28
HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 PROJECT November 2014 Organization and Human Resource Department Vietnam Electricity

HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

  • Upload
    vophuc

  • View
    230

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

HUMAN RESOURCE DEVELOPMENT

FOR NINH THUAN NPP 1 PROJECT November 2014

Organization and Human Resource Department

Vietnam Electricity

Page 2: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Table of Contents

I. NINH THUAN NPP PROJECT: BRIEF OVERVIEW

II. WORKFORCE PLANNING

III. EDUCATION AND TRAINING

IV. RISK MANAGEMENT

V. REQUEST FOR FURTHER SUPPORT FROM ROSATOM

2

Page 3: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

NINH THUAN NPP PROJECT: BRIEF OVERVIEW 3

Page 4: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Ninh Thuan Nuclear Power Project

• Ninh Thuan 1:

• Site: Phuoc Dinh commune

• 2 x 1,000 Mwe

• Investment Owner/Operator: EVN

• Technology: Advanced & proven (LWR)

• Cooling: Sea water

Ninh Thuan 2

• Site: Vinh Hai comu – Ninh Hai Dist

– NinhThuan.

• Capacity: approx 2 x 1000 MW Phuoc Dinh (Ninh Thuan)

4

Vinh Hai

Page 5: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

EVN Organization

Chart Vice President

Power Generation

Investment (South & South

Central) and Networks

Vice President

Nuclear Power

Construction

Investment

Vice President

Economics & Finance,

& IT

Vice President

Power Generation

Investment (North & North

Central)

Vice President

Business

Vice President

Operation

Central Area Electrical Mechanical JSC.

Thu Duc Electrical Mechanical JSC.

Power Engineering JSC.

Dong Anh Electrical Equipment Manufacturing

JSC.

Power Engineering Consulting JSC. No.1

Power Engineering Consulting JSC. No.2

Power Engineering Consulting JSC. No.3

Power Engineering Consulting JSC. No.4

EVN Finance JSC.

Hoa Binh Hydropower Company

Ialy HydropPower Company

Tri An Hydropower Company

Tuyen Quang Hydropower Company

Se San Hydropower Development Company.

Nghi Son 1 Thernal Power Company

Son La Hydropower Company

Son La Hydropower Project Management Board.

Hydropower Project Management Board No. 4

Ninh Thuan Nuclear Power Project Management

Board

Electric Power Trading Company

National Load Dispatch Center

Center of Power Electric Information

Information Technology Center

EVN Building Operation and Investment

Management Board

Electric Power University

Ho Chi Minh City Electric Power College

Central Electric Power College

Electric Vocational College

Vinh Tan 3 Energy JSC.

Thuan Binh Wind Power JSC.

An Binh Commercial Joint Stock Bank

An Binh Security JSC.

Global Insurance JSC.

Saigon Vina Real Estate JSC.

Central Power Real Estate JSC.

Vietnam Electricity Power Investment

& Construction JSC.

Dependent Units

Joint-Stock Companies Affiliates

INTERNAL

CONTROLLER

DEPT.

GENERAL

DEPT.

MEMBER COUNCIL

PRESIDENT AND

CEO

One Member Limited Comapies

Power Generation Corporation 1

Power Generation Corporation 2

Power Generation Corporation 3

National Power Transmission Corporation

Northern Power Corporation

Central Power Corporation

Southern Power Corporation

Hanoi City Power Power Corporation

Ho Chi Minh City Power Corporation

Science -

Technology &

Environment Dept.

Technical &

Operational Dept.

Business Dept.

General Affairs

Dept.

Power Market Dept.

Organization &

Human Resource

Dept.

Corporate Planning

Dept.

Legal Dept.

Investment

Management Dept.

Procurement

Management

Dept.

Construction

Management Dept.

Telecom & IT Dept.

Inspection Dept.

Public Relation

Dept.

Financial &

Accounting Dept.

International

Relation Dept.

Safety Dept.

Capital Investment

Dept.

5

Page 6: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

EVNNPB Organization Chart (Current)

Director

Deputy Director Deputy Director

Ad

min

istr

atio

n D

ept.

Org

aniz

atio

n &

Per

son

nel

D

ept

Eco

no

mic

an

d P

lan

nin

g D

ept.

Tec

hn

ical

Dep

t.

Deputy Director

Fin

ance

an

d A

cco

un

tin

g D

ept.

Inte

rnat

ion

al R

elat

ion

Dep

t.

Nu

clea

r Sa

fety

an

d

Reg

ula

tory

Co

nst

ruct

ion

Man

agem

ent

Dep

t.

