9
1 ? MS Mary Pyne Senior Executive Officer South Dublin County Council PO Box 4122 Town Centre Tallaght Dublin 24 1 lth May 2005 Reg No: 205-I An Ghniomhoireocht urn Choomhnti Comhrhooil Headquarters, PO Box 3000 Johnstown Castle Estate County Wexford, Ireland Ceanncheathri, Bosca Poist 3000 Eastdt ChaisMn Bhaile She&n Contae Loch Garman, tire T +353 53 60600 F: +353 53 60699 E: [email protected] W: www.epa.ie LoCall: 1890 33 55 99 Dear MS Pyne I am to advise you that the Agency has received an application for a Waste Licence from Greyhound Recycling & Recovery Limited, for a facility located at Greyhound Recycling & Recovery Limited, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Co Dublin. The applicant proposes, as part of this application, to provide for the discharge of process effluent to a sewer, which the applicant has stated is vested in, or controlled by, your Council. Process effluent includes trade effluent or other matter (other than domestic sewage or storm water). I enclose copy extracts from the application form, which detail proposed discharges. The provisions of Section 52 of the Waste Management Acts, 1996 to 2003, prov$ies that the Agency shall obtain the consent of the sanitary authority to the proposed discharge from an activity which involves the discharge of trade effluent or other matter (other than domestic sewage or storm water), to a sewer vested in or controlled by a sanitary authority. In order to expedite the Agency’s consideration of this waste licence application, I am to request your authority’s consent to the proposed discharge/s. It should be noted that, your authority’s consent may be subject to such conditions as your authority considers appropriate as provided for in Section 52 of the Waste Management Acts, 1996 to 2003 and Section 99E (3) of the Environmental Protection Agency Acts, 1992 and 2003. Your attention is drawn to paragraphs (3) and (4) of the attached copy of the relevant section of the Act. For your convenience please find attached a reply,form including a list of draft conditions compiled by the Agency. In accordance with paragraph (2) of this section of the Act, you are requested to forward your response within 5 weeks of the date of this letter. Please note that any decision given after the expiry period shall be invalid and in those circumstances the Agency may proceed to determine the application concerned as if consent was obtained. Greyhound Recycling 8c Recovery Limited is dealing with this matter and can be contacted at the Licensing Unit, Office of Licensing & Guidance Dublin (Tel. No.(Ol) - 2680100 if you have any queries. Your co-operation in this matter is appreciated. Yours sincerely ffzahaiQ is@kxDp Eve O’Sullivan Programme Officer Office of Licensing & Guidance

H.IO Discharge to SewerMonitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0 Attachment J.5 Sewer Discharge The flow and quality of

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: H.IO Discharge to SewerMonitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0 Attachment J.5 Sewer Discharge The flow and quality of

1

?

MS Mary Pyne Senior Executive Officer South Dublin County Council PO Box 4122 Town Centre Tallaght Dublin 24

1 lth May 2005 Reg No: 205-I

An Ghniomhoireocht urn Choomhnti Comhrhooil

Headquarters, PO Box 3000 Johnstown Castle Estate County Wexford, Ireland

Ceanncheathri, Bosca Poist 3000 Eastdt ChaisMn Bhaile She&n Contae Loch Garman, tire

T +353 53 60600 F: +353 53 60699 E: [email protected] W: www.epa.ie

LoCall: 1890 33 55 99

Dear MS Pyne

I am to advise you that the Agency has received an application for a Waste Licence from Greyhound Recycling & Recovery Limited, for a facility located at Greyhound Recycling & Recovery Limited, Crag Avenue, Clondalkin Industrial Estate, Clondalkin, Co Dublin.

The applicant proposes, as part of this application, to provide for the discharge of process effluent to a sewer, which the applicant has stated is vested in, or controlled by, your Council. Process effluent includes trade effluent or other matter (other than domestic sewage or storm water). I enclose copy extracts from the application form, which detail proposed discharges.

The provisions of Section 52 of the Waste Management Acts, 1996 to 2003, prov$ies that the Agency shall obtain the consent of the sanitary authority to the proposed discharge from an activity which involves the discharge of trade effluent or other matter (other than domestic sewage or storm water), to a sewer vested in or controlled by a sanitary authority.

