Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
1 Selected Firm GULAID CONSULTING ENGINEERS, P.C. V-91-013-20 Various Phase III Construction
District 1Proposed Subconsultants AMES ENGINEERING, INC.
GSG CONSULTANTS, INC.INTERRA, INC.MICHAEL BAKER INTERNATIONAL, INC.STANTEC CONSULTING SERVICES
1st Alternate CERA SOLUTIONS2nd Alternate INTERRA, INC.
29 Submitted on this item 201 of firms eligible to submit
2 Selected Firm ECOLOGY AND ENVIRONMENT, INC. D-91-441-20 Various Phase II Hazardous Waste District 1Proposed Subconsultants ENVIRONMENTAL DESIGN INTERNATIONAL
1st Alternate ARCADIS U.S., INC.2nd Alternate FEHR-GRAHAM & ASSOC. LLC
7 Submitted on this item 11 of firms eligible to submit
3 Selected Firm THE HOH GROUP, INC. D-91-365-20 Interstate 57 (FAI 57) at US 6 (159th
District 1Proposed Subconsultants CIORBA GROUP, INC.
DELTA ENGINEERING GROUP, LLCGSG CONSULTANTS, INC.SANCHEZ & ASSOCIATES, P.C.
1st Alternate MILHOUSE ENG. & CONSTRUCTION, INC.
2nd Alternate MACKIE CONSULTANTS, LLC/GARZA KARHOFF ENGINEERING, LLC
6 Submitted on this item 118 of firms eligible to submit
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
Dated: 07/22/2020 Page 1 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
4 Selected Firm GSG CONSULTANTS, INC. C-91-196-18 I-55 at Lemont Rd., Phase III Project District 1Proposed Subconsultants ATLAS ENGINEERING GROUP
COMPREHENSIVE CONSTRUCTION CONSULTING, INC.INTERRA, INC.KNIGHT E/A, INC.WSP USA INC.
1st Alternate APEX CONSULTING ENGINEERS, L.L.C.2nd Alternate MICHAEL BAKER INTERNATIONAL, INC.
28 Submitted on this item 201 of firms eligible to submit
5 Selected Firm GANNETT FLEMING, INC. D-91-453-20 US Route 20 from W. of Randall
District 1Proposed Subconsultants 2IM GROUP
AMERICAN SURVEYING & ENG., P.C.BURNS & MCDONNELL ENGINEERING COMPANY, INC.CERA SOLUTIONSEJM ENGINEERING DBA TRANSMART/EJM CORP.WANG ENGINEERING, INC.
1st Alternate WSP USA INC. 20 Submitted on this item 2nd Alternate BENESCH, ALFRED & CO. 103 of firms eligible to submit
Dated: 07/22/2020 Page 2 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
6 Selected Firm MOTT MACDONALD, LLC D-91-449-20 FAU 3585 Main Street from Wheeler
District 1
Proposed Subconsultants EJM ENGINEERING DBA TRANSMART/EJM CORP.
FLUIDCLARITYLOCHNER, H.W., INC.SANCHEZ & ASSOCIATES, P.C.WANG ENGINEERING, INC.
1st Alternate CIVILTECH ENGINEERING, INC.2nd Alternate ORION ENGINEERS LLC
9 Submitted on this item 118 of firms eligible to submit
7 Selected Firm PRIMERA ENGINEERS, LTD. D-91-444-20 Phase II Various Projects District 1Proposed Subconsultants ATLAS ENGINEERING GROUP
FLUIDCLARITYGONZALEZ COMPANIES, LLCLIN, T.Y. INTERN. GREAT LAKES, INC.
1st Alternate THE HOH GROUP, INC.2nd Alternate MASON, DAVID & ASSOC., INC.
31 Submitted on this item 118 of firms eligible to submit
8 Selected Firm DAMA CONSULTANTS, INC. P-91-036-20 Data Bank Management for Various District 1Proposed Subconsultants GSG CONSULTANTS, INC.
