CATEGORY 1REGULAT Y INFORMATION DISTRXBUTIOh SYSTEM (RIDS)
ACCESSION NBR:9905050200 DOC.DATE: 99/04/30 NOTARIZED: NO DOCKETFACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400
AUTH.NAME AUTHOR AFFILIATIONALEXANDER,D.B. Carolina Power a Light Co. '~ner~( +~~~ PO
RECIP.NAME RECIPIENT AFFILIATIONRecords Management Branch (Document Control Desk)
SUBJECT: Forwards info requested in 990324 RAI as suppl to 9812123.o'pplicationfor amend to license NPF-63 for alternative plan C
for spent fuel pool cooling a cleanup sys piping.C A
DISTR1'BUTIQN CQDE: A001D CQP1ES RECEIVED:LTR 1 ENCL i S1EE:TITLE: OR Submittal: General Distribution T
NOTES:Application for permit renewal filed. 0500040(P
RECIPIENTID CODE/NAME
LPD2-2 LALAUFER,R.
INTERNAL: ACRSNRR/DE/EMCBNRR/DSSA/SPLBNRR/SPSB JUNGPXOGC/HDS2
COPIESLTTR ENCL
1 11
1 11, 11 11 11 0
RECIPIENTID CODE/NAME
LPD2-2 PD
<LE CENTER 0NRR/DE/EMEBNRR/DSSA/SRXBNUDOCS-AB TRACT
COPIESLTTR ENCL
1 1
1 11 11 11
EXTERNAL: NOAC 1 1 NRC PDR
).o(~~ i~ ( ~4P.o t K4~gD
N
NOTE TO ALL NRIDSN RECIPIENTSPLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTSOR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROLDESK (DCD) ON EXTENSION 415-2083
TOTAL NUMBER OF COPIES REQUIRED'TTR 14 ENCL 13
Carolina Power & Ught CompanyHarris Nuclear PlantP.O. Box 165New HillNC 27562
APR g0 Bgy
SERIAL: HNP-99-069
United States Nuclear Regulatory CommissionATTENTION: Document Control DeskWashington, DC 20555
SHEARON HARRIS NUCLEARPOWER PLANTDOCKET NO. 50-400/LICENSE NO. NPF-63RESPONSE TO NRC REQUEST FOR ADDITIONALINFORMATIONREGARDING THE ALTERNATIVEPLANFOR SPENT FUEL POOL
" COOLING AND CLEANUP SYSTEM PIPING
Dear Sir or Madam:
By letter dated March 24, 1999, the NRC requested additional information regarding the HarrisNuclear Plant (HNP) license amendment request to place spent fuel pools 'C'nd 'D'n service.
Enclosure 8 of the HNP license amendment request (ref. SERIAL: HNP-98-188, dated December
23, 1998) provided a detailed description of the proposed alternatives to demonstrate compliancewith ASME B&PVCode requirements for spent fuel pool cooling and cleanup system piping inaccordance with 10 CFR 50.55a(a)(3)(i). The NRC has determined that additional information is
required to complete the review of the proposed alternative piping plan. Enclosed is the HNPresponse to the NRC request for additional information. The enclosed information is provided as
a supplement to our December 23, 1998 submittal and does not change our initial determinationthat the proposed license amendment represents a no significant hazards consideration.
Please refer any questions regarding the enclosed information to Mr. Steven Edwards at (919)362-2498.
