1 Hydropower Projects Portfolio By Jorge Aguinaga Diaz General Director for Electricity MINISTRY OF ENERGY AND MINES 18th Meeting, Iquitos- Peru, 04 March 2008 Business Network Forum

Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

1

Hydropower

Projects Portfolio

By Jorge Aguinaga Diaz

General Director for Electricity

MINISTRY OF ENERGY AND MINES

18th Meeting, Iquitos- Peru, 04 March 2008

Business Network Forum

Page 2: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

2

Content

I. GENERAL ASPECTS

• National Electric System

• Development Perspectives of the Power Generating System

II. HYDROPOWER POTENTIAL

• Characteristics

• Hydropower potential knowledge

III. HYDROPOWER PROJECTS PORTFOLIO

• General Table

• Greenfield Hydropower Projects for Electricity Exportation

IV. PROMOTION INCENTIVES TO DEVELOP HYDROPOWER PROJECTS

Page 3: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

3

CONTENT

I. GENERAL ASPECT

• National Electric System

• Development Perspectives of the Power Generating System

II. HYDROLECTRIC POTENTIAL

III. HYDROPOWER PROJECTS PORTFOLIO

IV. PROMOTION INCENTIVES TO DEVELOP HYDROPOWER PROJECTS

Page 4: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

4

Electricity coverage : 80 %

Consumption per capita : 943

KW.h/Inhabit

Installed Power : 7 059 MW

Hydropower (46 %)

Thermal (54%)

Production : 29 857 GW.h

Hydropower (65%)

Thermal (35%)

Transmission Lines :

220 kV ( 5 677 km )

138 kV ( 3 636 km )

Sales to final clients : 24 621 GW.h

Sales in US$ : 1 825 Million

Number of users : 4,35 Million

Distribution losses : 8,1 %

NATIONAL ELECTRIC SYSTEM

Electrical Basic Data 2007

IQUITOS

Page 5: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

5

DEVELOPMENT PERSPECTIVES OF THE POWER

GENERATING SYSTEM

For Peru internal

consumption

9 000 MW

National Power Capacity required

through the next 20 years

Potential Hydropower Projects

TTT

HHH

HH

T

T

0

5 000

10 000

15 000

20 000

2008 2018 2028

Ca

pa

cit

y (

MW

)

Thermal ProjectsHydro ProjectsCurrent HydroCurrent Thermal

60 000

Potential

Hydropower

Projects

Greenfields for

Exportation

Purposes

51 000 MW

Page 6: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

6

Content

I. GENERAL ASPECTS

II. HYDROPOWER POTENTIAL

• Characteristics

• Hydropower potential knowledge

III. HYDROPOWER PROJECTS PORTFOLIO

IV. PROMOTION INCENTIVES TO DEVELOP HYDROPOWER PROJECTS

Page 7: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

7

CHARACTERISTICS Topography

The Amazon River

Hydrographic Basins

1. The Coastal Region

2. The Andean Highlands

3. The Amazon Rain Forest:

The cloud forest

The lowland jungle

IQUITOS

LIMA

Divided on three areas:

There are three hydrographic systems:

Pacific: 53 basins

Atlantic: 49 basins

Titicaca Lake: 9 basins

One of the largest rivers in the world

Andean

Highlands

Amazon

Rain Forest

Coastal

Region

Page 8: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

8

HYDROPOTENTIAL KNOWLEDGE

Hydrographical Knowledge

Historical Measurements

1. The National Hydropower Potential Study (1980) lists the

existing hydrometrics (467) and rain stations (1255)

2. Electroperu compiled information of historical flows on the

Atlantic Slope side (1975-2000): Marañon river (24 years)

and Huallaga river (14 years), among others

Hydropower Projects

548 HHPP identified by the Study of the Hydropower

National Potential (1976 to 1979)

