HOUSING & DEVELOPMENT BOARD BUILDING QUALITY DEPARTMENT UPGRADING CONSTRUCTION MANAGEMENT SECTION UPGRADING CONSTRUCTION MAMAGEMENT UNIT 3 SITE OBSERVATION REPORT Ref No: 452-21-11-0163A Precinct Chai Chee / Chin Swee Blk 1,2, 50 to 54 / Blk 53 Contract HIP & LUP C64A Record Ref No. UCM / 002 / 11 Name of Main Contractor Logistics Construction Pte Ltd Contract No. D/076/09 Date of Visit 13 Jan 2011 Status of Works 63.0% Overall Work Done as at Dec 10 Works Within Flat Stage 1 : In Progress Project Manager IC AVP Chow Yew Keong Original Contract Period 26 May 09 to 04 Nov 11 Works Outside Flat In progress Site Superviso r SSS Ong Ting Hock Recorded By: PD Ong Toon Lian (Lead) PDA Wong Woon Meng AUDIT FINDINGS S/ N GOOD WORK PRACTICES REMARKS

HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

Embed Size (px)

DESCRIPTION

Housekeeping checkist

Citation preview

Page 1: HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

HOUSING & DEVELOPMENT BOARDBUILDING QUALITY DEPARTMENTUPGRADING CONSTRUCTION MANAGEMENT SECTIONUPGRADING CONSTRUCTION MAMAGEMENT UNIT 3

SITE OBSERVATION REPORT Ref No: 452-21-11-0163A

PrecinctChai Chee / Chin SweeBlk 1,2, 50 to 54 / Blk 53

Contract HIP & LUP C64ARecord Ref No.

UCM / 002 / 11

Name of Main Contractor

Logistics Construction Pte Ltd Contract No. D/076/09Date of Visit

13 Jan 2011

Status of Works 63.0% Overall Work Done as at Dec 10

Works Within Flat

Stage 1 : In Progress Project Manager IC

AVP Chow Yew Keong

Original Contract Period

26 May 09 to 04 Nov 11Works Outside Flat

In progressSite Supervisor

SSS Ong Ting Hock

Recorded By: PD Ong Toon Lian (Lead)PDA Wong Woon Meng

AUDIT FINDINGS

S/N GOOD WORK PRACTICES REMARKS

Overhead shelter provided at edge of hoarding to prevent falling object.

Page 2: HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

Precinct Work findings and clarifications (Consultants to Complete)

S/N OBSERVATIONS / NON-COMPLIANCES REMARKSCONSULTANTS COMMENTS / CLARIFICATIONS

B SAFETY / SECURITY PROVISIONS

1.0 Electrical trucking

We found the electrical trucking and wires hanging at ceiling not properly installed. @ Blk 52 #02-324 half landing

These will posed safety hazard, to instate immediately.

Electrical trucking and wire not properly instated The affected electrical trunking and wires have been properly reinstated.

Page 2 of 10TMPU – Technical Compliance & Project Management Audit - 020606

Page 3: HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

Precinct Work findings and clarifications (Consultants to Complete)

S/N OBSERVATIONS / NON-COMPLIANCES REMARKSCONSULTANTS COMMENTS / CLARIFICATIONS

2.0 Toe-board

We noticed the new lift lobby “Toe-boards” not provided.

This will posed falling object hazard. @ Blk 52

To rectify immediately.

Site staff and safety officer must carry out daily inspection to ensure all safety measures apply on site.

Toe-boards not provided

The affected lift lobby has been provided with toe boards.

3.0 Gondola

We found the gondola winches not symmetrically installed on cradle.

This will caused unbalance when the gondola in operation.

To adjust immediately.

Gondola winches not symmetrically installed The affected Gondola winches have been symmetrically installed on cradle.

Page 3 of 10TMPU – Technical Compliance & Project Management Audit - 020606

Page 4: HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

Precinct Work findings and clarifications (Consultants to Complete)

S/N OBSERVATIONS / NON-COMPLIANCES REMARKSCONSULTANTS COMMENTS / CLARIFICATIONS

C WORKSITE HOUSEKEEPING MEASURES

1.0 Housekeeping

We found poor housekeeping around lift lobby and drain. @ Blk 52 & 53

Debris collected around lift lobby

Debris and water stagnant at drain

The debris have been removed.

The debris and stagnant water at drain have been cleared.

Page 4 of 10TMPU – Technical Compliance & Project Management Audit - 020606

Page 5: HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

Precinct Work findings and clarifications (Consultants to Complete)

S/N OBSERVATIONS / NON-COMPLIANCES REMARKSCONSULTANTS COMMENTS / CLARIFICATIONS

1.0 Housekeeping(Con’t)

We found unwanted materials such as steel bars and mesh not cleared off. @ Blk 53

Unwanted materials not cleared off The unwanted materials have been cleared.

The unwanted timber has been cleared.

Page 5 of 10TMPU – Technical Compliance & Project Management Audit - 020606

Page 6: HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

Precinct Work findings and clarifications (Consultants to Complete)

S/N OBSERVATIONS / NON-COMPLIANCES REMARKSCONSULTANTS COMMENTS / CLARIFICATIONS

1.0 Casting work

We found lift lobby slab badly casted with honeycomb. @Blk 53 #04- 336

Contractor to propose repair method to Resident Engineer for approval.

Site staffs to tighten the casting work and to check and ensure all defects are rectify.

Slab casted badly

Steel bar exposed

The affected lift lobby slabs have rectified according to RE’s recommendation and site staff will step up their checks and supervisions on this aspect of casting works..

The affected steel bar and slab with the honeycomb have been rectified

Page 6 of 10TMPU – Technical Compliance & Project Management Audit - 020606

Page 7: HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

Precinct Work findings and clarifications (Consultants to Complete)

S/N OBSERVATIONS / NON-COMPLIANCES REMARKSCONSULTANTS COMMENTS / CLARIFICATIONS

1.0 Casting work(Con’t)

We found lift lobby slab badly casted with honeycomb. @Blk 52 # 02-324

Slab not properly castedThe affected slab with honeycomb has been rectified.

Page 7 of 10TMPU – Technical Compliance & Project Management Audit - 020606

Page 8: HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

Precinct Work findings and clarifications (Consultants to Complete)

S/N OBSERVATIONS / NON-COMPLIANCES REMARKSCONSULTANTS COMMENTS / CLARIFICATIONS

Page 8 of 10TMPU – Technical Compliance & Project Management Audit - 020606

Page 9: HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

Precinct Work findings and clarifications (Consultants to Complete)

S/N OBSERVATIONS / NON-COMPLIANCES REMARKSCONSULTANTS COMMENTS / CLARIFICATIONS

1.0 Casting work(Con’t)

We found lift lobby column not properly casted. @ Blk 53 #02-336

Column not properly casted

The affected column has been properly rectified.

Page 9 of 10TMPU – Technical Compliance & Project Management Audit - 020606

Page 10: HUP & LUP CCS C64A HDB Housekeeping & Safety Audit Report 13.01.2011

Precinct Work findings and clarifications (Consultants to Complete)

S/N OBSERVATIONS / NON-COMPLIANCES REMARKSCONSULTANTS COMMENTS / CLARIFICATIONS

E OTHERS OBSERVATION

1.0 Rain water down pipe

We found rain water down pipe at staircase half landing not reinstated after remove for clearing choke.@ Blk 53 #02-336

To rectify immediately to prevent rain water stagnant at lift lobby caused mosquito breeding hazard.

Rain water down pipe not reinstatedThe affected rainwater down pipe has been reinstated.