wayside and Network Infrastructure

January 2012

Jon Adams, Lilee SystemsSlide 3

Network Control Center

Page 4: IEEE 802-15-12-0052-00 Submission January 2012 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks

IEEE 802-15-12-0052-00

Submission

January 2012

Jon Adams, Lilee SystemsSlide 4Slide 4

SG PTC OfficersChair: Jon Adams (Lilee Systems)

Vice Chair: Dr. Alan Rao (US DOT Volpe Center)

Secretary: TBD

Technical Editor TBD

Page 5: IEEE 802-15-12-0052-00 Submission January 2012 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks

IEEE 802-15-12-0052-00

Submission

Substantive and Growing Participation• Daniel J Paulish        Siemens

Jon T. Adams    Lilee SystemsRick Alfvin     IEEELee Armstrong   US DOTMichael Bahr    SiemensTomasz Bluszcz  SiemensNancy Bravin    IndependentEd Callaway     Sunrise MicroPatrick M Centolanzi    US DOT FTAClint Chaplin   Samsung Information Systems AmericaBo Chen The Ohio State UniversityPark Chul       Electronics and Telecommunications Research Institute (Korea)Jia-ru Li       Lilee SystemsDavid Davenport GE ResearchAdrian Hellman  US DOT VolpeLester Hightower        SafetranEd Hollingsworth        Union Pacific RRWu Meng Hsun    IndependentWilliam Huang   IndependentBin-Chul Ihm    LG ElectronicsKen Jackson     Rail Safety ConsultingDennis Jensen   SiemensVolker Knollmann        SiemensZander Lei      Institute for Infocomm ResearchDaniel L. Mitten        Gannett FlemingKevin Nichter   Lilee SystemsAlejandro Ramirez       SiemensDan Rubin       Union Pacific RRAlp Sezen       Lilee SystemsChi-Sheng Shih  National Taiwan UniversitySamir Soliman   QualcommX H Deng        Independent

• Michael Ma      IndependentHenry Sun       Lilee SystemsLisa Ward       Rohde and SchwarzCharlene Wilder US DOT FTAHuang Shih Ya   IndependentAkhilesh Yadav  IndependentByungsik Yoon   Electronics and Telecommunications Research InstituteKyung-Hee Kim   Korea Railroad Research InstituteMark Lamborn    Bombardier TransportationMichael McInnis The Boeing CompanySteve Jillings  SemtechPatrick Kinney  Kinney Consulting LLCLiang Li        VinnotechCarl Kain       NoblisShuzo Kato      Research Institute of Electrical Communication, Tohoku UniversityZheng Zhao      Beijing University of Posts and TelecommunicationsEdward Gabrelian        CalAmpMonique Brown   IndependentPaul Chilton    NXPRobert Moskowitz        VerizonTero Kivinen    AuthentecMatt Boytim     SensusJohn Notor      Notor ResearchThomas Kuerner  TU BraunschweigJoseph Chung    Via TechnologiesStephen Lee     HalcrowTami Kurth  Lilee SystemsHarvey Glickenstein Parsons BrinckerhoffIbrahim Muftic  Parsons BrinckerhoffMark Hartong  US DOT FRAAlan Rao  US DOT Volpe

January 2012

Jon Adams, Lilee SystemsSlide 5

Page 6: IEEE 802-15-12-0052-00 Submission January 2012 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks

IEEE 802-15-12-0052-00

Submission

PTC Schedule

• PAR/5C (Study Group)– Approval of Study Group Nov 2011– Completion of PAR/5C Docs Jan 2012– Approval of PAR/5C Docs Jan 2012

• Preparation for Task Group Phase– Call for Applications Dec 2011– Completion of Call for Applications Mar 2012– Approval of PAR/5C by NESCOM and 802 EC Apr 2012

• Proposal Effort– Technical Guidance Document May 2012– Call for Proposals May 2012– Preliminary Proposals July 2012– Final Proposals Sep 2012– Adopt Baseline Nov 2012

• Drafting– Preliminary draft Jan 2013– Final draft (ready for WG Letter Ballot) July 2013

• Balloting– Letter ballot Sep 2013– Recirculation I Jan 2014– Recirculation II Mar 2014– Recirculation III May 2014– Sponsor Ballot July 2014

January 2012

Jon Adams, Lilee SystemsSlide 6

Page 7: IEEE 802-15-12-0052-00 Submission January 2012 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks

IEEE 802-15-12-0052-00

Submission

Scope

• This amendment specifies a physical layer (PHY) for IEEE 802.15.4, and medium access control (MAC) changes needed to support this PHY, for use in equipment intended to meet the United States (US) Positive Train Control regulatory requirements and similar regulatory requirements in other parts of the world.

– Enables operation in licensed or license-free radio frequency bands below 6 GHz

– Accommodates transmit power levels greater than the 1 W typical of Part 15 devices

– Meets performance requirements at speeds up to 600 km/h– Supports radio ranges on the order of 70 km– Allows operation in contiguous or non-contiguous channel bandwidths as narrow

as 5 kHz– Supports data rates up to 1 Mbps with flexible and robust quality of service– Provides modulation methods and spectral characteristics consistent with local

regulatory requirements– Accommodates rapidly changing network membership.

<month year>

<author>, <company>Slide 7

Page 8: IEEE 802-15-12-0052-00 Submission January 2012 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks

IEEE 802-15-12-0052-00

Submission

Purpose

• To add new operating frequency bands and address mobility requirements for IEEE 802.15.4 wireless networks intended for information exchange, and command and control applications

• May be used to establish an open standard for the wireless link for locomotive-wayside, locomotive-network infrastructure, and network infrastructure-wayside communications on rail signal and control systems

<month year>

<author>, <company>Slide 8

Page 9: IEEE 802-15-12-0052-00 Submission January 2012 Jon Adams, Lilee SystemsSlide 1 Project: IEEE P802.15 Working Group for Wireless Personal Area Networks

IEEE 802-15-12-0052-00

Submission

Motion to Approve PAR and 5C

• Request that the PAR and Five Criteria contained in documents 15-11-0821-08 and 15-11-0876-06 respectively, be approved by the IEEE 802.15 WG and that the EC be requested to forward the PAR to NesCom

• Moved:  Jon Adams (Lilee Systems)• Second: • Vote:Yes nn No xx Abstain yy

<month year>

<author>, <company>Slide 9