1st Alternate OSEH INC2nd Alternate CERA SOLUTIONS
3 Submitted on this item 144 of firms eligible to submit
Dated: 07/22/2020 Page 3 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
9 Selected Firm MATERIAL SOLUTIONS LABORATORY CORP. V-91-012-20 Various Phase III Construction
District 1Proposed Subconsultants TECMA ASSOCIATES
1st Alternate COTTER CONSULTING, INC.2nd Alternate STANTEC CONSULTING SERVICES
29 Submitted on this item201 of firms eligible to submit
10 Selected Firm LIN, T.Y. INTERN. GREAT LAKES, INC. D-91-451-20 FAP 346 (US Route 41) at IL Route
District 1Proposed Subconsultants GSG CONSULTANTS, INC.
SINGH & ASSOC., INC.STERLIN, DB CONSULTANTS, INC.
1st Alternate THOMAS ENGINEERING GROUP, LLC/CZAPLICKI LOPEZ, PLLC
2nd Alternate STV INCORPORATED30 Submitted on this item
118 of firms eligible to submit
11 Selected Firm HEY AND ASSOC., INC. P-91-037-20 Various Phase I Engineering for
District 1Proposed Subconsultants CLAASSEN, WHITE & ASSOCIATES, P.C.
M SQUARED ENGINEERING, LLC
1st Alternate M3 ENGINEERING GROUP, P.C.2nd Alternate FLUIDCLARITY
5 Submitted on this item 32 of firms eligible to submit
Dated: 07/22/2020 Page 4 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
12 Selected Firm STV INCORPORATED D-91-358-20 FAP 391 Pershing Rd from Ashland
District 1Proposed Subconsultants CZAPLICKI LOPEZ, PLLC
EJM ENGINEERING DBA TRANSMART/EJM CORP.
GSG CONSULTANTS, INC.STERLIN, DB CONSULTANTS, INC.
1st Alternate KNIGHT E/A, INC.2nd Alternate CIVILTECH ENGINEERING, INC.
31 Submitted on this item 118 of firms eligible to submit
13 Selected Firm H.N.T.B. CORP. D-91-369-20 Eastbound I-190 from Bessie
District 1Proposed Subconsultants ACCURATE GROUP, INC.
BLOOM COMPANIES, LLC
EJM ENGINEERING DBA TRANSMART/EJM CORP.
EXP US SERVICES, INC.GARZA KARHOFF ENGINEERING, LLCGEO SERVICES, INC.TRANSLAND ENGINEERING GROUP, LLC
1st Alternate GANNETT FLEMING, INC.2nd Alternate BENESCH, ALFRED & CO.
8 Submitted on this item 27 of firms eligible to submit
Dated: 07/22/2020 Page 5 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
14 Selected Firm BURKE, CHRISTOPHER B. ENG., LTD. D-91-370-20 I-190 at Bessie Coleman Drive,
District 1Proposed Subconsultants STERLIN, DB CONSULTANTS, INC.
THE RODERICK GROUP, INC. DBA ARDMORE RODERICKWANG ENGINEERING, INC.WSP USA INC.
1st Alternate KNIGHT E/A, INC.2nd Alternate EPSTEIN, A. & SONS INTERN., INC.
19 Submitted on this item 61 of firms eligible to submit
15 Selected Firm SAM SCHWARTZ ENGINEERING, D.P.C. D-91-445-20 Various Phase II Traffic Signal
District 1Proposed Subconsultants DAMA CONSULTANTS, INC.
1st Alternate SRF CONSULTING GROUP, INC.2nd Alternate GEWALT HAMILTON ASSOC., INC.
4 Submitted on this item21 of firms eligible to submit
16 Selected Firm INFRASTRUCTURE ENGINEERING, INC. D-91-443-20 Various Phase II Pavement and
District 1Proposed Subconsultants ATLAS ENGINEERING GROUP
EJM ENGINEERING DBA TRANSMART/EJM CORP.
INTERRA, INC.OSEH INC.RS&H, INC.
1st Alternate MICHAEL BAKER INTERNATIONAL, INC.2nd Alternate EPSTEIN, A. & SONS INTERN., INC.
25 Submitted on this item 118 of firms eligible to submit
Dated: 07/22/2020 Page 6 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
17 Selected Firm WANG ENGINEERING, INC. D-91-460-20 Various Phase I/II Geotechnical District 1Proposed Subconsultants CHICAGO TESTING LABORATORY, INC.
INTERRA, INC.LIN ENGINEERING, LTD.
1st Alternate TERRACON CONSULTANTS, INC.2nd Alternate GEI CONSULTANTS, INC.
