ANNUAL REPORT 2015-2016 GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007

GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

Embed Size (px)

Citation preview

Page 1: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

ANNUAL REPORT

2015-2016

GUJARAT ENGINEERING RESEARCH INSTITUTE

VADODARA - 390007

Page 2: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

1

GERI ANNUAL REPORT 2015-16

-:CONTENTS :- Sr. No. Description Page No.

SECTION:A RESEARCH WORKS 1.0 CENTRALLY SPONSERED RESEARCH SCHEMES 1.1 HP-II 4 2.0 STATE SPONSERED SCHEMES 2.1 Soil Mechanics Division 5 2.2 Geo Mechanics Division 5

2.3 Material Testing Division 6 2.4 Engineering Geology Division 7 2.5 Hydraulics Division 7 2.6 Narmada Hydraulic Division 7 2.7 Road Research Division 13 2.8 Deputy Director’s Office 15 2.9 Soil, Drainage and Reclamation Circle 15

2.10 Dam Safety Organization 17 3.0 Special creditable works if any during 2015-2016 17

SECTION:B Test conducted on various material 1.1 Tests conducted on various materials 18 1.2 Field tests conducted by various division 23 1.3 Petrological Laboratory Unit 24

1.4 Engineering Geology unit 25 SECTION:C Details of consultancy services offered by GERI

1.0 Within State 27 2.0 Outside State 27 3.0 Technical Papers 27

SECTION: D 1.0 Investigation and Testing Reports 28 2.0 Soil survey Reports 30 3.0 Deputation to Symposium/Conference/Seminar

workshop/training etc. attended by GERI Officer during year 2015-16

32

4.1 Workshop/ Seminars / Training / Organised by GERI during the year 2015-16

34

4.2 One Day Workshops on“ Quality Control in Civil Engineering Construction pertains to Water Resources Field”

35

5.0 Technical Forum Organised by GERI 35 6.0 Equipment procured during 2015-16 35

7.0 Visit by Dignitaries 35 8.0 Library Publication 36 9.0 Budget provision and expenditure during year 37

SECTION:E

1.0 Research Personnel 38

2.0 ABBREVIATION USED IN THE REPORT 44

Page 3: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

2

INTRODUCTION

Gujarat Engineering Research Institute (GERI) is one of the leading

research institutes of the country. It has the distinction of being adjudged as one of

the best research stations of the country as evidenced by honors bestowed upon it

by CBIP in the year 1989. GERI is working under Narmada Water Resources,

Water Supply & Kalpasar Department. The Institute aims at providing research

and development inputs to the activities of the Gujarat State in the field of water

resources, irrigation and roads & buildings. To this end it has its activities centered

on construction materials, soil, rocks, grouting materials etc. The activities are for

investigations, testing, consultancy, training, and quality control in addition to R & D

as stated above. It extends facilities to Government of Gujarat/ inter-state

Government, public and private sector bodies in the above different activities.

Making an humble beginning as sub division in 1950, GERI developed into a

research division in 1957. By 1960 when the Gujarat State was formed, it attained

the status of state research institute with 3 divisions as materials, soil-mechanics

and highway engineering.

Then onwards GERI progressively expanded its activities in the subsequent

decades and has now blossomed into 13 divisions.

A Director who is of the rank of a Chief Engineer heads the Institute. There

are three posts of Joint Director/Superintending Engineer manned by the officers

who are of the rank of Superintending Engineer, Joint Director (Roads) looks after

the works of Roads and buildings wing. Joint Director (Irrigation) looks after the

works of Irrigation wing, & the work of inspections of safety of all completed dams

of the state which is done by Executive Engineer (civil) & Executive Engineer

(Mech.) under Dam Safety Organisation, Superintending Engineer; Soil, Drainage

and Reclamation Circle looks after the works of Soil Survey wing.

Research work is organized in various divisions by the respective Research

Officers who are of the rank of Executive Engineer including Geologist (Senior-

Class-I officer) of Engineering Geology Division. Suitable technical and scientific

staff assist them. In addition to main laboratories at Vadodara, the institute has

regional research/testing divisions at Surat, Rajkot and Gandhinagar.

Under each regional division, set up of district laboratories are also there.

Page 4: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

3

PRELUDE

It gives me immense pleasure in presenting this Annual Report of Gujarat

Engineering Research Institute (GERI) for the year 2015-2016.

