HL-LHC WP2 Brainstorming Meeting
1
Purpose of this meeting: Introduce the main objectives of the new HL-LHC project:
• Prepare technical proposal by 2013 for a luminosity upgrade in the LHC by 2020 with goal of 5 1034 cm-2 sec-1 sustainable luminosity and integrated luminosity of 3000 fb-1 (merger of Phase 1 and sLHC upgrade projects).
Introduce the main objectives for WP2 of HL-LHC: • Develop one to three baseline configurations for the upgrade (e.g. based on NbTi; Nb3Sn or hybrid technology).
Collect ideas and proposals for tasks within WP2: • e.g. B-B studies for baseline configuration(s) (6D beam-beam, chaos onset, minimum required x-ing angle ( DA vs x-ing), with and without wire; CRAB cavities etc
Collect proposals of potential collaborators for WP2: • EU members (EU funding); US (relation with USLARP?); other (required collaboration agreement?)
O. Brüning – BE-ABPHL-LHC meeting 8. September 2010
HL-LHC WP 2 Brainstorming Meeting
2
Interesting Suggestions:
Introduce a Parameter and Layout Committee: • Assure consistent sets of parameters for the pursued options.
Maintain a central website: • Central repository with all related files and programs.
Evaluate need for formal collaboration agreements: • e.g. KEK and TRIUMF
O. Brüning – BE-ABPHL-LHC meeting 8. September 2010
HL-LHC Work Package 2 Brainstorming
3
Confirmed Collaboration interests:Europe:
• Crockcroft: Andy Wolski, Maxim Korostelev, Deepa Angal-Kalinin, Rob Appleby, Kay Hock• IFIC University Valencia: Angeles Faus-Golfe• CEA Grenoble: NN
US: • SLAC: Uli Wienands; Thomas Markiewicz• FNAL: Vladimir Shiltsev +; Eric Prebis (USLARP)• BNL: Wolfram Fischer; Rama Calaga
Asia: • KEK: Kazuhito Ohmi
O. Brüning – BE-ABPHL-LHC meeting 8. September 2010
HL-LHC Work Package 2 Brainstorming
4
Wished for Collaboration without confirmation:
Europe: • INFN: e.g. Pantaleo Raimondi• FZK: Anke Müller• PSI-EPFL: Leonid Rifkin
Canada: • Triumf: Fred Jones, Dobrin Kaltchev
Asia: • KEK: Etienne Forest
O. Brüning – BE-ABPHL-LHC meeting 8. September 2010
HL-LHC Work Package 2 Brainstorming
5
Issues for WP2:
NbTi versus Nb3Ti technology: • different performance reach (*, aperture, length etc.)• shielding and aperture requirements• close link with WP3 and WP5
Layout options: • L* (close link with WP7)• options for local correction of chromatic aberrations (triplet & IR layout)• local CC installations (close link with WP4)• 2-in-1 triplet design with large x-ing angle and CC (close link with WP4)
Beam parameter optimization: • operational experience from LHC• close link with Injector complex upgrade and consolidation Projects
O. Brüning – BE-ABPHL-LHC meeting 8. September 2010
HL-LHC Work Package 2 Brainstorming
6
Tentative Task List:
1) Communication & management:
2) Optics & Layout: • NbTi solutions with and without local CC; L*; round and flat beams; 2-in-1• Nb3Sn solutions with and without local CC; L*; round and flat beams; 2-in-1• Novel solutions for correction of chromatic aberrations (a la SF & PR)• IR4 layout and solution with global CC
magnet parameters (aperture and length)
3) Single particle studies: • DA studies and FQ specifications• Correction strategy and corrector specifications
magnet parameters (FQ and corrector elements)
O. Brüning – BE-ABPHL-LHC meeting 8. September 2010
HL-LHC Work Package 2 Brainstorming
7
Tentative Task List:
4) Collective Effects: • BB long range compensation schemes• BB limit for round and flat beams and coupling tolerances for flat beams• Head-on BB compensation schemes and options• Impedance estimates for new layout (collimator and aperture dependent)• IBS estimates for different beam configurations
beam separation; optimum configuration (flat beams vs round beams)
5) Beam Parameters and Luminosity optimization: • L reduction and leveling (CC and poor man leveling via x-ing angle)• Evaluation of operation experience of first 2 year LHC operation• Options for beam parameter variation for L optimization during run (e.g. Q)
beam parameter set (n, Nb, s etc.)
O. Brüning – BE-ABPHL-LHC meeting 8. September 2010
HL-LHC Work Package 2
8
Next Steps:
Prepare detailed activity lists for each task: • Circulation via email with potential second telephone meeting.
Follow-up on missing collaborators: • One-to-one contacts.
Prepare pairs of collaborators and task: • Identification of contributors for each task
O. Brüning – BE-ABPHL-LHC meeting 8. September 2010