12
Ice Class Vision HERNIS Thermal Camera tested in new waters HERNIS NEWS No. 2/06 National Oilwell Varco – a key customer for HERNIS Tankstore LTD Singapore expansion project

HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

  • Upload
    lamdat

  • View
    226

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

Ice Class VisionHERNIS Thermal Camera tested in new waters

H E R N I S N E W S No. 2/06

National Oilwell Varco – a key customer for HERNIS

Tankstore LTD Singapore expansion project

Page 2: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

New Contracts

Content Page

Thermal Camera

Stations for Ice

Detection 3

Gasco Ruwais

NGL 3

– Expansion project 4

Jurong Shipyard

PTE Contract 5

National Oilwell

Varco – a key

customer for

HERNIS 6

Tankstore LTD –

Singapore 7

German Agent

opens up HERNIS

Demo room! 8

Pemex visiting

HERNIS 8

Customer Seminar

at HERNIS 9

The World Comes

to OTC 2006 10

HERNIS has

received the

IEC Ex Certificate 11

ONSHORE:

HERNIS 400

Buyer: Saab Rosemount Marine

Middle East FZC

Owner:ADCO

Project: Jebel Dhanna Tank Farm Upgrade

Project

Buyer:Tecway Internat. (Oil & Gas)

Owner: Zhenhai Refining and

Chemical Co., Ltd

Project: ZRCC, New Area

Buyer: Snamprogetti SpA

Owner:Abu Dhabi Gas Industries Ltd.

(GASCO)

Project: Ruwais

Buyer: Punj Lloyd Limited, Singapore

Owner: PB Tankers

Project:Tankstore Petroleum Storage,

Expansion Ph. 5

Buyer:TransTel Engineering Pte Ltd

Owner: Nigerian National Petroleum Corp.

Project: East Area Project EPCS Bonny River

Buyer:Wesco Distribution International Inc.

Owner: Shell Oil Products US

Project: Los Angeles Refinery

OFFSHORE

HERNIS 400

Buyer:Western Advance Pty Ltd.

Owner:Woodside Energy Ltd.

Project:Angel Platform

Buyer / Owner:Transocean Offshore

International Ventures

Project: SemiSub: SEDCO 714

Buyer: Samsung Heavy Ind. Co., Ltd.

Owner: Stena Drilling Ltd.

Project: H1669, Drillship

Buyer: Samsung Heavy Ind. Co., Ltd.

Owner: Mosvold Shipping AS

Project: H1657, Drillship

Buyer: Samsung Heavy Ind. Co., Ltd.

Owner: Mosvold Drilling Ltd.

Project: H1687, Drillship

Buyer: National Oilwell Varco Norway AS

Owner: Statoil ASA

Project: Statfjord B

Buyer: National Oilwell Varco Norway AS

Owner:A.P. Møller, Maersk Contractors

Project: Maersk Ultra Deep Semi Sub #1

Buyer: National Oilwell Varco Norway AS

Owner:A.P. Møller, Maersk Contractors

Project: Maersk Ultra Deep Semi Sub #2

Buyer: Norsk Hydro AS

Owner: Norsk Hydro

Project: Brage

Buyer: Siemens AS

Owner: Sevan Marine AS

Project: SSP 300 Chestnut

Buyer / Owner: Transocean Offshore

Project:Transocean,Winner

Buyer: Jurong Shipyard Pte Ltd.

Owner: PetroRig

Project: PetroRig I Semi-submersible

Buyer: Prosafe Production Services Pte Ltd

Owner: Prosafe Production Services Pte Ltd

Project: POLVO FPSO

Buyer: Prosafe Production Services Pte Ltd

Owner: Prosafe Production Services Pte Ltd

Project:Tui Area Development

Buyer:TransTel Engineering Pte Ltd

Owner: Qatar Liquefied Gas Company Ltd

Project: Qatargas Offshore,WH1,WH2,WH3,

WH4,WH5 ++

Buyer: National Oilwell Varco

Owner: Scorpion Offshore

Project: Offshore Courageous

(newbuild Jackup under construction at

Keppel Amfels, Brownswille,Texas)

HERNIS 400 (8x8, series of 4 rigs)

Buyer: Resource Rig Supply, Inc.

