32 HORIZONTAL RESTRAINT STRAPS 35 x 97 min Strength Class C16 twice nailed to brace using 3.1 x 75mm long galvanised wire nails Strap fixed with a min of four fixings of which at least one is to be over the third joist. CONTENTS BEARING DETAILS Page POSI-JOIST TO GIRDER DETAIL 2 TIMBER FRAME (WITH NOGGINS) 3 TIMBER FRAME (WITH CONTINUOUS RESTRAINT) 4 TOP CHORD FIXING TO TIMBER FRAME 5 MASONRY HANGER DETAIL (WITH NOGGINS) 6 MASONRY HANGER DETAIL (WITH CONTINUOUS LEDGER) 7 BOTTOM CHORD BUILT INTO MASONRY 8 TOP CHORD BUILT INTO MASONRY 9 CONTINUOUS JOIST THROUGH MASONRY 10 TOP CHORD FIXING TO STEEL DOWNSTAND BEAM 11 INTERNAL BEARING 12 SHARED INTERNAL BEARING 13 BRACING DETAILS STRONGBACK DETAIL 14 STRONGBACK DETAIL (WEBS WITH BUILT IN VERTICALS) 15 STRONGBACK BRIDGING 16 STRONGBACK SPLICE 17 OPENING DETAILS STAICASE OPENING (POSI TO POSI) 18 STAICASE OPENING (POSI TO TRIMMER) 19 NARROW OPENING (TRIMMER ON HANGERS) 20 NARROW OPENING (TRIMMER BUILT IN) 21 FIXING ROUND SOIL VENT PIPE USING SVP HANGERS 22 FIXING ROUND SOIL VENT PIPE USING BEARER PLATES 23 FIXING ROUND SOIL VENT PIPE USING TRIMMER 24 WALL AND FLOOR DETAILS NON-LOADBEARING PARTITIONS PARALLEL TO FLOOR (ABOVE AND BELOW) 25 NON-LOADBEARING PARTITIONS PARALLEL TO FLOOR (ABOVE) 26 COMPARTMENT FLOOR/ PARTY WALL DETAIL 27 COMPARTMENT FLOOR/ PARTY WALL DETAIL (WITH SERVICE VOID) 28 MAXIMUM DUCT SIZES 29 EDGE CLOSURE DETAIL 30 HORIZONTAL RESTRAINT STRAP 31 HORIZONTAL RESTRAINT STRAP FIXED TO STRONGBACK 32 MISCELLANEOUS DETAILS

HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

  • Upload
    dokhanh

  • View
    227

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

32

HORIZONTAL RESTRAINT STRAPS

35 x 97 min Strength Class C16 twice nailed to brace using 3.1 x 75mm long galvanised wire nails

Strap fixed with a min of four fixings of which at least one is to be over the third joist.

CONTENTSBEARING DETAILS Page

POSI-JOIST TO GIRDER DETAIL 2TIMBER FRAME (WITH NOGGINS) 3TIMBER FRAME (WITH CONTINUOUS RESTRAINT) 4TOP CHORD FIXING TO TIMBER FRAME 5MASONRY HANGER DETAIL (WITH NOGGINS) 6MASONRY HANGER DETAIL (WITH CONTINUOUS LEDGER) 7BOTTOM CHORD BUILT INTO MASONRY 8TOP CHORD BUILT INTO MASONRY 9CONTINUOUS JOIST THROUGH MASONRY 10TOP CHORD FIXING TO STEEL DOWNSTAND BEAM 11INTERNAL BEARING 12SHARED INTERNAL BEARING 13

BRACING DETAILS

STRONGBACK DETAIL 14STRONGBACK DETAIL (WEBS WITH BUILT IN VERTICALS) 15STRONGBACK BRIDGING 16STRONGBACK SPLICE 17

OPENING DETAILS

STAICASE OPENING (POSI TO POSI) 18STAICASE OPENING (POSI TO TRIMMER) 19NARROW OPENING (TRIMMER ON HANGERS) 20NARROW OPENING (TRIMMER BUILT IN) 21FIXING ROUND SOIL VENT PIPE USING SVP HANGERS 22FIXING ROUND SOIL VENT PIPE USING BEARER PLATES 23FIXING ROUND SOIL VENT PIPE USING TRIMMER 24

