HYDROGRAPHIC SOCIETY4 DECEMBER 2007
NICK HARRINGTON, BSc, MRICS
WHY RENEWABLE ENERGY?
• Reduction of emissions, Kyoto targets• Security of supply• Cost
MARINE ENERGY
• Tidal Barrage • Tidal Stream• Wave Energy
– Shoreline– Seabed– Shallow water– Deep water
WHY IN SOUTH WEST?
• Strong wave and tidal resource• Existing marine sector• Academic base• Opportunities in new industry
WAVE POWER LEVELS
Source: World Energy Council website - based on Claesson, (1987)
TIDAL RESOURCE
WAVE RESOURCE
STRONG EXISTING GRID
COSTS OF ELECTRICITY GENERATION
Source: PB Power “Powering the Nation” March 2006
WAVE HUB – UK ROUTE TO COMMERCIALISATION
R&D
Initial prototype
Refined prototype
Pre- commercial device
Market entry with commercial product
Market penetration
DemonstrationDemonstrationNaREC
Wave Hub
EMEC
WAVE HUB PROVIDES
• Consented sea area• Grid connected 5MW per berth• Monitoring and testing• Power purchase agreement• Opportunities to collaborate• Access to suppliers’ research base
WESTWAVE - PELAMIS
OCEAN POWER TECHNOLOGIES - POWERBUOY
OCEANLINX
FRED OLSEN – FO3 BULDRA
SITE IDENTIFICATION
• Wave resource• Grid connection• Shipping• Wildlife• Fishing• Military• 12 NM limit
SITE SELECTION
Source: Halcrow Wave Hub Technical Feasibility Study – Jan 2005
Fig 5.2 Anatec Navigational Risk Assessment (May 2006)
PLANNING CONSENT
• Electricity Act 1989 – Section 36– declaration to extinguish rights of navigation– deemed consent for works on land
• Food & Environment Protection Act 1985 – Section 5• Coast Protection Act 1949 – Section 34
FURTHER APPLICATIONS
• Safety zones• Device specific FEPA licences
ENVIRONMENTAL IMPACT ASSESSMENT
• Terrestrial ecology• Intertidal ecology• Subtidal ecology• Ornithology• Marine ecology• Fish and fisheries study• Cetacean survey• Water quality
• Sediment quality• Archaeological
assessment• Landscape and visual
amenity • Underwater video• Impact on surfing beaches• Stakeholder and
community consultation
SOUTH WEST WAVE HUB
• Coastal Processes Study• Marine Traffic Survey• Navigation Risk Assessment
CONSENT
Consent granted 17 September 2007
• First Section 36 marine renewables consent in UK• Consent conditions
LOCATION OF TSS RELATIVE TO THE WAVE HUB DEPLOYMENT AREA
Fig 5.2 Anatec Navigational Risk Assessment (May 2006)
OVERVIEW CHART OF TRACKS RECORDED 7 AUGUST 2005 (BUSIEST DAY)
Fig 4.7 Anatec Marine Traffic Survey (August 2005)
MAIN MERCHANT ROUTES IDENTIFED FROM SURVEY DATA
Fig 5 Page 117 Anatec Navigational Risk Assessment (May 2006)
FISHERIES
• Liaison under FLOWW guidelines• Rights to fish removed by Secretary of State declaration• No statutory entitlement to compensation• Expectation developers to mitigate/compensate• Difficult to assess individual impacts
PRI-MaRE
Universities of Plymouth and Exeter
• Plymouth Marine Laboratory• Marine Biological Association• Sir Alister Hardy Foundation for Ocean Science• The Met Office
PRI-MaRE
• Resource assessment• Coastal processes• Electrical operations• Operations and maintenance• Moorings design• Environmental impacts• Safety of operations• Social and economic
PROGRAMME
• Board approval April 2007• Consents September 2007• Financial close December 2007• Order cable January 2008• Construction Summer 2009• First devices deployed Late summer 2009
CAPTURING THE BENEFITS
• Inward investment• Supply chain• Marine facilities• Support services• Research and knowledge economy• Overseas markets
THE FUTURE
• Marine Spatial Planning• Strategic Environmental Assessment
• Track record of performance from devices• Environmental impacts understood• Applications for commercial projects