, ggCZI.KRP ED DOCUMENT DIS 'UBUTION SYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED: NO : DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH. NAME AUTHOR AFFILIATION PARRISH,J.V. Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) SUBJECT: Forwards revised ISI program Relief Requests 2-ISI-001 6 2-ISI-010 to be implemented during third insp period of first insp interval.GE coverage repts for R-8 6 R-7 S coverage plot for N3 main steam also encl. DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code NOTES: RECIPIENT ID CODE/NAME PDV LA CLIFFORD,J COPIES LTTR ENCL 1 0 2 2 RECIPIENT ID CODE/NAME PDV PD COPIES LTTR ENCL 1 1 INTERNAL: ACRS NUDOCS-ABSTRACT OGC/HDS1 RES/DSIR/EIB 6 6 1 1 1 0 1 1 NRR/DE/EMEB GpQMQQB REG 01 1 1 1 0 1 1 EXTERNAL: EG6 G BROWN i B NRC PDR 1 ' 1 1 EG&G RANSOMEiC NSIC 1 - 1 1 1 NOTE TO, ALL "RIDS" RECIPIENTS: PLEASE HELP US TO REDUCE WASTEt CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 504-2065) TO EUMINATEYOUR NAME FROM DISI'RIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED! TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 17

ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

, ggCZI.KRP ED DOCUMENT DIS 'UBUTION SYSTEMREGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS)

ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED: NO — : DOCKETFACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397

AUTH.NAME AUTHOR AFFILIATIONPARRISH,J.V. Washington Public Power Supply System

RECIP.NAME RECIPIENT AFFILIATIONDocument Control Branch (Document Control Desk)

SUBJECT: Forwards revised ISI program Relief Requests 2-ISI-001 62-ISI-010 to be implemented during third insp period offirst insp interval.GE coverage repts for R-8 6 R-7 S

coverage plot for N3 — main steam also encl.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code

NOTES:

RECIPIENTID CODE/NAME

PDV LACLIFFORD,J

COPIESLTTR ENCL

1 02 2

RECIPIENTID CODE/NAME

PDV PD

COPIESLTTR ENCL

1 1

INTERNAL: ACRSNUDOCS-ABSTRACTOGC/HDS1RES/DSIR/EIB

6 61 11 01 1

NRR/DE/EMEBGpQMQQB

REG 01

1 11 01 1

EXTERNAL: EG6 G BROWN i BNRC PDR

1 '

1 1EG&G RANSOMEiCNSIC

1 - 11 1

NOTE TO, ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEt CONTACT THE DOCUMENT CONTROL DESK,

ROOM Pl-37 (EXT. 504-2065) TO EUMINATEYOUR NAME FROM DISI'RIBUTIONLISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 17

Page 2: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WASHINGTON PUBLIC POWER SUPPLY SYSTEM

P.O. Bm 968 ~ 3000 George Wasbfngton Way ~ Richland, Wasbtngton 993524968 ~ (509) 372-5000

June 24, 1993G02-93-166

Docket No. 50-397

U.S. Nuclear Regulatory CommissionAttn: Document Control DeskWashington, D.C. 20555

Gentlemen:

Subject: WNP-2, OPERATING LICENSE NPF-21INSERVICE INSPECTION PROGRAMRELIEF REQUESTS 2-ISI-001 AND 2-ISI-010

References: 1)

2)

3)

Letter G02-86-679, dated July 22, 1986, G.C. Sorensen (SS) toMs. E.G. Adensam (NRC), "Inservice Inspections and Inservice TestingPrograms and Response to Request for Information"Letter, dated March 27, 1987, Ms. E.G. Adensam (NRC) toG.C. Sorensen (SS), "Safety Evaluation for First Ten-Year IntervalInspection Program and Requests for Relief from Certain Requirements"10CFR50.55a, August 6, 1992.

This letter submits for Commission review and approval, revised relief request 2-ISI-001 andnew relief request 2-ISI-010. Both'relief requests will be implemented during the thirdinspection period of the first'inspection interval. H

Relief request 2-ISI-001 was submitted to the Commission by Reference 1 and approved byReference 2. On August 6, 1992, the Commission issued 10CFR50.55a (Reference 3) whichrevoked all previously granted relief requests for Reactor Pressure Vessel (RPV) shell welds(Section XIcategory B-A, item number B1.10). At refueling outage R-8 (Spring 1993) WNP-2performed RPV weld examinations and was able to comply with the increased coverage requiredin Reference 3 except for one longitudinal weld. Revised relief request 2-ISI-001 defines thecoverage obtainable.

Relief request 2-ISI-010 defines the examination coverage obtainable on the RPV nozzle-to-vessel welds. Complete Code required volume was not obtainable due to the nozzleconfiguration.

9307020374'930624PDR ADOCK 05000397O'DR '

Page 3: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

i4.

k

is 1I

Page 4: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

Page TwoINSERVICE INSPECTION PROGRAMRELIEF REQUESTS 2-ISI-001 AND 2-ISI-010

Commission review and disposition is requested prior to February 1, 1994, to support the Spring1994 refueling outage.

Sincerel,

J. V. Parrish t,Mail Drop 1023)Assistant Managing Director, Operations

MGE/bk

Attachments: 1)

2)

3)

ISI Weld and Component Diagram RPV-101, RPV-102

Relief Request 2-ISI-001General Electric Coverage Report for R-8

Relief Request 2-ISI-010General Electric Coverage Report for=R-7

Coverage Plot for N3 - Main Steam

CC: BH Faulkenberry - NRC RVNS Reynolds - Winston & StrawnJW Clifford - NRCDL Williams - BPA/399NRC Site Inspector - 901A

Page 5: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

Page 6: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

9~Pgp2O3~~

ATTACHMENT1

Page 7: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

0

Page 8: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

7 10

AE

7 1/4 T

JO

6 7/16 T

340'l

4A

Qr2

0 04 220

N148

210'

160'14C

170'K

15EE NOTE 2)~los'38

TOP FLANGE

Q ~ I CSEE NOTE 5 Tft FOR 6)

20'l

40

~ a. 50o'-0

~ EL571'-

EL 568'0 I/4'

ICFCR 10 FIC)CAAJI tLAN S SOCOAC TACLCS

FCR E)SARINATICN C CALIOt)TIOIILLIEO/IACIENIS.