WALL AND FLOOR DETAILS

NON-LOADBEARING PARTITIONS PARALLEL TO FLOOR (ABOVE AND BELOW) 25NON-LOADBEARING PARTITIONS PARALLEL TO FLOOR (ABOVE) 26COMPARTMENT FLOOR/ PARTY WALL DETAIL 27COMPARTMENT FLOOR/ PARTY WALL DETAIL (WITH SERVICE VOID) 28

MAXIMUM DUCT SIZES 29EDGE CLOSURE DETAIL 30HORIZONTAL RESTRAINT STRAP 31HORIZONTAL RESTRAINT STRAP FIXED TO STRONGBACK 32

MISCELLANEOUS DETAILS

Page 2: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

31

HORIZONTAL RESTRAINT STRAPS FIXED DIRECTLY TO STRONGBACK

Strap fixed with a min of four fixings of which at least one is to be over the third joist.

Twice nailed to brace using 3.1 x 75mm long galvanised wire nails

2

POSI-JOIST TO GIRDER DETAIL

Simpson L70 angles or similar as specified by design

Simpson LBV hanger or Cullen OWF/OWT hangers

Bottom member of posito be notched over bottom flange of hanger

Page 3: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

30

EDGE CLOSURE DETAILS

35MM Prefabricated edge closure Pre-faced with plywood with 20mm lap at the top edge

50mm min

3

47x72 top chord restraint fixed between beams

Head binder

BOTTOM CHORD FIXING TO TIMBER FRAME (WITH RESTRAINT NOGGINS)

Page 4: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

4

BOTTOM CHORD FIXING TO TIMBER FRAME (WITH CONTINUOUS RESTRAINT)

Continuous 47x72 top chord restraint fixed over ribbon block

Head binder

29

MAXIMUM DUCT SIZES

INSERT LARGE SERVICES THROUGH JOISTS BEFORE FIXING JOISTS. IT MAY NOT BE POSSIBLE AFTER JOISTS HAVE BEEN FIXED

W

RECTANGLE WIDTH

RECTANGLE DEPTH50 75 100 125 150 175 200 225 250 275 300

POSIJOISTSIZE

W CIRCLEDIA

SQUARE

PS-8PS-9PS-10PS-210PS-14PS-16

108 105 95134 130 115159 150 135210 190 155286 250 200324 275 220

270 180 90100180240310

320350490510 470 430 390 340 300 260 220 170 130 90

6011016020070110160

80160210270310440 390

260 210350 300 250

- - - - - - - - - - - -

- - - -

- - - - -

- - - - -

Page 5: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

28

SERVICE VOID

200approx

Ceiling (not shown) comprising:-2 Layers 15mm Gyproc Fireline Board on 16mm resilient bars at 400mm centres. First layer fixed with 38mm Gyproc screws at 230mm centres. Second layer fixed with 60mm Gyproc screws at 230mm centres. Staggered with first layer screws. Lay Fireline board in echelon pattern with staggered joints.

TIMBER FRAME PARTY WALL (WITH SERVICE VOID)

Posi-web over bearing by min 15 mm

Floor Comprising:-22mm T&G Chipboard on 19mmplasterboard plank on 47x75mm resilient floor batten at 600mm centres on 18mm T & G chipboard. All T&G edges glued.

Mineral wool cavity barrier

100mm Mineral wool insulation quilt min weight 23kg/m2.

Service void

47 x 89 Continuous pack

Bead of sealent applied to floor deck prior to fixing 19mm plasterboard plank.

2 no 30 x 200mm GMS straps at 12mm centres.

47x89 Packs between joists

Posi-Joists parallel to wall

First Posi-beam set back from wall.