3 Submitted on this item13 of firms eligible to submit
18 Selected Firm EPSTEIN, A. & SONS INTERN., INC. D-91-450-20 FAP 383 Ohio Street at North Branch
District 1Proposed Subconsultants AAA ENGINEERING
FLOOD TESTINGORION ENGINEERS LLCSINGH & ASSOC., INC.STERLIN, DB CONSULTANTS, INC.
1st Alternate BLOOM COMPANIES, LLC
2nd Alternate COLLINS ENGINEERS, INC./HARDESTY & HANOVER LLC
4 Submitted on this item 18 of firms eligible to submit
Dated: 07/22/2020 Page 7 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
19 Selected Firm CDM SMITH INC. P-91-040-20 Various Phase I Engineering District 1Proposed Subconsultants ABNA ENGINEERING, INC.
METRO STRATEGIES INCORPORATEDQUIGG ENGINEERING, INC.
1st Alternate CIVILTECH ENGINEERING, INC.2nd Alternate HAMPTON, LENZINI AND RENWICK, INC.
9 Submitted on this item 35 of firms eligible to submit
20 Selected Firm GREENMAN-PEDERSEN, INC. V-91-014-20 Various Bridge Painting Inspections,
District 1Proposed Subconsultants GANNETT FLEMING, INC.
1st Alternate KTA-TATOR, INC.2nd Alternate N/A
2 Submitted on this item Specialty Not Applicable
21 Selected Firm HBK ENGINEERING, LLC. D-91-446-20 Various Phase I/II Land Survey District 1Proposed Subconsultants ENVIRONMENTAL DESIGN INTERNATIONAL
THE RODERICK GROUP, INC. DBA ARDMORE RODERICK
1st Alternate HAMPTON, LENZINI AND RENWICK, INC.2nd Alternate THE W-T GROUP, LLC
16 Submitted on this item 141 of firms eligible to submit
Dated: 07/22/2020 Page 8 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
22 Selected Firm THE W-T GROUP, LLC D-91-448-20 Various Phase I/II Land Survey District 1Proposed Subconsultants TECMA ASSOCIATES
1st Alternate CIVIL & ENVIRONMENTAL CONSULTANTS, INC.2nd Alternate HAMPTON, LENZINI AND RENWICK, INC.
16 Submitted on this item 141 of firms eligible to submit
23 Selected Firm ENGINEERING SERVICES GROUP, INC. V-91-015-20 Various Phase III Inspection Projects
District 1Proposed Subconsultants OSEH INC.
STANLEY CONSULTANTS, INC.
1st Alternate CERA SOLUTIONS2nd Alternate APEX CONSULTING ENGINEERS, L.L.C.
11 Submitted on this item 201 of firms eligible to submit
24 Selected Firm PERALTE-CLARK LLC D-92-083-05 Reconstruction and Widening of IL
District 2Proposed Subconsultants EPSTEIN, A. & SONS INTERN., INC.
QUIGG ENGINEERING, INC.SINGH & ASSOC., INC.
1st Alternate CIVILTECH ENGINEERING, INC.2nd Alternate IMEG CORP
21 Submitted on this item 229 of firms eligible to submit
Dated: 07/22/2020 Page 9 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
25 Selected Firm AMERICAN SURVEYING & ENG., P.C. P-92-007-19 Various Phase I Survey Projects District 2Proposed Subconsultants N/A
1st Alternate FEHR-GRAHAM & ASSOC. LLC2nd Alternate ENVIRONMENTAL DESIGN INTERNATIONAL
9 Submitted on this item141 of firms eligible to submit
26 Selected Firm BRAVO COMPANY ENGINEERING, INC. V-92-007-20 Various Phase III Projects District 2Proposed Subconsultants MATERIAL SOLUTIONS LABORATORY CORP.
QUIGG ENGINEERING, INC.TRANSLAND ENGINEERING GROUP, LLC
1st Alternate ARK ENGINEERING ASSOCIATES, LTD.2nd Alternate AMERICAN ENGINEERING CONSULTANTS, INC.
9 Submitted on this item 201 of firms eligible to submit
27 Selected Firm IMEG CORP P-92-011-20 Various Phase I/II Projects District 2Proposed Subconsultants HERMANN & ASSOCIATES, LLC
KASKASKIA ENGINEERING GROUP, LLC
1st Alternate UPCHURCH GROUP, THE, INC.2nd Alternate CIVILTECH ENGINEERING, INC.