Irre'IDICATTS NAZI INPAII NEA. NVe

~3 Al R)E N)f)LC To SAFE~ )CLO tr0eIS N)f NCAW.

3 ~ rl IS 2 I/O TO 3 7/I )I CCFIN IIS IS VIDE SY XI'INL NOIE TVAT ~ol AREA CMKR IS CON)SIOINLY SRXKtD.

4. FCR CaSuS CF N)fnc A)M)CLYCCC ~II).

6 7/16 7

Q r6

0330'LF

0340

315')20

HSC

Q rs

027O 0HCE 240'16

190'813s

210'40

180'SEE

NOTE 4) Hlo

Q44

0150'4A

190'0

p160'35')28

ISIS

200eBH

200'3Se

H12C

00 SO120'48NS

100'F

~3Q 10'H13A

30'IIC

'Io'E

45'0'OA

H12A

+ EL564'-

a.562'+

n. Ssl'

a. 95s'

EL 554'-9 I/4

EL 552'EL 551'W'L

551'W9/16'Tot

ACTIVE CCRE

S. CLACOIIA PATCH LOCA)IOds~IATae Al~2 Af 27s)'l

INC 21 ICLOI FLANeC Llt)~SAT a Al~4 Af Ifs)'l~S Af 240'l~I Af 3)0'l

CAIN 24 ACOYC IIC Nl Is)ZNCS)

9 7/16 1

AA6 3/O'T

8 T

a. 544'~ I/4

2 6 3)

9

330'2K

His

0 0 0300e

270'Ql

N2H

205'15'0

240'QO

-0210'2F

225'C

Q 0)ooHIA

SKIRT KIQCKLE~332'-51'C8 272'%1'DA 212'-51'DF

BOTTOH NEAO

152'-51'DE

IVVe r4 CSEE NOTE 2)

0 0 0120'0'0'2D

H2C H28

105'35'SA

88

030eH2A Oe45'IS

SA

32'Wl 'DC

+ EL 540'-21/4'L

53$ 'W9/16'BOTTON

ACTIVE CORE

~ a. 53)'EL

535'.

EL 533'

a. 529'-4 I/Is

+ EL 527'-9 I/4'a. 525'

25/32'EEEIESE42a.

~erode I ac CR)vlleoIoro KY 2

Oe Ia'

0'. 270'80'UTSIDE

VIEM

SO''HISCRAVINO IS INTENXO FOI

I/SE IN FIESCRVICE AH) IN)ENTICE

INSPCC'floNS FROCIAICS OLY

COAL)TV CLASSe I ASIE CODE CLASSe IENCRs K IWWN CO) VNs K~ DATEs 2-23-7O

VASNIIAITOIFOLIC FOeER

SUPPLY SYSTE)4

IIRLNo, vs)selscfcse Ns)cc

4 17~57 secor esseeeee. essssesso seeo.coesccsso soer sose soe seets4sseeso

3 ll 1-ll IL ACI'w'sr %$)'cscsco oct loc cNN Io coseclcc, K~AtltlleC SYSTOI

Ir)NCIAISO

NCNINILVAIL

TNICAESS

RATERIAL

SPECIFICATION

Irrs-2

IELO S COPOCNT

IDENTIF ICAT ICH DIACRAN

2 II 5 do Ns c)cvrf lcess Ac'Ilvc ccwc

H I 7 17 lv ocsl5$ eccRA Nlcse) rcA ss osLI. Acccr asc) 4 A 5. MoA

0 ll ll 70 ISSCO fCI COC

'IFN

Lfo

Isclc)ce) trcsss/sc vccSKL 751 VA 7 I/4, I 7/IC, $ 7/IS CA 10I CI ~ CS ls)IC I

I 5 lf 70 IS)CD FOS INOVIATICNOLY

avlsloIKmA

DVOHOe RPy-TE)q

Page 9: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

D8r

0'RIESI MTR TO SROC$ NI SLQI 4 SCOEIÃAE 'fARES

fCR ETINIHATICHCALIRIATIOICOCKICOIIISTSNfL

1. SCR DETALS Ct HOER'SIONLT ISE ftf Ill.

SLPPOflT SKIRT

31S''sI272'70'

DA

l\

Oa«T~

OF

O'7

0H'IS

Nil

lI

AS

// AA

CC315'12e

152'80'NSIDE

PLAN VIEll

285e W

5 I/O 7

3 S/O'T ON18

ISEE tOTE 2lAH

AO 135'AIALITTCLA55e ASIC CCCE CLASS e

I19$ '

Is (RP )

PLAH VIEN

IeCOISIIO LOCO. RGRAON oav

tiff!RSTSIENIKRDIAIHD

THIS ORAVIHS 15 INmfEEO FOR

USE IN PICSERT ICE Afo INSERT ICE

INSPECT ICHS PRCCRAHS OLTe

HATERIAL

SPEC IFICATICH

ENCI4 4 AAIC CRAWe K~ OATEe 2-20-74

VASHIIRTCR SIRLIC tOCR

SNIPLY SYSTEII

~IOAAIRe NIRNINIOI%SR

ICLO 0 COPCtCNT

IDQITIFI CAT I CH DIACRAH

2 12MIH I 4 70.7$

0 12-22-70

5-17-70

OOICAIED TEML OCIAT IDAQEOI

HKEO NOTE 2

ISSCEO SIR IIOE

ISRCO SCR INOOIATION OLT

AAIISICH

K~A OPR TfH 5 5/0, S I/O Sl SC4 CR 4 7 ITLEeICACTCR ffCSSLIC VESSEL

TOt 4 ODTIINI ICAD ICLOS

DNOlee RPV 102

Page 10: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

ATTACHMENT2

Page 11: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

REQUEST FOR RELIEF NO. ISI-2-001r

Component orSystem

Code

Number ofWelds

Section XIRequirements

ASME Class 1, Section XI Category B-A pressure retaining welds in reactor

p I. ~S ht blAllof the subject welds were designed and fabricated to ASME Section IIIClass 1 1971 Edition, Summer 1971 Addenda. The inservice inattention is tobe performed to the 1980 Edition Winter 1980 Addenda of ASME Section XI.

