ICAOTechnical Co-operation Bureau
Field Procurement Section
presented by:presented by:
Patrick F. MolinariPatrick F. Molinari
Technical OfficerTechnical Officer
Objective
The overall objective of ICAO’s Procurement activities, is to ensure that procurement of equipment, supplies and services are effected in the best interests of the Organization and/or Assisted States.
Procurement Activities support the projects initiated and administered by the Technical Co-operation program in assisting Member States to implement ICAO Standards and Recommended Practices (SARPs).
All Procurement Activities are regulated by the ICAO Procurement Code.
Why Acquire Through Procurement Section ?
Compliance with ICAO Standards AssuredCompliance with ICAO Standards Assured Possibility to Purchase Under Tax Free Conditions Possibility to Purchase Under Tax Free Conditions Insight on Technological AdvancesInsight on Technological Advances Best Market Prices (Competitive Tender)Best Market Prices (Competitive Tender) Optimum Warranty ConditionsOptimum Warranty Conditions Clear and Short Delivery Times Clear and Short Delivery Times Full TransparencyFull Transparency Full Contract Management and Supervision Full Contract Management and Supervision Field Through Dedicated ExpertsField Through Dedicated Experts
Procurement Section Functions
Technical Support UnitTechnical Support Unit Stringent Registration / Stringent Registration /
Evaluation of Potential Evaluation of Potential SuppliersSuppliers
Development of Technical Development of Technical SpecificationsSpecifications
Budgetary EstimatesBudgetary Estimates Technical Negotiations Technical Negotiations Factory and Site Factory and Site
AcceptanceAcceptance Field SupportField Support
Procurement UnitProcurement Unit Procurement of Procurement of
Goods/Services Goods/Services Contract PreparationContract Preparation Tendering Tendering Contract Administration/ Contract Administration/
Project ManagementProject Management Financial ManagementFinancial Management Liaise with Field Liaise with Field
Operations / Field StaffOperations / Field Staff Liaise with States and CAALiaise with States and CAA
Typical Areas of Implementation
GoodsGoods Aviation SecurityAviation Security Satellite NetworksSatellite Networks Navigational AidsNavigational Aids Fire Fighting VehiclesFire Fighting Vehicles ATC Centers & Radar ATC Centers & Radar Comm. (VHF, HF, VCCS) Comm. (VHF, HF, VCCS) AircraftAircraft Airfield LightingAirfield Lighting
ServicesServices Airport PlanningAirport Planning Civil Works Design Civil Works Design Feasibility StudiesFeasibility Studies Airspace PlanningAirspace Planning
Implementation ATC Radars
DEPV – BrazilDEPV – Brazil 10 Terminal Approach 10 Terminal Approach
PSR/Mode-S SSR PSR/Mode-S SSR
U.A.E.A.C. – ColombiaU.A.E.A.C. – Colombia 4 PSR/SSR 4 PSR/SSR
ImplementationATC Centers
DAC – EcuadorDAC – Ecuador Guayaquil ATC Guayaquil ATC
CenterCenter
U.A.E.A.C. – ColombiaU.A.E.A.C. – Colombia Bogota ATC CenterBogota ATC Center
FPRO_2003
Control Tower Structures
FPRO_2003
Navigational Aids
FPRO_2003
Aircraft & Flight Calibration
Assistance and OperationAssistance and Operation
1.1. Establish Requirements Establish Requirements
2.2. Tendering ProcessTendering Process
3.3. Evaluation and Contract Negotiations Evaluation and Contract Negotiations
4.4. Project ManagementProject Management
5.5. Continuing SupportContinuing Support
1. Establish Requirements
Assign Dedicated Technical Experts Assign Dedicated Technical Experts Effect Site SurveyEffect Site Survey Develop Technical Specifications Develop Technical Specifications Budgetary QuotationsBudgetary Quotations Clarification of Financing and PaymentClarification of Financing and Payment
2. Tendering Process
Phase 1Tender Documentation
Preparation
Phase 2 ICAO Auditor’s Review
Joint Collaboration (ICAO/CAA)•Tech. Spec / Compliance•Instructions to Bidders•Establish Site Survey Dates•Establish Tech. Meeting• ICAO Terms / Conditions•Bidder Pre-Qualification•List of Bidders
Issue Tender
3. Evaluation and Contract Negotiations
ICAOICAOReceipt of TendersReceipt of Tenders
Evaluation Phase Evaluation Phase
•Technical/Commercial Technical/Commercial Evaluation of ProposalsEvaluation of Proposals
•WarrantiesWarranties
•Service Support /References Service Support /References
•Compliance with SARPSCompliance with SARPS
Contract NegotiationsContract Negotiations
Joint Collaboration Joint Collaboration ICAO/CAAICAO/CAA
•Contracts Board ApprovalContracts Board Approval
•Contract PreparationContract Preparation
•ICAO Legal Support ICAO Legal Support
4. Project Management
Design and Progress Review Design and Progress Review Utilize Interim ReportsUtilize Interim Reports Revision of FAT / SAT ProtocolsRevision of FAT / SAT Protocols Attend Factory and Site Acceptance TestsAttend Factory and Site Acceptance Tests Coordinate Shipping, Manage Invoices & PaymentsCoordinate Shipping, Manage Invoices & Payments Warranty Period SupportWarranty Period Support Transfer of Property Equipment Transfer of Property Equipment
5. Continuing Support
Property TransferProperty Transfer Administration of Warranties and ClaimsAdministration of Warranties and Claims TrainingTraining AmendmentsAmendments Procurement of Spare PartsProcurement of Spare Parts Assessment of Customer SatisfactionAssessment of Customer Satisfaction
Contact Field Procurement Section
Director, Technical Co-operation BureauDirector, Technical Co-operation Bureau
Mr. Abelardo SanchezMr. Abelardo Sanchez
Tel: +514-954-8065Tel: +514-954-8065
Fax: +514-954-6287Fax: +514-954-6287
E-Mail: [email protected]: [email protected]