In order to expedite the Agency’s consideration of this waste licence application, I am to request your authority’s consent to the proposed discharge/s. It should be noted that, your authority’s consent may be subject to such conditions as your authority considers appropriate as provided for in Section 52 of the Waste Management Acts, 1996 to 2003 and Section 99E (3) of the Environmental Protection Agency Acts, 1992 and 2003. Your attention is drawn to paragraphs (3) and (4) of the attached copy of the relevant section of the Act. For your convenience please find attached a reply,form including a list of draft conditions compiled by the Agency.

In accordance with paragraph (2) of this section of the Act, you are requested to forward your response within 5 weeks of the date of this letter. Please note that any decision given after the expiry period shall be invalid and in those circumstances the Agency may proceed to determine the application concerned as if consent was obtained. Greyhound Recycling 8c Recovery Limited is dealing with this matter and can be contacted at the Licensing Unit, Office of Licensing & Guidance Dublin (Tel. No.(Ol) - 2680100 if you have any queries.

Your co-operation in this matter is appreciated.

Yours sincerely

ffzahaiQ is@kxDp Eve O’Sullivan Programme Officer Office of Licensing & Guidance

Page 2: H.IO Discharge to SewerMonitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0 Attachment J.5 Sewer Discharge The flow and quality of

the environment. Apart from ‘domestic’ wastewater (from washing facilities, sinks and toilets), these discharges consist only of washings from trucks and cars entering and exiting the facility and therefore do

-3 not contain any noxious pollutants.

Waste Licence Application Form- Recovery/Disposal Activities (other than Landjill)

The proposed use of this rainwater is for truck washing and cleaning only and the pipework and tappings will be marked as such.

Refer to Drawings DG0015 (for location details) and DG0018 (for cross-sectional details of the tank) in Appendix A .

H.IO Discharge to Sewer

.&ttach&etit i&tided. ‘.. : . . 1 yes q no0 not applicable0

Attachment HlO

Impacts It is not envisaged that discharges from the facility to the foul sewer will cause any significant impacts on

Mitigation Measures

zl It is proposed to place a silt trap and an interceptor followed by asampling chamber before the point of discharge of the wash-bay to foul sewer. The sampling chamber will be used to collect a sample of

i3 discharge to monitor for quality and flow rates ‘of the discharge according to values specified by the agency. The silt trap will prevent significant amounts of silt from being carried to foul sewer. The interceptor will also prevent the possibility of fats, oils and greases from being carried to foul sewer and

I4 hence prevent the possibility of discharges with a high BOD and COD loading. Refer to Drawing DGOOlS for location details.

ApfimJulyl ?.doc 07/04/2004 Page 94 of 116

Page 3: H.IO Discharge to SewerMonitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0 Attachment J.5 Sewer Discharge The flow and quality of

;.. L Waste Licence Application Form- Recoverv/Disaosal Activities lother than Landfill)

Monitoring Programme specified yes Cl dJ not applicable@ Attachment included yes El no0 not applicable0

Attachment 5.4 Air Base line air quality monitoring regarding Benzene, SO2, NO2, and PM10 concentrations at locations in the vicinity of the proposed facility was carried out and the results of which are available in Volume 2 Section 9.3 of the attached EIS. Generally, the results showed the air quality was typical of an industrial ‘estate and a screening model predicted that the pollutant concentrations in the immediate vicinity of the site will not be adversely affected by the operation of the proposed facility. Therefore, no regular monitoring for air quality is proposed.

Sewer Discharge

Monitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0

Attachment J.5 Sewer Discharge The flow and quality of the discharge from wash-bay to foul sewer will be monitored according to the specifications for quality parameters and flow rates stipulated by the Agency.

J J. 6 Mefeorological Data

Monitoring Programme specified 3-s 0 noDa not applicablelX) Attachment included 3-s Cl dXl not applicablem

J. 7 Noise

Monitoring Programme specified yes EJ dIl not applicable0 Attachment. included c yes W dl not applicable0

Attachment 5.7 Noise The site is generally isolated from noise sensitive locations. The nearest residential premises are located along station road and within James Connolly Park to the western site boundary approximately 500m from the site.

