5
HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, 2018 5:30 PM 600 S. Commerce Ave. Sebring, FL 33870 AGENDA 1 MEETING CALLED TO ORDER: Invitation to fill out "citizens not on the agenda forms" Please silence all cell phones and devices. 2 INVOCATION: 3 PLEDGE OF ALLEGIANCE 4 PUBLIC HEARING: 4.A Consideration of construction of Sebring Parkway Phase III project using Highlands County employees, services, and equipment. Clinton Howerton Jr., P.E. - County Engineer W. Kyle Green, Road and Bridge Superintendent Total project budget is currently $10,073,280.41. An additional $1,408,460.92 will be needed to fully fund the project as proposed. Phase III Cost comparison.pdf Parkway Phase III location map.pdf 5 CITIZENS NOT ON THE AGENDA 6 COMMISSIONERS 7 ADJOURN Any person who might wish to appeal any decision made by the Board of County Commissioners of Highlands County, Florida, in public hearing or meeting is hereby advised that he will need a record of the proceedings, and for such purpose may need to ensure that a verbatim record of the proceedings is made which will include the testimony and evidence upon which such appeal is to be based. The Board of County Commissioners of Highlands County, Florida, does not discriminate upon the basis of any individual's disability status. This non-discrimination policy involves every aspect of the Board's functions, including one's access to, participation, employment or treatment in its programs or activities. Anyone requiring reasonable accommodation as provided for in the Americans with Disabilities Act or Section 286.26 Florida Statutes should contact Ms. Pam Rogers, ADA Coordinator at: 863-402-6509 (Voice), or via Florida Relay Service 711, or by e-mail: [email protected] . Requests for CART or interpreter services should be made at least 24 hours in advance to permit coordination of the service. PLEASE NOTE OUR WEB SITE ADDRESS: For more information on the meeting, see the County Commission page online: www.hcbcc.net Any invocation that may be offered before the official start of the Commission meeting shall be the voluntary offering of a private citizen, to and for the benefit of the Commission. The views or beliefs expressed by the invocation speaker have not been previously reviewed or approved by the Commission, and the Commission is not allowed by law to endorse the religious beliefs or views of this, or any other speaker. 1

HIGHLANDS COUNTY BOARD OF COUNTY … COUNTY BOARD OF COUNTY COMMISSIONERS Tuesday, February 20, 2018 5:30 PM 600 S. Commerce Ave. Sebring, FL 33870 AGENDA 1 MEETING CALLED TO ORDER:

  • Upload
    vokhanh

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

HIGHLANDS COUNTY BOARD OF COUNTY COMMISSIONERSTuesday, February 20, 2018

5:30 PM600 S. Commerce Ave. Sebring, FL 33870

AGENDA

1 MEETING CALLED TO ORDER: Invitation to fill out "citizens not on the agenda forms"Please silence all cell phones and devices.

2 INVOCATION:

3 PLEDGE OF ALLEGIANCE

4 PUBLIC HEARING: 4.A Consideration of construction of Sebring Parkway Phase III project using Highlands

County employees, services, and equipment.Clinton Howerton Jr., P.E. - County EngineerW. Kyle Green, Road and Bridge Superintendent Total project budget is currently $10,073,280.41. An additional $1,408,460.92 will beneeded to fully fund the project as proposed. Phase III Cost comparison.pdfParkway Phase III location map.pdf

5 CITIZENS NOT ON THE AGENDA

6 COMMISSIONERS

7 ADJOURN Any person who might wish to appeal any decision made by the Board of County Commissioners of Highlands County, Florida, inpublic hearing or meeting is hereby advised that he will need a record of the proceedings, and for such purpose may need to ensurethat a verbatim record of the proceedings is made which will include the testimony and evidence upon which such appeal is to bebased. The Board of County Commissioners of Highlands County, Florida, does not discriminate upon the basis of any individual'sdisability status. This non-discrimination policy involves every aspect of the Board's functions, including one's access to,participation, employment or treatment in its programs or activities. Anyone requiring reasonable accommodation as provided for inthe Americans with Disabilities Act or Section 286.26 Florida Statutes should contact Ms. Pam Rogers, ADA Coordinator at:863-402-6509 (Voice), or via Florida Relay Service 711, or by e-mail: [email protected]. Requests for CART or interpreterservices should be made at least 24 hours in advance to permit coordination of the service. PLEASE NOTE OUR WEB SITEADDRESS: For more information on the meeting, see the County Commission page online: www.hcbcc.net

Any invocation that may be offered before the official start of the Commission meeting shall bethe voluntary offering of a private citizen, to and for the benefit of the Commission. The views orbeliefs expressed by the invocation speaker have not been previously reviewed or approved bythe Commission, and the Commission is not allowed by law to endorse the religious beliefs orviews of this, or any other speaker.