16 Submitted on this item35 of firms eligible to submit
Dated: 07/22/2020 Page 10 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
28 Selected Firm HR GREEN, INC. V-93-004-20 Various Phase III Projects District 3
Proposed Subconsultants ILLINOIS CONSTRUCTION & ENVIRONMENTAL CONSULTING, INC.KASKASKIA ENGINEERING GROUP, LLC
1st Alternate MATERIAL SOLUTIONS LABORATORY CORP.2nd Alternate ARK ENGINEERING, INC.
9 Submitted on this item201 of firms eligible to submit
29 Selected Firm ENGINEERING ENTERPRISES, INC. P-93-028-20 Various Phase I/II Land Survey District 3Proposed Subconsultants ENVIRONMENTAL DESIGN INTERNATIONAL
1st Alternate CIVIL & ENVIRONMENTAL CONSULTANTS, INC.2nd Alternate CHAMLIN & ASOC., INC.
9 Submitted on this item 141 of firms eligible to submit
30 Selected Firm STANLEY CONSULTANTS, INC.P-93-026-20/D-93-067-20
US 6 from Ashton Road to IL 47 in Morris, Phase I and II Engineering S
District 3
Proposed Subconsultants AMERICAN SURVEYING & ENG., P.C.AMES ENGINEERING, INC.HBK ENGINEERING, LLC.HUFF & HUFF, INC.KASKASKIA ENGINEERING GROUP, LLCMORREALE COMMUNICATIONS
1st Alternate UPCHURCH GROUP, THE, INC.2nd Alternate HAMPTON, LENZINI AND RENWICK, INC.
18 Submitted on this item36 of firms eligible to submit
Dated: 07/22/2020 Page 11 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
31 Selected Firm CUMMINS ENGINEEERING CORPORATION P-94-029-20 Various Phase I/II Engineering District 4Proposed Subconsultants HANSON PROFESSIONAL SERVICES INC.
KASKASKIA ENGINEERING GROUP, LLC
1st Alternate INFRASTRUCTURE ENGINEERING, INC.2nd Alternate IMEG CORP
13 Submitted on this item113 of firms eligible to submit
32 Selected Firm EXP US SERVICES, INC. V-94-009-20 FAI 474 (I-474) and FAI 74 (i-74)
District 4Proposed Subconsultants AMES ENGINEERING, INC.
FLUIDCLARITYKASKASKIA ENGINEERING GROUP, LLCPRAIRIE ENGINEERS, P.C.
1st Alternate B.L.A., INC. DBA BOLLINGER, LACH
2nd Alternate WOOD ENVIRONMENT & INFRASTRUCTURE SOLUTIONS, INC.
20 Submitted on this item118 of firms eligible to submit
33 Selected Firm BRUNER, COOPER & ZUCK, INC. V-94-004-20 Various Phase III Construction
District 4Proposed Subconsultants PRAIRIE ENGINEERS, P.C.
1st Alternate HERMANN & ASSOCIATES, LLC2nd Alternate MIDWEST ENGINEERING ASSOC. INC.
9 Submitted on this item 201 of firms eligible to submit
Dated: 07/22/2020 Page 12 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
34 Selected Firm STRAND ASSOC., INC. V-94-008-20 FAI 155 (I-155) and FAI 74 (I-74) District 4Proposed Subconsultants CLAASSEN, WHITE & ASSOCIATES, P.C.
HANSON PROFESSIONAL SERVICES INC.MILLENNIA PROF. SERVICES, LTD.QUIGG ENGINEERING, INC.WANG ENGINEERING, INC.
1st Alternate EXP US SERVICES, INC.
2nd Alternate BURNS & MCDONNELL ENGINEERING COMPANY, INC.
22 Submitted on this item 118 of firms eligible to submit
35 Selected Firm HERMANN & ASSOCIATES, LLC V-94-006-20 Various Phase III Construction
District 4Proposed Subconsultants HUTCHISON ENGINEERING, INC.
1st Alternate MIDWEST ENGINEERING ASSOC. INC.2nd Alternate INFRASTRUCTURE ENGINEERING, INC.