328 HHPP technically feasible studies to develop

200 000 MW of theoretical hydroelectric potential from

which 58 937 MW are technically usable

1. National Map 1:100 000 scale available

2. The studies of main hydropower projects are more

concentrated in topographic issues than in hydrological info

BASINS

PACIFIC

ATLANTIC

TITICACA LAKE

INTERNAL BASINS

HYDROLOGICAL BASINS

OF PERU

Rainy

Zone

Page 9: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

9

Content

I. GENERAL ASPECTS

II. HYDROPOWER POTENTIAL

III. HYDROPOWER PROJECTS PORTFOLIO

• General Table

• Greenfield Hydropower Projects for Energy Exportation

IV. PROMOTION INCENTIVES TO DEVELOP HYDROPOWER PROJECTS

Page 10: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

10

GENERAL TABLE

1. Definitive Concession:

6 HHPP, 914 MW

2. Temporary Concession:

8 HHPP, 1 600 MW

3. Greenfield Projects

without Concession:

15 Projects, 19 680 MW

HHPP LARGER THAN 100 MW

Page 11: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

11

HYDROPOWER PROJECTS FOR ELECTRICITY

EXPORTATION (1)

2 Projects

Nº Plants Region

1 C.H. PONGO DE MANSERICHE 7 550 Loreto

2 C.H. CUMBA 4 825 Amazonas

3 C.H. CHADIN 2 600 Amazonas y Cajamarca

4 C.H. LA BALSA 915 Cajamarca

5 C.H. CHAGLLA 444 Huánuco

6 C.H. RENTEMA 1 525 Amazonas

7 C.H. LA GUITARRA 220 Huancavelica

8 C.H. MAN 270 286 Huancavelica

9 C.H. SUMABENI 1 074 Junín

10 C.H. PAQUITZAPANGO 1 379 Junín

11 C.H. TAMBO - PTO. PRADO 620 Junín

C.H. VIZCATÁN y CUQUIPAMPA 1 550 Huancavelica y Ayacucho

14 C.H. INA 200 1 355 Madre de Dios

15 C.H. URU 320 942 Cusco

19 285

Capacity (MW)

TOTAL

12 y 13

HP La Balsa HP Rentema

Page 12: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

12

HYDROPOWER PROJECTS FOR ELECTRICITY

EXPORTATION (2)

HP Urubamba

HH.PP. VIZCATAN & CUQUIPAMPA

1550 MW

Nº Plants Region1 C.H. PONGO DE MANSERICHE 7 550 Loreto2 C.H. CUMBA 4 825 Amazonas3 C.H. CHADIN 2 600 Amazonas y Cajamarca4 C.H. LA BALSA 915 Cajamarca5 C.H. CHAGLLA 444 Huánuco6 C.H. RENTEMA 1 525 Amazonas7 C.H. LA GUITARRA 220 Huancavelica8 C.H. MAN 270 286 Huancavelica9 C.H. SUMABENI 1 074 Junín

10 C.H. PAQUITZAPANGO 1 379 Junín11 C.H. TAMBO - PTO. PRADO 620 Junín

C.H. VIZCATÁN y CUQUIPAMPA 1 550 Huancavelica y Ayacucho14 C.H. INA 200 1 355 Madre de Dios15 C.H. URU 320 942 Cusco

19 285

Capacity (MW)

TOTAL

12 y 13

Page 13: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

13

Item MWInvestment

US $ MMTM CO2 MM

per year

US $ G-B

per yearDeffinitive

Concessions914 1,143 2.6 32

Temporal

Concessions1,600 2,000 4.6 56

Greenfield

HEPP19,680 24,600 56.9 683

Total 22,194 27,743 64.2 770

Note.- Considers 0,55 CO2 TM / MWh and $12/CO2 TM

HEPP INVESTMENT, GREEN BONDS & BAR ENERGY PRICE

Marginal Cost Evolution

The Compound Electrical Energy Bar Price in the Peruvian

Electrical System is close to $40 per MWh ($33 due energy

and $7 due the capacity)

Page 14: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

14

Content

I. GENERAL ASPECTS

II. HYDROPOWER POTENTIAL

III. HYDROPOWER PROJECTS PORTFOLIO

IV. PROMOTION INCENTIVES TO DEVELOP HYDROPOWER PROJECTS

Page 15: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

15

PROMOTION INCENTIVES TO DEVELOP HEPP [1]

Attractive legal framework for

Foreign Direct Investment

based on freedom and equality

Profits Free Exportation

Country risk below the Latin

American average

Lowest inflation in Latin America

and a very stable exchange rate

(free)

Economy committed to the

commercial integration process

(USA, Canada, and EU)

Sustainable economy growth

Important flow hydro head

sources

Permanent Rainy regime

Localization between south

American neighbors.