C'~te sorO No.

B-A 44 9

Section XI requires examination of 100% of the pressure retaining welds inCategory B-A be performed completely. The following examinations arerequired:

Basis forRequestingRelief

AlternativeExaminations

Impact on PlantQuality andSafety

B-A Allpressure retaining welds in reactor vessel. Volumetric

Relief is required from ASME Section XI examination requirements on thebasis of partial inaccessibility of the weld due to plant design. The design andaccess provisions complied with earlier Codes which did not require 100%examination. Per 10CFR50.55a (g) (4), access is not required to be upgradedto the Inservice Inspection Code.

The accessible portion of each weld willbe examined per Section XIrequirements augmented by Regulatory Guide 1.150, Revision 1, Appendix A

There willbe no adverse impact on plant quality and safety by doing only apartial Code examination of these welds.

The Class 1 RPV welds have passed radiographic, magnetic particleand ultrasonic examinations in accordance with Section III.

2.

5.

Allof the identified welds willbe subject to a system pressure test inaccordance with Section XI Class 1 requirements.

Leak detection systems identify significant leakage in the areas of thesubject welds. Appropriate operator action would occur due to leakdetection system alarms.

Other similar welds in the vessel will receive full Code examinations.The integrity of the pressure boundary can thus be verified bysampling.

Improves on plant quality and safety by increasing the coverage ofRPV weld examinations over previous ReliefRequest revision.

Page 12: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

REQUEST FOR RELIEF NO. ISI-2-001

CCC-A

ISO No.

RPV-101

RPV-102

RPV-102

RPV-102

RPV-102

RPV-102

RPV-102

RPV-102

RPV-102

Weld Number

AB

DA

DB

DC

DD

DE

DF

DG

DR

Description

¹1-¹2 SC CRC WD

BTM HD MRD at272'TM

HD MRD at332'TM

HD MRD at32'TM

HD MRD at92'TM

HD MRD at152'TM

HD MRD at212'OT

HD DOL at270'OT

HD DOL at 90'

of WeldExaminable

$2% 79.7%

67% 78.6%

67% 78.6%

67% 78.6%

67% 78.6%

67% 78.6%

67-% 78. 6%

17%

17%

Remarks

See Note4 4

Thermocouples at weld AAintersection. See Note 2

See Note 2

See Note 2

See Note 2

See Note 2

See Note 2

See Note 3

See Note 3

Notes to Table

2.

3.

Design of RPV shield wall and external inservice inspection system was completed prior to promulgation of amendments to10CFR50.55a. Their design limits access to less than 100% of this weld.

Only 21" starting from the intersection of weld AA and 14" starting from the intersection of weld AJ can be examined dueto the vessel skirt. (Approximately one foot is not being examined on each weld.)

Only 12" to 23" on each end of the weld, starting from the intersection of weld AJ, can be examined due to CRD penetrationsand housings.

4. Examination coverage limited by weld taper.

Page 13: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

Page 14: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

Documentation Supporting Relief Request 2-ISI-001

On August 6, 1992, the Commission issued 10CFR50.55a with augmented RPV examinationrequirements. This rule revoked all previously granted relief requests for RPV shell welds inCategory B-A, Item No. B1.10. This rule revoked Supply System relief ISI-2-001 for weldsAA, AB, AC, AD, AE, BJ and BK. This rule also allowed utilities that could examine greaterthan 90% of the weld to take credit for the entire volume without seeking relief. At refuelingoutage, R-8, WNP-2 was able to examine greater than 90% of welds AA, AC BJ and BK.Welds AD and AE will be examined manually at R-9 and greater than 90% coverage isexpected. This leaves only shell weld, AB where it is not possible to obtain at least 90%examination cover.

Weld AB received 79.7% examination volume coverage at R-8. This examination was restricteddue to the weld taper going from the 9 7/16" shell course 1 plate to the 6 2/16" shell course 2plate. This weld is located about one foot above the bottom of the active core. This coverageexceeded the 52% that was obtained using the original inspection system.

WNP-2 is able to examine 92% of the total shell welds volume and 89.4% of the total shellwelds volume in the belt line region. The main restriction to 100% examination in the belt lineregion is the taper on weld AB.

I

Following is the coverage report prepared for WNP-2 by General Electric at the conclusion ofthe R-8 RPV examinations. This report is provided to support the commission review of thisrelief request. Included in the report is a table listing the coverage obtained during refuelingoutage R-8 and coverage plates for weld AB. From these plates it can be seen that the innerportion of the examination volume is examined.

In the reports table welds BN, BP and BR are identified as receiving approximately 60%coverage due to insulation. This insulation willbe removed at R-9 in support of welds AD andAE examination, The remaining volume of welds BN, BP and BR will be examined at thattime. It is expected that greater than 90% coverage willbe achieved.

RPV fabrication code was corrected to 1971 Edition, Summer 1971 Addendum.