1

HIGHLANDS COUNTYCOUNTY COMMISSION AGENDA ITEM

DATE OF ACTION REQUEST: Feb 20, 2018

PRESENTER: Clinton Howerton Jr., P.E. - County EngineerW. Kyle Green, Road and Bridge Superintendent

SUBJECT/TITLE: Consideration of construction of Sebring Parkway Phase III project usingHighlands County employees, services, and equipment.

STATEMENT OF ISSUE

On August 16, 2011, the Board approved the State of Florida Department of Transportation (FDOT) County IncentiveGrant Program (CIGP) Agreement (FDOT financial project ID #420082-2-58-01) in which FDOT agreed to share thecost of Sebring Parkway Phase III Project in the maximum participated amount of three million dollars ($3,000,000.00)for design, construction, and construction engineering and inspection services to construct 4.2 miles of roadway. Thisproject will begin at the existing 90-degree bend in the Sebring Parkway Phase I project and continue north along theabandoned Seaboard Railroad right-of-way and end at Memorial Drive. This project is necessary to maintain thecurrent levels of service for our existing roadways and to accommodate future development in the area. Per the original executed FDOT CIGP Agreement, the Sebring Parkway Phase III construction was required to becompleted by October 2014. In April 2016, the County requested an extension for the second time extending theproject through December 31, 2017. In July, 2017, a revised environmental resource permit was issued bySWFWMD for a revised design by a separate engineering firm hired by the County. In November 2017, FDOTgranted another extension to complete the project prior to December 31, 2019. The current design-build contractor, Preferred Materials Inc., does not wish to incorporate the revised design desiredby Highlands County as their plan for construction without additional compensation provides for construction of only 2separated lanes. The current contract amount is $6,359,550.00 but will require an estimated additional $2 million ormore with no certainty of final future costs. After reviewing the revised plans and reviewing construction prices and costs, staff has determined the complete 4 laneroadway can be constructed for the same approximate cost as needed for the contractor to complete their contract ifbuilt using County employees, services, and equipment. Recommendation by staff is to construct all 4 lanes of theproposed roadway in this method.

RECOMMENDED ACTION

Move to direct staff to prepare to complete the construction plans and construct the 4-lane roadway usingHighlands County services, employees and equipment.

FISCAL IMPACT

Total project budget is currently $10,073,280.41. An additional $1,408,460.92 will be needed to fully fund the projectas proposed.

2

No. Item Description Quan. Unit Unit Cost TotalEstimated HC

Unit Cost HC Total Projected SavingsI.1. 101-1 Mobilization(10%) 1 LS 800,000.00 $800,000.00 10,000.00 $10,000.00 -790,000.002. 102-1 Maintenance of Traffic 1 LS 75,000.00 $75,000.00 40,000.00 $40,000.00 -35,000.00

SUB-TOTAL= $875,000.00 $50,000.00 -825,000.00II1 104-11 Floating Turbidity Barrier 200 LF $10.00 $2,000.00 $10.00 $2,000.00 $0.002 104-13-1 Erosion and Sediment Control/Staked Silt Fence Type III 45,124 LF $2.50 $112,810.00 $1.80 $81,223.20 -$31,586.803 105-1 Contractor Quality Control (Materials Testing) 1 LS $100,000.00 $100,000.00 $50,000.00 $50,000.00 -$50,000.004 110-1-1 Clearing and Grubbing 67 AC $1,000.00 $67,000.00 $850.00 $56,950.00 -$10,050.005 120-1 Regular Excavation 70,464 CY $4.00 $281,856.00 $3.05 $214,915.20 -$66,940.806 120-6 Embankment 76,221 CY $8.00 $609,768.00 $6.50 $495,436.50 -$114,331.507 160-4 Stabilization Type B (12") 195,784 SY $4.00 $783,136.00 $3.05 $597,141.20 -$185,994.808 285-704 Op. Base Group 4 (6" Shell rock, LBR 100)(8 ft. Multi-Use Path) 23,706 SY $13.18 $312,445.08 $10.85 $257,210.10 -$55,234.989 285-709 Optional Base Group 9 (10" Shell rock, LBR 100)(Roadway) 165,906 SY $16.40 $2,720,858.40 $13.70 $2,272,912.20 -$447,946.20

