Home Base Project StatusWeek Ending February 7, 2014
February 11, 2014 Webinar
Weekly Home Base Project Status — PowerSchool
Weekly Home Base Project Status
• Successes and Recent Accomplishments
• Major Attention Areas• Calendar – Future
Updates/Releases• Professional Development and
Training Schedule
Successes and Recent Accomplishments – PowerSchool / Clusters Completed development and quality assurance necessary to promote the following into production over maintenance weekend:•PS Release 7.10.0.1•NC State Compliance Reporting Release 14.1.3.2.0 (includes PMR/GRS, AIG and DropOut)•Additional Staff Roles (updated Code Set)•Enterprise Controller (Added code sets for Course and Sections - Delivery Mode, CTE Level, Third Party Provider, External Provider, Post Secondary Institution Codes and updated sort order for Course Lengths)•Staff Vehicles
Major Attention AreasPowerSchool / Clusters
Attention Area StatusState Compliance Reports PMR/GRS, AIG and DropOut were addressed with February 7
maintenance weekend. Known issues communicated through NCSIS Channels.
Student Transfers Across Districts
Student Transfers across districts currently under development.
Admission status and summarized attendance are coming to NCDPI QA next week.
Pearson core product changes are necessary to resolve known issues with entry/exit codes and historical grade fields.
Full resolution anticipated later this spring (version 7.10.2.0).
Major Attention AreasPowerSchool / Clusters
Attention Area StatusCourse Credit & GPA Added Value
Corrected problem introduced last weekend when course credit and added values for current courses were added to Enterprise Controller.
A script to update GPA added on historical grades was run over the weekend. Course credits are still outstanding and will require a subsequent script.
NC Transcript fixes UNC Minimum requirements not accurately reflected when current year courses are used in place of old year course codes.
Additional transcript issues have been identified and communicated to Pearson.
Major Attention AreasPowerSchool / Clusters
Attention Area StatusReport Cards There are two (2) alternate report cards due to issues with the
standard report card.
Software issues working toward resolution:•When students transfer to a new school, both the current and prior teacher show.•When a teacher in the same school leaves, PowerSchool reports results for both teachers.•Special characters in comments prevent printing.
Process/Data issues:•Districts must work with Pearson IPMs and HBSC reps to address and correct set-up issues (e.g. overlapping exam dates prevent grades from storing)
Black Box (Emergency Contact List)
An alternative solution to provide student emergency contact information was deemed a security risk. Pearson will provide this customization instead.
Auto-Dialer Failed QA and back in Pearson development for correction. Targeting later in February for production release.
Major Attention AreasPowerSchool / Clusters
Attention Area StatusSystem Performance Weekly server restarts (Sunday 12 a.m. – 4 a.m.) are occurring to
proactively address PowerSchool performance concerns. Ongoing monitoring is underway and will continue to ensure service levels are met. At least two (2) districts experienced outages this week.
Outstanding Requirements Finalization
NCDPI finalized business requirements for Syncing UID Student Demographics with Power School.
Lottery requirements review session planned with Pearson team on 2/10.
Pearson will confirm delivery dates for this deliverable after completing requirements review and high-level specs.
NCDPI will complete Military requirements by March. Delivery dates are to be determined.
Calendar – Future Updates/ReleasesPowerSchool / Clusters
Timeframe Component / Feature
February 2014 • PMR/GRS fixes• AIG Enhancements• Initial Dropout Reporting• EDDIE integration turned back on• Course & Section Enhancements • Ongoing Statewide Alternative Report Card • EC CECAS (Phase II)• CTE Concentrator Survey • Auto Dialer
Healthcare Features • Office Visit Enhancement• Medication Log• Accident Injury Log• Student Health Care Plan
Calendar – Future Updates/ReleasesPowerSchool / Clusters
Timeframe Component / Feature
March 2014 • Title X Homeless• LEP/WAPT• Title I ESSR• Athletic Eligibility
April 2014 • Title III Immigrant• EC CECAS (Phase III)• Accountability• SADLS (Driver Eligibility)• Teacher Verification of Course Certification• Phase 3 Test Score Imports
May 2014 • Grad Plans• Black Box
July 2014 • Standards-Based Report Cards (SBRC)• Academically and Intellectually Gifted - Phase 2
2014-15 School Year
• Historical Data Conversion• Historical Transcript/Cum Folder Solution
Professional Development & Training Schedule - PowerSchool / Clusters
PowerSchool Scheduling training is well underway http://www.nc-sis.org/calendar_February.html
Home Base Symposium is February 17-19: http://www.nc-sis.org/symposium14.html. Early Registration ended February 7.
Weekly Home Base Project Status — Schoolnet & OpenClass
Successes and Recent Accomplishments – Schoolnet
• Pearson implemented changes in web caching this week that resulted in marked improvements in Schoolnet system performance. Many LEAs reported that the system was significantly more responsive than it has been in recent weeks.