8 Submitted on this item 201 of firms eligible to submit
36 Selected Firm CLAASSEN, WHITE & ASSOCIATES, P.C. P-94-045-20 Various Phase I/II Land and Route District 4Proposed Subconsultants SURVEYING AND MAPPING, LLC
1st Alternate IMEG CORP2nd Alternate WILLETT, HOFMANN & ASSOC., INC.
11 Submitted on this item 141 of firms eligible to submit
Dated: 07/22/2020 Page 13 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
37 Selected Firm ESI CONSULTANTS, LTD. C-95-029-17 Phase III Construction Inspection District 5Proposed Subconsultants FARNSWORTH GROUP, INC.
GREENE & BRADFORD, INC., OF SPFLD.MIDWEST ENGINEERING & TESTING, INC.THE RODERICK GROUP, INC. DBA ARDMORE RODERICK
1st Alternate GREENE & BRADFORD, INC., OF SPFLD.2nd Alternate N/A
2 Submitted on this item201 of firms eligible to submit
38 Selected Firm DESIGN CONSULTING ENGINEERS, INC. V-95-001-20 Various Phase III Construction District 5Proposed Subconsultants COLLINS ENGINEERS, INC.
GEO SERVICES, INC.PIN POINT PRECISIONSANCHEZ & ASSOCIATES, P.C.
1st Alternate GREENE & BRADFORD, INC., OF SPFLD.2nd Alternate ESCA CONSULTANTS, INC.
3 Submitted on this item 201 of firms eligible to submit
39 Selected Firm LIN ENGINEERING, LTD. P-96-006-20/ D-96-045-20
IL 96 from US 24 to North of Kochs Lane in Quincy. Phase I and II
District 6
Proposed Subconsultants KLINGNER & ASSOC., P.C.
1st Alternate GREENE & BRADFORD, INC., OF SPFLD.2nd Alternate BENTON & ASSOC., INC.
4 Submitted on this item 155 of firms eligible to submit
Dated: 07/22/2020 Page 14 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
40 Selected Firm JUNEAU ASSOC., INC., P.C. P-96-011-20/ D-96-528-07
IL 4 from NCL of East Gillespie to IL 16, Phase I and II Engineering District 6
Proposed Subconsultants FUHRMANN ENGINEERING, INC.
1st Alternate LIN ENGINEERING, LTD.2nd Alternate GREENE & BRADFORD, INC., OF SPFLD.
5 Submitted on this item 155 of firms eligible to submit
41 Selected Firm UPCHURCH GROUP, THE, INC. P-96-012-20 Various Phase I/II Engineering District 6Proposed Subconsultants KASKASKIA ENGINEERING GROUP, LLC
QUIGG ENGINEERING, INC.SINGH & ASSOC., INC.
1st Alternate INFRASTRUCTURE ENGINEERING, INC.2nd Alternate JUNEAU ASSOC., INC., P.C.
9 Submitted on this item113 of firms eligible to submit
42 Selected Firm HURST-ROSCHE, INC. V-96-001-20 Various Phase III Projects District 6Proposed Subconsultants FUHRMANN ENGINEERING, INC.
1st Alternate BACON FARMER WORKMAN ENGR. & TESTNG2nd Alternate QUIGG ENGINEERING, INC.
4 Submitted on this item201 of firms eligible to submit
Dated: 07/22/2020 Page 15 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
43 Selected Firm RUBINOS & MESIA ENGINEERS, INC. D-96-081-20 Various Phase II Hanley Building
District 6Proposed Subconsultants BACON FARMER WORKMAN ENGR. & TESTNG
QUIGG ENGINEERING, INC.SINGH & ASSOC., INC.
1st Alternate GREENE & BRADFORD, INC., OF SPFLD.2nd Alternate CUMMINS ENGINEERING CORPORATION
3 Submitted on this item 118 of firms eligible to submit
44 Selected Firm CIVIL DESIGN, INC D-97-089-20 Fayette Avenue, Reconstruction US
District 7Proposed Subconsultants FARNSWORTH GROUP, INC.
KNIGHT & ASSOCIATES SURVEYING, LLCMIDWEST ENGINEERING & TESTING, INC.TERRA ENGINEERING, LTD.