10 327-70-6 Milling Existing Asphalt Pav't (1 1/2" Avg Depth) 7,550 SY $1.80 $13,590.00 $1.80 $13,590.00 $0.0011 334-1-13 Type SP 9.5 Asph. Conc. (1.5")(8 ft. Multi-Use Path) 174 TN $93.00 $16,182.00 $80.00 $13,920.00 -$2,262.0012 334-1-13 Type SP 9.5 Asph. Conc. (1.5")(1st Lift Parkway) 12,816 TN $93.00 $1,191,888.00 $80.00 $1,025,280.00 -$166,608.0013 334-1-13 Type FC 9.5 Asph. Conc. (1")(2nd Lift Parkway) 8,544 TN $93.00 $794,592.00 $80.00 $683,520.00 -$111,072.0014 339-1 Miscellaneous Asphalt 10 TN $168.00 $1,680.00 $125.00 $1,250.00 -$430.0015 400-0-11 Class NS Concrete (Gravity Wall)(2237 LFx 0.43) 962 CY $498.00 $479,076.00 $498.00 $479,076.00 $0.0016 400-2-2 Class II Concrete (Endwalls) 70 CY $1,158.00 $81,060.00 $1,158.00 $81,060.00 $0.0017 410-70- 3 ft. x 6 ft. Concrete Box Culvert 352 LF $650.00 $228,800.00 $600.00 $211,200.00 -$17,600.0018 425-1-361 Inlets (Curb) (Type P-6) (<10') 7 EA $4,619.00 $32,333.00 $4,619.00 $32,333.00 $0.0019 425-1-521 Inlets (Ditch Bottom) (Type C) (<10') 31 EA $2,528.00 $78,368.00 $2,528.00 $78,368.00 $0.0020 425-1-541 Inlets (Ditch Bottom) (Type D) (<10') 15 EA $3,000.00 $45,000.00 $3,000.00 $45,000.00 $0.0021 425-1-551 Inlets (Ditch Bottom) (Type E) (<10') 3 EA $3,200.00 $9,600.00 $3,200.00 $9,600.00 $0.0022 425-1-701 Inlets (Gutter Type S) (< 10') 4 EA $3,500.00 $14,000.00 $3,500.00 $14,000.00 $0.0023 425-3-61 Manholes, J-7, < 10 ft. 7 EA $5,000.00 $35,000.00 $5,000.00 $35,000.00 $0.0024 430-175-118 Pipe Culvert, Optional Material, Round, 18", S/CD 3,775 LF $52.00 $196,300.00 $40.00 $151,000.00 -$45,300.0025 430-175-124 Pipe Culvert, Optional Material Round, 24", S/CD 976 LF $62.00 $60,512.00 $51.00 $49,776.00 -$10,736.0026 430-175-130 Pipe Culvert, Optional Material, Round, 30", S/CD 8 LF $80.00 $640.00 $77.00 $616.00 -$24.0027 430-175-136 Pipe Culvert, Optional Material, Round, 36", S/CD 971 LF $94.00 $91,274.00 $84.00 $81,564.00 -$9,710.0028 430-175-215 Pipe Conc. Culv.(12"x 18" SS) 16 x 106' 15 LF $124.00 $1,860.00 $124.00 $1,860.00 $0.0029 430-175-248 Pipe Conc. Culv. (38"x 60" SS) 119 LF $196.00 $23,324.00 $196.00 $23,324.00 $0.0030 430-982-125 Mitered End Section, Optional Round, 18", CD 11 EA $902.00 $9,922.00 $600.00 $6,600.00 -$3,322.0031 430-982-129 Mitered End Section, Optional Round, 24", CD 1 EA $1,067.00 $1,067.00 $700.00 $700.00 -$367.0032 430-982-623 Mitered End Section, Ellip/Arch 15" 1 EA $669.00 $669.00 $580.00 $580.00 -$89.0033 436-1-2 Trench Drain (24" Perforated HDPE) 123 LF $160.00 $19,680.00 $150.00 $18,450.00 -$1,230.0034 520-1-10 Concrete Curb and Gutter, Type F 5,946 LF $18.00 $107,028.00 $18.00 $107,028.00 $0.0035 520-2-4 Concrete Curb, Type "D" (Along Trail) 213 LF $14.00 $2,982.00 $14.00 $2,982.00 $0.0036 520-2-8 Concrete Curb, Type "RA" 404 LF $16.00 $6,464.00 $16.00 $6,464.00 $0.0037 520-2-9 Concrete Ribbon Curb 701 LF $14.00 $9,814.00 $14.00 $9,814.00 $0.0038 520-5-41 Traffic Separator 924 LF $40.00 $36,960.00 $40.00 $36,960.00 $0.0039 520-6 Shoulder Gutter, Concrete 1,269 LF $20.00 $25,380.00 $20.00 $25,380.00 $0.0040 527-1 Detectable Warning 16 EA $250.00 $4,000.00 $200.00 $3,200.00 -$800.0041 536-1-1 Guardrail 230 LF $25.00 $5,750.00 $25.00 $5,750.00 $0.0042 536-85-22 End Anchorage Assembly 8 EA $1,810.00 $14,480.00 $1,810.00 $14,480.00 $0.0043 547-70-1 Rip Rap, Fabric Formed Concrete 100 SY $74.00 $7,400.00 $74.00 $7,400.00 $0.0044 550-10-110 Fencing, Type A 45,124 LF $8.50 $383,554.00 $5.50 $248,182.00 -$135,372.0045 570-1-1 Temporary Seed and Mulch (NPDES Erosion Control) 150,000 SY $1.00 $150,000.00 $0.80 $120,000.00 -$30,000.0046 570-1-2 Sodding (Incl. Top Soil, Fertilizer & Water) 246,400 SY $2.11 $519,904.00 $1.90 $468,160.00 -$51,744.0047 700-20-11 Single Post Sign, F&I, Less Than 12 SF 39 EA $250.00 $9,750.00 $250.00 $9,750.00 $0.0048 711-11-111 Thermoplastic, Standard, White, 6" 50,554 LF $0.60 $30,332.40 $0.60 $30,332.40 $0.0049 711-11-123 Thermoplastic, Standard, White, 12" 807 LF $2.20 $1,775.40 $2.20 $1,775.40 $0.0050 711-11-125 Thermoplastic, Standard, White, 24" 246 LF $4.17 $1,025.82 $4.17 $1,025.82 $0.0051 711-11-151 Thermoplastic, Standard, White, 6" Dotted Guideline, 6-10 skip 1,640 $0.75 $1,230.00 $0.75 $1,230.00 $0.0052 711-11-170 Thermoplastic, Standard, White, Arrow 64 EA $64.98 $4,158.72 $64.98 $4,158.72 $0.0053 711-11-211 Thermoplastic, Standard, Yellow, 6" 45,654 LF $0.60 $27,392.40 $0.60 $27,392.40 $0.0054 711-11-224 Thermoplastic, Standard Yellow, 18" 313 LF $3.21 $1,004.73 $3.21 $1,004.73 $0.0055 711-11-251 Thermoplastic, Standard Yellow, 6" Dotted Guideline, 6-10 skip 1,319 LF $0.75 $989.25 $0.75 $989.25 $0.0056 Ditch Blocks Concrete 33 EA $1,000.00 $33,000.00 $1,000.00 $33,000.00 $0.0057 Ditch Blocks Sodded 122 EA $500.00 $61,000.00 $500.00 $61,000.00 $0.0058 Traffic Signals 1 EA $250,000.00 $250,000.00 $200,000.00 $200,000.00 -$50,000.0059 Tortoise Relocation 1 EA $50,000.00 $50,000.00 $35,000.00 $35,000.00 -$15,000.00

