49
HYUNDAI LIVART COMPANY INTRODUCTION (Overseas Project Reference)

HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

HYUNDAI LIVARTCOMPANYINTRODUCTION(Overseas Project Reference)

Page 2: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

1. COMPANY PROFILE

2015. 12. Launched the “LIVART CHAIRS” brand

2015. 09. Ranked 1st in KWCI(Korea Well-being Consumer Index)

for 11 years in a row

2015. 07. Launched the “HAUM” brand

2014. 09. Launched the “LIVART KIDS” brand

2014. 08. Ranked 1st in KWCI(Korea Well-being Consumer Index)

for 10 years in a row

2014. 04. Launched the “enSleep” mattress brand

2014. 03. Changed the company name to “HYUNDAI LIVART FURNITURE Co. Ltd”

2014. 02. Opened “LIVART HOUSING” a total remodeling consultant shop

2013. 11. Awarded the presidential medal of the Korea National Quality Award

in the area of service innovation

2013. 08. Concluded the 3rd Environmental Purchase Agreement voluntarily

2012. 12. Won the Prime Minister’s commendation in the 2012

Consumer Rights day

2012. 04. Founded local subsidiary in Canada

2012. 02. Incorporated into affiliates of the Hyundai Department Store Group

2011 10 Korea Sustainable Management Minister of Environment Award

2011 09 Product Safety Day, Dongtop Industrial Medal Award

2011 09 Awarded PIN UP DESIGN AWARD GOLD

2011 06 Grand Prize for Quality Satisfaction No.1 by Women Consumers

2011 06 Open Nonhyeon Exhibition hall of LIVART Styleshop

2011 05 Awarded Korea Premium Brand Grand Prize for Kirchen furniture

2010. 12. Joined Green Economy, Green Economy international conference

2010. 04. Certification of Consumer Complaints Management System (CCMS)

2010. 03. Ministry of Environment, The army`s Eco Tree Campaign

2008. 07. Finalized demonstration project “ Green House-gas Emission Indication”

2007. 04. Establishment of overseas Independent Corporation

“Livart Vina” in Vietnam

2005. 11. Award for Health House (Minister of Construction and Transportation)

2005. 11. Listing of LIVART in KOSPI

2005. 10. Acquisition of management system Certification

2004. 12. Korea Design Award (President`s Award)

2004. 05. Korea Marketing Award 2004 (Design Distribution)

2003. 10. Ritchen received the Gold Medal in KS Award

2001. 09. Launch of new brands – Ritchen, Neoce

1999. 10. Acquisition of ISO 9001

1999. 06. Establishment of LIVART., Inc

1996. 05. Changed brand name to LIVART

1994. 04. Establishment of Technology Institute

1981. 01. Change of company name to Hyundai Total Woods Materials. Inc

1978. 01. Establishment of Gumgang Wood Materials., Inc

1977. 05. Launch of the Furniture Operation Division of Hyundai E&C

1-1. History

Page 3: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

CEO Sales Strategy Division Strategy & Operations Team

Product Planning Team

Quality Management Team

Customer Satisfaction TeamEco-Friendliness Committee

Design R&D Center Integrated Design Team

Strategic Design TeamQuality Committee Sales Director

Technical Quotation Team

B2C Division Dealer Sales Management Team

Direct Sales Team

Online Sales Team

Furniture Sales Team

Kitchen Sales Team

KIDS Furniture Sales Team

Corporate Management Team

B2B Division BUILT-IN Sales Team

NEOCE Sales Team

MARINE Sales Team

Overseas Sales Team

Production Division Production Management Team

Construction Team

Operation Support Division Support Team

Finance Team

IT Team

Purchase Team

Overseas Subsidiaries LIVART VINA

LIVART CANADA

LIVART QATAR

LIVART SINGAPORE

LIVART CHINA

LIVART KAZAKHSTAN

LIVART LAOS

1. COMPANY PROFILE

1-2. Organization

Page 4: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

1. COMPANY PROFILE

1-3. Business Field

Built-in Casework Office Furniture Marine Casework

Home Furniture Built-in Kitchen Kids Furniture

Page 5: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

Korea(Head-Office)

Canada (Vancouver)

China(Guangzhou)

Vietnam(Hochiminh & Hanoi)

Qatar (Doha)

KSA (Dammam)

Kazakhstan(Astana)

Singapore

Laos (Vientiane)