Plasterboard nogginsRing beams in solid timber or LVL.

Posi-Joists bearing on wall.

5

TOP CHORD FIXING TO TIMBER FRAME

Posi-web over bearing by min 15mm

47x89 Packing piece

Ring beam (size to suit)

Max 6mm gap

40x47 Continuous plasterboard noggin

Page 6: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

6

MASONRY HANGER DETAIL

47x72 top chord restraint fixed between beams

Minimum bearing determined by design (choose correct hanger for load. Bearing width and coursework level of hanger bearing flange).

200approx

Ceiling (not shown) comprising:-2 Layers 15mm Gyproc Fireline Board on 16mm resilient bars at 400mm centres. First layer fixed with 38mm Gyproc screws at 230mm centres. Second layer fixed with 60mm Gyproc screws at 230mm centres. Staggered with first layer screws. Lay Fireline board in echelon pattern with staggered joints.

Posi-web over bearing by min 15mm

Floor Comprising:-18mm T&G Chipboard on 19mm plasterboard plank on 25mm fibreglass slab on 18mm T&G chipboard. All T&G edges glued, and 19mm plank bonded to chipboard with dabs of Gyproc sealant at 300mm centres. Joints between chipboard and plasterboard to be staggered and board direction reversed.

Mineral wool cavity barrier

100mm Mineral wool insulation quilt min weight 23kg/m2.

47 x 89 Continuous pack

Bead of sealent applied to floor deck prior to fixing 19mm plasterboard plank.

2 no 30 x 200mm GMS straps at 12mm centres.

47x89 Packs between joists

Posi-Joists parallel to wall

First Posi-beam set back from wall.

Plasterboard noggins Ring beams in solid timber or LVL.

Posi-Joists bearing on wall.

27

TIMBER FRAME PARTY WALL

Page 7: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

26

NON-LOADBEARING PARTITIONS ABOVE AND PARALLEL TO FLOOR BEAMS

Wall panel skew nailed through onto noggin with a min of 2 no 3.35 diagalvanised wire nails, length to suit

Purpose made noggins at max 600mm centres

7

MASONRY HANGER DETAIL (WITH CONTINUOUS LEDGER)

Minimum bearing determined by design (choose correct hanger for load. Bearing width and coursework level of hanger bearing flange).

Continuous 47x72 ledger fixed over ribbon block

Page 8: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

8

BOTTOM CHORD BUILT INTO MASONRY

Blockwork to continue between beams to provide restraint

(DTLR Robust Detail For Thermal Bridging should be observed)

Note: This is Not Allowed On External Walls

25

NON-LOADBEARING PARTITIONS PARALLEL TO FLOOR BEAMS

Simpson Z35N clips

Noggin nailed down onto wall panel

Wall panel skew nailed through onto noggin with a min of 2 no 3.35 diagalvanised wire nails, length to suit

Page 9: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

24

FIXING ROUND SOIL VENT PIPE USING TRIMMER

Posi-web over bearing by min 15mm

Masonry hanger

Solid timber or LVL trimmer (depth to suit)

Simpson LBV or Cullen OWF/OWT hangers

Masonry hanger

9

TOP CHORD BUILT INTO MASONRY

Posi-web over bearing by min 15mm

Continuous 47x72 ledger fixed to wall

Max 6mm gap

(DTLR Robust Detail For Thermal Bridging should be observed)Note: This is Not Allowed On External Walls

Page 10: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

10

CONTINUOUS JOIST THROUGH MASONRY

Solid timber block grain parallel to span

(DTLR Robust Detail For Thermal Bridging should be observed)

Note: This is Not Allowed On External Or Fire Walls

23

FIXING ROUND VOIL VENT PIPES USING BEARERS

Masonry hanger

50x100 Bearers fixed directly to wall to pick up both floor and ceiling

This may not perform well acoustically as sound will be transmitted directly from the floor to the bearer through the inner leaf of the wall.