Physical conditionsLegal and Economical

Close to investment grade

First place in Latin America regarding

the State receptiveness to investment

(WEF).

Second place in Latin America for

protecting the Foreign Direct

Investment (WB).

Ranking

GENERAL INCENTIVES

Page 16: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

16

PROMOTION INCENTIVES TO DEVELOP HEPP [2]

General Sales Tax Drawback Regime,

A HEPP portfolio should be maintained as ordered by the Law Nº 28832

Bidding Process for energy supply with fixed prices in long term

Guarantee for recover the investment in Transmission Power Systems

The accelerated depreciation method for any HEPP size is included in

the projected law for generating power using renewable energy

resources

PARTICULAR LEGAL INCENTIVES

Page 17: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

17

Thanks for your kind attention

[email protected]

http://www.minem.gob.pe/

Page 18: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

18

LA BALSA HEPP, 915 MW Installed Capacity. Located on

The Marañon River, downstream from the La Balsa Village

Map

Page 19: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

19

CHADIN HEPP, 2, 600 MW Installed Capacity. Located on

The Marañon River, upstream from the intersection with

the Llaucano River

Map

Page 20: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

20

CHAGLLA HEPP, 444 MW Installed Capacity

Huallaga River, downstream from Huanuco City

Map

Page 21: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

21

RENTEMA HEPP, 1 525 MW Installed Capacity. Located on

the Marañon River. Amojao Hydrometric Station,

downstream from the Rentema Pongo site

Map

Page 22: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

22

LA GUITARRA (MAN 250) HEPP, 220 MW Installed Capacity.

Located on The Mantaro River, downstream Restitución HEPP

Map

Page 23: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

23

MANTARO 270 HEPP, 286 MW Installed capacity. Located on The

Mantaro River, near the Apurimac River and Pariahuanca Village

intersection

Map

Page 24: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

24

HEPP Scheme on the Ene River and Tambo River

SUMABENI HEPP (1 074 MW), PAQUITZAPANGO HEPP (1 379 MW)

and TAMBO-PUERTO PRADO HEPP (620 MW)

Map

Page 25: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

25

PAQUITZAPANGO (ENE 40) HEPP, 1379 MW Installed Capacity.

Located upstream from intersection of Ene River and Perene River

Map

Next

Page 26: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

26

PAQUITZAPANGO HEPP, 1 379 MW Installed capacity.

Located on The Ene River, upstream from its intersection

with The Perene River

Map

Page 27: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

27

TAMBO – PUERTO PRADO HEPP, 620 MW Installed capacity.

Located downstream the intersection of the Perene River

and The Ene River

Map

Next

Page 28: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

28

TAMBO – PUERTO PRADO HEPP, 620 MW Installed capacity.

Located on The Tambo River, downstream from the

intersection of The Ene River and The Perene River

Map

Page 29: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

29

URUBAMBA 320 HEPP, 942 MW Installed capacity. Located

on The Urubamba River, downstream from the intersection

with The Paucartambo River

Map

Page 30: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

30

Field of Influence

H.P. Pongo de Manseriche.

Next

Map

PONGO DE MANSERICHE HEPP, 7 550 MW Installed capacity.

Page 31: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

31

Pongo de Manseriche

Next

Map

Page 32: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

32

Pongo

Next

Map

Page 33: Hydropower Projects Portafolio - Asia-Pacific Economic … Projects_Hydropowe… · Hydropower Projects Portafolio Author: LVilchez_Rev H Armas Created Date: 11/13/2009 6:03:17 PM

33

0

20

40

60

80

100

120

140

160

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

Feb

Mar

Apr

May

Jun

Jul

Aug

Sep

Oct

Nov

Dec

Jan

2004 2005 2006 2007 2008

MONTH

US

$/M

W.h

Average Montly

Marginal Cost

Short Term

Active Enegy

Bar Price

Back

Marginal Cost Evolution