DESCRIPTION
HiRadMat : report from WG2 – WANF dismantling . Agenda. Activities carried out in Week 1 Planning for Week 2 WANF cleaning : preparation T1 dismantling : news. Activities carried out in Week 1. MCA and TCX blocks. January 08, 2010. Forklift shielding in progress. - PowerPoint PPT Presentation
Citation preview
HiRadMat : report from WG2 – WANF dismantling
January 08, 2010S. Evrard
1
• Activities carried out in Week 1• Planning for Week 2• WANF cleaning : preparation• T1 dismantling : news.
Agenda
Activities carried out in Week 1
S. Evrard
2 MCA and TCX blocks
• Forklift shielding in progress
January 08, 2010
Activities carried out in Week 1
S. Evrard
3 B846 pit reconnaissance
• Two doors opened by Fire Brigade• Crinoline ladder seems to be OK
January 08, 2010
Activities carried out in Week 1
S. Evrard
4 Cabling
• 3 cables pulled for door interlocks and patrol box• Red telephone cable still missing• Lighting power cable already available : additional TL’s in late January
January 08, 2010
Activities carried out in Week 1
S. Evrard
5 Furet dismantling and electrical cupboard refurbishment
• Work in progress• FURET on the floor• Cerap will clean it on Monday
January 08, 2010
Co-activities in January 2010 6 Planning in week 2
EN-HE
EN-HE
EN-CVContractor
EN-HE
GS-ASE, IT
-CS
EN-HE: T1 : MCA + Tax blocksEN-HE: furet removalEN-HE: Electrical cabinet refurbish.
January 08, 2010
WANF cleaning
S. Evrard
7
• ENDEL SCTN best offer out of 4 companies enquired (all contacted):• Work procedure transmitted today by Endel• Analysis in progress with DG-SCR• Work preparation (safety courses, access requests, equipment on site,…)
on Thursday 14 and Friday 15• Work in Week 3 (18 22 January)
January 08, 2010
T1 dismantling : news
S. Evrard
8
• Location of remaining beam pipe defined (Thanks to V. De Jesus)
January 08, 2010