Highway School, Ithaca NYJune 1, 2009
Michael RonkinDesigning Streets for Pedestrians and Bicyclists
6
We know how to build right
7
Yet many roads are built like this
8
What is a Complete Street?
A Complete Street is safe, comfortable & convenient for travel via automobile, foot, bicycle, & transit
9
What is a Complete Streets policy?Ensures that the entire right-of-way is designed for all users
10
What is a Complete Streets policy?Ensures that the entire right-of-way is designed for all users
11
Complete streets policies provide for:PedestriansBicyclistsTransitMotoristsTravelers of all ages and abilities
US Access BoardUS Access Board
12
Why have a complete streets policy?To gradually create a complete network ofroads that serve all users
13
Why have a complete streets policy?To shift transportationinvestments so they create better streets now
14
Why have a complete streets policy?To save money:
Retrofits cost more than getting it right initially
15
Who wants Complete Streets?Most Americans would rather drive less & walk moreTransit is growing faster than population or drivingAbout one-third of Americans don’t drive:
21% of Americans over 65Children under 16Low income Americans can’t afford to drive
Americans want complete streets
From Active Transportation for America: the case for Increased federal investment in bicycling and walking. RTC 2008 16
Roads 37%Public Trans 41%Bike/walk 22%
Roads 79%Public Trans 20%Bike/walk 1%
17
Why have a complete streets policy?To make the needs of To make the needs of all users the all users the defaultdefault forforeverydayeveryday transportationtransportationplanning practicesplanning practices
18
Everyone wins with Complete Streets
19
Benefits: older Americans21% over 65 do not driveOver 50% of non-drivers stayat home on a given day because they lack travel options54% of older Americans living in inhospitable neighborhoods say they’d walk and ride more often if things improved
20
Now Americans move Now Americans move without movingwithout moving60% are at risk for 60% are at risk for diseasesdiseases associatedassociatedwithwith inactivityinactivity::
ObesityObesityDiabetesDiabetesHigh blood pressureHigh blood pressureOther chronic diseasesOther chronic diseases
Benefits: health
21
Benefits: physical activityResidents more likely to walk in a Residents more likely to walk in a neighborhood w/ neighborhood w/ sidewalkssidewalksCities with more Cities with more bike lanesbike lanes havehavehigher levels of bicyclinghigher levels of bicycling1/3 of regular 1/3 of regular transit userstransit users meetmeetminimum daily physical activityminimum daily physical activityrequirement during their commuterequirement during their commute
22
Benefits: physical activityIt makes a difference!It makes a difference!
Source: Journal of Physical Activity and Health, 2008, 5, 795-814Walking, Cycling, and Obesity Rates in Europe, North America, and AustraliaDavid R. Bassett, Jr., John Pucher, Ralph Buehler, Dixie L. Thompson, and Scott E. Crouter
23
Benefits: safety
Sidewalks reduce ped crash risk by 88%Intersections designed for peds can reduce crash risk by 28%
24
Benefits: people with disabilities
Improved mobility for people with disabilities
25
Benefits: better use of transit funds
A year of paratransit service for a daily commuter: $38,500
Making a transit stop accessible:$7,000-$58,000
Source: Maryland Transit Administration
26
Benefits: the environment
Fewer emissionsLess noise pollutionLess noise pollutionLess wear & tear on Less wear & tear on our roadsour roadsLess need to widen Less need to widen roadsroads
27
Benefits: reduced traffic
Trips in metro areas:50% - less than 3 miles28% - less than 1 mile:
65% of trips under 1 mile are now taken by car
28
Benefits: the economy/your wallet Benefits: the economy/your wallet
Multi-modal streets:Increase home valuesRevitalize retailPeople can leavetheir car at home
29
How do Complete Streets change the How do Complete Streets change the built environment?built environment?
