HJ International Latin America, Inc.
New vision regarding the real average New vision regarding the real average load of distribution transformers in load of distribution transformers in
Latinamerican Latinamerican electrical grids.electrical grids.
The situation and the various paths to a The situation and the various paths to a soluction.soluction.
Arguments based on IEEE C57.91-1995 (R2004)Arguments based on IEEE C57.91-1995 (R2004)
HJ International Latin America, Inc.
DEFINITIONDEFINITION
0
0.2
0.4
0.6
0.8
1
1.2
1.4
1 4 7
10
13
16
19
22
Load p.u.
rms equiv
Transf p.u.
Demand curve RMS value in kVADemand curve RMS value in kVA
Cm = ---------------------------------------------------- Cm = ----------------------------------------------------
Nominal kVA value of the Nominal kVA value of the transformer transformer
HJ International Latin America, Inc.
Regarding cycles of equivalent loadsRegarding cycles of equivalent loadsNote that the levels of overload and its duration are Note that the levels of overload and its duration are
extracted from the proper curves of the real load and extracted from the proper curves of the real load and not from a standard…!!not from a standard…!!
The accummulative concept of the loss of life…
…day, month, year, all its life…
HJ International Latin America, Inc.
Cycles of equivalent loadsCycles of equivalent loadsIEEE C57.91-1995IEEE C57.91-1995
A transformer subjected to any one of these 3 cycles will exhibit the same performance in terms of energy
While the RMS value of the load curve is below the nominal capacity of the transformer, the loss of life of the unit will be below the maximum
permitted!!
HJ International Latin America, Inc.
Diagram of temperaturesDiagram of temperatures
GRALTAGRUPO DE INVESTIGACION
EN ALTA TENSION
HJ International Latin America, Inc.
Diagram of temperaturesDiagram of temperatures
Direct measurement (thermocouples)
Indirect measurement (resistance)
Calculated(recomendations IEEE)
ΘSUP ΘTO
ΘINF
ΘA
Tanque Aceite Devanado
Temperatura [ºC]
Posición vertical
ΔΘW
ΔΘH
Nivel Superior Aceite
Nivel Superior Devanado
Nivel Inferior Devanado
ΔΘT
ΔΘT / 2
ΔΘAO
ΔΘTO
ΘAO
ΔΘW
ΘW
ΔΘBO
ΔΘT
Punto caliente
ΘH
GRALTAGRUPO DE INVESTIGACION
EN ALTA TENSION
HJ International Latin America, Inc.
Regarding the limits of load and Regarding the limits of load and temperaturetemperature
For operations above the nominal loadFor operations above the nominal loadPer IEEE C57.91 – Table 6Per IEEE C57.91 – Table 6
DISTRIBUTION TRANSFORMERSDISTRIBUTION TRANSFORMERS
Temperature of the hot spot of the conductor: 200degC
Short duration load (1/2 hour or less) 300%
Top oil temperature: 120degC
HJ International Latin America, Inc.
Regarding the limits of load and Regarding the limits of load and temperaturetemperature
For operation s above the nominal load For operation s above the nominal load Per IEEE C57.91 – Table 7Per IEEE C57.91 – Table 7POWER TRANSFORMERSPOWER TRANSFORMERS
Temperature of the hot spot of the conductor: 180degC
Short duration load (1/2 hour or less): 200%
Top oil temperature: 110degC
HJ International Latin America, Inc.
How a COMPLETE heat run should be done…How a COMPLETE heat run should be done…
HJ International Latin America, Inc.
DEFINITION:DEFINITION:Factor regarding energerized Factor regarding energerized
medium load medium load
• Annual invoicing in GWhAnnual invoicing in GWh
Fcme = --------------------------------------------------Fcme = --------------------------------------------------
CITD * fp * 24 * 360CITD * fp * 24 * 360
CITD: Installed capacity of Distribution Transformers, CITD: Installed capacity of Distribution Transformers, GVAGVA
fp: Global power factor of the systemfp: Global power factor of the system
HJ International Latin America, Inc.
Average loadability of Average loadability of distribution transformers en distribution transformers en
the system (Example)the system (Example)
0-10%>25%10-25%
• The average sizes in the grid can be reduced in factors of 2 to 5!!
HJ International Latin America, Inc.