Han

oi R

ep. O

ffic

e

6

Page 7: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

WORKFORCE PLANNING

7

Page 8: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

EVNNPB Organization Chart (at peak time-plan)

8

Total: 400 staff

DIRECTOR

GENETAL (1)

Administration Dept. (30)

Organization and Personnel Dept. (10)

Finance and Accounting Dept. (10)

Technical Dept. (40)

Economic – Planning Dept. (15)

International Relation Dept. (10)

Material and Equipment Dept. (15)

Construction Management Dept. (20)

Nuclear Safety and Regulation Dept. (15)

Public Relation Dept. (15)

Quality Assurance and Quality Control Dept. (15)

HR Management and Development Dept. (10)

Hanoi Office (15)

Pre-Generation Board (180)

DEPUTY DIRECTOR GENERALS (5)

Page 9: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Organization Chart of Ninh Thuan NPP (2x1000MW) (Plan) Director NPP [1]

Deputy Director

Administration

Deputy Director Business

]

Technical Deputy Director

Operation

Technical Deputy Director

Maintenance

Deputy Director

Safety

Deputy Director

Technical

Office/ General Dept. [30]

Personnel-Organization Dept. [10]

Finance &Accounting Dept. [10]

Planning Dept. [10]

Materials & Equipment

Dept. [15]

Public Relation Dept.& Center [10]

Health Physics Dept. [9]

Security & Safeguard Dept. [132]

Unit 1 Operation Workshop [131]

Unit 2 Operation Workshop [131]

Reactor Maintenance Workshop [180]

Mechanic-Electric Maintenance Workshop

[220]

Laboratory Dept. [20]

Fuel Management Dept. [6]

Safety & Regulation Dept. [40]

Waste Management Workshop PX [40]

Technical Dept. [48]

Quality Control Dept. [19]

Training Center [32]

Total number: 1100 employees

9

Page 10: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Nuclear power; 47,50%

Radiation Safety; 9,05%

Chemistry; 7,25%

Others; 36,20%

University degree disciplines

University degree 40.20%

Vocational college 41.90%

Unskilled worker 17.90%

WORKFORCE IN THE OPERATOR ORGANIZATION

By education level

10

Page 11: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Education requirement

11

Quantity Place Field of study

University degree 442

282 Russia Nuclear-related fields

160 Vietnam Electric, mechanic, automation, IT…

Vocational training 461 Vietnam Electric, mechanic, chemistry…

Unskilled worker 197

Total 1100

Page 12: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

0

200

400

600

800

1000

1200

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Nu

mb

er

of

pe

rso

ns

Year

NPB

Pre-Operation under NPB

Operator Organization under EVN

<------------- Phase 3 ------------>Design, Construct, Comm'n

<-- --Phase 1---->Feasibility

<------------- Phase 2------------>Site Investigation, Bid

Preparations

Milestone 1Milestone 2 Milestone 3

Staffing Schedule

12

Page 13: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

EDUCATION AND TRAINING

13

Page 14: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Select

experienced

staffs from

operating power

plants

OJT at site

OJT at site

2 years

High-school

students

University under/graduate

Vocational training

O&M

5 – 7 years

3 years

Training in

EPC contract

Core member

training

Education and Training flow chart

Language

training

1 year 5 - 8 year

14

Page 15: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Attract excellent students

• Annually, EVN organize a trip to Ninh Thuan and adjacent provinces to attract new students apply to study nuclear.

• Target to: final grade of high school

• Contents:

• Nuclear and Nuclear safety

• Ninh Thuan NPP project

• Scholarship scheme to study nuclear in Russia

• Committment

15

Phuoc Dinh (Ninh Thuan)

Vinh Hai

Page 16: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Year of sending

Quantity Major – University (Country) Degree Year of graduate

2006 9 Nuclear Power – MPEI (Rus.) MSc 2013

2007 5 Nuclear Power – MPEI (Rus.) MSc 2014

2008 11 Nuclear Power – MPEI (Rus.) MSc 2015

2009 4 Nuclear Power – MPEI (Rus.) MSc 2016

2010 (MOET) 20 NPP and Instal. – MEPHI (Rus.)

Specialist 2017

2011 (MOET) 51 Specialist 2018

2012 (MOET) 39 NPP and Instal. – MEPHI (Rus.) Specialist 2019

2013 (MOET) 60 Nuclear related specialties (Rus.) Specialist 2020

2014 (MOET) 65 Nuclear related specialties (Rus.) Specialist 2021

Total 264

Study halt 4

Training need 22

University Education in Russia

16

Page 17: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Various disciplines for NPP

SPECIALTIES Number of students

Nuclear Reactor and nuclear material 5

Nuclear power and thermal physics 8

Thermal power and engineering 2

NPP and installing system 1

Nuclear power plant and substation 5

Nuclear physics and technology 7

Nuclear power plant: design, construction and operation

197

Radiation safety 8

Nuclear power plant: Automation of thermal process 6

Nuclear Power plant and equipments 6

Nuclear Power plant 15

TOTAL 260 17

Page 18: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

18

Page 19: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Follow-up activities for newly graduated students