1st Alternate MIDWEST ENGINEERING ASSOC. INC.2nd Alternate UPCHURCH GROUP, THE, INC.
18 Submitted on this item 229 of firms eligible to submit
45 Selected Firm EFK MOEN, LLC D-98-109-20 Widening of I-270 from Mississippi
District 8Proposed Subconsultants ABNA ENGINEERING, INC.
ADDED DIMENSION, LLCCRAWFORD, MURPHY & TILLY, INC.H.N.T.B. CORP.SCI ENGINEERING, INC.
1st Alternate HORNER & SHIFRIN, INC.
2nd Alternate LOCHMUELLER GROUP, INC./GEORGE BUTLER ASSOCIATES, INC.
9 Submitted on this item 64 of firms eligible to submit
Dated: 07/22/2020 Page 16 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
46 Selected Firm HENRY, MEISENHEIMER & GENDE, INC. D-98-064-12 I-57 from Jefferson County Line to
District 8Proposed Subconsultants FUHRMANN ENGINEERING, INC.
QUIGG ENGINEERING, INC.SCI ENGINEERING, INC.
1st Alternate CIVIL DESIGN, INC.2nd Alternate MIDWEST ENGINEERING ASSOC. INC.
9 Submitted on this item 103 of firms eligible to submit
47 Selected Firm TRANSYSTEMS CORPORATION P-98-001-25/ D-98-002-25
Superstructure Replacement of S.N. 060-0202 carrying IL Route 3 over
District 8
Proposed Subconsultants EFK MOEN, LLCKASKASKIA ENGINEERING GROUP, LLCTERRA ENGINEERING, LTD.
1st Alternate GEORGE BUTLER ASSOCIATES, INC.2nd Alternate MODJESKI & MASTERS, INC.
6 Submitted on this item 62 of firms eligible to submit
48 Selected Firm SCI ENGINEERING, INC. C-98-119-20 Phase III Construction Engineering,
District 8Proposed Subconsultants EFK MOEN, LLC
JUNEAU ASSOC., INC., P.C.
1st Alternate JUNEAU ASSOC., INC., P.C.2nd Alternate MILLENNIA PROF. SERVICES, LTD.
5 Submitted on this item 201 of firms eligible to submit
Dated: 07/22/2020 Page 17 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
49 Selected Firm CLARK DIETZ, INC. P-98-022-20 IL Route 140 (FAP 785) Terra Dr. to
District 8Proposed Subconsultants AMERICAN SURVEYING & ENG., P.C.
EFK MOEN, LLCHUFF & HUFF, INC.LIN ENGINEERING, LTD.
1st Alternate STV INCORPORATED2nd Alternate HUTCHISON ENGINEERING, INC.
5 Submitted on this item 130 of firms eligible to submit
50 Selected Firm TERRA ENGINEERING, LTD. P-98-007-24/ D-98-017-17
IL Route 4 South of I-55 to South of IL Route 143, Phase I and II
S
District 8
Proposed Subconsultants CIVIL DESIGN, INC.ENGINEERING DESIGN SOURCE, INC.ESI CONSULTANTS, LTD.GEOTECHNOLOGY, INC.LOCHMUELLER GROUP, INC.
1st Alternate HENRY, MEISENHEIMER & GENDE, INC.2nd Alternate JUNEAU ASSOC., INC., P.C.
12 Submitted on this item 113 of firms eligible to submit
51 Selected Firm QUALITY TESTING & ENGINEERING, INC. MT-98-001-20 Various Phase III Materials Quality
District 8Proposed Subconsultants ABNA ENGINEERING, INC.
1st Alternate N/A2nd Alternate N/A
1 Submitted on this item 201 of firms eligible to submit
Dated: 07/22/2020 Page 18 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
52 Selected Firm SHERRILL ASSOC., INC. D-98-111-20 Various Phase I/II Survey Projects,
District 8Proposed Subconsultants N/A
1st Alternate AMERICAN SURVEYING & ENG., P.C.2nd Alternate JUNEAU ASSOC., INC., P.C.
11 Submitted on this item 141 of firms eligible to submit
53 Selected Firm ENGINEERING DESIGN SOURCE, INC. P-98-038-20 Various Phase I and/or II Projects District 8Proposed Subconsultants FARNSWORTH GROUP, INC.
