47
© ABB Group September 08 Slide 1 BorWin 1 The Worlds First 400 MW HVDC Light® connection for wind power BWEA 31 21 October 2009 Peter Jones Head of Technology ABB [email protected]

Hvdc Borwin by Abb

Embed Size (px)

Citation preview

Page 1: Hvdc Borwin by Abb

© ABB Group September 08 Slide 1

BorWin 1 The Worlds First 400 MW HVDC Light® connection for wind power BWEA 31 21 October 2009

Peter Jones Head of Technology ABB [email protected]

Page 2: Hvdc Borwin by Abb

© ABB Group September 08 Slide 2

The Project

Page 3: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 3

75 km land cable

125 km sea cable

400 MW Offshore converter

400 MW converter

First HVDC Wind Power Connector

Contract Sep 2007 Completion Nov 2009

BorWin 1, 400 MW HVDC Light

Page 4: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 4

BorWin 1 Project

Customer   transpower offshore gmbh (former E.ON Netz Offshore GmbH, Germany)

Scope   400 MW HVDC Light® system off-shore

station on platform with sub-sea structure   Onshore station at E.ON substation Diele   Telecommunication   Control and protection

Cables   DC cable submarine (2x125km)   DC cable on land (2x75km)   Fibre optic cable (200 km)

Page 5: Hvdc Borwin by Abb

© ABB Group September 08 Slide 5

The Platform

Page 6: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 6

Jacket Piles

Crane

Transformers

Helipad

J-Tubes

Topside

BorWin 1 Overview of platform layout

Page 7: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 7

BorWin 1

 Topside weight approx 3200 t

 Size approx 50 x 33,5 x 22 m

  Jacket weight 1700 t

 Height 62 m

 Sea level to topside 20 m

Page 8: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 8

BorWin 1

 Topside and jacket verified, witnessed and approved by Germanische Lloyd according to the German rules & regulations

 Permits for the platform has to be obtained from BSH before start of installation & operation

Page 9: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 9

BorWin 1 – Fabrication at Heerema, Vlissingen, Deck elevation east February 2009

Page 10: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 10

BorWin 1 – Fabrication at Heerema, Vlissingen, Jacket structure roll-up April 2009

Page 11: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 11

BorWin 1 – Fabrication at Heerema, Vlissingen, Topside roll out May 4, 2009

Page 12: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 12

BorWin 1, 400 MW HVDC Light

Page 13: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 13

BorWin 1 Jacket in place

Page 14: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 14

BorWin 1 Jacket installation

Page 15: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 15

BorWin 1 Various weather at BorWin Alpha site

Page 16: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 16

BorWin 1 Platform in Place

Page 17: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 17

BorWin 1 Top deck from helicopter August 2009

Page 18: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 18

BorWin 1 Installation of additional cables September 2009

Page 19: Hvdc Borwin by Abb

© ABB Group September 08 Slide 19

The Onshore HVDC Converter

Page 20: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 20

Diele - Onshore site Diele – Onshore HVDC Light station

Cooling Units

Reactors Valves

Chopper

AC Filter Yard

DC Filter Yard

Power Transformer

Page 21: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 21

Diele - Onshore site Earth work early September 2008

Page 22: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 22

Diele - Onshore site Converter building January 2009

Page 23: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 23

Diele - Onshore site Installation of valve and control enclosures April 2009

Page 24: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 24

Diele - Onshore site Transformer transport

Page 25: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 25

Diele - Onshore site Chopper resistors

Page 26: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 26

Diele - Onshore site Overview of substation

Page 27: Hvdc Borwin by Abb

© ABB Group September 08 Slide 27

Onshore and Offshore Cable

Page 28: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 28

BorWin 1 HVDC Light cable

  121 km sea cable (1200 mm2 Cu)

  8,4 km Wadden Sea, Norderney and Ems (1600 mm2 Cu)

  73,6 km land cable (2300 mm2 Al)

Page 29: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 29

BorWin 1 Cable – 125km Offshore route

Page 30: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 30

BorWin 1 Cable – Part of submarine cable Waiting for installation March 2009

Page 31: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 31

BorWin 1 Cable – Team Oman – installation vessel for submarine cables

Page 32: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 32

BorWin 1 Waiting for the Weather

Page 33: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 33

BorWin 1 Cable – Onshore route

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

Page 34: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 34

Cable pieces   Approx. 750 m cable

per drum   Approx. weight 10 t

per drum Standard

150

cm

Cable - protection

BorWin 1 Cable – Installation of land cable

Page 35: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 35

BorWin 1

Cable – Installation LK Aurich Excavating trenches: summer 2008

Page 36: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 36

BorWin 1 Cable – Installation LK Aurich Installation of land cable: summer 2008

Page 37: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 37

BorWin 1

Cable – Installation LK Aurich Cable jointing cubicle: summer 2008

Page 38: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 38

BorWin 1 Cable – Installation LK Aurich Cable jointing: summer 2008

Page 39: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 39

BorWin 1

Cable – Installation Drilling rig for river Ems crossing: autumn 2008

Page 40: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 40

BorWin 1

Cable – Installation Welded steel pipes for river Ems Crossing: autumn 2008

Page 41: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 41

BorWin 1 Cable – Trenching equipment Excalibur

Page 42: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 42

BorWin 1 Cable – Installation at Wadden Sea

Page 43: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 43

BorWin 1 Cable – Installation at Wadden Sea

Page 44: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 44

BorWin 1 Cable – Installation at Wadden Sea

Page 45: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 45

BorWin 1 Cable – Installation at Wadden Sea

Page 46: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 46

BorWin 1 Cable – Installation at Wadden Sea

Page 47: Hvdc Borwin by Abb

© ABB Group September 08 | Slide 47