Training on Vietnamese

legal documents related to

the project management, technical norms and standards

Translating technical

documents and

standards(from English and Russian languages)

OJT in thermal

power plant construction

sites

Project management training at

NPP sites

19

Start

working 2 months 1 year 1,5 years 2 years

Page 20: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Training Plan (1)

20

# Targeted audience Training contents Duration No. of trainees

Venue

I General training course

1 All staffs related to the project

Nuclear Power Basics 1 month 750 Vietnam

II Training for managers, consulting firms

2 Management personnel of EVNNPB, EVN and consulting firms

Knowledge relates to nuclear power project management

1/2 month 70 Oversea

3

Staff of technical department and construction management department of EVNNPB

Provide knowledge on thermal power, on the job training at the thermal power project management board

3 months 20 Vietnam

4 EVNNPB staff Advanced training on project managemet (minimum 50%OJT)

3 months 40 Oversea

5 Consulting firms, staff of EVNNPB

Training design consultant, supervision consultant (minimum 50% OJT)

6 months 10 Oversea

Page 21: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Training Plan (2)

21

# Targeted audience Training contents Duration No. of trainees

Venue

III Training for O&M (EPC contract)

IV Training for EVN’s University and colleges*

10 Lecturers Professional courses and/or research at universities

3 months 30 Oversea

11 Lecturers Master/PhD on nuclear related fields

2-3 years 6 Oversea

*EVN has one Electric Power University and three Electric Power Colleges

Page 22: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Place Quantity Contents Targeted group

Vietnam 1599 Basics knowledge related on nuclear power and NPPs

Project staff, stakeholders

Japan 312

Basics, Legal, Safety, site selection, FS, planning, project management, licensing

Various from project staff to higher level

Korea 22 NPP project management Project staff and EVN HO

France 20 Introduction to NPP Managers

Russia 37 Nuclear Island, HR Project staff and EVN HO

Short-term training

22

Page 23: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

RISK MANAGEMENT

23

Page 24: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Risk Analysis

24

• Experienced and competent persons donot choose to work for the project.

• Outstanding students don’t choose to follow nuclear power fields. Or the university could not supply adequate students for the project to recruit.

Risk 1: Shortage in required manpower for the

project

• Wrong competency definition of certain position.

• Could not attract well-experienced staffs to work for the project or outstanding students to follow nuclear field.

Risk 2: Recruited personnel or the trained staffs are not competent enough to meet the work

requirement

• No experience in workforce and training planning for a NPP project.

• Changes in national policy or legal framework; changes in the project (technology, schedule…)

Risk 3: The workforce plan and training plan is

not appropriate

• Language constrain

• Cultural shock and cultural difference

• Change in the mood of trainees

• Limited information provided because of the sensitivity of the nuclear power field

Risk 4: Training oversea is not as efficient as needed

Page 25: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Risk Mitigation

25

• The policy and mechanism to give more incentives to people working and studying nuclear power should have clear guideline for implementation.

• Increase public communication about nuclear power to get public acceptance and awareness on nuclear power.

Risk 1: Shortage in required manpower for the

project

• Close cooperation with vendor to review and revise the competency description for each position.

• Regular monitoring and evaluating the training efficiency.

• Focus on OJT.

• Develop Knowledge Management system.

Risk 2: Recruited personnel or the trained staffs are not competent enough to meet the work

requirement

• Regular review and revise the manpower and training plan in response to changes of the project.

• Close cooperation with EPC contractor during project implementation.

Risk 3: The workforce plan and training plan is

not appropriate

• Adequate language training for trainees to study oversea.

• Introduction of the destination country culture should be given to the trainees.

• Carefully select trainees with good attitude (eg. eager for discovering new technology, for being promoted…)

• Detailed training program should be discussed and agreed with the contractor.

Risk 4: Training oversea is not as efficient as needed

Page 26: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

REQUEST FOR FURTHER SUPPORT FROM ROSATOM 26

Page 27: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

Conclusion

EVN need further support from Rosatom to:

• Determine specific specialization of the students studying in Russia to assure that we will have the right number of the right person for the Ninh Thuan NPP No 1.

• Determine training plan for project management staff in preparation for coming construction period. OJT is required so we need to cooperate with specific similar technology NPP construction site in Russia

• Determine further detail for the training plan for: managerial staff, O&M (key staffs, technician etc).

27

Page 28: HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP … · HUMAN RESOURCE DEVELOPMENT FOR NINH THUAN NPP 1 ... Quality Assurance and Quality Control Dept. ... with specific similar technology

THANK YOU FOR YOUR ATTENTION!

28