HUANCAYO HUANCAVELICA RAILWAY PRELIMINARY FINANCIAL SCHEME* *SUBJECT TO INTERNAL APPROVALS

HUANCAYO HUANCAVELICA RAILWAY · 3 rpmo: compensation for operation and maintenance projetc method ppp –state initiative cofinanced concession selection process bidding contest1

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HUANCAYO HUANCAVELICA RAILWAY · 3 rpmo: compensation for operation and maintenance projetc method ppp –state initiative cofinanced concession selection process bidding contest1

HUANCAYO HUANCAVELICA RAILWAYPRELIMINARY FINANCIAL SCHEME*

*SUBJECT TO INTERNAL APPROVALS

Page 2: HUANCAYO HUANCAVELICA RAILWAY · 3 rpmo: compensation for operation and maintenance projetc method ppp –state initiative cofinanced concession selection process bidding contest1

GENERAL OVERVIEW

1 Design, Financing, Construction - Upgrade, Rehabilitation, Procurement Of Rolling Stock, Operation And Maintenance, including the transfer to the grantor at the end of concession term2 RPI: Composed by two concepts: 1) Compensation for Investment in Civil Works and Infrastructure (term: 15 years) and 2) Compensation for Rolling Stock Material (term: 10 – 15 years) 3 RPMO: Compensation for Operation and Maintenance

PROJETC

METHOD

PPP – STATE INITIATIVE

COFINANCED

CONCESSION

SELECTION

PROCESS

BIDDING

CONTEST1

COMPETITION

FACTOR

LOWEST ECONOMIC BID (RPI2 + RPMO3)

INVESTMENT

US$ 226 MM + VAT

TRANCHE 1: US$ 117

MM TRANCHE 2: US$

56 MM ROLLING

STOCK: US$ 46 MM

STUDIES: US$ 7MM

CONCESSION TERM

30 YEARS

AWARD

I QUARTER 2019

Page 3: HUANCAYO HUANCAVELICA RAILWAY · 3 rpmo: compensation for operation and maintenance projetc method ppp –state initiative cofinanced concession selection process bidding contest1

PROJECT DESCRIPTION

FINAL STUDIES

ELABORATION AND

ENVIRONMENTAL

CERTIFICATION

EXISTING RAILWAY

INFRASTRUCTURE

REHABILITATION &

IMPROVEMENT

STATIONS AND TRAIN

STOPS RESTORATION

& MODERNIZATION

OPERATION

AND

MAINTENANCE

PROCUREMENT OF

ROLLING STOCK

Page 4: HUANCAYO HUANCAVELICA RAILWAY · 3 rpmo: compensation for operation and maintenance projetc method ppp –state initiative cofinanced concession selection process bidding contest1

Bid Terms of the Comprehensive Project

Bid for the Concession of the

"Huancayo Huancavelica Railroad“; and

related Process Documents are published

in ProInversión Web site.

Filing of Envelope # 1, is currently open

(Shortlisting Credentials)

The Project has financial viability in the

framework of the Multiannual

Programming System and Management

of Investments, invest.pe

Concession Contract

Contract will be published soon for opinion

of the interested parties

CURRENT STATUS

Page 5: HUANCAYO HUANCAVELICA RAILWAY · 3 rpmo: compensation for operation and maintenance projetc method ppp –state initiative cofinanced concession selection process bidding contest1

RAILWAY COMPONENTS

Section

Platform ($35MM)

S&RS ($74MM)

∑KM

Slope, riparian defenses, drainage and

platform

Slope, riparian defenses, drainage and

platform

Superstructure and railway system Superstructure and railway system

Completed Works (CW)

Progressive works

(divisibleinto sub-sections)

S1

11 34 53 78

Acces

facility

Diiculty of Access by

narrowpath

Diiculty of Access by

narrowpath

Acces

facility

S2

102 128

Diiculty of Access by

narrowpath

Diiculty of Access by

narrowpath

Train

Cross Section

PTCourtyards workshop($13MM) 01 -- -- -- -- -- 01

E Stations ($3MM) 01 -- 01 02 01 02 07

Bridges ($12MM) 01 -- 01 01 04 08 15

Stops ($7MM) 02 04 02 03 04 04 19

Tunnels ($7MM) -- 03 06 02 12 15 38

$ MM

T1: 26

T2: 15

T1: 32

T2: 10

T1: 59

T2: 31

Page 6: HUANCAYO HUANCAVELICA RAILWAY · 3 rpmo: compensation for operation and maintenance projetc method ppp –state initiative cofinanced concession selection process bidding contest1

