Hybrid & Module Testing StatusHybrid & Module Testing Status
Week of 4/25-4/29
2
UCSB Hybrid Testing StatusUCSB Hybrid Testing Status
Weekly Cumulative
Pass Fail Pass Fail % Pass
L12pd 0 0 0 0 0.00%
L34p 49 1 368 5 98.66%
L56p 19 0 366 5 98.65%
R5N 0 0 65 2 97.01%
R5S 0 0 47 0 100.00%
R6 0 0 87 1 98.86%
R7 0 0 0 0 0.00%
Total 68 1 932 13 98.62%
Failing Hybrids Over-counted
3
UCSB Hybrid Testing FailuresUCSB Hybrid Testing Failures
This Week1 Too Many Opens
• Damaged PA
Cumulative3 with Shorts in PA
• Repairable
1 Major Scratch in PA
1 Smashed APV-PA Bonds• Repairable
2 Failed Inspection• Never should have sent
1 Broken Ceramic
1 Bad Bond Feet
1 Weak Wirebonds
1 Too Many Opens
2 with unknown failure
4
UCSB Hybrid Testing IssuesUCSB Hybrid Testing Issues
Need to finish validation of new softwareBruno contacted about bugs/features
Need to add automatic upload of data to new software
Hybrids with shorts need repairingOnce repaired need to keep bookkeeping
straight
5
UCSB ARCS Testing StatusUCSB ARCS Testing Status
Weekly Cumulative
A B F A B F % A or B
L12pu 0 0 0 0 0 0 0.00%
L12pd 0 0 0 0 0 0 0.00%
L12su 0 0 0 0 0 0 0.00%
L12sd 0 0 0 0 0 0 0.00%
L34p 0 0 0 85 1 2 97.73%
L56p 40 0 0 277 1 2 99.29%
R5N 6 0 0 38 1 1 97.50%
R5S 0 0 0 0 0 0 0.00%
R6 44 0 0 68 0 0 100.00%
R7 0 0 0 0 0 0 0.00%
Total 90 0 0 468 3 5 98.95%
6
UCSB ARCS Testing FailuresUCSB ARCS Testing Failures
This WeekNone
Cumulative1 with >2% Bad Channels
• Debris on sensor
1 Bad DCU
1 HV Shorted to CF Frame
2 with >20 A Bias Current• 1 leaky pinhole
• 1 scratched sensor
7
UCSB ARCS Testing IssuesUCSB ARCS Testing Issues
Need to confirm cuts on TEC modulesGetting some confusion between 1SO/2SO
Have not produced TEC R6 modules in a year
Still need to validate ARCS 8.0Currently using ARCS 7.2bugfix
8
UCSB LT Testing StatusUCSB LT Testing Status
Weekly Cumulative
Pass Fail Pass Fail % Pass
L12pu 0 0 0 0 0.00%
L12pd 0 0 0 0 0.00%
L12su 0 0 0 0 0.00%
L12sd 0 0 0 0 0.00%
L34p 0 0 84 0 100.00%
L56p 36 0 259 0 100.00%
R5N 5 0 39 0 0.00%
R5S 0 0 0 0 0.00%
R6 28 0 43 0 100.00%
R7 0 0 0 0 0.00%
Total 69 0 425 0 100.00%