For the losses and typically kVA cost that we found For the losses and typically kVA cost that we found throughout the Latinamerican grids, the minimum operative throughout the Latinamerican grids, the minimum operative
cost for Cm to be between 50% and 75% of the nominal cost for Cm to be between 50% and 75% of the nominal capacity of the distribution transformers. capacity of the distribution transformers.
OPTIMUM SIZING
0
20,000
40,000
60,000
80,000
100,000
120,000
15% 25% 60% 80% 110%
La
USD
Costo total
Costo energia
Costo activos
HJ International Latin America, Inc.
THE COMPROMISE…THE COMPROMISE…
WHERE WE ARE AT WHERE WE ARE AT TODAY:TODAY:
WHERE WE HAVE TO BE: WHERE WE HAVE TO BE:
Cm = 15 Cm = 15 %%
Cm = 60 to 75 Cm = 60 to 75 %%
HJ International Latin America, Inc.
Determination of the real demand Determination of the real demand
Indirect measurements – CEMIG (Gemini)
Administration of actives due to accummulated loss of life
Compare the energy sold to the end users connected to the transformer to the energy the transformer has the capacity to
deliver
The real losses at the sight of installation are not accounted for.
HJ International Latin America, Inc.
Direct measurement of energy Direct measurement of energy delivered by the transformerdelivered by the transformer
• The reading is compared to the energy sold to the end-users The reading is compared to the energy sold to the end-users connected to the unit. connected to the unit.
• If you compare the energy delivered by the transformer to a load If you compare the energy delivered by the transformer to a load profile, you will have a precise vision of the percentage of load. profile, you will have a precise vision of the percentage of load.
(Fuente: Redes de EEPPM)(Fuente: Redes de EEPPM)
HJ International Latin America, Inc.
Other variants practiced currentlyOther variants practiced currently
• Digital measurementsDigital measurements
• Remote readingsRemote readings
• Remote signalsRemote signals
(Fuente: Redes de EEPPM)(Fuente: Redes de EEPPM)
HJ International Latin America, Inc.
Distribution of loads in a grid with Distribution of loads in a grid with optimum sizingoptimum sizing
• CRITICAL ZONE WITH CRITICAL ZONE WITH THE NEED TO THE NEED TO ADEQUATE THERMO ADEQUATE THERMO PROTECTIONPROTECTION
• Example: Cm/Fd (0.60/0.65 Example: Cm/Fd (0.60/0.65 =0.92)=0.92)
CRITICALLOAD ZONE
AVERAGE LOAD 50 – 75 %
HJ International Latin America, Inc.
IS EVERYTHING CLEAR ?IS EVERYTHING CLEAR ?
HJ International Latin America, Inc.
Factors to consider for the optimum sizing Factors to consider for the optimum sizing based on the consumption of energybased on the consumption of energy
• REAL LOAD CURVE OR CHARACTERIZED AND 2 EQUIVALENT CYCLES.REAL LOAD CURVE OR CHARACTERIZED AND 2 EQUIVALENT CYCLES.
• DETERMINE THE RMS VALUE OF THE LOAD CURVE BASED ON THE DETERMINE THE RMS VALUE OF THE LOAD CURVE BASED ON THE ACTUAL CONSUMPTION.ACTUAL CONSUMPTION.
• LIMIT THE PROJECTION OF THE LOAD CURVE TO NO MORE THAN 5 LIMIT THE PROJECTION OF THE LOAD CURVE TO NO MORE THAN 5 YEARS. YEARS.
• DEFINED A UNTI SIZE THAT WILL REACH ITS OPTIMUM LOAD IN THE DEFINED A UNTI SIZE THAT WILL REACH ITS OPTIMUM LOAD IN THE PROJECTED TIME.PROJECTED TIME.
• SELECT AN APPROPRIATE THERMAL PROTECTIONSELECT AN APPROPRIATE THERMAL PROTECTION
HJ International Latin America, Inc.
The type of transformer to be used The type of transformer to be used in an optimized load environmentin an optimized load environment
To successfully operate distribution To successfully operate distribution transformers at Cm levels between 50% transformers at Cm levels between 50%
and 75%, it is considered imperative and 75%, it is considered imperative that the protective devices used for the that the protective devices used for the
transformer, identify those levels of transformer, identify those levels of overload in magnitud and duration that overload in magnitud and duration that cause loss of life above the maximum cause loss of life above the maximum
permitted. permitted.