LOCHMUELLER GROUP, INC.TERRACON CONSULTANTS, INC.THOUVENOT, WADE AND MOERCHEN, INC.
1st Alternate HENRY, MEISENHEIMER & GENDE, INC.2nd Alternate GEORGE BUTLER ASSOCIATES, INC.
7 Submitted on this item 105 of firms eligible to submit
54 Selected Firm ARTISAN CONSULTING ENGINEERS, LLC P-98-039-20/ D-98-112-20
Various Phase I/II Land Surveying Projects District 8
Proposed Subconsultants JUNEAU ASSOC., INC., P.C.SHAWNEE SURVEY & CONSULTING, INC.VOLKERT, INC.
1st Alternate JUNEAU ASSOC., INC., P.C.2nd Alternate HENEGHAN AND ASSOC., P.C.
10 Submitted on this item141 of firms eligible to submit
Dated: 07/22/2020 Page 19 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
55 Selected Firm HORNER & SHIFRIN, INC. P-98-001-05 IL Route 3 (FAP 312) over the A & S
District 8Proposed Subconsultants AMERICAN SURVEYING & ENG., P.C.
EFK MOEN, LLCHR GREEN, INC.WEIS DESIGN GROUP
1st Alternate STV INCORPORATED2nd Alternate VOLKERT, INC.
11 Submitted on this item 38 of firms eligible to submit
56 Selected Firm FARNSWORTH GROUP, INC. D-98-108-20 FAI 64 (I-64) from West of Green
District 8
Proposed Subconsultants ENGINEERING DESIGN SOURCE, INC.KASKASKIA ENGINEERING GROUP, LLCLOCHMUELLER GROUP, INC.QUIGG ENGINEERING, INC.VOLKERT, INC.
1st Alternate CIVIL DESIGN, INC.
2nd Alternate BACON FARMER WORKMAN ENGR. & TESTNG
14 Submitted on this item 103 of firms eligible to submit
57 Selected Firm LOCHMUELLER GROUP, INC. D-98-067-14 IL 158 Extension from IL 161 to IL
District 8Proposed Subconsultants ENGINEERING DESIGN SOURCE, INC.
HORNER & SHIFRIN, INC.MILLENNIA PROF. SERVICES, LTD.
1st Alternate GEORGE BUTLER ASSOCIATES, INC.2nd Alternate HENRY, MEISENHEIMER & GENDE, INC.
11 Submitted on this item 118 of firms eligible to submit
Dated: 07/22/2020 Page 20 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
58 Selected Firm VOLKERT, INC. P-98-004-21 US Route 40 from Formosa Road to
District 8Proposed Subconsultants LIN ENGINEERING, LTD.
LOCHMUELLER GROUP, INC.
1st Alternate CDM SMITH INC.2nd Alternate HR GREEN, INC.
9 Submitted on this item 130 of firms eligible to submit
59 Selected Firm HUTCHISON ENGINEERING, INC. D-98-110-20 Various Phase I and/or II Projects on
District 8Proposed Subconsultants CIVIL DESIGN, INC.
CRAWFORD, MURPHY, & TILLY, INC.HUFF & HUFF, INC.KASKASKIA ENGINEERING GROUP, LLCMILLENNIA PROF. SERVICES, LTD.
1st Alternate HR GREEN, INC.2nd Alternate ESI CONSULTANTS, LTD.
16 Submitted on this item 127 of firms eligible to submit
60 Selected Firm ACCESS ENGINEERING, LLC D-98-069-12 IL 3 Intersection Reconstruction at
District 8Proposed Subconsultants HORNER & SHIFRIN, INC.
HURST-ROSCHE, INC.LOCHMUELLER GROUP, INC.
1st Alternate BARTLETT & WEST, INC.2nd Alternate JUNEAU ASSOC., INC., P.C.
9 Submitted on this item229 of firms eligible to submit
Dated: 07/22/2020 Page 21 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
61 Selected Firm OATES ASSOC., INC. P-99-014-20 Various Phase I/II Engineering District 9Proposed Subconsultants ABNA ENGINEERING, INC.
EFK MOEN, LLCHR GREEN, INC.MILLENNIA PROF. SERVICES, LTD.
1st Alternate LOCHMUELLER GROUP, INC.2nd Alternate ESCA CONSULTANTS, INC.