During the construction phase even though there will be increased vehicular traftic to the constructior site, the number of additional vehicles is unlikely to have any affect on the existing flows of traffic or Cloverhill Road and Station Road. Consequently the existing noise climate will remain nominall) unaffected during this stage and therefore no additional noise monitoring will be required.

Operational noise monitoring locations are given in the table below. See also Figure 10.1 in Section 10.3.2,Volume 2 of the attached EIS for exact monitoring locations.

ApjimluIyI 7.doc 07/04/2004 Page 100.0f116

Page 4: H.IO Discharge to SewerMonitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0 Attachment J.5 Sewer Discharge The flow and quality of

Sustainable Resource Recovery Facility Article 12 Compliance Requlrements

Give full particulars of the source, composition, quantity, level and rate of emissions to sewer and the period or periods during which such emissions are to be made. This information shall include, as a minimum, details relating to collection and treatment of effluent arising from:

l truck wash

l dust and odour suppression systems;

l floor washing in the materials recovery building.

Submit a new revision of drawing DGOOIS with any amendments. This drawing shall clearly indicate the source of any effluent, its route to the final discharge point to sewer and the location of this point.

Floor Washings and DusffOdour Suppression Systems

The nature of the new facility will minimise the rate emissions to sewer by efficient. management of on- site runoff sources. From experience, Greyhound will ensure that operations with.in the main warehouse building do not generate substantial effluent discharges from either the dust/ odour suppression systems or the floor washings in the materials recovery building.

The main floor of the facility will be swept clean using a road sweeper (which Greyhound own) on a daily basis, which will vacuum up any water spillages and grit and prevent a build up of surface water within the facility. Greyhound do not expect significant quantities of material to be collected and will recycle the material collected through the onsite truck wash cleaning system as required. Similarly the mist air system is not expected to generate any surface water within the building due to the fine nature of the water particles.

Spillages on site or within the main processing building will be dealt with using a ‘spill kit’ which will be stored on-site and form part of the health and safety procedures. Residual material from any spillages will be treated as contaminated waste and Greyhound will employ an appropriate waste contractor to remove and dispose of the material off-site.

Truck Wash . . .

The primary source of emission from the new facility will be generated from the truck wash effluent which will discharge via a grit trap and oil interceptor in the local foul sewer network. The truck wash will be used intermittingly on a daily basis to ensure that all vehicles leaving the site are clean for road use. The composition, quantity, level and rate of emissions to sewer and the period or periods during which such emissions are to be made from the truck wash are provided in the Table below:

I’s.aurce

Truck Wash L :; T SOD mg/l

COD mgll

Total Suspended Solids mgll

Ammoniacal Nitrogen mgll

PH

6000

18000 2000

100'