Page 11: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

22

FIXING ROUND SOIL VENT PIPE USING SOIL VENT PIPE HANGERS

Simpson Z35n clips

Masonry hanger Noggin to provide floor fixing

Cullen SVP Soil vent pipe hanger (may be handed).

11

TOP CHORD FIXING TO STEEL DOWNSTAND BEAM

Posi-web over bearing by min 15mm

47x97 between top chords

Timber plate fixed to top of beam

Timber pack fixed to beam (size to suit) Max 6mm gap

Page 12: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

12

INTERNAL BEARING

21

NARROW OPENING

Cullen UZ47 clips or similar as specified by design

Beam (depth to suit slotted through girders)

Packing piece to pick up ceiling

Page 13: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

20

NARROW OPENING

Cullen UZ47 clips or similar as specified by design

Simpson LBV hangers or Cullen OWL/OWT hangers

Trimmer to be notched over bottom flange of hanger

13

SHARED INTERNAL BEARING

Page 14: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

14

STRONGBACK DETAIL (FIX AT MAX 4.0 METRE CENTRES)

38X75 (min) blocks twice nailed to top and bottom members and twice nailed to brace using 3.1 x 75mm long galvanised wire nails

Strongback, see table for sizes.

Position strongback tight to the underside of the top chord

Web SizeMinimum Strongback

Section

PS-8, PS-9 & PS-10PS-12, PS-14 & PS-16

50 x 100*35 x 150*

INSERT STRONGBACKS THROUGH JOISTS BEFORE FIXING JOISTS. IT MAY NOT BE

POSSIBLE AFTER JOISTS HAVE BEEN FIXED

* Size to be specified by manufacturer, the deeper the strongback the stronger the floor.

19

STAIRCASE OPENING

Posi-web over bearing by min 15mm

Cullen UZ47 clips or similar as specified by design

Solid timber or LVL trimmer depth to suit

Simpson LBV hangers or Cullen OWL/OWT hangers

Trimmer to be notched over bottom flange of hanger

Page 15: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

18

STAIRCASE OPENING

Cullen UZ47 clips or similar as specified by design

Simpson LBV hangers or Cullen OWF/OWT hangers

Bottom member of posi to be notched over bottom flange of hanger

15

STRONGBACK DETAIL (WEBS WITH BUILT IN VERTICALS) FIX AT MAX 4.0 METRE CENTRES.

Position strongback tight to the underside of the top chord

Twice nailed to brace using 3.1 x 75mm long galvanised wire nails

INSERT STRONGBACKS THROUGH JOISTS BEFORE FIXING JOISTS. IT MAY NOT BE POSSIBLE AFTER JOISTS HAVE BEEN FIXED

Page 16: HORIZONTAL RESTRAINT STRAPS - Roof Truss · horizontal restraint straps ... top chord fixing to timber frame 5 masonry han ger detail (with noggins ... rectangle width

16

STRONGBACK BRIDGING

(WEBS WITH BUILT IN VERTICALS)

Twice nailed to brace using 3.1 x 75mm long galvanised wire nails

Position strongback tight to the underside of the top chord

INSERT STRONGBACKS THROUGH JOISTS BEFORE FIXING JOISTS. IT MAY NOT BE

POSSIBLE AFTER JOISTS HAVE BEEN FIXED

17

STRONGBACK SPLICE

Strongback, see table for depths

35x75 (min) blocks twice nailed to top and bottom members and twice nailed to brace using 3.1 x 75mm long galvanised wire nails

1200mm long splice fixed with 10 no 3.1 x 70mm long galvanised wire nails each side of splice, nailed through and clenched over on far side

INSERT STRONGBACKS THROUGH JOISTS BEFORE FIXING JOISTS. IT MAY NOT BE

POSSIBLE AFTER JOISTS HAVE BEEN FIXED

Web SizeMinimum Strongback

Section

PS-8, PS-9 & PS-10

PS-12, PS-14 & PS-16

50 x 100*

35 x 150*

* Size to be specified by manufacturer, the deeper the strongback the stronger the floor.