Page 15: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:
Page 16: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WASHINGTON PUBLIC POWER SUPPLY SYSTEIVIWASHINGTON NUCLEAR PLANT - UNIT 2

COVERAGE REPORT

Page 17: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:
Page 18: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WASHINGTON NUCLEAR PLANT UNIT 2 RFO-8 INSERVICE EXAMINATION

COVERAGE REPORT

INTRDDUGTIDN

No automated inspection system in use today is capable of effectively examining 100% of the ASMECode examination volume defined in Section XI - IWB 2500-7(b) ~ This fact has been recognized in thatthe NRC Regulatory Guide 1.150 requires that volumes that are not examined be defined anddocumented in the examination report.

This document describes the capability of General Electric's automated RPV inspection system (GERIS)to meet the requirements of Regulatory Guide 1.150 paragraphs 7.b and 7.c and 10CFR50-55a(g).

Examination techniques described in this report are those used by General Electric when performingautomatic ultrasonic inspections on ASME Code category B-A pressure retaining welds in pressurevessels and adjoining base material regions. Scanning coverage for both longitudinal andcircumferential seams is documented in this report. The ASME Boiler and Pressure Vessel Codereferenced in this report is the 1980 Edition with Winter 1980 Addenda.

ASME CDDE AND REGULATDRY GUIDE 1.150 REQUIREMENTs

Section 50.55a, "Codes and Standards," of 10 CFR Part 50 requires that Class I components perAmerican Society for Mechanical Engineers Boiler and Pressure Vessel Code (ASME BS.PV Code) meetthe requirements set forth in Section XI, "Rules for Inservice Inspection of Nuclear Power PlantComponents," of the ASME Code.

Section XI IWB-2500-1 requires that pressure retaining welds in pressure vessels be examinedperiodically by volumetric inspection techniques.

Ultrasonic examinations are performed in accordance with the ASME Code, Section V, Article 4"Ultrasonic Examination When Dimensioning of Indications is Required" . Scanning is performed byangle beam and straight beam techniques per paragraphs T-441.5 through T-441.7 wherever suchscanning is feasible.

The United States Nuclear Regulatory Commission (NRC) has issued Regulatory Guide 1.150,"Ultrasonic Testing of Reactor Vessel Welds During Preservice and Inservice Examinations", to assureimproved pressure vessel inspections. The recommendations of this guide are supplemental to therequirements of Section XI.

For longitudinal and circumferential seam welds in the vessel shell, and for meridianal andcircumferential welds in the vessel heads, the area to be examined per Figure IWB-2500-7(b) is definedas the weld metal and 1/2T of base metal on either side of the weld.

For volumes that are inaccessible to the transducer, or volumes shadowed by part geometry thatcannot be effectively examined, Regulatory Guide 1.150 paragraph 7.b requires that a best estimate ofthe affected volume be reported along with the ultrasonic examination results.

EQUIPMENT DESGRIPTIDN

The scanner used for vessel welds is shown in Fig. 1. It is held on the vessel surface by permanentmagnetic wheels. No tracks are required. DC gearmotors are used for propulsion. The front wheels ofthe vehicle are steerable.

Attitude or heading of the vehicle is read by a pendulum attached to an encoder. A magnetic odometerwheel runs on the vessel surface to drive another encoder which reads distance travelled. A videocamera and lights are mounted on the vehicle to permit the operator to see where he is going.

Coverape Report

Page 19: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:
Page 20: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

The scanning mechanism comprises the transducer package, shown in Fig.2, a ballscrew to move thepackage, stepper motors, an encoder and various support members. Couplant is supplied to thepackage via flexible tubing.

The transducer package includes five UT transducers: one L-wave, one 45'-scan (transverse to theweld), one 60'-scan, one 45'-scan (parallel to weld) and one 60'-scan.

0 000

0 0

FIGURE 1

Qtraa RpV Iereeeree Voh'e'4

Tr~ bool@~ e4tttrl wvNv M

~eence IvowrFIGURE 2

EXAMINATIONTECHNIQUES

The scanner moves the transducer package across the weld as the vehicle steps along the centerline ofthe weld under computer control. Each transducer is pulsed as required to examine the weld. In generaltwo passes along the weld are made, one in each direction. If required because of access limitations, itis possible to reverse the transducer package or to reverse the P-scan transducers to gain additionalcoverage.

SCAN LIMITATIONSAND VOLUMEOF COVERAGE

Scanning of the RPV welds was restricted in several areas so that complete coverage could not beattained.

Welds where scanning was limited by the vessel design include weld AB, where the large difference inthickness between adjacent shell courses caused some areas to be missed, and sections of the bottomhead meridianal welds which are covered by the support skirt. The stabilizer support brackets alsoconstitute a limitation on scanning of some welds.

Automated scanning was limited in some areas by permanent tracks used by other examinationsystems and by insulation. Some of these restrictions will be removed in future outages.

In areas where automated examination cannot be performed, manual examinations are performed to theextent feasible. Feasibility depends primarily on weld geometry and accessibility, although ALARAconsiderations may also apply.

Table 1 summarizes the examined volume for each weld scanned during RFO-8.