6-10

15,OOOVday

~~~~~~~~~~~~~~~S ‘:..

Assume a Typical working day of 12 hours.

Rate = 1250Vhr or 0.341/s

MtiE0163RP0007OUN 21 Rev DO1

Page 5: H.IO Discharge to SewerMonitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0 Attachment J.5 Sewer Discharge The flow and quality of

,I.‘._ ’

‘.

: L , , ‘I

: 1

/

*

Section 99E (3) & (4) of the Environmental Protection Agency Acts, 1992 and 2003

(3) Subject to subsection (4), a consent under subsection (1) may be granted. subject to or without conditions and if it is granted subject to conditions the Agency shall include in the licence or revised licence concerned conditions corresponding to them or, as the Agency may think appropriate, conditions more strict than them.

(4) The conditions that may be attached to a consent by a sanitary authority under this section are the following and no other conditions, namely conditions-

(a) relating to-

(i) the nature, composition, temperature, volume, level, rate, and location of the discharge concerned and the period during which the discharge may, or may not, be made,

(ii) the provision, operation, maintenance and supervision of meters, gauges, manholes;inspection chambers and other apparatus and other means for monitoring the nature, extent and effect of emissions,

(iii) the taking and analysis of samples, the keeping of records and furnishing of information to the sanitary authority,

(b) providing for the payment by the licensee to the sanitary authority concerned of such amount or amounts as may be determined by the sanitary authority having regard to the expenditure incurred or to be incurred by it in monitoring, treating and disposing of discharges of trade effluent, sewage effluent and other matter to sewers in its functional area or a specified part of its functional area,

(c)’ specifying a. d t a e not later than which any conditions attached under this section shall be complied with,

(d) relating to, providing for or specifying such other’ matter as may be prescribed.

Page 6: H.IO Discharge to SewerMonitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0 Attachment J.5 Sewer Discharge The flow and quality of

, I , .

/ , . . : / .

, , . I .<’

t

SANITARY AUTHORITY RESPONSE re: SECTION 52 Ol? THE WASTE MANAGEMENT ACTS, 1996 to 2003

Name & Address ufSanilary Authority: South Dublin County Council, PO Box 4122, Town Centre, Tallaght, Dublin 24.

Waste Reg. No. 205-l

Waste Facility: Greyhound R&cycling & Recovery Limited, Crag Avenue , Clondalkin Industrial Estate, Clondalkin, Co Dublin

kaste Licence Applicant: Greyhound Recycling & Recovery Limited

Consent: Indicate Yes to one of the following statements:

Consent granted subject to the consent conditions outlined below Consent granted without conditions Consent refused Note ’ I

Note 1 Where it is proposed to refuse~ermissioa the reasons for the refusal should be clearly outlined in fife response.

value set out in Schedule B: Emissions Limits to Sewer, There shall be no other emission to sewer of environmental significance.

!. The licensee shall carry out such sampling, analyses, measurements, examinations, maintenance and calibrations as out in Schedule C.

1. Monitoring and analytical equipment shall be operated and maintained as necessary so that moni&ing accurately reflects the discharge or emission.

1. The licensee shall permit authorised persons of the Agency and,the Sanitary Authority to inspect, examine and test, at all ieasonable times, any works and apparatus installed, in connection with the process effluent, and to take samples of the process effluent.

5. All automatic monitors and samplers shall be tinctioning at all times (except during maintenance and calibration) when the activity is being carried on unless alternative sampling or monitoring has been agreed in writing by the Agency for a limited period. In the event of the malfunction of any continuous monitor, the licensee shall contact the Agency as soon as practicable, and alternative sampling and monitoring facilities shall be put in place. Prior written agreement for the use of alternative equipment, other than in. emergency situations, shall be obtained from the Agency.

6. The licensee shall record all sampling, analyses, measurements, examinations, calibrations and maintenance carried out in accordance with the rkquirements ol this licence.

I

7. The licensee shall provide safe and permanent access to all on-site sampling and monitoring points and to off-site points as required by the Agency.

8. The licensee shall at no time discharge or permit to be discharged into the sewer any liquid matter or thing which is or may be liable to set or congeal at average sewer temperature or is capable of giving off any inflammable or explosive gas or any acid, alkali or other substance in sufficient concentration to cause corrosion to sewer pipes, penstock and sewer fittings or the general integrity of the sewer.

9. In the event of any incident which relates to discharges to sewer, having taken place, the licensee shall notify the Agency, Local Authority and Sanitary Authority as soon as practicable after the incident:

Page 7: H.IO Discharge to SewerMonitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0 Attachment J.5 Sewer Discharge The flow and quality of

c

. ,.’ . ,, ‘-

Page 8: H.IO Discharge to SewerMonitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0 Attachment J.5 Sewer Discharge The flow and quality of

c

Limit Values for Process Effluent to Sewkr

Schedule B: Emission Limits

Waste licence application Register No. 205-1

Emission Point Reference No:

Emission to (sewer descr&tim):

Volume? to be emitted: Maximum in any one day: m3

Maximum rate per hour: m3

Suspended Solids I I I

PH

Temperature I I

ADDITIONAL PARAMETERS

(if required)

Page3of7

Page 9: H.IO Discharge to SewerMonitoring Programme specified yes ISI dIl not apphcablea Attachment included yes q dl not applicable0 Attachment J.5 Sewer Discharge The flow and quality of

Frequency of Monitoring Process Effluent to Sewer

Schedule C

Waste Licence application Register No. 205-1

Emission Point Reference No:

Flow to sewer

Temperature

PH

BOD

COD

Suspended Solids

I I

ADDITIONAL PARAMETERS

(if required)

1 Annual Monitoring Costs

Signed on behalf of South Dublin County Council

Date

Page4of7 !