SUB-TOTAL= $10,161,665.20 $8,547,914.12 -$1,613,751.08$11,036,665.20 $8,597,914.12 -$2,438,751.08

Engineering Consultants 1 EA $100,000.00 $100,000.00 $100,000.00 $0.00Engineering Department expenses 1 EA $30,000.00 $40,000.00 $40,000.00 $10,000.00Construction Engineering and Inspection 1 EA $150,000.00 $100,000.00 $100,000.00 -$50,000.00R&B Project Management expenses 1 EA $140,000.00 $140,000.00 $140,000.00County Admin/Legal expenses 1 EA $45,000.00 $35,000.00 $35,000.00 -$10,000.00Survey 1 EA $30,000.00 $30,000.00 $30,000.00

III. $938,116.54 $730,822.70$12,299,781.74 $9,773,736.82 -$2,526,044.92

Cell Coloring GuideCosts provided by Engineer EstimateCosts provided by Highlands CountyComparison of two estimates

SEBRING PARKWAY PHASE III4 LANES

PRELIMINARY OPINION OF PROBABLE COST25-Jan-18

Engineers Estimate

GRAND TOTAL SEBRING PARKWAY PHASE III =

Highlands County Construction Cost Estimate

GENERAL

PARKWAY DRAINAGE CONSTRUCTION

TOTAL CONSTRUCTION COST =

8.5% Contingency

G:\PROJECTS\Sebring Parkway Phase III\BOARD MEETING\2018\2018 Public Hearing\Phase III Cost Est.xls4

5