Owner: Resource Rig Supply, Inc.

Project: Rig 134, CraneTV

Buyer: SBM-IMODCO

Owner: PETROBRAS

Project: P-53 - Marlim Leste FPU

Buyer: National Oilwell Varco Norway

Owner: Dolphin Drilling Ltd.

(a Fred Olsen Company)

Project: Blackford Dolphin (ex Liberator),

Semi-Sub

Buyer / Owner: Songa Offshore

Project: Songa Saturn

OFFSHORE

Crane TV

Buyer / Owner: Resource Rig Supply, Inc.

Project: Rig 134, CraneTV

Buyer: National Oilwell Varco Norway

Owner: Dolphin Drilling Ltd.

(a Fred Olsen Company)

Project: Blackford Dolphin (ex Liberator),

Semi-Sub

Buyer: National Oilwell Varco Norway

Owner:A.P. Møller, Maersk Contractors DK

Project: Maersk Ultra Deep Water Semi Sub.

Buyer: National Oilwell Varco Norway

Buyer / Owner:A.P. Møller,

Maersk Contractors DK,Copenhagen

Project: Maersk Ultra Deep Semi Sub #2

Buyer: National Oilwell Varco Norway

Owner: SeaDrill

Project:West E-drill, Eastern Drilling (Smedvig)

Buyer: National Oilwell Varco Norway

Owner: SeaDrill

Project:West E-drill, Eastern Drilling (Smedvig)

Buyer: National Oilwell Varco Norway

Owner: Statoil ASA

Project: Gullfaks A

Buyer: National Oilwell Varco Norway

Owner: Statoil ASA

Project: Gullfaks C

Buyer: OSM Offshore AS

Owner:Anders Wilhelmsen & Co.AS

Project:Awilco:Port Rival,SemiSub

(ex Borgila Dolphin)

Buyer: Sojitz Europe Plc

(Nissho Iwai Deutschland)

Owner: NYK Line

(Nippon Yusen Kabushiki Kaisha)

Project: MHI 2230, LNGC Sakhalin

SHIPPING

HERNIS 400

Buyer: Shell Int.Trading & Shipping Co Ltd

(STASCo)

Owner: Shell Int.Trading & Shipping Co Ltd

(STASCo)

Project: Shell LNG Port Harcourt, STASCo

Buyer: Sojitz Kyushu Corporation

Owner: NYK Line (Nippon Yusen Kabushiki

Kaisha)

Project: MHI 2229, LNGC Sakhalin

Buyer: Hyundai Heavy Industries Co.

Owner: Mitsui O.S.K. Lines (MOL)

Project: Hyundai HI, H-1876, MOL, LNG

Carrier

Buyer:Aker Kvaerner Pusnes AS

Owner:Teekay Marine Services AS

Project: Navion Gotheborg / Teekay:

Suezmax/SHI 1557

Buyer:Aker Kvaerner Pusnes AS

Owner:Teekay Marine Services AS

Project: Navion Bergen / Teekay (ex

Bergitta/Bergshav)

Buyer: Ulstein Verft AS

Owner: Solstad Shipping

Project: NB277, Offshore construction vessel

Buyer: Marinvest

Owner: Marinvest

Project: Brodosplit NB 448,Tanker

Buyer: Songa Offshore

Owner: Songa Offshore

Project: Songa Saturn

Page 3: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

A close corporation with Royal Arctic Line AS in

Denmark led to an exiting pilot project, which took

place in Greenland this spring, when it was agreed

to install two thermal HERNIS camera stations

onboard the M/S Mary Arctica for ice detection.

In order for this pilot project to become a success,

the camera stations would have to detect the top of

the growlers at a restricted view and at a longer

range than the human eye is capable of.

The two thermal camera stations were installed

onboard the M/S Mary Arctica, when it was docked

in Poland March 2006. When the ship laid out for

her journey to Greenland in April, HERNIS Service

Engineer Reidar Olsbu went onboard the ship in

Nuuk for maintenance and testing of the camera

stations for ice detection.

On his trip from the 20th – 26th April 2006, he

logged the results of the ice detection and found

that the project was a success. “This project has

been a useful experience for HERNIS”, says Reidar

Olsbu. “This is certainly new waters for HERNIS

and we are very exited to be a part of this project

with Royal Arctic Line, who have been very

cooperative and helpful during the entire process.