2-1. International Network

CorporationCanada VancouverVietnam Hochiminh

Joint VentureKSA DammamLaos Vientiane

BranchVietnam HanoiSingaporeQatar DohaChina GuangzhouKazakhstan Astana

Overseas Subsidiary Overseas Dealer

UAEOmanKSAQatarKuwaitJordan

PakistanEgyptKenyaLaosKazakhstanMexico

ChinaPeruColombiaHongkongVietnamJapan

USAEl SalvadorAustralia

Page 6: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

1. Client : Ashghal

2. Project : Hamad Bin Khalifa Medical City CP300B Fit-out PJT (Doha, Qatar)

3. Unit : 450 Bed (Patient Room)

4. Item : Overall Built-in Casework, Glass door with stainless steel,

Plastic Laminate Door (Including Fire rated & Lead Line door)

Toilet Cubicle, Phenolic Locker, Interior Bench Etc

5. Schedule : 2011. Octber ~ On-going

6. Finish Material : HPM, LPM, Solid Surface Etc

7. View

< Patient Room > < Patient Room > < Patient Room >

■ Qatar Hamad Bin Khalifa Medical City

Page 7: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

< Public Casework > < Public Casework > < Public Casework >

< Plastic Laminate Door > < Plastic Laminate Fire Rated Door > < Plastic Laminate Fire Rated Door >

■ Qatar Hamad Bin Khalifa Medical City

Page 8: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

< Phenolic Locker > < Toile Cubicle > < Toilet Wash Basin >

< Interior Desk > < Reception Desk > < Nurse Station >

■ Qatar Hamad Bin Khalifa Medical City

Page 9: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

■ Qatar Hamad Bin Khalifa Medical City

< Upholstery Sofa > < Upholstery Sofa > < Window Sofa >

< Glass Door with Stainless Steel > < Glass Door with Stainless Steel > < Glass Door with Stainless Steel >

Page 10: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

■ Qatar Hamad Bin Khalifa Medical City

[ 3D Proposal Image ] [ Actual Image ]

Page 11: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

■ Qatar Hamad Bin Khalifa Medical City

[ 3D Proposal Image ] [ Actual Image ]

Page 12: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

■ Qatar Hamad Bin Khalifa Medical City

[ 3D Proposal Image ] [ Actual Image ]

Page 13: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

■ Qatar Hamad Bin Khalifa Medical City

[ 3D Proposal Image ] [ Actual Image ]

Page 14: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

■ Qatar Hamad Bin Khalifa Medical City

[ 3D Proposal Image ] [ Actual Image ]

Page 15: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

■ Qatar Hamad Bin Khalifa Medical City

[ 3D Proposal Image ]

[ Actual Image ]

Page 16: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

■ Qatar Hamad Bin Khalifa Medical City

Page 17: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

■ Qatar Hamad Medical Research Center

1. Client : HMC

2. Project : Hamad Medical Research Center Office Furniture PJT (Doha, Qatar)

3. Unit : 30 office room with Pantry area

4. Item : Office Furniture (Workstation, pantry kitchen)

5. Schedule : 2013. March ~ June

6. Finish Material : HPM, LPM, Genuine Leather, Engineered marble

7. View

< Director Room > < Manager Room > < Staff Room >

Page 18: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

< Staff Room > < Document Controller Room > < Staff Room >

< Staff Room > < Staff Room > < Meeting Room >

■ Qatar Hamad Medical Research Center

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 19: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

< Pantry Kitchen > < Reception Lounge >

■ Qatar Hamad Medical Research Center

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 20: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Qatar Hamad Medical Research Center

< 3D Proposal Image >

< Actual Image >

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 21: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Qatar Barwa Al Khor Housing PJT

1. Client : Barwa Group

2. Project : Barwa Al Khor Housing PJT (Shell petroleum staff accommodation)

3. Unit : 350 Housing (Villa: 50, Apartment: 300)

4. Item : Built-in Kitchen, Wardrobe & Toilet Wash Basin

5. Schedule : 2013. June ~ 2015. May

6. Finish Material : LPM, Solid Surface

7. View

< Villa Kitchen > < Apartment Kitchen > < Toilet Wash Basin >

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 22: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Qatar Barwa Al Khor Housing PJT

< Bedroom Wardrobe > < Bedroom Wardrobe > < Bedroom Wardrobe >

< Corridor Wardrobe > < Corridor Wardrobe > < Single Wash Basin >

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 23: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Qatar Barwa Al Khor Housing PJT

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 24: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ KSA Joint Venture Business

< Dammam Factory Showroom > < Dammam Factory Showroom > < Dammam Factory Showroom >

1. Company Name : Albawardi Livart Woodwork Industries

2. Address

-. Factory : M. & A. ALBAWARDI. PO BOX 112. DAMMAM 31411

-. TEL: +966 3 833 33 33

-. FAX: +966 3 833 66 66

-. E-mail: [email protected]