TR

AN

CH

E1

TR

AN

CH

E2

Years0

0

0

0

Years

Years

Years

3

5

5

RPI_Works T1: payment for 15 years

RPI_T2: payment for 15 years

RPI _RS T1: payment for 10 years

RPI _RST2: payment for 10 years

WORKS

TRANCHE13

WORKSTRANCHE2

ROLLINGSTOCK (RS)TRANCHE2

ROLING STOCK(RS)TRANCHE1

COMPENSATION FOR INVESTMENTS (RPI)

ENGINEERING

STUDIES

RPMO2: payment for 25 yearsRPMO1

RPMO1: Operation and Maintenance compensation during Tranche 1 partial operation (Tranche 2 under

Construction fase) RPMO2: Operation and Maintenance compensation for Tranche 1 and Tranche 2 in full

operation fase

CAOS RECOGNITION

Financial

Closing

Page 7: HUANCAYO HUANCAVELICA RAILWAY · 3 rpmo: compensation for operation and maintenance projetc method ppp –state initiative cofinanced concession selection process bidding contest1

PRELIMINARY FINANCING STRUCTURE*

PERIOD

Months

PROJECT STUDIES

Concession Contract Financial Closing

16– 18months

rmPlatfo

T1

Completed Works T1 Completed Works T2

Platform

T2

Divided in 3

continued blocks

1 block

only

1

Rolling

Stock

provision

order

Tranche 1

Rolling

Stock

Tranche 2

Rolling

Stock

2 9

3 4 5

6 7 8 10

1112

13 14

15

16

T1 CONSTRUCTION T2 CONSTRUCTION O&M

18months 18months 25years

7 months 11months 6 months 4 months 8 months

RPI

15

years

RPI RS

10

years

RPMO

25 years

T1 ConstructionPeriod

Guarantee

CAOs Milestones:

1. Studies approval: After financial closing approval.

2. RS provision order: After financial closing and studies approval (max 30% of RS

budget).

3. T1 Platform 1: Complete and continued platform asset according Concessionaire

division approved proposal.

4. T1 Platform 2: Complete and continued platform asset according Concessionaire

division approved proposal.

5. T1 Platform 3: Complete and continued platform asset according Concessionaire

division approved proposal.

6. T1 S&Rsy1: According to Concessionaire division approved proposal. This milestone

can add the budget expensed in “Completed Works T1” at milestone requirement.

7. T1 S&Rsy2: According to Concessionaire division approved proposal. This milestone can

add the budget expensed in “Completed Works T1” at milestone requirement.

8. T1 S&Rsy3: According to Concessionaire division approved proposal. This milestone

can add the budget expensed in “Completed Works T1” at milestone requirement.

9. T1 RS provision: When rolling stock for T1 is received for partial T1 operation testing.

10. T1 S&Rsy4: According to Concessionaire division approved proposal. This milestone

can add the budget expensed in “Completed Works T1” at milestone requirement.

The same milestone recognition reasonability applies for T2 assets (milestones 11, 12, 13,

14, 15 and 16).

Additionally, every time that Concessionaire requires milestones recognition for S&Rsy assets,

Concedent will require an increase on guarantees for the same recognizedamount.

S&

R

SyT

1

S&RSyT2

* Under revisión and pending approvals

Divided in 4 blocks

Page 8: HUANCAYO HUANCAVELICA RAILWAY · 3 rpmo: compensation for operation and maintenance projetc method ppp –state initiative cofinanced concession selection process bidding contest1

CONTACT INFORMATION

Hernán Castañeda C.

Railways Projects Director

Projects Portfolio Directorate

150 Enrique Canaval Moreyra Avenue. 10th Floor – San Isidro- Lima Peru

Telephone + (511) 200 - 1200 Extension 1222

E-mails: [email protected]; [email protected]

Web: www.proinversion.gob.pe

For futher information: www.proinversion.gob.pe/fhh