CoverarIe Report

Page 21: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

Weld ID Length C/S Area Coverage Restrictions

AA

( AB

AC

860.2 71.8 in'9.8%840.1 70.5 in'9.7%840.1 57.9 in'2.4%

None

Taper on shell course ¹1

nozzles N6A, N6B & N6C

AJ

BA

BB

684.5 70.4 in* 100% None

'I

130.2 119.8in'0.8% t Taper on shell course ¹1, nozzles N2A & N2B

130.2 119.8 in'1.9% Taper on shell course ¹1, nozzles N2D & N2E

BC

BD

BE

BF

BG

BH

BJ

BK

i BM

BP

BR

DA

DB

DC

DD

DE

DF

DG

DR

55.8 62.7 in'8.6%55.8 62.7 in'8.6%219.2 77.3 in'6.7%219.2 77.3 in'6.7%

130.2 119.8 in'1.2%130.2 119.8 in'2.8%175.0 53.2 in'8.1%175.0 53.2 in'5.6%175.0 53.2 in'8.1%175.0 53.2 in'3.7%169.0 61.9 in'1.7%169.0 61.9 in* 96.8%

169.0 61.9 in'2.1%145.9 66.8 in* 64.8%

145.9 66.8 in'2.9%145.9 66.8 in'0.3%55.8 62.7 in'8.6%55.8 62.7 in'8.6%55.8 62.7 in'8.6%55.8 62.7 in* 78.6%

'aper

on shell course ¹1, nozzles N2F & N2G

Taper on shell course ¹1, nozzles N2J & N2K

Taper on shell course ¹1, nozzle N12A

Taper on shell course ¹1

Taper on shell course ¹1, nozzle N12C

Taper on shell course ¹1

Insulation, stabilizer bracket

Insulation, stabilizer bracket

Insulation

Insulation

Insulation, nozzles N3A & N3B

Insulation

Support skirt

Support skirt

Support skirt

Support skirt

Support skirt

Support skirt

CRD lines

CRD lines

MRP1 30.0 98.1 in* 100% None

TABLE 1: EXAMINATIONCOVERAGE

Coverege Report

Page 22: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2WELD AB

aCode vol c/s area 70.5 ln

0'eld metal scan

c/s area examined 53.0 In

Page 23: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

li

k

Page 24: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

VNP-2VELD AB

tCode vol c/s area 70.5'In

45'nd 60'-scantc/s area examined 59.8 In

Page 25: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

E

1

(

Page 26: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2WELD AB

tCode vol c/s area 70.5 in

45'-scan from bottom side

c/s area examined 54.5 In'

Page 27: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

)

Page 28: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

VNP-2VELD AB

tCode vol c/s area 70.5 In

45'-scan Frow top sideac/s area examined 46.8 In

Page 29: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0I

i

Page 30: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

MNP-2MELD AB

aCode vol c/s area 70.5 In

60'-scan from bottom sIde

c/s area examIned 65.3 In

Page 31: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

l

Page 32: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

VNP-2VELD AB

tCode vol c/s area 70.5 In

60'-scan From top sidetc/s area examtned 46.8 In

Page 33: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

~"

II

0

Page 34: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

A%I'ACHMENT3

Page 35: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

REQUEST FOR RELIEF NO. ISI-2-010

Component orSystem

Code

Number ofWelds

Section XIRequirements

Basis forRequestingRelief

AlternativeExaminations

Impact on PlantQuality andSafety

ASME Class 1, Section XI Category B-D, item B3.90, pressure retainingwelds in reactor pressure vessel. See table below.

Allof the subject welds were designed and fabricated to ASME Section IIIClass 1 1971 Edition, Summer 1971 Addenda. The inservice inspection is to

be performed to the 1980 Edition Winter 1980 Addenda of ASME Section XI.

~Ca e ~orO ~N

B-D 27

Section XI requires that 100% of the examination volume defined in FigureIWB-2500-7(b) be examined.

Relief is required from ASME Section XI examination requirements on thebasis of partial inaccessibility of the weld due to configuration. The design ofthe vessel to nozzle weld prevents examination of 100% of the volume definedin Figure IWB-2500-7(b) with today's available equipment.

The accessible portion of each weld willbe examined per Section XIrequirements, augmented with Regulatory Guide 1.150 Revision 1, AppendixA requirements.

There willbe no adverse impact on plant quality and safety by doing only a

partial Code examination of these welds.

The Cla'ss 1 RPV welds have passed radiographic, magnetic particleand ultrasonic examinations in accordance with Section III.

2.

3.

4.

5.

6.

Allof the identified welds willbe subject to a system pressure test inaccordance with Section XI Class 1 requirements.

Leak detection systems identify significant leakage in the areas of the

subject welds. Appropriate operator action would occur due to leakdetection system alarms.

No automatic inspection system in use today can effectively examine100% of the required code volume. Additional manual examinationswillnot significantly increase, ifat all, the volume examined.

The Section XI weld examinations willbe augmented by RegulatoryGuide 1.150 Revision 1, Appendix A requirements.

The achievable coverage willdetect flaws in the inner volume wherethey are most likely to occur.

Page 36: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:
Page 37: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

REQUEST FOR RELIEF NO. ISI-2-010

Table of Weld Coverage

NozzleNumber

N1

N2

N3

Description

ReactorRecirculationOutlet

ReactorRecirculationInlet

Main Steam

Number ofNozzles

10

% VolumeExamined45 Degree

75

75

86

% VolumeExamined60 Degree

81

81

90

N4 Feed water 71 79

N5 Low PressureCore Spray

Low PressureCore Injection

86

72

90

79

N16 High PressureCore Spray

72 80

Page 38: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

I

I

Page 39: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

Documentation Supporting Relief Request 2-ISI-010

Following is the coverage report prepared for WNP-2 by General Electric at the conclusion ofrefueling outage R-7 RPV nozzle to vessel examinations. This report is provided to support the

commission's review of this relief request. Included in the report is a table listing the coverage

obtained during R-7 and coverage plates.

Following General Electric coverage report is a coverage plot for nozzle to vessel weld for N3,main steam. The N3 nozzle to vessel welds were done manually between outages R-2 and R-7.

Page 40: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

O.

Page 41: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WASHINGTON PUBLIC POWER SUPPLY SYSTEMWASHINGTON NUCLEAR PLANT — UNIT 2

COVERAGE REPORT

Page 42: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

t

I

Page 43: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

I. INTRODUCTION

This document describes the capability of General Electric's automated RPV

inspection system (GERIS) to meet the requirements of Regulatory Guide 1.150paragraphs 7.b and 7.c and 10 CFR 50-55a(g).

