Bay Area Express LanesI‐880 Corridor
What is an Express Lane?
2
• High Occupancy Toll (HOT) Lanes• HOV with toll option
– Carpools, buses free – Other drivers can choose to pay
• Electronic toll• Dynamic tolls keep lane free
flowing (congestion pricing)
Why Express Lanes?
While the region grows…Spending on new infrastructure is set
3
• Encourage carpools, vanpools and express buses
• Make the best use of HOV lane capacity
• Offer choice• Provide reliability
Goal – Improve Mobility
4
5
550 mile network
Expansion over time
Convert existing HOV lanes
Close HOV system gaps
Completion by 2035
Bay Area Express Lanes
5
6
4 Agency Operators
Seamless Network
I‐880 Conversion is an MTC Lane
Bay Area Express Lanes Network by Operator
6
I‐880 Express Lane Project Limits
7
I‐880 TodayLooking Northbound at AM Peak Traffic
HOV Lanes
Looking Southbound at PM Peak Traffic
HOV Lanes8
2017 HOV Lane CongestionWithout Project2017 Express Lane CongestionWith Project
9
Southbound: AM Peak Max Congestion
Northbound: PM Peak Max Congestion
General Purpose Lane Congestion
• Project does not negatively impact the GP lanes
• I‐880 Express Lane project reduces congestion:
• Reduced maximum congestion queue length southbound
• Reduced southbound A.M. peak congestion duration
• Reduced northbound P.M. peak congestion duration
10
Achieving Mobility Improvements
Reclaim capacity lost to weaving• Maintain open access
where possible• Use buffers where
necessary
11
Enforcement• Switchable toll tags• License plate recognition• Increased CHP presence
• Beacon light alerts• CHP enforcement areas• Citations issued for violations
12
I‐880 Express Lane Project Schedule
13
Coordination is Key
Other I‐880 Corridor Investments
• Integrated Corridor Management (ICM) (MTC)
• HOV/Interchange Improvements (ACTC)
• Goods Movement Studies (ACTC)
• Future Projects subject to voter approval in November 2014 (ACTC)
• Ramp Metering and other Freeway Performance Initiative equipment (Caltrans & MTC)
• Median Barrier Improvements (Caltrans)
14
System and Demand Management
• 511 Traveler Information
• Rideshare and Dynamic Rideshare
• Freeway Service Patrol
• East Bay Smart Corridors
Backhaul Network• Data communications network• Repair existing, empty conduit along I‐880 and pull fiber • Could be part of regional transportation communications network
15