We were able to test our equipment under extreme

conditions and the outcome has been very useful”.

Royal Arctic Line concludes that they had good

experience with the cameras during favourable

weather conditions, where they were able to detect

the top of the growlers in the sea at a longer range

than without the camera. “We are looking forward

to seeing the development from HERNIS in this

area, and to improve the range estimation and

prevent icing of the equipment” says Allan Idd

Jensen, Superintendent with Royal Arctic Line in

Denmark.

In the middle of June, the camera stations were

dismounted from the ship and brought back to

HERNIS, who will continue to develop and expand

their product range for handling the challenging

tasks of ice detection.

Thermal Camera Stations for Ice Detection

3

Allan Idd Jensen,Superintendent with RoyalArctic Line

Reidar Olsbu, ServiceEngineer at HERNIS

Page 4: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

Gasco Ruwais NGL 3 - Expansion project

Snamprogetti SpA in Italy has awarded HERNIS a

major contract for delivery of a large CCTV system

to the GASCO NGL Train 3 Project at Ruwais in

UAE. The order for HERNIS involves the latest

CCTV technology, including an advanced control

system.

HERNIS also delivered the CCTV system for the

existing plant. The new equipment will be

integrated to the HERNIS 400 control system

already in operation. The control system will be

upgraded to incorporate redundancy which will

result in an even more reliable performance. In

addition a large number of new camera stations will

be installed for surveillance covering the process,

perimeter and jetty areas. In total the system will

serve different operators assisting them to improve

the overall plant safety and security.

The third NGL train will process NGL transported

via a new pipeline from OGD-III and AGD-II,

supplemented by a new LPG stream from the

adjacent refinery, owned by TAKREER.

The NGL will be processed in a 24,400 tonnes per

day fractionation and treatment train to produce

ethane, liquefied propane and butane and pentane

and heavier hydrocarbons. In addition, the project

included four 83,600m3 liquefied petroleum gas

storage tanks, a single 76,000m3 pentane storage

tank and a two-berth extension to the export jetty.

The project is expected to be completed by the end

of the first quarter 2008.

The owner is ABU DHABI GAS INDUSTRIES

LTD. (GASCO), which is the operating company

in Abu Dhabi responsible for processing associate

and non-associate gas from onshore oil production.

Page 5: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

HERNIS have recently signed two new contracts

with Jurong Shipyard Pte. Ltd. to deliver the CCTV

System for Petromena’s PetroRig I and II Semi-

submersible Rigs. Jurong Shipyard will build the 6th

generation ultra-deepwater semi-submersible

drilling rig based on the Friede & Goldman (F&G)

Ex-D design.

The semi-submersible rigs are capable of operating

in 3,000 meters water depth under harsh

environmental drilling conditions. It is suitable for

operation in most of the world’s known challenging

deepwater arena. The rig is engineered for stability

and versatility with operational displacement of

43,400 metric tons at 17 meters draft and 46,750

metric tons at 20 meters draft.

HERNIS will be delivering the ever reliable Control

System and Equipment, consisting of HERNIS 400

with several Ex286W, Ex291, PT9W and S9

Camera Stations, Crane TV’s and Exp Monitors

with control keyboards. Furthermore, HERNIS will

Jurong Shipyard PTE Contract

5

Svein Gundersen, Managing Director in HERNIS Singapore, Mr. Adam Koay, Chee Kim Kwang of JSLboth are Senior Procurement Manager and Rizalino S. Esquivel Jr. at HERNIS office in Singapore

be providing software that would enable interfaces

with other drilling equipments onboard.

The construction has been started in the yard and

with delivery schedule on the 1st quarter and last

quarter of 2009 respectively.

Again, we are very happy and fortunate to be

cooperating closely with Jurong Shipyard. We

would like to extend our gratitude and thanks to all

the good people involved both from Shipyard side

and the owner side. We are looking forward to be

offering our best possible service for these Projects

and many more to come…

Page 6: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

For a number of years, HERNIS have developed a

strong and productive cooperation with National

Oilwell Varco in Norway. One of our current

projects with National Oilwell Varco is the Maersk

Ultra Deep Semi Sub # 1 and 2, for which National

Oilwell Varco supplies the automation systems. The

semi subs are under construction in Singapore at

the Keppel Fels Shipyard, and no. 1 is ready for

delivery in 2006, and no. 2 in 2007.