Examination techniques described in this report are those used by GeneralElectric when performing automatic ultrasonic inspections on ASME Code categoryB-D nozzle to vessel attachment welds and adjoining base material regions, andnozzle inner radius areas. Scanning coverage documented in this report is fornozzle forging (flange type) to vessel welds. The ASME Boiler and PressureVessel Code referenced in this report is the 1980 Edition, Winter 1980 Addenda.

No automated inspection system in use today is capable of effectively examining100% of the ASME Code examination volume defined in Section XI - IWB 2500-7(b).This fact has been recognized in that the NRC Regulatory Guide 1.150 requiresthat volumes that are not examined be defined and documented in the examinationreport.

\

Manual examination of areas inaccessible to the automatic equipment due to nozzlegeometry (excluding areas inaccesible due to restrictive adjacent nozzles) wouldyield only a small increase in the volume examined. Complete coverage wouldstill 'not be attained.

II. ASME CODE AND REGULATORY GUIDE 1.150 REQUIREMENTS

Section 50.55a, "Codes and Standards," of 10 CFR Part 50 requires that Class Icomponents per American Society for Mechanic'al Engineers Boiler and PressureVessel Code (ASME BRPV Code) meet the requirements set forth in Section XI,"Rules for Inservice Inspection of Nuclear Power Plant Components," of the ASME

Code.

Section XI IWB-2500-1 requires that nozzle to vessel and vessel seam welds beexamined by volumetric inspection techniques.

Nozzle-to-Vessel Welds

For nozzle to vessel welds, the area to be volumetrically examined per figureIWB-2500-7(b) is defined as the weld metal plus adjacent base material regionsas shown in Figure 1.

Nozzle Inner-Radius'nd Bore

For the nozzle inner radius region, the area to be examined per FigureIWB-2500-7(b) is defined as the inner 1/2 inch of the inner radius and the nozzlebore through to vessel wall thickness. This region is identified in Figure 2 asZone 1 and Zone 2A. The nozzle bore extends out from the end of the inner radiousection to the end of the cylindrical portion of the nozzle; this region isidentified in Figure 2 as Zone 2B and Zone 3.

Page 44: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

For volumes that are inaccessible to the transducer, or volumes shadowed by partgeometry that have not been effectively examined, Regulatory Guide 1.150paragraph 7.b requires that a best estimate of the affected volume be reportedalong with the ultrasonic examination results.

III. AUTOMATED NOZZLE AND VESSEL SCANNER

EQUIPMENT DESCRIPTION

Nozzle to Vessel Weld and Nozzle Inner Radius Scanner

The nozzle device, mounted on a channel track clamped around the nozzle OD

cylindrical surface, provides the means of performing a remote ultrasonicexamination of the nozzle welds (see Figure 3). The nozzle device includes thenozzle tractor, scanner arm and transducer package.

Scanner

TransducerPackage

+ Tractor

Nozzle

TrackVeld Centerlne

FRONT SIDE

Figure 3

Nozzle Tractor and Scanner

The nozzle tractor consists of a main body with two motor driven magnetic wheelsand two hinged end sections, each with one motor driven magnetic wheel assembly.A pendulum and resolver are mounted on the main body to give the angular positionof the nozzle tractor. The reciprocating scanner arm is attached to the nozzletractor and extends perpendicular to the nozzle track for scanning the nozzle tovessel welds and nozzle inner radius.

Page 45: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

C:3 canc vs.uec

Figure 1Nozzle Weld Examination Volume

Sere

Zo~e 2$

Wo 2A

Inner WCI

?one I

Figure 2Nozzle Inner Radius and Bore Examination Volume

Ultrasonic examinations are performed according to Article 4 "UltrasonicExamination When Dimensioning of Indications is Required" of Section V. Scanningis performed by angle beam and straight beam techniques per paragraphs T-441.5through T-441.7 wherever such scanning is feasible.

The United States Nuclear Regulatory Commission (NRC) has issued Regulatory Guide1.150, "Ultrasonic Testing 'of Reactor Vessel Welds During Preservice andInservice Examinations", to assure improved pressure vessel inspections. Therecommendations of this guide are supplemental to the requirements of Section XI.

Page 46: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

P

t

Page 47: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

The scanner arm consists of a frame, two tandem mounted stepping motors, a wormgear driven resolver, and a ball screw driven plate which holds the ultrasonictransducer package. The scanner arm is held to the vessel wall with two springloaded guide rods on the inboard end and two magnetic wheels mounted at theoutboard end of the scanner arm. The transducer package consists of a combinationof various transducer wedges individually mounted in a frame. The wedges producebeam angles as required by Section V. To improve coupling efficiency, aspecially designed soft rubber-faced transducer wedge is used.

EXAMINATIONTECHNIQUES

Nozzle to Vessel fields"

The accessible examination volume of nozzle to vessel welds is examined by usingtwo types of scanning packages as described below.

The T-scan (shear wave sound beam transverse to the weld axis) transducer packageconsists of 45 and 60 angle beam wedges (see Figure 4). The 45~ and 60 anglebeam wedges are angulated to produce a sound beam that is perpendicular to theweld centerline at the vessel inner surface.

VELD CEHTERLINC

450 T

PACKS OP POLIT

60'

NOZZLE T

Figure 4T-Scan Transducer Package

One complete revolution of the nozzle scanner with the T-scan package will scanthe accessible examination volume for parallel oriented reflectors using a 45and 60'ngle beam. The P-scan {shear wave sound beam parallel to the weld axis)transducer package consists of 45 and 60~ angle beam wedges. The wedges areangulated to produce a sound beam that is tangent to the weld centerline at thevessel inner surface. The P|-scan consists of a 454 angle beam pointed in the

Page 48: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

1

Page 49: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

counterclockwise direction and a 60 angle beam pointed in the clockwisedirection. For the P2-scan the 45~ is pointed in the clockwise direction and the60 in the counterclockwise direction (see Figure 5).