GERI is a premier R & D Institute of Government of Gujarat working under

Narmada Water Resources, Water Supply and Kalpsar Department. It is entrusted

with the work of Research, Investigation, Testing Consultancy & Training in Various

disciplines of civil engineering which includes Soil Mechanics, Material Testing,

Geo mechanics Grouting Technology, Engineering Geology, Remote Sensing,

Seismology, Hydraulic Model Studies, Sedimentation Surveys, Road & Traffic

Engineering, Dam Safety, Soil surveys etc.

On research side, GERI had completed 2 centrally sponsored schemes

under Hydrology Project-II. GERI is carrying out research study for 11 state

sponsored research schemes under various disciplines.

Kalpasar Seismological project is under administrative approval.

Also, model study for 10 hydraulics structures has been carried out during the year.

About 164817 samples were tested in various laboratories of GERI during

the year. Dam Safety Organisation of GERI has inspected 56 large dams and 51

gated dams and recommended safety measures to the project authorities. During

the year about 17.20 lac ha GCA pre & post irrigation survey has been carried out

by Soil drainage reclamation Circle under GERI. To enrich and update the technical

knowledge of state engineer/ scientists, GERI has organized 30

symposiums/workshops/one day Seminar. Also GERI personnel have attended 10

Training programs. 4 Technical Paper published.

During the year, 92 new books were added in GERI library.

The Annual Report presented here is a nutshell of activities of the institute

carried out during the year 2015-2016. I wish to place on record, sincere and hard

efforts made by each one in GERI, for doing appreciable work. Suggestions and

comments on the works reported herein are most welcome.

K. A. Keshvani

Chief Engineer & Director, GERI, Vadodara.

Page 5: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

4

SECTION-A

RESEARCH WORKS

1.0 (A) Centrally Sponsored Research Schemes under progress. NIL

1.0 (B) Centrally Sponsored Research Schemes under H.P.-II Completed. 1.1 To study the trend in water quality of the locations identified as hot spot.

Aim/Objective:- To assess the pollution due to human activity in terms of nutrients and industrial pollutants.

Methodology :- There are eight locations to be identified and water samples to

be collected every month for two years. Water samples will betested for 25 parameters for pre monsoon and 15 parameters for post monsoon.

Position:- Final Report is accepted by Technical Assistant Manage

Committee, (TAMC) of HP-II, and completed in all respect.

1.2 Study of Water Quality Fluctuation in Vishwamitri River.

Aim/Objective:- To study the effect of water quality along the length of river Vishvamitri passing through Vadadodara city

Methodology :- There are eleven locations for surface water and seven locations for ground water to be identified nearby Vishwamitri river. Water samples are to be collected bi-monthly and will be tested for 20 parameters

Position:- Final Report is accepted by Technical Assistant Management Committee, (TAMC) of HP-II, and completed in all respect.

Page 6: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

5

2.0 STATE SPONSORED RESEARCH SCHEMES. 2.1 SOIL MECHANICS DIVISION

(A) During the year 2015-2016, 2027 soil samples were tested. Due to heavy work load in routine testing and urgency of work, R & D activities are delayed.

2.2 GEOMECHANICS DIVISION:

(A) State sponsored research schemes under progress. 1 Title : Design of plastic concrete mix for slurry trench diaphragms used

as under seepage control technique. (Grouting Lab.) Objective : Objective of the study is to develop the standard method for design of plastic concrete mix which is to be used for construction of slurry trench diaphragms Position: Collection of literature and data completed. Study is under progress & after completion of study, reporting shall be taken up.

2 Title: State of art report on “Design and construction of diaphragms as Under seepage control Measures” (Grouting Lab.) Objective: Objective of the study is to cover the details of selection of type of diaphragms wall for different geological conditions, heterogeneity/permeability of sub-surface strata, anticipated stress and deformations due to construction and filling of reservoir etc. Design of mix considering different physical and engineering properties in the laboratory construction method etc. It will cover the current methods for design and construction of diaphragm wall in our country as well as abroad. This attempt of compiling techno-feasible data specifications. (On diaphragms wall as a seepage control measures) etc., will provide a comprehensive guide line to the designers and field engineers at a glance and will be proved as a hand book on diaphragms wall.

Position: Collection of literature and data completed. Study is under progress & after completion of study, reporting shall be taken up.