HERNIS will deliver complete CCTV systems and

both rigs will be fully equipped with each 3

HERNIS 400 Systems with more than 70 camera

stations on each rig, including the EX286, EX291,

PT9 and S9.

National Oilwell Varco is a leading provider for the

worldwide oil and gas industry and has been

dedicated to providing the highest quality oilfield

products and services for more than 140 years. By

constantly developing and acquiring new

technologies and services to better serve future

customer requirements, National Oilwell Varco will

continue to be the premier source for diversified

products and services worldwide.

“HERNIS appreciates the cooperation with

National Oilwell Varco, and we are looking forward

to more projects and business relationship in the

years to come”, says Espen Christensen, Area Sales

Manager for the Norwegian market.

National Oilwell Varco – a key customer for HERNIS

The National Oilwell Varco drillers cabin and a cyperbase®, fromwhere the drilling operation is controlled.

Page 7: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

Tankstore LTD – Singapore

7

HERNIS activity plan 200621st – 23rd August Agent Seminar, Arendal

22nd – 25th August ONS, Stavanger, Hall D booth # D 456

26th – 29th September SMM, Hamburg, Norwegian Pavilion Hall 2 booth # 112

2nd – 3rd November IFEA Security Conference 2006 (HERNIS Guest Speaker) SAS Hotel, Oslo

5th – 8th December OSEA, Singapore

The market for the storage of oil and chemical

products in south-east Asia has grown rapidly

during the past decades. On the Southern Islands of

Singapore a large (petro)chemical industrial area is

developed including storage tank and the other

associated infrastructure such as jetties. Just recently,

Tankstore Ltd. Singapore had expansion project for

Petroleum Storage in Pulau Busing. HERNIS has

been awarded to supply the CCTV System and

Equipment to replace the existing equipment on the

tank farms and jetty areas.

HERNIS will supply the well known HERNIS 400

Control System coupled with several Ex286 and

PT9 Camera Stations and Digital Video Recording

facility.

Owner has commented that they will consider

HERNIS again for new installations in the future.

Page 8: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

Our German agent Marine & Offshore Equipment recently opened up a

Demo Room at their premises in Reinbek close to Hamburg. During the last

10 years Germany has become a strong and stable market for HERNIS CCTV

systems and it was therefore agreed to offer German customers the chance to

put hands on HERNIS equipment locally.

Various camera stations, monitors and keyboards as well as a HERNIS 400

system can be tested. Also operational software HWIN and Seatouch are part

of the system. This gives the customer the chance to compare ethernet based

technology with analogue technology under realistic circumstances.

Please do not hesitate to contact HERNIS or our local agent Marine Offshore

Equipment in case you would like to stop by. You will be most welcome.

German Agent opens up HERNIS Demo room!

Leonard Pool (Sidus Solutions Inc.), Francisco Gonzalez Peña (Pemex), Eduardo Delangel Rincón(Prodar), Lisandro Paniagua (Pemex), Jan Kleivene (HERNIS Scan Systems), Teofilo Garcia Mancha(Prodar)

Elisabeth compares the operation of an analogue keyboard by using Seatouch

Pemex visiting HERNISWhile both HERNIS General Manager in the US,

Jan Kleivene and Agent, Leonard Pool, Sidus

Solutions Inc. were in Norway in June 2006,

HERNIS was fortunate to welcome the two key

Petróleos Mexicanos "Pemex" operation managers.

They are evaluating HERNIS' capacity to provide

an integrated surveillance and monitoring system

for several new offshore platforms and marine

terminal. These independent facilities will be linked

to their command and control center (CONAVI)

via a secure proprietary IP protocol allowing 24

hours monitoring and providing rapid response for

all operational and tactical issues.

They was very impressed with the company, the

staff's commitment to quality and the forward

thinking that is built into the software.

HERNIS is always pleased to welcome their close

business associates or potential customers for an

informal meeting and discussion on future projects.