9905050200 990430PDR ADOCK 05000400P PDR
Sincerely,
Donna B. AlexanderManager, Regulatory AffairsHarris Nuclear Plant
r/
Pad/
KWS/kws
Enclosures
5413 Shearon Harris Road New Hill NC
0 4
(ijjj g Q rf lA
Document Control Desk~ SERIAL: HNP-99-069
Page 2
c:
Mr. J. B. Brady, NRC Senior Resident Inspector (w/ Enclosure 1)Mr. Mel Fry, N.C. DEHNR (w/ Enclosure 1)Mr. R. J. Laufer, NRC Project Manager (w/ all Enclosures)Mr. L. A. Reyes, NRC Regional Administrator (w/ Enclosure 1)
Document Control DeskSerial: HNP-99-069Page 3
bc: (w/o enclosures)
Mr. K. B. AltmanMr. G. E. AttarianMr. R. H. BazemoreMr. S. R. CarrMr. J. R. CavesMr. H. K. Chernoff (RNP)Mr. B. H. ClarkMr. W. F. ConwayMr. G. W. DavisMr. W. J. Dorman (BNP)Mr. R. S. EdwardsMr. R. J. FieldMr. K. N. Harris
Ms. L N. HartzMr. W J. HindmanMr. C. S. HinnantMr. W. D. JohnsonMr. G. J. KlineMs. W. C. Langston (PE8cRAS File)Mr. R. D. MartinMr. T. C. MortonMr. J. H. O'eill, Jr.Mr. J. M. TaylorNuclear RecordsHarris Licensing FileFiles: H-X-0511
H-X-0642
Enclosure 2 to Serial: HNP-99-069
Markups of Isometric drawings showing:
(1) Piping Within Scope of Alternative Plan (28 sheets)
(2) Continuance of Design and Construction (41 sheets)
,i.9905050200
J
Enclosure 3 to Serial: HNP-99-069Page 1 of 13
Matrix of Construction Records Pertaining toUnits 2 &3 Spent Fuel Pool Cooling System
0
Enclos o Serial: HNP-99-069Page 2 of 13
Field WeldNo.
Access? Id ofweldeditems?
Welddocumentsavailable?
SpeciTied FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
Qual Record &:Welder ID
NDERecords
HydrotcstRecords
Inspectionscompleted(ANI/ QC)
2-SF-1-FW-1
2-SF-1-FW-2
Embedded
Embedded
No, butassured bypipinginstallation,hydro andconcrete pourprocedurerequirements
No, butassured bypipmginstallation,hydro andconcrete pourpfoccdufcrequirements
No, but reviewof "WeldDocumentation"contained inHydro testrccofd
No, but reviewof "WeldDocumentation" contained inHydro testrecord
~ SFA 5.9/5.4No
~ Assured byweld doc
review in hydrorecords, sitespecification SS-
021, proceduralr uirements~ SFA 5.9/5.4~ No~ Assured byweld doc
review in hydrorecords, sitespecification SS-021, procedural
uirements
No, but assured byweld doc review inhydro records;program andproceduralrequirements
No, but assured byweld doc review inhydro records;program andproceduralrequirements
No, but assured byweld documentationreview in hydrorecords, program andproceduralrequirements.
No, but assured byweld documentationreview in hydrorecords, program andproceduralrequirements.
Yes Hydro -QC &ANI(ref. DDR 1347) (ref. DDR 1347)
Yes Hydro -QC &ANI(ref. DDR 1347) (ref. DDR 1347)
2-SF-1-FW-3 Yes, byinspection
No ~ SFA 5.9/5.4~ No~ by alloy
analyzer
YesB61, G97
Yes, by re-inspection. No
2-SF-1-FW-4 Embedded Yes, on oneside (ref.D DR-1347).Also assured
by pipinginstallation,hydro andconcrete pourprocedurer uirements
No, but reviewof"WeldDocumentation" contained inHydro testfccofd
SFA 5.9/5.4~ No~ Assured byweld doc
review in hydrorecords, sitespecification SS-
021, proceduralrequirements
No, but assured byweld doc review inhydro records;program andproceduralrequirements
No, but assured byweld documentationreview in hydrorecords, program andproceduralrequirements.
Yes Hydro -QC & ANI(ref. DDR 1347) (ref. DDR 1347)
Enclos o Serial: HNP-99-069Page 3 of 13
Field WeldNo.
Access? Id ofweldeditems?
Welddocumentsavailable?
Specified FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
Qual Record &Welder ID
NDERecords
HydrotestRecords
Inspectionscompleted(ANI/ QC)
2-SF-1-FW-5 Embedded Yes, WDR onhand (ref.DDR-1347)Also assured
by pipinginstallation,hydro andconcrete pourprocedurer uirements
Yes, WDR onhand (ref.DDR-1347)
~ SFA 5.9/5.4~ Yes, WDR
on hand inDDR-1347
~ Notrequired
Yes, in welddocumentation(ref. DDR-1347)
Yes, attested to inweld documentation.