-. www.albawardi.com

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 25: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ KSA Eastern Province Phrase-1 PJT

< Bedroom Wardrobe > < Timber Door > < Kitchen >

1. Client : Saudi Oger LLC (K.S.A)

2. Project : Construction of 5,000 Villas in Eastern Province (Al Khobar, KSA)

3. Unit : 500 ( 4 Types)

4. Item : Built-in Wardrobe & Kitchen, Timber Door

5. Schedule : December. 2011 ~ October 2012

6. Finish Material : Natural Veneer and Solid Wood etc

7. View

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 26: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Vietnam Intercontinental Hotel Loose Furniture

< Loose Furniture > < Loose Furniture > < Loose Furniture >

1. Client : Kum Ho Construction Co. Ltd.

2. Project : Asiana Plaza Intercontinental Hotel (Ho Chi Minh, Vietnam)

3. Unit : 305 ( 15 Types)

4. Item : Hotel Furniture

5. Schedule : May. 2010 ~ September. 2010

6. Finish Material : Natural Veneer and Fabric etc

7. View

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 27: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

< Entrance Door -1 >

1. Client : M+S Development (Main-con : Hyundai E&C – GS JV)

2. Project : Marinaone Residences PJT(Singapore)

3. Unit : 1,042 Housings

4. Item : Timber door, Sliding & Folding door, Wardrobe

5. Schedule : 2015 . May ~ On going

6. Finish Material : Wood veneer and Plastic Laminate

7. View

■ Singapore Marinaone Residence PJT

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

< Entrance Door -2 > < Entrance Door -3 > < Room Door > < Sliding Door >

Page 28: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

< Bedroom wardrobe - 1 >

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

■ Singapore Marinaone Residence PJT

< Bedroom wardrobe - 2 > < Bedroom wardrobe - 3 >

Page 29: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

< Workstation > < Workstation > < Partition >

1. Client : CJ International Singapore Branch

2. Project : CJ International Branch Office renewal work (Singapore)

3. Unit : 150 staff

4. Item : Office Furniture (Workstation, Sofa Etc)

5. Schedule : 2015 . Oct ~ Nov

6. Finish Material : HPM, LPM

7. View

■ Singapore CJ International Branch Office renewal PJT

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 30: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

< Workstation > < Workstation > < Workstation >

< Conference room > < Pantry room > < meeting room >

■ Singapore CJ International Branch Office renewal PJT

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 31: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

< Client Owner room > < Client Owner room > < Client Owner room >

■ Qatar Samsung C&T Facility D IWPP PJT

1. Client : Samsung C&T

2. Project : Umm Al Houl Power PJT office furniture work (Doha, Qatar)

3. Unit : 320 staffs

4. Item : Office Furniture

5. Schedule : 2015. Sep ~ Dec

6. Finish Material : HPM, LPM, Melamine

7. View

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 32: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

< Management room > < Management room > < Management room >

< Main Conference room > < Semi Conference room > < Meeting room >

■ Qatar Samsung C&T Facility D IWPP PJT

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 33: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

< Manager room > < Manager room > < Document Controller room >

< Lobby chair> < Staff room> < Receiption >

■ Qatar Samsung C&T Facility D IWPP PJT

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 34: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Qatar Samsung C&T Facility D IWPP PJT

< Actual Image >< 3D Proposal Image >

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 35: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Qatar Samsung C&T Facility D IWPP PJT

< 3D Proposal Image > < Actual Image >

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 36: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Canada Concord Pacific Uptown Apartment PJT

< Kitchen > < Island Kitchen > < Bath wardrobe>

1. Client : Concord Pacific

2. Project : Uptown Apartment (Vancouver, Canada)

3. Unit : 380 ( 12 Types)

4. Item : Built-in Kitchen & Bath Wardrobe

5. Schedule : July. 2014 ~ April. 2014

6. Finish Material : High glossy painting

7. View

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 37: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Canada Inter Gulf Development Group Kits 360 PJT

< Kitchen > < Kitchen > < Kitchen >

1. Client : Inter Gulf Development Group

2. Project : Kits360 Apartment (Vancouver, Canada)

3. Unit : 250 ( 8 Types)

4. Item : Built-in Kitchen

5. Schedule : March. 2013 ~ December. 2013

6. Finish Material : LPM and High glossy Painting etc

7. View

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 38: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Canada Inter Gulf Development Group Promenade PJT

< Kitchen > < Bath wardrobe > < Kitchen >

1. Client : Inter Gulf Development Group

2. Project : Promenade Apartment (Vancouver, Canada)

3. Unit : 180 ( 8 Types)

4. Item : Built-in Kitchen & Bath wardrobe

5. Schedule : September. 2012 ~ October. 2013

6. Finish Material : Wood Veneer and High glossy Painting etc

7. View

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 39: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Canada Concord Pacific Garden PJT