HJ International Latin America, Inc.
The areas of Over-Current Protection in a The areas of Over-Current Protection in a transformer...transformer...
HJ International Latin America, Inc.
The type of transformer to be utilized on The type of transformer to be utilized on optimum load environments and optimum load environments and
THE DEFINITIONS OF THE PROTECTION TO BE THE DEFINITIONS OF THE PROTECTION TO BE UTILIZEDUTILIZED
• Emphasis on the control of the thermal compartment (following the load currents and the interior temperatures)
• Asset management of the gridAsset management of the grid
• Reduction of installation costs.Reduction of installation costs.
• Significant reductions of the global failure Significant reductions of the global failure indices of transformers in the distribution system.indices of transformers in the distribution system.
HJ International Latin America, Inc.
The type of transformer to be utilized in an The type of transformer to be utilized in an optimum load environment…optimum load environment…
Lighted signal
or
Information sent remotely
Priviledging the need to interrupt dangerous load y even finding a better solution, we are installing CSP type
transformers to provide an exact thermal protection and the capacity to interrupt at the site.
HJ International Latin America, Inc.
The solution that the CSP transformer offers…The solution that the CSP transformer offers…
SELF-SELF-PROTECTEDPROTECTED
CONVENTIONALCONVENTIONAL
CAJA NEGRA
HJ International Latin America, Inc.
The solution that the CSP transformer offers…The solution that the CSP transformer offers…
HV ARRESTER
LV BREAKER
FUSES
LV ARRESTER
HJ International Latin America, Inc.
The solution that the CSP transformer offers…The solution that the CSP transformer offers…
SIGNAL LIGHT
HANDLE AND EMERGENCY OVERLOAD LEVER
HJ International Latin America, Inc.
The signal lamp as an element in providing an The signal lamp as an element in providing an effective managemente of loads and assets effective managemente of loads and assets along with an important role in balancing along with an important role in balancing
loads.loads.
• LIGHT OFFLIGHT OFF
• STATUS OF GRID AND STATUS OF GRID AND LOAD ARE NORMALLOAD ARE NORMAL
• LIGHT ONLIGHT ON
• STATUS OF GRID AND STATUS OF GRID AND LOAD ARE ABNORMALLOAD ARE ABNORMAL
HJ International Latin America, Inc.
A practical application of the proposed A practical application of the proposed model model
Case CFE – Veracruz District/Division
Pilot grid used to size unit with an optimum Cm
HJ International Latin America, Inc.
Summary of the pilot project achieved Summary of the pilot project achieved in the City of Veracruz - Mexicoin the City of Veracruz - Mexico
1. GRID INSTALLED OPTIMIZED2. Number of units 39 393. Average kVA 43.1 16.84. Total KVA 1,722.5 6555. Kwh./year 1,012,283 1,012,2836. Fcme 15.2% 39%7. Capitalized cost US$65.8kUS$34.4k units + losses8. % Capitalized cost. 100% 52.2%9. Type of units Conventional CSP
HJ International Latin America, Inc.
Summary of the pilot project Summary of the pilot project achieved in the City of Veracruz - achieved in the City of Veracruz -
MexicoMexico
HJ International Latin America, Inc.
Important points for a successful Important points for a successful applicationapplication
COORDINATION OF PROTECTIVE DEVICES AND REAL COORDINATION OF PROTECTIVE DEVICES AND REAL EXERCISES OF OVERLOAD PROTECTIONEXERCISES OF OVERLOAD PROTECTION
kk TTTR
RT 0
0
HJ International Latin America, Inc.
When making an economic evaluation of a When making an economic evaluation of a project using conventional vs CSP type project using conventional vs CSP type
transformerstransformers
THE SIZE OF TRANSFORMER BEING COMPARED THE SIZE OF TRANSFORMER BEING COMPARED ARE DIFFERENTARE DIFFERENT
CONVENTIONALCONVENTIONAL
kVA = X kVA = X/2kVA = X/2
HJ International Latin America, Inc.
The experience in Mexico was worth The experience in Mexico was worth the effort… the effort…
Letter from the Sub-Director of CFE indicating all the benefits achieved.
HJ International Latin America, Inc.
ENDEND
NATALIA
Other recommendations:
The case of transformers in Distribution Substations