• Many LEAs reported issues this week getting a “Service is Unavailable” error when attempting to access Schoolnet. Pearson identified and corrected the issue, which was tied to the single sign-on solution (SSO).
• Pearson successfully added 5 additional web servers.• Schoolnet performance has been stable for several days
now. Users will continue to see incremental improvements in Schoolnet performance over the next few months.
Major Attention AreasSchoolnet
Attention Area StatusSystem performance Pearson continues to make infrastructure and configuration
improvements and system code changes to improve Schoolnet system performance. Recent changes include changes to web caching that had a significant impact on performance. Pearson added 50% more webservers (5 more) to the pool this past weekend to increase capacity. Pearson and DPI have performance monitoring tools to monitor system performance and take corrective action. End-users will see incremental improvements over the next few months until system performance and availability comply with our Service Level Agreement.
Calendar – Future Updates/Releases
Timeframe System / Organization Component / Feature
February Schoolnet Addition of 5 more web servers to the pool
February Schoolnet Continued code optimization.
March/April 2014 Schoolnet Schoolnet version 15.4 expected in Production
July 2014 Schoolnet Schoolnet version 16.0 slated for Production.
Calendar – Future Updates/Releases
Timeframe System/ Organization
Component / Feature
Fall 2014 TestNav Summative Assessment
Add summative assessment component (TestNav) to the Home Base suite of applications. Pilot Summative Assessment capability by delivering 10 of the 30 NC Final Exams through the Summative Assessment platform.
March 2015 TestNav Summative Assessment
Field test 3 High School EOC tests
Spring 2015 TestNav Summative Assessment
Pilot remaining 20 NC Final Exams and 3 High School EOC tests through the Summative Assessment platform.
Professional Development & Training Schedule – Schoolnet & OpenClass
For more on professional development and training, please see http://www.ncpublicschools.org/homebase/training/schedule/ and http://bit.ly/12txEvM.
Weekly Home Base Project Status — Educator Evaluation System & Professional Development
Successes and Recent Accomplishments – Educator Evaluation System
Professional Development Tool Pilot #1•Over the last several months, many LEAs have reported intermittent problems getting an “openSAML: Fatal Exception” error. Truenorthlogic identified and corrected the root cause of this issue and continues to monitor SSO connections.•Many LEAs reported issues this week getting a “Service is Unavailable” error when attempting to access the Educator Evaluation System. Pearson identified and corrected the issue, which was tied to the Pearson single sign-on solution (SSO). •Provided the ability for district Educator Evaluation administrators to reset user passwords for the direct login access.•Continued delivery of the second pilot course which runs through March 2014.•General rollout of the Professional Development System to all LEAs is scheduled for April 2014.
Major Attention AreasEducator Evaluation System
Attention Area StatusLog-Ins Provided direct login access to the Educator Evaluation and
Professional Development systems, which allows end-users to access the system without logging in through PowerSchool. This new feature has enabled LEAs to continue to use the Educator Evaluation System whenever they encountered issues with PowerSchool single sign-on (SSO) and when PowerSchool was down for maintenance.
Calendar – Future Updates/Releases
Timeframe System / Organization Component / Feature
February 2014 Educator Evaluation System Deliver improved evaluation screens (to reduce horizontal scrolling required in current screens)
February/March 2014
Professional Development System
Conduct second pilot course “Effective digital strategies for teaching and learning in the K-12 classroom”
April 2014 Professional Development System
Professional Development Tool goes live for all LEAs.
Professional Development & TrainingSchedule – Educator Evaluation System & Professional Development
For more information about professional development and training, please see http://www.ncpublicschools.org/homebase/training/schedule/ and http://bit.ly/12txEvM.
Weekly Home Base Project Status —Home Base Support Center (HBSC)
HBSC - Weekly Performance IndicatorsIncident Management
Weekly Submitted vs. Resolved Home Base Tickets
Outstanding Ticket Resolution - (pre 1/10/14 submissions)
Submitted Resolved % Resolved
445 389 87%
Resolutions (week) Total to Date
81 751
HBSC - Weekly Performance Indicators Call Center
Weekly Calls - % Home Base calls reaching an agent - (HBSC staff answer other telephone support requests in addition to Home Base)
Weekly Home Base Calls – Average Wait Time
Reached an Agent Unanswered (eMail)
89% 11%
Calls Average Wait Time
235 44 Seconds
HBSC - Weekly Performance Indicators
Weekly Backlog 285 tickets waiting to be picked up by HBSC or members of SME groups where tickets are assigned
Top Five Issue Categories for the Week• Marks• Security/Login• Instructional Tools/Content• PowerSchool Reporting• State Reporting
** HBSC staff availability impacted by mandatory training from February 3rd through February 14th. HBSC staff will be facilitating sessions at Symposium, February 17th through February 19th.
New online Weekly Project Status will be live beginning Feb. 17.
Questions?