3 Title: Preparation of chart for correcting the values of compressive strength of the core samples with L/D ratio less than two for sand stone. (RM.Lab.) Objective: Objective the scheme is to study effect of varying L/D ratio on uniaxial compressive strength for sandstone available in Gujarat and thereby to develop co-relation between them. Different types of sandstone available in Gujarat collected in sample quantity, so as to obtain minimum 375 samples from each locations, Samples should have diameter @ 54 mm and L/D ratio varying from 1.20 to 2 with an increase interval of 0.20. All samples are to be tested in dry and oven dry wet conditions. The selected chunk should be of least apparently homogeneous, free from

Page 7: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

6

cracks or any soft of discontinuities. Specimens are to be prepared in the laboratory reforming guide line IS-9179-1991 and IS-9143-1991.

It is proposed to conduct petro graphical studies and all other studies like physical properties etc. if, felt necessary.

Position: -- Report submitted & is under approval.

4 Title: ”State of art report on shear strength parameters of rock” (RM. Field)

Objective: Objective of art report on shear strength parameters of rock will cover the details of equipment and testing procedures followed in past. It will also cover the current procedure followed in the country as well as abroad. Position: Literature and data pertains to study area are collected. Study is under progress.

2.3 MATERIAL TESTING DIVISION:

(A) State Sponsored Scheme under progress. NIL

(B) EDP Centre Activities:

1) GSWAN (Gujarat State Wide Area Network) Arranging alternative facility at Kuber Bhavan to carry out relevant work. Installation of BSNL lease line done at EDP Center after communication & intense interaction with S & T officials and BSNL personnel. Extending support to GSWAN users to get their work done, in addition to communicate personnel at GSWAN server for trouble shooting to maintain connectivity.

2) GERI Website / web page After convincing authority at GERI and department level, GERI details were merged and got separate web pages on departments website. Doing needful to upload periodical details e.g. Sample details, SOR ,bio-data of officials, annual report etc.

3) MIS (Management Information system)

Facilitating invoice preparation through MIS to all district laboratories of GERI Trouble shooting by Remote Desktop Access using Team Viewer software Maintenance of servers & customized software Doing needful to get BSNL phone line for extending MIS facility to district laboratories of GERI against TATA broadband line, services of which company has stopped due to technical /commercial reasons.

4) Provision of internet facility through LAN (Local Area Network) in GERI campus

5) Providing& maintaining common Fax facility for administration & technical work

6) Facilitating & renewal of Anti Virus solutions to all computers in GERI campus

7) AMC for computers & allied hardware and trouble shooting for network issues

Page 8: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

7

8) Assisting SK Branch ,GERI for documentation related to awarding AMC of computers, printers, peripherals etc.

9) Planning periodical training to staff, officials & arranging support for trainees from other offices imparting workshops in GERI campus.

2.4 ENGINEERING GEOLOGY DIVISION.

(A) State Sponsored Scheme under progress. NIL

• Kalpasar Seismological project : The proposal on ‘Establishment and Monitoring of a network of eight

Seismological Observatories around Kalpasar project’ was modified with

recent exchange rates and specifications of seismological as well as VSAT

instruments, as per requirements of Kalpasar Department and submitted to

government. The estimate of this proposal is 12.19 crores.

• Administrative approval from Kalpasar Department is awaited.

• Right to Information related activities.

2.5 HYDRAULIC DIVISION:

(a) (i) Final report of Revised elevation Vs storage capacity Survey of Brahmani-I & Ozat-II reservoir by remote sensing method is submitted.

2.6 NARMADA HYDRAULIC DIVISION: (A) State sponsored research schemes under progress.

(i) Defining the ill effects of improper information of roller in the roller bucket type of energy dissipater

The objective of the scheme is to define safety & proper functioning of dam structure & fool proof behavior of spillway & its energy dissipater at its toe. Literature study as well as construction of flume model has been completed and experimental work is started.

(ii) Establishing concepts for change of model bed material effect on

observation with the change of energy dissipater The objective of the scheme is to study the effect of different bed material with the change of energy dissipater for proper formation of energy dissipating arrangement for spillway structures. Literature study as well as construction of flume model is completed with sand as bed material. Experimental work is progress.

(iii) Assessing the D/S nappy profile procedures of the spillways and weirs under free flow, submerged flow and partially operated gate condition as apply.

