Bendigo Mine

Workings

Pumped Hydro

Renewable Energy Storage

Chris Corr

12 August 2017

www.bsg.org.au

Page 2: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

BSG Vision

• Repower Bendigo with:

– 100% renewably generated energy

– 100% community owned energy

• Keep money and

benefits local

Page 3: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Bendigo Electorate Rooftop Solar

• 8,500 systems

• 20% of households

• 30 MW installed capacity

Page 4: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

BSG Renewable Energy Examples

www.bsg.org.au

• Community owned renewable energy

• Local BSG led projects

– Bendigo Library 20 kW crowd funded

– Discovery Centre 11 kW crowd funded

– Bendigo Tramways 50 kW CFCV funded

– Bendigo Archives 30 kW BSG funded

• Consultancies for other council / organisation

buildings

Page 5: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Bendigo’s Energy Needs

• Min power 15 – 20 MW (overnight)

• Max power 55 – 60 MW (hot summer day)

• Annual use 550 GWh

• Annual spend $120 - 150+ million???

Page 6: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Requirements for Energy Storage

www.bsg.org.au

• Solar Thermal

• Batteries

– Costs reducing rapidly

– Interest and installations taking off

• Pumped Hydro

– presently 97% of Worlds stored dispatchable

energy for electrical power

– None in Australia for last 40 years

Page 7: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Pumped Hydro Storage

www.bsg.org.au

• Water supply

• Top & Bottom storages

with

elevation difference between

• Infrastructure

– Water transfer

– Generating / pumping

• Power Supply Connection

to demand

• Typical run time 4 to 6 hours

Page 8: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Bendigo Mine Workings

• 150 year gold mining history

• Greatest concentration of deep shafts in World

– over 5,000 shafts sunk under Bendigo

• Some shafts over 1 km deep

– deepest 1,406 metres

• Hundreds of kilometres of tunnels

Page 9: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Bendigo Mine Workings

Page 10: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage
Page 11: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Bendigo Mine Groundwater

• Gold mining ceased in last five years

– Pumping and treatment of groundwater ceased

• Groundwater has risen creating issues

– Central Deborah tourist mine pumping water

– Victorian Government interim treatment solution ($30m)

• Pumped Hydro is independent of the groundwater

issue but likely complimentary

Page 12: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Collection

& Delivery

of Water

All reefs

Refer: DELWP; 2015; Managing

groundwater from Bendigo’s

mines; (JACOB’s Report)

http://delwp.vic.gov.au/__data/as

sets/pdf_file/0009/297855/Managi

ng-groundwater-from-Bendigos-

mines-Technical-report.pdf

Collect all reefs

into Garden

Gully Reef

Pump ~2.5 ML/d to

Epsom for treatment

Page 13: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

~250m

or more

~30m

Reef Workings

with Deep

Groundwater Level

Reef Workings

with Shallow

Groundwater Level

PumpingPower Used

GenerationPower

Recovered

Time - Standby

Page 14: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

~250m

or more

~30m

Reef Workings

with Deep

Groundwater Level

Reef Workings

with Shallow

Groundwater Level

PumpingPower Used

GenerationPower

Recovered

Day - Charging

Page 15: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

~250m

or more

~30m

Reef Workings

with Deep

Groundwater Level

Reef Workings

with Shallow

Groundwater Level

PumpingPower Used

GenerationPower

Recovered

Night - Generating

Page 16: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Pumped Hydro

Standby

Pumping water up to:

- Garden Gully Reef

- New Chum South reef

Page 17: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Pumped Hydro

Re-Charging

Pumping water up to:

- Garden Gully Reef

- New Chum South reef

Page 18: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Pumped Hydro

Generating

Releasing water down to:

- Sheepshead Reef

- Deborah Reef

- Hustlers Reef

Page 19: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Mine

Water

Levels

Current

0

230

-40

-280

mAHD

240mhead

Page 20: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Potential Energy Storage

• Energy Storage Capacity?

– 5 MW / 40 MWh - Kangaroo Flat incline

– Potentially much more over multiple distributed sites (if feasible)

– Replicable / stageable

• finance / cost / renewable energy generation

• Potential (values yet to be determined with confidence)

– Storage in excess of: 800 MWh

– Instantaneous generation: 20 MW+

– Long run times: 40 hours

www.bsg.org.au

Page 21: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Mine

Water

Levels

Deeper

0

230

-40

-280

mAHD

240mhead

500mhead

Page 22: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Kidston PH QLD (270 km north west Townsville)

• Average operating head 190 metres

• Instantaneous generation 250 MW

• Running time 6 hours

• Energy storage 1,500 MWh

• Estimated Cost $282 million ($0.2m/MWh)

Page 23: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Potential Energy Storage

• Snowy 2.0 7-10 years $300 /kWh

• Batteries 1 year $600 / kWh

• Bgo Pumped Hydro ? years $? / kWh

• SA - 100 MW / 123 MWh battery cost approx $75 m

• Bendigo Pumped Hydro – costs and capacity presently unknown but battery $ equivalent if: – 50 MWh $28 million

– 100 MWh $57 million

– 200 MWh $114 million

– 400 MWh $228 million

– 800 MWh $455 million ($150m at Kidston cost)

Page 24: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

CORE Future

www.bsg.org.au

• Community owned renewable energy

• Community Power Hub

• Big and Small projects

– Solar Rooftops

– Small Solar Farms (1 – 5 MW)

Page 25: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Funding & Community Involvement

• Required storage for larger solar / wind farms

across region

• Community ownership / Governance

• Community long-term benefit

• Enables Bendigo to be 100% renewably

powered in near to medium term future

www.bsg.org.au

Page 26: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Pumped Hydro - Next Steps

• Feasibility Study�Consultancy � Optimal solution

• Management of Study�Small Representative Group Overseeing

� Independence, Community based

• Cost Estimates (NPV over 25 years)

• Funding Model�Capital input

�Ongoing Running Costs & Funding

www.bsg.org.au

Page 27: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Potential Stakeholders

www.bsg.org.au

Page 28: Bendigo Mine Workings Pumped Hydro Renewable Energy Storage

Thanks for listening

Questions?