Yes(ref. DDR 1347)
Hydro -QC &ANI(ref. DDR 1347)weld documentation-QC &ANI(ref. DDR 1347)DDR-1347 - QC &ANI
2-SF-1-FW-6 Yes Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No D41~ by alloy
analyzer
Yes, by re-inspection. No
2-SF-8-FW-65 Embedded
2-SF-8-FW-66 Embedded
Yes, on oneside by DDR-1387. Alsoassured bypipinginstallation,concrete pourprocedurer uirements
Yes, on oneside by DDR-1387 Alsoassured bypipinginstallation,concrete pourprocedurer uirements
No
No
~ SFA 5.9/5.4~ No
Assured bysite
specification SS-
021, proceduralrequirements
~ SFA 5.9/5.4No
~ Assured bysite
specification SS-
021, proceduralrequirements
No, but assured byweld program andproceduralrequirements
No, but assured byweld program andproceduralrequirements
No, but assured byprogram andproceduralrequirements. Will besubject to internalcamera inspection
No, but assured byprogram andproceduralrequirements. Willbesubject to internalcamera inspection
No
No
liner leak test - QC
liner leak test - QC
Enclos o Serial: HNP-99-069Page 4 of 13
Field WeldNo.
Access? Id ofweldeditems?
Welddocumentsavailable?
SpeciTied FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
Qual Record RWelder ID
NDERecords
HydrotestRecords
Inspectionscompleted(ANI/ QC)
2-SF-70-FW-325
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No Bj, D41~ by alloy
analyzer
Yesby re-inspection
No,willbe hydro-tested by Mod
2-SF-72-FW-326
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No E21~ by alloy
analyzer
Yesby re-inspection
No,willbe hydro-tested by Mod
2-SF-72-FW-327
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No E21, C97~ by alloy
analyzer
Yesby re-inspection
No,willbe hydro-tested by Mod
2-SF-69-FW-328
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No B61~ by alloy
analyzer
Yesby re-inspection
No,willbe hydro-tested by Mod
2-SF-69-FW-329
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No B61~ by alloy
analyzer
Yesby re-inspection
No,willbe hydro-tested by Mod
Enclos to Serial: HNP-99-069Page 5 of 13
Field WeldNo.
2-SF-71-FW-329
Access? Id ofweldeditems?
Yes, byinspection
%Veld
documentsavailable?
No
Specified FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
~ SFA 5.9/5.4~ No~ by alloy
analyzer,cheinicalanalysis
Qual Record &Welder ID
YesB7
NDERecords
Yesby re-inspection
HydrotestRecords
No,willbe hydrotested by Mod
Inspectionscompleted(ANI/ QC)
2-SF-30-FW-381
Yes Yes, byinspection
No ~ SFA 5.9/5.4~ No~ by alloy
analyzer
YesE21, C97
Yes
by re-inspectionNo
2-SF-148-FW-382
Yes, byinspection
No ~ SFA 5.9/5.4~ No~ by alloy
analyzer
YesE21
Yes, by re-inspection. No
2-SF-149-FW-408
Embedded Yes(ref. DDR-829). Alsoassured bypipinginstallation,hydro andconcrete pourprocedurerequirements
No, but haverepair WDR onhand, also welddocumentationreview signoffin North NewFuel PoolHydro Record,
~ SFA 5.9/5.4~ Partial,
WDR onhand forrepair weld.
~ Assured
by weld docreview in hydrorecords, sitespecification SS-
021, proceduralrequirements.
B61 (NCR W-207)Also repair WDRon hand (DDR829)
Yes, (fullLP in DDR Yes,829). Will besubject seeNorth Newto internal camera Fuel Pool Hydroinspection Test Record.
Hydro -QC &ANIRepair welddocumentation - QC &,
ANINDE rpt. - QC A ANI(ref. DDR-829)DDR-829 - QC k, ANI
Enclos to Serial: HNP-99-069Page 6 of 13
Field WeldNo.
2-SF-150-FW-412
2-SF-14-FW-424
2-SF-31-FW-426
Access?
Yes
Yes
Id of weldeditems?
Yes, byinspection
Yes, byinspection
Yes, byinspection
Welddocumentsavailable?
No
No
No
Specified FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethodSFA 5.9/5.4Noby alloyanalyzer
SFA 5.9/5.4No
by alloyanal zerSFA 5.9/5.4Noby alloyanalyzer
Qual Record &Welder ID
YesE21
YesB61
YesE21, C97
NDERecords
Yes, by re-inspection.