The objective of study is to evaluate the submergence effect on upper nape under free flow, submerged flow and partially operated gate flow. Literature study, data collection work and construction of one flume is completed. The construction of second flume of model work is started along with the Experimental work on first flume.

Page 9: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

8

(iv) Evolving an effective and economical section of Tidal Regulator

The objective of the scheme is to ascertain the economical section of low level flexible structure constructed by locally available material using blocks or gabions on u/s & d/s side. The literature study has been completed and experimental work on flume model using blocks as protective work is started.

(B) Abstract of completed state sponsored research scheme. NIL

� During the year following Model Studies are Carried Out

(A) Study Of Narmada Basin Hydraulic Models

1) Model Study of Garudeshwar Weir (D/S of Sardar Sarovar Dam)

(a) 2- D SECTIONAL MODEL STUDIES

The 2- D sectional model with G.S.S. 1:60 for Garudeshwar weir constructed for slopping apron at GERI, Gotri Campus, Vadodara .The officers from Narmada designs circle of Vadodara along with team of officers from CWC New Delhi visited the model site at Gotri, Vadodara on dated 14-11-2014. They witnessed the performance of slopping apron type energy dissipater with solid end sill slope from 16.00 mt to 12.00 mt and additional apron length of 20.00 mt at different discharges corresponding tail water levels controlled at Ch. 600 mt d/s. The performance of apron with 60.00 mt length is found satisfactory .The CWC officers had suggested to see the performance of the slopping apron by reducing 10 m length i.e.50.60 mt .Study with construction of the reduced length slopping apron is carried out and report is submitted .Further study will be carried out as per requirements conveyed by field officials.

(b) 3-D COMPOSITE MODEL STUDIES

Earlier the composite model for Garudeshwar weir was constructed to G.S.S. 1:150, The performance at 10 to 100 % different discharges of 22.18 lakh cusecs is found satisfactory. So 60.60 mt slopping apron type energy dissipater having solid end sill (Slope 16.0m to 12.0 m) with additional apron of 20 mt d/s of end sill has been constructed. The officers from Narmada designs circle of Vadodara along with team of officers from CWC New Delhi visited the model site at Gotri, Vadodara on dated 14th Nov-2014. They witnessed the performance of this model. Study is carried out with Observation taken at different design discharges of 10 to 100 %.Report is submitted.

(B) Study Of Sabarmati Basin Hydraulic Models

(a,b) Composite model study for bank Protection work on Banks of River Sabarmati at village Nabhoi & Rinza Model study for the work of bank protection for Nabhoi & Rinza villages on river Sabarmati was proposed by Executive Engineer, Petlad Irrigation Division, Dist Anand with data & other detail for model study. The model construction & Reproduction of Topography work is completed. The new revised additional data are awaited to initiate the model runs.

Page 10: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

9

(c) Composite model study for bank Protection work on Banks of River Sabarmati at village Ingoli

S.E. Ahmadabad Irrigation Project Circle, Ahmadabad has proposed to carry out the Composite Model study .of Bank protection work at Village Ingoli. On receipt of the remaining data, the model construction would be

initiated. However the fund has been deposited for the study.

(d) Composite model study of Bank Protection work on River Sabarmati at village Kasindra S.E., Ahmadabad Irrigation Project Circle, Ahmadabad has suggested to carry out the Composite Model study of Bank protection work at Village Kasindra .On receipt of the other data like Index plan Elevation, Cross Section, Complete detailed drawings, Contour map,U/s and D/s location of weir, Topographical data , terms of reference etc ,the construction of the model will be initiated.

(e) Composite model study for Construction work of Protection work on bank of River Sabarmati from Shahpur Bridge to d/s of Gift City In Gujarat state Gujarat International Finance Tec City (GIFT) is being developed as a global financial and IT hub in Gandhinagar,first of its kind in India.. GIFT will encompass an area of 886 acres (358 hect.) Mostly located on banks of river Sabarmati. Therefore it is prone to considerable erosion of bank from Gift City to Shahpur Bridge during the flood. So river bank protection work is necessary. The model construction with the revised topography is in progress .

(f) Floor protection works of Lakroda barrage on composite model and sectional model Construction of 3D Model structure and layout of topography is completed. Study with different discharges is in progress.