30
CS changes intersection design
31
CS changes intersection design
32
CS changes bicycling
33
CS changes bicycling
34
CS changes transit
35
CS changes transit
36
CS changes accessibility
37
CS changes accessibility
Complete streets and trails
Streets provide Streets provide accessaccess tototrailstrailsComplete streets and Complete streets and trails form a trails form a comprehensivecomprehensive nonnon--motorized networkmotorized networkCS take pressure off CS take pressure off overcrowdedovercrowded trailstrails
38
Complete Streets is NOT:
A design prescriptionA mandate for immediate retrofitA silver bullet; other initiatives must beaddressed:
Land use (proximity, mixed-use)Environmental concernsVMT reduction
(but complete streets will help!)
39
40
What each mode needsAll travelers seek a similar experience:All travelers seek a similar experience:
ConvenienceConvenienceSafetySafetyComfortComfortAccessAccessReasonable travel timeReasonable travel timeLow costLow costSpeed?Speed?
41
What does a complete street look like?
One size doesnOne size doesn’’t fit all: t fit all: Complete Streets doesnComplete Streets doesn’’t mean t mean everyevery streetstreethas sidewalks, bike lanes and transithas sidewalks, bike lanes and transit
42
What does a complete street look like?
There is no magic formulaThere is no magic formula
43
The many types of Complete Streets
One crossing completes a Safe Route to SchoolOne crossing completes a Safe Route to School
44
The many types of Complete Streets
Shoulder bikeways on rural roadsShoulder bikeways on rural roads
45
The many types of Complete Streets
Transit routesTransit routes
46
The many types of Complete Streets
Suburban thoroughfaresSuburban thoroughfares
47
The many types of Complete Streets
Busy multiBusy multi--modal thoroughfaresmodal thoroughfares
48
The many types of Complete Streets
Residential skinny streetsResidential skinny streets
49
The many types of Complete Streets
Low traffic streetsLow traffic streets
50
The many types of Complete Streets
Historic Main StreetHistoric Main Street
Complete Streets doesn’t mean wider streets…
51
52
Complete Streets makes better use of the available width
53Bridgeport Way, University Place, Washington
Different goals => different outcomes
Both designs based on same design manuals
54Bridgeport Way, University Place, Washington
What can you do to further Complete Streets?
Pavement management: don’t leave a seam in the shoulder
55Bridgeport Way, University Place, Washington
What can you do to further Complete Streets?
Pavement management: clean up blade patch debris
56Bridgeport Way, University Place, Washington
What can you do to further Complete Streets?
Pavement management: pave the bike lane too
57Bridgeport Way, University Place, Washington
What can you do to further Complete Streets?
Pavement management: don’t chip seal the shoulder
58Bridgeport Way, University Place, Washington
What can you do to further Complete Streets?
Pavement management: bicyclists LOVE smooth pavement!
59Bridgeport Way, University Place, Washington
What can you do to further Complete Streets?
Signal technician: Find and mark bike “sweet spot”
60Bridgeport Way, University Place, Washington
What can you do to further Complete Streets?
Signal technician: place pushbutton where it can be reached
What can you do to further Complete Streets?What can you do to further Complete Streets?
Striping crews: narrow lanes to provide bike lanes Striping crews: narrow lanes to provide bike lanes
What can you do to further Complete Streets?What can you do to further Complete Streets?
Striping crews: narrow lanes to provide bike lanes Striping crews: narrow lanes to provide bike lanes
What can you do to further Complete Streets?What can you do to further Complete Streets?
Striping crews: place crosswalks out of wheel tracksStriping crews: place crosswalks out of wheel tracks
64Bridgeport Way, University Place, Washington
What can you do to further Complete Streets?
Utility specialist: watch where that hydrant goes!
65Bridgeport Way, University Place, Washington
What can you do to further Complete Streets?
Utility specialist: watch where that pole goes!
66Bridgeport Way, University Place, Washington
What can you do to further Complete Streets?
Utility specialist: keep that guy wire out of my face!
67
Complete Streets Goal: wComplete Streets Goal: wise investments that will enhance the entire community
Come to this afternoonCome to this afternoon’’s sessions,s sessions, where wewhere we’’ll talk more about ll talk more about YOURYOUR role in creating role in creating
Complete Streets in NYComplete Streets in NY