Yesby re-inspection
Yesby re-inspection
HydrotcstRecords
No
No,willbe hydrotested by Mod
No
Inspectionscompleted(ANI/ QC)
2-SF-35-FW-440
Yes, byinspection
No SFA 5.9/5.4Noby alloyanalyzer
YesE21
Yes
by re-inspectionNo NDE rpt. - QC &ANI
(ref. NCR WP-016)
2-SF-37-FW-441
2-SF-16-FW-447
Yes, byinspection
Yes, byinspection
No
No
SFA 5.9/5.4Noby alloyanalyzer
SFA 5.9/5.4Noby alloyanalyzer
YesE59, F60, E25,B47
YesB61
Yes, by re-inspection.Willalso be subject todirect internalexamination whenadjacent strainer isdisassembled.
Yesby re-inspection
No,willbe hydrotested by Mod
No,willbe hydrotested by Mod
DDR-895 - QC &ANI
Enclos o Serial: HNP-99-069Page 7 of 13
Field WeldNo.
2-SF-36-FW-448*See Note2-SF-36-FW-449
2-SF-36-FW-450
Access? Id ofweldeditems?
Yes, byinspection
Yes, byinspection
Weld. documents
available?
No
No
Specified FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
SFA 5.9/5.4Noby alloyanalyzer
SFA 5.9/5.4Noby alloyanalyzer 4chemicalanalysis
Qual Record &Welder ID
YesD41, B47
YesB47
NDERecords
Yes, by re-inspection.Willalso be subject todirect internalexamination whenadjacent strainer isdisassembled.
Yes, by re-inspection.Willalso be subject todirect internalexamination whenadjacent strainer isdisassembled.
HydrotestRecords
No,willbe hydrotested by Mod
No,willbe hydrotested by Mod
Inspectionscompleted(ANI / QC)
2-SF-38-FW-451
Yes, byinspection
No SFA 5.9/5.4Noby alloyanalyzer Bc
chemicalanalysis
YesG1, B7
Yes, by re-inspection.Willalso be subject todirect internalexamination whenadjacent strainer isdisassembled.
No,willbe hydrotested by Mod
2-SF-67-FW-452
Yes, byinspection
No SFA 5.9/5.4Noby alloyanalyzer
YesE21
Yes, by re-inspection. No
2-SF-68-FW-454
Yes, byinspection
No SFA 5.9/5.4Noby alloyanalyzer
YesC97, D87
Yes, by re-inspection. No
Enclos to Serial: HNP-99-069Page 8 of 13
Field WeldNo.
2-SF-143-FW-512
2-SF-143-FW-513
Access?
Embedded
Embedded
Id ofweldeditems?
Assured bypipinginstallation,hydro andconcrete pourprocedurerequirements
Assured bypipinginstallation,hydro andconcrete pourprocedurerequirements
Welddocumentsavailable?
No, but WDRreview signoffin North NewFuel PoolHydro Record,
No, but WDRreview signoffin North NewFuel PoolHydro Record,
Specified FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
~ SFA 5.9/5.4~ No~ Assured byweld doc
review in hydrorecords, sitespecification SS-
021, proceduralr uirements~ SFA 5.9/5.4~ No~ Assured byweld doc
review in hydrorecords, sitespecification SS-021, proceduralrequirements
Qual Record RWelder ID
No, but assured byweld doc review inhydro records,program andproceduralrequirements
No, but assured byweld doc review inhydro records,program andproceduralrequirements
NDERecords
No, but assured byweld documentationreview in hydrorecords, program andproceduralrequirements.
No, but assured byweld documentationreview in hydrorecords, program andproceduralrequirements.
HydrotestRecords
Yes,see North NewFuel Pool HydroTest Record.
Yes,see North NewFuel Pool HydroTest Record.
Inspectionscompleted(ANI / QC)
Hydro -QC &ANI
Hydro -QC R ANI
2-SF-143-FW-514
Embedded Yes, ref.DDR-888Also assured
by pipinginstallation,hydro andconcrete pourprocedurerequirements
No, but WDRreview signoffin North NewFuel PoolHydro Record,
~ SFA 5.9/5.4~ No~ Assured byweld doc
review in hydrorecords, sitespecification SS-
021, proceduralrequirements
No, but assured byweld doc review inhydro records,program andproceduralrequirements
No, but assured byweld documentationreview in hydrorecords, program andproceduralrequirements Willbesubject to internalcamera inspection
Yes,see North NewFuel Pool HydroTest Record.