60'V 45'V

H01Z(.C Pl

Figure 5P-scan Transducer Package

Two c'omplete revolutions of the nozzle scanner, one revolution with the P1package and one revolution with the P2 package are performed to scan (from twodirections) the accessible examination volume for transverse oriented reflectors.

The L-wave scan (0 longitudinal wave) transducer package consists of a 0~longitudinal wave transducer (see Figure 6).; (

One complete revolution of the nozzle scanner with the L wave package will scanthe accessible examination volume for planar and laminar reflectors using a 04straight beam.

Nozzle Inner Radius and Bore

The nozzle inner radius and bore are divided into two zones, identified as Zone1 and Zone 2A. Each zone is examined by a separate testing technique. Each

'xamination technique has its own unique transducer array.

Zone 1 Examination

Page 50: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

H

Page 51: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

VELD CENTERL(NE

VELD METAL L-VAVE 0

PARADE ILO POINT~BASE NETAL L-VAVEGF'AALtOQLEl

,0 ~

FIZZLE L-VAYU SCAN

Figure 6L-wave Transducer Package

The nozzle inner radius is examined from the vessel plate with a refracted shearwave that passes through the nozzle to vessel weld (see Figure '7).

I

Beam and rotation angles are calculated assuming the sound beam incident pointis located 4 inches out from the vessel to nozzle outer radius tangent pointwhere the sound beam lies in a plane 45 to 60 degrees to the vertical as viewedalong the nozzle axis. The axial reflector location is at the center of thenozzle inner radius located at the top dead center of the nozzle.

When wedges are not available to meet the exact wedge design criteria, wedges areselected with closely matched sound beam angles. The incident point and rotationangles are then recalculated using the selected beam angle.

Zone 2A Examination (Nozzle Scanner)

The Zone 2A area of the nozzle bore as shown in figure 3 is examined withrefracted shear waves from the surface where the nozzle OD blend radius mergeswith the cylindrical surfaces of the RPV. This scan is performed with the nozzlescanner.

The sound beam and rotation angles are calculated assuming that the incidentpoint of the sound beam is located on the nozzle OD blend radius adjacent to thevessel surface and the axial reflector location is located at the intersectionpoint of Zones 2A and 2B. The Zone 2A transducer is designed to perform scanningfrom the nozzle OD blend radius. Typically, coverage extends from the Zone 1

Page 52: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

MELD CENTERLINE

Zu COV

PACKAGE 4) Pa|MT ~

ZD CV

Figure 7Zone 1 Transducer Package

region well into the Zone 2B area.

One complete revolution of the nozzle scanner with two Zone 2A transducers, onedirected in the clockwise direction and the other in the counter-clockwisedirection scans the accessible Zone 1 and Zone 2A examination .volume for axialreflectors.

IV. SCANNING COVERAGE

The flanged nozzle design when examined from the outside vessel surface does notallow a full volumetric inspection of the volume specified in FigureIVB-2500-7(b) . The main limitation is the fact that the volume can only beexamined from one side.

Scan Limitations and Volume of Coverage.

Table 1 summarizes the examined volume from the coverage plots in Appendix A.Note that the area not examined due to near field effects, which has beendetermined to be the outer 0.5" of the examination volume, has been excluded fromthe 'Volume Examined'ercentages in the table.

Page 53: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

Summary sheets and data sheets for four N2 nozzles (N2-90, N2-120, N2-270, andN2- 300) list a restriction on the 60O T-scan by N9 nozzles. This is .arestriction on the intended scanning area only. At the outer pulsing limit, the60'eam intersects the ID surface 1.1" outside the edge of the weld. This doesnot constitute a restriction of coverage for Code purposes.

The figures show the extent of scan coverage attained on all scans of all sevennozzle types examined. These figures treat the sound beam as a single ray andtake no credit for beam spread. Coverage is taken as that portion of the cross-sectional area of the Code volume (including the outer 0.5", as shown in thefigures) which is actually intersected by the sound beam'. Results for the

0'eldmetal examination, 45 6 60 T-scans (transverse, to the weld), 45 & 60P-scans (parallel to the weld), and the inner radius section are shown.

Page 54: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

t

l

0,

Page 55: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N I

Recirc OutletCode voI c/s area 134.0 i n

45 deg T-scan 105.4

Page 56: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0,

0

~ „

Page 57: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N I

Recirc OutletCode vo I c/s area l 34.0 i n

60 deg T-scan II4.4 85 4X

Page 58: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N I

Recirc OutletCode vol c/s area 134.0 in

L-wave 63.1 47 Ii

Page 59: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:
Page 60: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N I

Recirc OutletCode vol c/s area I34.0 in

45 deg P-scan 73.9 55 Ii

Page 61: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N I

Recirc OutletCode vol c/s area l34.0 in

60 deg P-scan 98. 0

Page 62: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

Igf

f

0

Page 63: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N I

Rec:irc OutletCode vol c/s area I34.0

in'nner

Radius c/s area 5.9 I00.0%

Page 64: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:
Page 65: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 I'42

Recirc Inlet

(ode voI c/s area 135 in~

'15 deg 7-scan . l06.6

Page 66: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

t

~ '