12 Submitted on this item 100 of firms eligible to submit
62 Selected Firm ESCA CONSULTANTS, INC. P-99-016-20/ D-99-061-20
Various Phase I/II ProjectsDistrict 9
Proposed Subconsultants KASKASKIA ENGINEERING GROUP, LLCLIN ENGINEERING, LTD.
1st Alternate HENRY, MEISENHEIMER & GENDE, INC.2nd Alternate HORNER & SHIFRIN, INC.
19 Submitted on this item113 of firms eligible to submit
63 Selected Firm ITERIS, INC. P-99-017-20 Various Phase II Engineering District 9Proposed Subconsultants CDM SMITH INC.
EJM ENGINEERING DBA TRANSMART/EJM CORP.
1st Alternate CBB2nd Alternate SRF CONSULTING GROUP, INC.
3 Submitted on this item 21 of firms eligible to submit
Dated: 07/22/2020 Page 22 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
64 Selected Firm 2IM GROUP N-37-001-20 2D Hydraulic Quick Check
BBSProposed Subconsultants HANSON PROFESSIONAL SERVICES INC.
1st Alternate KABBES ENGINEERING, INC.2nd Alternate D'ESCOTO, INC.
3 Submitted on this item 94 of firms eligible to submit
65 Selected Firm HUFF & HUFF, INC. P-30-005-20 Various Statewide Noise and
BDEProposed Subconsultants KASKASKIA ENGINEERING GROUP, LLC
URBAN GIS, INC.WSP USA INC.
1st Alternate LOCHNER, H.W., INC.2nd Alternate N/A
2 Submitted on this item 42 of firms eligible to submit
66 Selected Firm GEWALT HAMILTON ASSOC., INC. S-60-001-21 Various Traffic Signal Coordination
OperationsProposed Subconsultants N/A
1st Alternate CBB2nd Alternate SRF CONSULTING GROUP, INC
6 Submitted on this item 22 of firms eligible to submit
67 Selected Firm ABNA ENGINEERING, INC. D-60-001-21 Various Statewide Sign Structure
OperationsProposed Subconsultants N/A
1st Alternate HURST-ROSCHE, INC.2nd Alternate N/A
2 Submitted on this item 124 of firms eligible to submit
Dated: 07/22/2020 Page 23 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
68 Selected Firm CBB S-60-002-21 Various Traffic Signal Coordination
OperationsProposed Subconsultants N/A
1st Alternate BARTLETT & WEST, INC.2nd Alternate SRF CONSULTING GROUP, INC
5 Submitted on this item 22 of firms eligible to submit
69 Selected Firm HBM ENGINEERING GROUP, LLC D-60-002-21 Various District 1 Sign and Tower
OperationsProposed Subconsultants N/A
1st Alternate ABNA ENGINEERING, INC.2nd Alternate N/A
2 Submitted on this item124 of firms eligible to submit
70 Selected Firm QUANDEL CONSULTANTS, INC. HPR-66-026-20 Illinois Rail Needs Assessment
UPPProposed Subconsultants IMAGES, INC.
WSP USA INC.
1st Alternate N/A2nd Alternate N/A
1 Submitted on this item 34 of firms eligible to submit
71 Selected Firm IDNRProposed Subconsultants
To be selected in the near future by1st Alternate The Illinois Department of Natural Resources2nd Alternate
Various Construction Inspection and Site Investigation Projects
Dated: 07/22/2020 Page 24 of 25
Number of firms were determined: 6/11/2020
Item # Selection Results Job # Project Description Location
Illinois Department of Transportation Professional Transportation Bulletin 196
Advertised May 7, 2020Selection July 22, 2020
72 Selected Firm IDNRProposed Subconsultants
To be selected in the near future by1st Alternate The Illinois Department of Natural Resources2nd Alternate
73 Selected Firm IDNRProposed Subconsultants
To be selected in the near future by1st Alternate The Illinois Department of Natural Resources2nd Alternate
74 Selected Firm IDNRProposed Subconsultants
To be selected in the near future by1st Alternate The Illinois Department of Natural Resources2nd Alternate
Various Construction Inspection and Site Investigation Projects
Various Construction Inspection Projects
Hennepin Canal - West End Levee Restoration Project
Dated: 07/22/2020 Page 25 of 25