Upload
mohammad-yousuf-shaikh
View
239
Download
1
Embed Size (px)
Citation preview
Procurement of External Service
Change Document for HR
Contents
1. Scenario: Payroll for Non Production ............................................................................................. 3
1.1 As-Is Process .................................................................................................................................. 3
1.2 To-Be Process ................................................................................................................................ 5
2. Comparison between Planned Price vs. Actual Consumption ........................................................ 7
3. Possible Cases ................................................................................................................................. 8
3.1 Case 1 ............................................................................................................................................ 8
3.2 Case 2 .......................................................................................................................................... 10
3.3 Case 3 .......................................................................................................................................... 11
4. Representation.............................................................................................................................. 11
1. Scenario: Payroll for Non Production
1.1 As-Is Process
PR for AS-IS process: 5000005228
PO 4800034879
SES: 1000063655
1.2 To-Be Process
PR: 5000005229
Change in the process:
1. Logic: Since we dont know the cost for different cost centers, therefore we will use Account
Assignment Category U i.e. unknown
2. YEB for a month is Rs. 250,000. So for 3 months it will be Rs. 750,000. However, I have added
Rs. 10,000 extra here and made it Rs. 760,000
3. You will not be required to enter G/L and Cost center in PR
4. Save the PR and PO will be created by the respective person
PO: 4800034880
1. PO creator will adopt the PR in the same way as he/she adopts on regular basis.
Service Entry Sheet: 1000063656
1. Since we didnt mention the Cost Center as Account Assignment Category in PR, therefore,
we will mention it here as I have marked it too
2. You can add as many Service No. as its required along with its cost center and GL account.
You will also have a liberty to enter the price as per the invoice you have received from the
vendor.
3. The Green box shows that the tick on Unplanned will be popped up automatically
*For the convenience, you can use the option Auto repeat AA. This will enable you to enter
GL account and cost center once then the system will automatically determine the Account
assignment for rest of the line items
2. Comparison between Planned Price vs. Actual Consumption
1. Its very likely that at any point you want to check how much amount you planned for the
specific PR and how much actually you have consumed. To check this, go to ME23N, in limit
tab, you can see the amount you mentioned at the time of PR creation and the amount you
have actually consumed by GR. This Actual amount field is updated automatically
3. Possible Cases
3.1 Case 1
There is a probability that the amount you have mentioned in PR may not be consumed fully. If
this happens, then at the time of last SES, you can actually restrict any GR against the same PR
for future purpose.
1. We have created PR for Rs. 760,000 for 3 months. At the end of 3rd month, we have
consumed Rs. 740,000. Then to make sure that no more GR can be recorded, even by
mistake, you can use the option Set Final Entry. This is on header level. No Gr will be
created against that Line Item
2. If we mistakenly create GR against that PR, system will pop up a message as shown in
screenshot
3.2 Case 2
In case if the invoice amount exceeds the total amount of PR, then you can add the line item of
the price that is mentioned in the invoice. This can possible be the case in the last month only.
1. Since you know the actual amount therefore, now you can use Service tab and/or Limit tab.
2. After getting it save, ask the PO creator to adopt that line item only
3. Then you can do your GR
3.3 Case 3
Overall Limit crossed: In case, if you exceed the limit mentioned in PR, then system will stop you by
prompting an error message
4. Representation
1. This box color represents the change in the process and effects of the change
2. This shows the option available for difference scenarios
3. The color represents how the system will treat the types of services planned or
unplanned
4. Error message