Hydro -QC A ANIDDR-888
Enclos to Serial: HNP-99-069Page 9 of 13
Field WeldNo.
2-SF-144-FW-515
Access?
Embedded
Id ofweldeditems?
Assured bypipinginstallation,hydro andconcrete pourprocedurerequirements
Welddocumentsavailable?
No, but WDRreview signoffin North NewFuel PoolHydro Record,
Specified FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
~ SFA 5.9/5.4~ No~ Assured byweld doc
review in hydrorecords, sitespecification SS-
021, proceduralrequirements
Qual Record &Welder ID
No, but assured byweld doc review inhydro records,program andproceduralrequirements
NDERecords
No, but assured byweld documentationreview in hydrorecords, program andproceduralrequirements. Willbesubject to internalcamera inspection
HydrotestRecords
Yes,see North NewFuel Pool HydroTest Record.
Inspectionscompleted(ANI / QC)
Hydro -QC &ANI
2-SF-144-FW-516
Embedded Yes, on oneside, ref.DDR-869.Also assured
by pipinginstallation,hydro andconcrete pourprocedurerequirements
No, but WDRreview signoffin North NewFuel PoolHydro Record,
~ SFA 5.9/5.4~ No~ Assured byweld doc
review in hydrorecords, sitespecification SS-
021, proceduralrequirements
No, but assured byweld doc review inhydro records,program andproceduralrequirements
No, but assured byweld documentationreview in hydrorecords, program andproceduralrequirements. Willbesubject to internalcamera inspection
Yes,see North NewFuel Pool HydroTest Record.
Hydro -QC &ANIDDR-921 - QC &ANI
2-SF-144-FW-517
Embedded Yes - refDDR-869.Also assured
by pipinginstallation,hydro andconcrete pourprocedurerequirements
No, but WDRreview signoffin North NewFuel PoolHydro Record.
~ SFA 5.9/5.4~ No~ Assured byweld doc
review in hydrorecords, sitespecification SS-
021, proceduralrequirements
No, but assured byweld doc review inhydro records,program andproceduralrequirements
Yes, partial UT &LPperformed underDDR-869. Also,assured by welddocumentation reviewin hydro records,program andproceduralrequirements. Willbesubject to internalcamera ins ection
Yes,see North NewFuel Pool HydroTest Record.Also ref. DDR-869.
Hydro -QC &ANIRepair welddocumentation - QC &ANI(ref. DDR-869)DDR-869 - QC &ANI
Enclos to Serial: HNP-99-069Page 10 of 13
Field WeldNo.
Access? Id of weldeditems?
Welddocumentsavailable?
Specified FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
Qual Record &Welder ID
NDERecords
HydrotestRecords
Inspectionscompleted(ANI / QC)
2-SF-159-FW-518
2-SF-159-FW-519
Embedded
Embedded
Also assured
by pipinginstallation,hydro andconcrete pourprocedurerequirements
Yes, on oneside (ref.NCR-85-1318,Also assured
by pipinginstallation,hydro andconcrete pourprocedurerequirements
No, but WDRreview signoffin North NewFuel PoolHydro Record
No, but WDRreview signoffin North NewFuel PoolHydro Record
~ SFA 5.9/5.4~ No~ Assured byweld doc
review in hydrorecords, sitespecification SS-
021, proceduraluirements
SFA 5.9/5.4NoAssured by
weld docreview in hydrorecords, sitespecification SS-
021, proceduralrequirements
No, but assured byweld doc review inhydro records,program andproceduralrequirements
Yes, C-20(see NCR W-103)
No, but assured byweld documentationreview in hydrorecords, program andproceduralrequirements
No, but assured byweld documentationreview in hydrorecords, program andproceduralrequirements
Yes, Hydro -QC &ANIsee North NewFuel Pool HydroTest Record.
Yes, Hydro -QC &ANIsee North New NCR W-103 - QCFuel Pool HydroTest Record.
