Page 1: HC Ladce TG2  Guaranty Measurements

HC Ladce TG2 Guaranty Measurements

Division Control Systems

OSC, a. s.Staňkova 18a

Brno, Czech Republic

Petr Ševčík

Page 2: HC Ladce TG2  Guaranty Measurements

OSC, a.s. – Highly qualified engineering and field services, incl. Hi-tech deliveries for Power Industry

Hydro Power Plants Field acceptance tests (hydraulic turbines, storage

pumps, pump-turbines) Hydraulic performance guarantees Steady state and transient tests Control systems improvement Diagnostics measurements

Power Plants for fossil fuel Operation assessment and optimization Control system performance evaluation, optimization

and final tuning Power Plant monitoring systems Process systems diagnostics

Nuclear Power Plants Turnkey delivery of full scope replica type simulators

and simulation systems Control system performance assessment,

enhancement, tuning and maintenance

Power Industry Dispatch type control systems for units and utilities Engineering services for units preparation to provide

ancillary services Expertise and consultation services Special electronics systems and devices Refurbishment and field services I&C systems

Page 3: HC Ladce TG2  Guaranty Measurements

History of measurements/tests on HC Ladce

Year 1983 - TG1 and TG2 efficiency evaluation tests

Years 1988 –1990 - channel Doľné Kočkovce – Trenčín flow capacity and efficiency tests

Page 4: HC Ladce TG2  Guaranty Measurements

HC Ladce guaranty data evaluation

Guaranty data

• GM commission, on-site evaluation, GM results protocol• GM test’s preparation, execution and guaranty

measurements design according IEC 41/1993• Evaluation provided by TS HYDRO (recently OSC)• Flow detection by Hydrometrics co.

Parameter Unit Original New

Runner diameter D [mm] 3250 3450 Nominal rotaion speed n [ot/min] 187,5 166,67 Head H = [m] 10,7 ÷ 15 10,7 ÷ 15 Design discharge Qmax [m

3/s] 75 90 Turbine output Pmax [MW] 7,5 9,15

Page 5: HC Ladce TG2  Guaranty Measurements

Q

Z1L Z1R

Z2L Z2R dp Qi

Pw, U, I

yG

yR

Guaranty measurement following turbine recontruction

Page 6: HC Ladce TG2  Guaranty Measurements

Flow detection – intake profile

measuring cart

see detail A

propeller carrier

measured distance

grooved stake with division 1 cm DETAIL A

SCHEME OF INTAKE PROFILE DIMENSION MEASUREMENT

Page 7: HC Ladce TG2  Guaranty Measurements

Flow detection – intake profile

Page 8: HC Ladce TG2  Guaranty Measurements

Flow detection – cable reels for flow detectors carts

Page 9: HC Ladce TG2  Guaranty Measurements

Flow detection – data evaluation

2 x 9 points vertical profile integration

2 x horizontal profile

integration

Page 10: HC Ladce TG2  Guaranty Measurements

Flow detection – Isotachs

Q = 40.404 m3/s Q = 38.714 m3/s

Q = 79.118 m3/s

Page 11: HC Ladce TG2  Guaranty Measurements

Head detection

Page 12: HC Ladce TG2  Guaranty Measurements

70

75

80

85

90

40 50 60 70 80 90 100

T [%]

Qisp [m3/s]

Original turbine efficiencyH = 12.5 m (measured y. 1983)

New turbine efficiencyH = 12.05 ÷ 12.84 m (guaranty tests y. 2001)

Guaranty value

GM results - efficiency

fP 0,74%fQ 1,79%

fH 0,20%

f 1,95%

Measurement uncertainties

Page 13: HC Ladce TG2  Guaranty Measurements

GM results – link determination between guide vane and runner blades opening

72

74

76

78

80

82

84

86

88

90

40 50 60 70 80 90 100

55

60

65

70

75

80

85

90

95

100

TG [%]

Qi [m3/s]

yG [%]

zone of optimal vicket gate opening for yR = 34 %

Page 14: HC Ladce TG2  Guaranty Measurements

GM results – on came curve

0

10

20

30

40

50

60

70

80

90

100

50 60 70 80 90 100

yG [%]

y R [

%]

zone of optimal on cam regulation

original on cam curve

proposal of new on cam curve

Page 15: HC Ladce TG2  Guaranty Measurements

Profit associated with optimalon cam curve

74

76

78

80

82

84

86

88

90

40 50 60 70 80 90 100 110

55

60

65

70

75

80

85

90

95

100

U [%]

Qi [m3/s]

yG [%]

turbine-generator unit efficiency with optimal on cam regulation

turbine-generator unit efficiency with original on cam regulation

Wicket gate opening

Page 16: HC Ladce TG2  Guaranty Measurements

Contact address

OSC, a. s.Staňkova 18a612 00, Brno, Czech RepublicMr. Petr Ševčík, leading engineer for hydro powerMr. Miroslav Konečný, head of control systems divisionphone: (+420) 541 643 130fax: (+420) 541 643 109e-mail: [email protected] www.osc.cz