Best Practices in High-Rise Construction Tom Connors April 23, 2012 – Times Square Marriott Marquis

High Rise Construction

Embed Size (px)

DESCRIPTION

Best Practices in Highrise Construction.

Citation preview

Page 1: High Rise Construction

Best Practices in High-Rise Construction

Tom ConnorsApril 23, 2012 – Times Square Marriott Marquis

Page 2: High Rise Construction

The NYC Department of Buildings is a registered Provider with The American Institute of Architects Continuing Education Systems (AIA/ CES). Credit earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of Completion for both members and non‐AIA members are available upon request.

This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or constructed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. 

Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Page 3: High Rise Construction

This presentation is protected by US and International Copyright laws.  Reproduction, distribution, display and use of the presentation without written permission of the speaker is prohibited.

©NYC Department of Buildings

Copyright Materials

Page 4: High Rise Construction

Course Description

This course will give an overview of safe construction in New York City, which is regulated by the 2008 NYC Construction Codes to ensure that regulations remain up‐to‐date with evolving safe practices. The Department of Buildings is at the forefront of approving new materials and technology, enabling it to advance safe practices through education and specialized on‐site inspections with ownership and contractors.

Electronic visual examples will provide an understanding for the best and worst practices found on construction sites across the City. This presentation will allow participants to incorporate best practices in future projects – while better enabling them to identify and mitigate risks that could pose safety threats to the public. 

Page 5: High Rise Construction

Learning Objectives

At the end of this program, participants will have learned:

• The provisions for construction high‐rise site safety from Chapter 33 of the 2008 NYC Building Code

• The best and new practices being used to protect the public during construction through the use of visual examples of state‐of‐the‐art cocoons and vertical protection technology

• How to identify processes that pose a potential risk to the public during construction and to mitigate overhead hazards in high‐rise site safety

• Proper demolition practices critical to conducting a safe high‐rise construction project

Page 6: High Rise Construction

BEST Practices in High-Rise Construction

• Primary Strategies

• Alternative Strategies

• Demolition Strategies

• Major Projects Initiative

Page 7: High Rise Construction

Major Building Projects Filings Progression

0

100

200

300

400

500

600

700

800

2008 2009 2010 2011 2012

196

306368

600

758

Page 8: High Rise Construction

Current Major Building Filing Types

140

22

398 17

New Buildings

Alt‐1 Conversions

Façade Repair

Demolitions

Page 9: High Rise Construction

Primary Strategies for Safe High-Rise Construction

• Standpipes

• Sidewalk Sheds

• Jersey Barriers

• Vertical Netting

• Horizontal Netting

Page 10: High Rise Construction

Standpipe Systems (3308.8.11)

• Alt‐2 Filing

• Dedicated Power Supply

• Check Valves

• Locks & Caps

• Manual Air Release

• Signage

• Audible Alarm Range:

• 15 dBa Above Ambient   

• Noise <110 dBa

Page 11: High Rise Construction

Standpipe Systems

Air Gauge at Highest Point

Alarm Bell at Guardhouse  

Page 12: High Rise Construction

• 300 lb. Live Load: Buildings > 100 ft• 150 lb. Live Load: Buildings < 100 ft

Sidewalk Shed Requirements

Page 13: High Rise Construction

Lighting at 8 Feet

Sidewalk Shed = Overhead Protection for the Public (3307.3.1)

Page 14: High Rise Construction

Lane Closure Utilizing Jersey Barriers

Page 15: High Rise Construction

DOT Compliant

Lane Closure (3307.4.3)

Page 16: High Rise Construction

Highly Visible Barriers = Safe Site

Page 17: High Rise Construction

60” Code Compliant Vertical Netting (3308.1.1)

Page 18: High Rise Construction

Supported Scaffold with FullHeight Debris Netting (3308.1)

Page 19: High Rise Construction

HorizontalNetting(3308.1.2)

Page 20: High Rise Construction

• Horizontal Netting   

• Interior Climbing Crane

• Work Platforms

Examples of Good Practices

Page 21: High Rise Construction

Good and Bad Netting

Good

Bad

Ugly

Page 22: High Rise Construction

Poor Scaffold Netting Maintenance

Page 23: High Rise Construction

Alternative Strategies

• Full Height Vertical Netting

• Rigid Vertical Protection

• Static Horizontal Netting

• Partial Cocoon systems

• Full Cocoon systems

Page 24: High Rise Construction

Full Height Vertical Perimeter Netting

Page 25: High Rise Construction

Rigid Vertical Perimeter Protection

Page 26: High Rise Construction

60” Rigid VerticalPerimeter Protection

Page 27: High Rise Construction

Added Protection Afforded by Static Horizontal Netting

Page 28: High Rise Construction

StaticHorizontal& VerticalSafetyNetting

Page 29: High Rise Construction

Requirements for Cocoons

•Compliance with Buildings Bulletin # 2010‐019

•Alteration Type 2 Application

•CCD‐1 Submittal to Engineering and Safety

•Operations Division

•Review of Application 

Page 30: High Rise Construction

Partial Cocoon

Page 31: High Rise Construction

Cocoons of Solid Material

Page 32: High Rise Construction

Full Cocoon with FullHeight Vertical Netting

Page 33: High Rise Construction

Cocoons Loading Platform

Page 34: High Rise Construction

Screen Cocoon with Full Height Netting

Page 35: High Rise Construction

Conventional Top Deck

Page 36: High Rise Construction

Full Cocoon Protection on Top Deck

Page 37: High Rise Construction

Cocoon = Comfort & Safety

Page 38: High Rise Construction

Cocoon Being Raised

Page 39: High Rise Construction

Shear Wall Forming Behind a Cocoon

Page 40: High Rise Construction

• Slab to Slab Vertical Nets

• Static Horizontal Nets

• Cocoon System

• Sidewalk Shed

Full Public Protection

Page 41: High Rise Construction

Safe High-RiseConstruction=

A Long Life

Page 42: High Rise Construction

Safe Demolitions ofMajor Buildings

Page 43: High Rise Construction

Sidewalk Sheds

Page 44: High Rise Construction

Steel & ConcreteDemolition

Page 45: High Rise Construction

Full MechanicalDemolition

Page 46: High Rise Construction

Dust Control (3306.9.3)

Page 47: High Rise Construction

Common Interior Demolition Hazards

Page 48: High Rise Construction

Unsafe Storage of Demolition Debris

Page 49: High Rise Construction

Major Projects Initiative

Page 50: High Rise Construction

• Education

• Communication

• Cooperation

• Innovation

• Technology

• Expectations

Benefits of the Major Projects Initiative

Page 51: High Rise Construction

• Share Information

• DOB Point Person

• On Site Meetings

• Joint Inspections

• Address Challenges

Page 52: High Rise Construction

Results of the Major Projects Initiative

0102030405060708090100

2009 2010 2011 2012

Amount of Full Stop Work Orders for Major Buildings

Page 53: High Rise Construction

27 Current Participants

Contact Engineering & Safety Operations

Become a Partner in theMajor Projects Initiative

Page 54: High Rise Construction

Questions?This concludes the American Institute of Architects 

Continuing Education Systems Course

NYC Department of BuildingsBuildings University AIA Point of Contact:

Allison Ginsburg [email protected]

212‐566‐4415