Page 9: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

The HERNIS tradition of a yearly seminar for

Norwegian offshore customers was as usual a

success. This year customers visited from Aker

Kvaerner, APL, Sevan Marine, Bergesen, Bjørge

Steinco, National Oilwell, Statoil and Ulstein Verft

The program included information on HERNIS

control systems and camera stations as well as new

available applications, video detection etc.

Customer Seminar at HERNIS

9

Some of the participants at the seminarduring lunch at HERNIS, from left: HaraldAlbretsen (Bjørge Steinco Moland), HåkonVidar Straume (National Oilwell), ThoreStubberud (Bergesen), Jan Kristensen(HERNIS), Jan Robert Moen (Statoil), CarlAre Hopen and Espen Christensen (bothHERNIS), Anders Holme and Tor AsleGarborg (both National Oilwell)

Frank Wehus, Wtek AS was invited as the guest

speaker. Wtek are software developers and

consultants, with main focus on safety, and

extensive knowledge within wireless data acquisition

as RFID, IEEE802.x, UHF, VHF etc.

The seminar was followed by at boat trip in the

skerries and a lovely dinner in Arendal.

Page 10: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

Attendance at the 2006 Offshore Technology

Conference (OTC) reached a 24-year high, as

59,236 exploration and production professionals

met to learn about the latest technology to find the

oil and gas that the world needs. The world’s largest

offshore event was held 1-4 May at Reliant Center

at Reliant Park in Houston.

HERNIS has a strong tradition of attending the

OTC and to use this exhibition to introduce new

technology and meet with existing and potential

new customers.

Together with US Agent Sidus Solutions Inc.,

HERNIS experienced good activity during the

week.

The World Comes to OTC 2006

Jan Kristensen (HERNIS) and Leonard Pool (Sidus) during the OTC 2006

TECHNICAL CORNER

ZONESOnce the nature of the potential hazard in the

form of an explosive atmosphere has been defined,

the likelihood of the hazard existing needs to be

considered. Clearly, there will be an infinite range

of possibilities from definitely always present´ to

`perhaps present for very short periods`. However,

three distinctions are recognised. The term zone is

used to describe the likelihood of an explosive

atmosphere existing at any given time.

Zones are defined by the IEC as follows:

Zone 0 Areas where an explosive atmosphere

occurs constantly or over long periods.

Zone 1 Areas where an explosive atmosphere

occurs occasionally under normal

operating conditions.

Zone 2 Areas where an explosive atmosphere

occurs only exceptionally, and then only

for short periods.

Page 11: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

IECEx Scheme ObjectiveThe objective of the IECEx Scheme is to facilitate

international trade in equipment and services for

use in explosive atmospheres, while maintaining the

required level of safety:

• reduced testing and certification costs to

manufacturer

• reduced time to market

• international confidence in the product

assessment process

• one international database listing

• maintaining International Confidence in

equipment and services covered by IECEx

Certification

HERNIS has received the IEC Ex Certificate

11

Page 12: HERNIS Thermal Camera tested in new · PDF fileHERNIS Thermal Camera tested in new waters ... to the GASCO NGL Train 3 Project at Ruwais in ... day fractionation and treatment train

The HERNIS Camera Station EX285 trained on the Flare of the Bayu Undan Platform.

Extreme conditions calls for extreme equipment!

HERNIS Scan Systems AS manufactures CCTV (closed circuit television) systems for marine,offshore and petroleum related installations onshore. Established to produce CCTV systemsfor marine environments in 1982, the company is wholly owned by Vislink Plc., listedin the UK techMARK Index. HERNIS has appointed agents around the world.

Agent:

P.O. Box 619, NO-4809 Arendal, Norway, Tel: +47 37 06 37 00, Fax: +47 37 06 37 06, e-mail: [email protected] office: 6 Changi North Street 1, Spanners Building, Singapore 498825,Tel: +65 654 59 068, Fax: +65 654 29 068, e-mail: [email protected]

USA office: Dairy Ashford Plaza, Suite # 495, 2000 Dairy Ashford, Houston,TX 77077, USA,Tel: +1 281 560 8050, Fax: +1 281 560 8054, e-mail: [email protected]

P a r t o f t h e V i s l i n k P l c .

www.hernis.com

•9

90

0