< Kitchen > < Door accessory > < Utensil compartment >

1. Client : Concord Pacific

2. Project : Garden Apartment (Vancouver, Canada)

3. Unit : 150 ( 8 Types)

4. Item : Built-in Kitchen

5. Schedule : April. 2014 ~ August. 2014

6. Finish Material : LPM and High glossy Painting etc

7. View

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 40: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

■ Korea Sheraton Hotel PJT

< Bed & Bed head unit > < Loose furniture > < Office furniture >

1. Client : Daesung E&C

2. Project : D Cube Sheraton Hotel (Seoul, Korea)

3. Unit : 270 ( 12 Types)

4. Item : Loose furniture

5. Schedule : June. 2010 ~ May. 2011

6. Finish Material : Natural Veneer and Fabric etc

7. View

2. OVERSEAS DIVISION PROFILE

2-2. Outstanding Project

Page 41: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

3. MANUFACTURE SYSTEM

3-1. Factory summary

Factories

Headquarter Yongin Factory

Anseong Factory

Gyeongju Factory

Mokpo Factory

Vietnam (Ho Chi Minh)

Canada (Vancouver)

Area

141,000 m2

20,936 m2

10,248 m2

6,942 m2

75,500 m2

3,580 m2

Product

Built-in Furniture

Built-in Kitchen

Timber Door

Office Furniture(Workstation)

Office Furniture Chair

Capacity

5,000 Housings

5,000 Housings

1,500 Sets

10,000 Sets

10,000 Sets

Unit

Set Per Month

Set Per Month

Set Per Month

Set Per Month

Set Per Month

Factories Scale

Manufacture Capacity (Only Export)

HQ Yongin Factory Anseong Factory

Gyeongju Factory Mokpo Factory

Gimhae Factory Vina Factory(Vietnam)

Area

141,000 m2

20,936 m2

10,248 m2

6,942 m2

75,500 m2

(Warehouse)

Page 42: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

3. MANUFACTURE SYSTEM

3-1. Factory summary

< Angular (Giant)Saw > < Panel Saw > < Double Edge Vending M/C >

< Painting Booth > < Point M/C > < Running Point M/C >

Page 43: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

3. MANUFACTURE SYSTEM

3-1. Factory summary

< Flush Pressorer > < NC M/C > < Assembly Area >

< Knock-Down Packing Area > < Automatic Warehouse > < Warehouse >

Page 44: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

3. MANUFACTURE SYSTEM

3-2. Quality control

HYUNDAI LIVART FURNITURELABORATORY IN YONGIN FACTORY

HYUNDAI LIVART runs a set of quality management systems consisting of Prevention of Quality Deterioration, Q/C activities and TQM (Total Quality Management) in a bid to deliver even stronger customer satisfaction to its customers.

Prevention of Quality Deterioration

• Checking specifications demanded bycustomers (on-site orientation/drawings)

• Checking quality issues involved in newmaterials/techniques

• Checking agenda for project managermeetings

Quality Control (QC) Activities

• Quality check at each process(both inside and outside the company):cutting – adhesion – boring -assembly/packaging

• Verification of properties andenvironmental impacts of finished goods

• Pre-inspection of temporary assembly

Total Quality Management

• Real-time feedback on key qualityinformation: quality issues and processchanges (4M+1E)

• Quality improvement meetings withsuppliers (twice a month)

• Technology standardization and educationon quality improvement information

Page 45: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

3. MANUFACTURE SYSTEM

3-3. Maintenance & Customer Service

Customer request Site visiting

Check & Register

Service processing #1

Claim materials

Service processing #2

Complete

Production

Inspection

※We are able to change warranty period as per Client’s requested.

Page 46: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

3. MANUFACTURE SYSTEM

3-4. International Certificate, License & Award

< BIFMA MEMBER >

Page 47: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

3. MANUFACTURE SYSTEM

3-4. International Certificate, License & Award

< QS-CERTIFICATE OF ASSESMENT > < KOLAS CERTIFICATE >

< KOREA STANDARD CERTIFICATE >< ISO 9001:2009 > < ISO 14001:2009 >

< ECO-LABEL CERTIFICATE >

Page 48: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

3. MANUFACTURE SYSTEM

3-4. International Certificate, License & Award

Page 49: HYUNDAI LIVART COMPANY INTRODUCTION · 4. Item : Timber door, Sliding & Folding door, Wardrobe 5. Schedule : 2015 . May ~ On going 6. Finish Material : Wood veneer and Plastic Laminate

End of Document