2-SF-71-FW-331
(HangerAttach. Weld)
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No D75, E50, D69~ by alloy
analyzer
Yesby re-inspection
N/A (Hangerattachmentweld)
2-SF-71-FW-332 (HangerAttach. Weld)
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No E50, D69~ by alloy
analyzer
Yesby re-inspection
N/A (Hangerattachmentweld)
Enclos to Serial: HNP-99-069Page 11 of 13
Field WeldNo.
Access? Id of weldeditems?
Welddocumentsavailable?
Specified FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
Qual Record RWelder ID
NDERecords
HydrotestRecords
Inspectionscompleted(ANI/ QC)
2-SF-71-FW-333 (HangerAttach. Weld)
Yes Yes, byinspection
No SFA 5.9/5.4 Yes~ No D69~ by alloy
analyzer
Yesby re-inspection
N/A (Hangerattachmentweld)
2-SF-71-FW-334 (HangerAttach. Weld)
2-SF-71-FW-335 (HangerAttach. Weld)
Yes
Yes
Yes, byinspection
Yes, byinspection
No
No
~ SFA 5.9/5.4 Yes~ No D75, E50, D69~ by alloy
analyzer
~ SFA 5.9/5.4 Ycs~ No D69~ by alloy
analyzer
Yes
by re-inspection
Yesby re-inspection
N/A (Hangerattachmentweld)
N/A (Hangerattachmentweld)
2-SF-71-FW-336 (HangerAttach. Weld)
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No D69~ by alloy
analyzer
Yesby re-inspection
N/A (Hangerattachmentweld)
2-SF-71-FW-337 (HangerAttach. Weld)
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No E50, D69~ by alloy
analyzer
Yesby re-inspection
N/A (Hangerattachmentweld)
Enclos to Serial: HNP-99-069Page 12 of 13
Field WeldNo.
Access? Id ofweldeditems?
Welddocumentsavailable?
Specified FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
Qual Record &Welder ID
NDERecords
HydrotestRecords
Inspectionscompleted(ANI / QC)
2-SF-71-FW-338 (HangerAttach. Weld)
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No D69~ by alloy
analyzer
Yesby re-inspection
N/A (Hangerattachmentweld)
2-SF-71-FW-339 (HangerAttach. Weld)
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No D75, D69~ by alloy
analyzer
Yesby re-inspection
N/A (Hangerattachmentweld)
2-SF-71-FW-340 (HangerAttach. Weld)
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No D75, E50, D69~ by alloy
analyzer
Yesby re-inspection
N/A (Hangerattachmentweld)
2-SF-71-FW-341 (HangerAttach. Weld)
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No D75, E50, D69~ by alloy
analyzer
Yes
by re-inspectionN/A (Hangerattachmentweld)
2-SF-71-FW-342 (HangerAttach. Weld)
Yes, byinspection
No ~ SFA 5.9/5.4 Yes~ No D75, D69~ by alloy
analyzer
Yes
by re-inspectionN/A (Hangerattachmentweld)
Enclos to Serial: HNP-99-069Page 13 of 13
Field WeldNo.
2-CC-3-FW-207
Access? Id ofweldeditems?
No, but isaccessible andwillbevisuallyverified.
Welddocumentsavailable?
No
Specified FillerMaterial ID/
Documentationon hand/
Alt.VerificationMethod
~ SFA5.18/5.1NoTBD bychemicalanalysis
Qual Record &Welder ID
Yes,K40
NDERecords
Yes
by re-inspection
HydrotestRecords
No,to be hydrotested by Mod
Inspectionscompleted(ANI/ QC)
2-CC-3-RV-208
No, but isaccessible andwillbevisuallyverified
No ~ SFA5.18/5.1
~ No~ TBD by
chemicalanalysis
Yes,Cl 1
Yesby re-inspection
No,to be hydrotested by Mod
2-CC-3-FW-209
No, but isaccessible andwillbevisuallyverified
No ~ SFA5.18/5.1
~ No~ TBD by
chemicalanalysis
Yes,Bl
Yesby re-inspection
No,to be hydrotested by Mod
Note ": Field Weld 2-SF-FW-36-448 is a completed and stamped field weld, but willbe cut out and replaced as itjoinsa section of piping which was affected by a pipe spool modification.
Enclosure 4 to Serial: HNP-99-069
Metallurgy Unit Report forSpent Fuel Pool Weld Metal Composition Analysis