    Chris ElliottBHA Working Group MemberWestern Renewable Energy

    How to develop a

    Hydropower Facility

    Cornwall Renewable EnergyShow

    27 J uly 2012

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    2/16

    What is Hydropower?

    Water Mills Low impact!

    Dams High impactStorage

    Run-of-River

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    3/16

    Diversion Channel

    Intake

    Pipeline

    Tailrace

    Powerhouse

    Power LinePower Line

    What is Hydropower?

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    4/16

    Head (H)

    HH

    Hydro Basics

    It all depends on the head

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    5/16

    Head (H)

    Flow rate (Q) QQ HH

    . and Flow Rate

    Hydro Basics

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    6/16

    QQ HH

    Power

    Water poweravailable = H x Q

    Power output also

    depends upon:

    Head losses

    Turbine EfficiencyGenerator Efficiency

    Drive losses

    xx

    Hydro Basics

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    7/16

    Theres no such thing as a 80 kW water turbine

    Medium Head = 10m

    Flow = 1m/s P = 80 kW

    Low Head = 1m

    Flow = 10m/s P = 80 kW

    Small water turbineLarge water turbine

    Hydro Basics

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    8/16

    Impulse turbines

    High head

    25m or more head In SW mainly small

    flows 100 l/s or less

    Upland rivers Long deprived reaches

    Minor rivers

    Quite hidden

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    9/16

    Crossflow Turbines

    5 to 25m headtypically

    Typically 50 to 1000l/s

    Flat efficiency curve Lots of SW sites

    suitable

    Makes use of draft Often good for old

    mills on smaller rivers

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    10/16

    Reaction machines

    Francis machines

    Similar applicability toCrossflows

    Available new, alsocommon historical design

    Reliable and typically fromUK firm

    Kaplan machines

    5m or less head

    1000 l/s or more

    Needs screening

    Great efficiency

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    11/16

    Screw turbines

    5m or less head

    500 l/s or more No screening needed

    Good efficiency

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    12/16

    1. Pre-Feasibility

    2. Feasibility3. Planning and Licensing

    4. Detailed Design5. Construction

    Five stages

    THE PROJECT LIFE CYCLE

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    13/16

    Experience

    BHA membership

    REAL Assurance

    member

    Professionally qualified

    staff

    Local contacts

    Long term relationshipChoosing an installer

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    14/16

    Timescales & Costs

    Stage Typical Timescale Approximate Cost

    1. Pre-Feasibility 2 months 500 - 2,000

    2. Feasibility 4 months 3,000 - 10,000

    3. Planning &

    Licensing

    6 24 months 1,000 - 25,000

    4. DetailedDesign

    Included in 5 Included in 5

    5. Construction 10 12 months 2,000 - 10,000

    per kW

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    15/16

    Sources of further information:

    www.british-hydro.org

    BHA installer listings

    Mills groups

    BHA Micro hydro guide

    Environment Agency Good

    Practice Guide

  • 8/22/2019 How to Develop a Hydro Power Facility. Chris Elliot, Western Renewable Energy

    16/16

    HYDROPOWER

    A New Lease of Life