8
1 Hybrid & Module Testing Hybrid & Module Testing Status Status Week of 4/25-4/29

Hybrid & Module Testing Status

Embed Size (px)

DESCRIPTION

Hybrid & Module Testing Status. Week of 4/25-4/29. UCSB Hybrid Testing Status. Failing Hybrids Over-counted. This Week 1 Too Many Opens Damaged PA. Cumulative 3 with Shorts in PA Repairable 1 Major Scratch in PA 1 Smashed APV-PA Bonds Repairable 2 Failed Inspection - PowerPoint PPT Presentation

Citation preview

Page 1: Hybrid & Module Testing Status

1

Hybrid & Module Testing StatusHybrid & Module Testing Status

Week of 4/25-4/29

Page 2: Hybrid & Module Testing Status

2

UCSB Hybrid Testing StatusUCSB Hybrid Testing Status

Weekly Cumulative  

Pass Fail Pass Fail % Pass

L12pd 0 0 0 0 0.00%

L34p 49 1 368 5 98.66%

L56p 19 0 366 5 98.65%

R5N 0 0 65 2 97.01%

R5S 0 0 47 0 100.00%

R6 0 0 87 1 98.86%

R7 0 0 0 0 0.00%

Total 68 1 932 13 98.62%

Failing Hybrids Over-counted

Page 3: Hybrid & Module Testing Status

3

UCSB Hybrid Testing FailuresUCSB Hybrid Testing Failures

This Week1 Too Many Opens

• Damaged PA

Cumulative3 with Shorts in PA

• Repairable

1 Major Scratch in PA

1 Smashed APV-PA Bonds• Repairable

2 Failed Inspection• Never should have sent

1 Broken Ceramic

1 Bad Bond Feet

1 Weak Wirebonds

1 Too Many Opens

2 with unknown failure

Page 4: Hybrid & Module Testing Status

4

UCSB Hybrid Testing IssuesUCSB Hybrid Testing Issues

Need to finish validation of new softwareBruno contacted about bugs/features

Need to add automatic upload of data to new software

Hybrids with shorts need repairingOnce repaired need to keep bookkeeping

straight

Page 5: Hybrid & Module Testing Status

5

UCSB ARCS Testing StatusUCSB ARCS Testing Status

Weekly Cumulative  

A B F A B F % A or B

L12pu 0 0 0 0 0 0 0.00%

L12pd 0 0 0 0 0 0 0.00%

L12su 0 0 0 0 0 0 0.00%

L12sd 0 0 0 0 0 0 0.00%

L34p 0 0 0 85 1 2 97.73%

L56p 40 0 0 277 1 2 99.29%

R5N 6 0 0 38 1 1 97.50%

R5S 0 0 0 0 0 0 0.00%

R6 44 0 0 68 0 0 100.00%

R7 0 0 0 0 0 0 0.00%

Total 90 0 0 468 3 5 98.95%

Page 6: Hybrid & Module Testing Status

6

UCSB ARCS Testing FailuresUCSB ARCS Testing Failures

This WeekNone

Cumulative1 with >2% Bad Channels

• Debris on sensor

1 Bad DCU

1 HV Shorted to CF Frame

2 with >20 A Bias Current• 1 leaky pinhole

• 1 scratched sensor

Page 7: Hybrid & Module Testing Status

7

UCSB ARCS Testing IssuesUCSB ARCS Testing Issues

Need to confirm cuts on TEC modulesGetting some confusion between 1SO/2SO

Have not produced TEC R6 modules in a year

Still need to validate ARCS 8.0Currently using ARCS 7.2bugfix

Page 8: Hybrid & Module Testing Status

8

UCSB LT Testing StatusUCSB LT Testing Status

Weekly Cumulative  

Pass Fail Pass Fail % Pass

L12pu 0 0 0 0 0.00%

L12pd 0 0 0 0 0.00%

L12su 0 0 0 0 0.00%

L12sd 0 0 0 0 0.00%

L34p 0 0 84 0 100.00%

L56p 36 0 259 0 100.00%

R5N 5 0 39 0 0.00%

R5S 0 0 0 0 0.00%

R6 28 0 43 0 100.00%

R7 0 0 0 0 0.00%

Total 69 0 425 0 100.00%