Page 67: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 IU2

R ecir c Inlet

Code vol c/s area l3S. in~

60 deg T-scan IIS.4

Page 68: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

f

Page 69: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

IAINP-2 N2Recirc Inlet

Code vo I c/s area I 35 i ri2

L-wove 6l 5

Page 70: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

k

II

Page 71: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N2Recirc Inlet

Code vol c/s area l35. in

15 deg P-scan 94.0

Page 72: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

I

II

~ i

Page 73: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N2Recirc Inlet

Code vol c/s area l55. in

60 deg P-scan 1 07. 0

Page 74: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

~,i

lit

Page 75: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 l>I2

E(eel/ c !:11

~I'ode

vc I:/s ar ea I 35. i n

Inner radius c.'/s area 6.0

Page 76: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

If

0

0

hi

i

f"I

I

IriI

~ i

Page 77: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 IU4

Feedwater

Code vo I c/s area 64. 2 i n

45 deg T-scan

Page 78: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:
Page 79: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N4

Feedwater

Code vo I c/s area 64. 2 i n2

60 deg T-scan r~g

Page 80: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

l~

III

t

t

,J

Page 81: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2

Feedljjluter

Code vol c/s area 64.2 in

L-wave

Page 82: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N4

Feedwater

Code vo I c/s ar ea 64. 2 i n

45 deg P- scan 34

Page 83: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WIMP-2 IU4

Feedwater

Code vol c/s ur.ea 64.2 in 2

60 deg P-scan 39. 6

Page 84: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N4

Feedwater

Code vo I c/s area 64. 2 i n2

Inner radius c/s area 3.9 I 00. Oi

Page 85: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

~ li

t N'

Page 86: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WISP-2 N5RHR/LPC I

Code vol c/s area 64.3 in 2

4S deg T-scan 50.I

Page 87: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

,

Page 88: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

IIII'NP-2 N 6RWR/LPCI

Code vol c/s area 64.3 in

60 deg T-scan 54. 6

Page 89: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

4

l

Page 90: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 IU5RHR/LPCI

Code vol c/s area 64.3 in~ 2

L-wave 30.I

Page 91: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N5RWR/LPCI

Code vol c/s area 64.3 in~ 2

45 deg P-scan

Page 92: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

Page 93: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

trtj'NP-2 N 6RHR/LPCI

Code vol c/s area 6<.3 in

60 deg P-scan

Page 94: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

fl I

Page 95: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 I'~l 5RWR/LPCI

Code vo I c/s ar ea 64. 3 i n

inner radius c/s area 4.0

Page 96: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

I

~ i

Page 97: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WHIP-2 Nl 9Je t Pump In st rurnen t

Code vol c/s orea l27.5 in"

15 deg T-scan I) 0

Page 98: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

r

j

1

0'

Page 99: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N 9Jet Pump Instrument

Code vo! c/s area I 27. 5 in"-

60 deg T-scan I~4.0

Page 100: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

0

I

i

Page 101: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N gJPt PUMp lllStl Llfllr

I1t'ode

vol c/s area l27.5

L-wave

Page 102: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 NQJet Pump Instrument

Code vol c/s area l27.5 tn.

45 deg P-scan 98. 8

Page 103: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

'

Page 104: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

IJIJNP-2 N 9Jet Pump Instrument

Code vo I c/s area l 27. 5 i n

60 deg P-scan 98. 8 77 5~

Page 105: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 NQJet Pump Instrumenl

Code vol c/s area I'7.5 in

Inner radius c/s area

Page 106: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

lt ll

I

0

1

t

I

Page 107: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WIMP-2 N I 0CRD Hydraulic Return

Code vol c/s at e<3 |5I . I in~ 2

45 deg T-scan 60.2

Page 108: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

l

f

I

Page 109: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WISP-" IU I 0CRD Hydraulic Return

Code vo I c/s area 6I . I in~ 2

60 deg T-scan

Page 110: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

tf

j

1

iI

Page 111: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WNP-2 N I'0

CRD Hydraulic Return

Code vol c/s area 6l.l in

L-wave 52. 6

Page 112: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

II

Page 113: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WHIP-2 N I 0CRD Hydr aulic R< turn

2Code vo I c/s ar ea 6I . I i n"

45 deg P-scan 52.6

Page 114: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WlxlP-2 N It.')

CRD Hyclraulic R~-tur.n

Code vol c/.s area 6I.I in

60 deg P-scan

Page 115: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

li i

I

. l

Page 116: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WIMP-2 N I C?

CRD Hydr aulic Retur n

Code vol c/s area 61. I i n

Inner radius c/s area

Page 117: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

I

,i, l

tl

Page 118: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WISP-2 N I 6Core Spray/'I-IPCI

Code vo I c/s area 66. 2 i n

45 deg T-scan 5I.5

Page 119: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

I

1

i,,'l

i I

Page 120: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

tiff'NP-2 IU I 6Core Spruy/HPCICode vol c/s area 66.2 in

60 deg T-.scan 56.1

Page 121: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

1

II

I[

}

Ih

1

>I

'r

Page 122: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WISP-2 N I 6Core Spray/HPCICode vol c/s area 66.2 in

45 de|3 P-scan 35.2 53 3~

s

Page 123: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

f

1 y,

,I'

t

0

Page 124: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

WISP-2 N I 5Co t- e S p r a y /HPC I

r

Code voI c/s area 66.2 in

!nner radius c/s area 4.0 IOO Oi

Page 125: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

t

Page 126: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

COVERAGE PLOT FOR N3NOZZLE TO VESSEL WELD

MAINSTEAM

Page 127: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

fI

I

0

Il

II

Page 128: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

MA~ 5TEAQ

o ~)[hW IQ8'byg = 8C o

(O = fO +O

V'/a3/16

VoI4n@

Ew~s i~a.d

Regceivcd Va tuse

8-D- E'-H

I 1/lR

SS CLADDlNG~

RPV

3 1/2 R

1 5/8

5 5/8

CI

pCD

NOZZLE

Page 129: ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM, ggCZI.KRP ED DOCUMENT DIS 'UBUTIONSYSTEM REGUL RY INFORMATION'ISTRIBUT SYSTEM (RIDS) ACCESSION NBR:9307020374 DOC.DATE: 93/06/24 NOTARIZED:

1

0,