(C) Study Of Tapi river Works

(1) Study of Balloon Barrage

The proposal for physical model study of Rubber Balloon Barrage on Tapi river at Magdalla, Surat is received from SMC,

(a) The Composite model of Tapi river has been used to study the flow pattern with modification in topography. The study is completed and report has been submitted. (b) For Sectional Model study with geometrically similar scale 1:55 has been completed for energy dissipation and performance of the structure. The report of the study is submitted to SIC.

Page 11: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

10

(D) Study Of Narmada Main Canal Aqueduct on River Orasang

Superintending Engineer, Narmada Project Design Circle, Gandhinagar has proposed the study of Protection work of Narmada main canal aqueduct on river Orasang and river banks wide letter dtd-11/08/2014. Construction of Model structure and layout of topography is completed. Study with different discharges is in progress.

Page 12: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

11

(E) Composite model study of Gulf of Khambhat Project (Kalpsar)

Kalpasar department has proposed to carry out the physical model studies of Kalpasar Project at GERI with horizontal scale 1:500 and vertical scale 1:100. It was suggested by the Kalpasar department that a 3-D model of Kalpasar should cover the entire reservoir and sea portion up to about 5 km south of Narmada and some part of Narmada creek. The model will also include some estuarine part of Sabarmati River, Mahi River and Dhadhar with the maximum discharge in these rivers as upstream boundary condition. The Kalpasar dam of 34 km length is to be reproduced including spillway of 2 km having 105 spans each 15.0 m and rest portion as embankment dam in the sea. The downstream boundary of the model will have Tide generating system to stimulate the highest tide in the seaward side. During the fourth Scientific Audit Committee (SAC) meeting of Kalpasar Project 7-9 July-2014 at GERI, Vadodara following models were suggested to be taken up by GERI. (1) 3-D model of Kalpasar Project covering the entire reservoir and sea portion up to about 5 km south of Narmada includes some part of Narmada creek, Sabarmati creek, Mahi creek and Dhadhar creek etc. (2) 2-D wave model for dam cross section (3) Truncated model of Gulf of Khambhat to study flow conditions during different phases of construction of work islands, Dam closure sequences, spillway layout and flow conditions in the vicinity. (4) 2-D model for spillway operation study The estimate of the studies has been submitted to the kalpsar department for obtaining administrative approval.

Page 13: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

12

(F) Bhadbhut barrage On Narmada River (Kalpasar Dept)

(a) 3 -D COMPOSITE MODEL STUDIES Of Bhadbhut barrage

Various studies have carried out as per suggestions of National level consultants on 3-D model with horizontal scale 1:250 & vertical scale 1:50. The reports of the studies were submitted to the Kalpsar department. The model runs with different alternatives were shown to the SAC and National level consultants (1) Phase-I (Virgin Condition) study of river is completed & Report is submitted to

Kalpsar Department.

Page 14: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

13

(2) Phase-II study without flood embankment on left bank of Narmada River for

Bhadbhut barrage completed and the report is submitted.

(3) Phase III study with flood embankment on left bank & right Bank u/s of barrage is also completed. The secretary of kalpasar department had visited the model to witness the performance of the structure on the model. Report Phase III is submitted as per his suggestions. With reference to letter dtd 15/04/2015 from kalpasar dept the further study with alternate alignment of left bank flood protection embankment towards river was completed and report is also submitted. Further studies will be taken up as directed by National level consultants deployed for Kalpasar Project.

(b) 2-D Sectional model study of Bhadbhut barrage on Narmada River

The sectional model was constructed with G.S.Scale 1.30 scale .as per suggestion of national level consultants Shri Khatsuriya & Shri D N Deshmukh for reproducing two Spans. * The studies at various discharges with the d/s rigid bed, d/s mobile bed (Sand) are completed. In free flow condition. *.The studies at various discharges with the d/s mobile bed & different combinations of gate operations are carried out and report is submitted.

(c) 2-D Sectional model study of Narmada Diversion Canal Structure from

(H) Bhadbhut Barrage on Narmada River

Necessary data is awaited from kalpsar dept for study of Narmada Diversion Canal Structure from Bhadbhut barrage on Narmada River.

2.7 ROAD RESEARCH DIVISION 1 & 4. (A) Abstract of state sponsored Research Scheme under progress.

(1) Traffic census on Vadodara – Savli Road ( Dumad Chowkadi) District Vadodara

Objective: The main objectives of this study are:

(A) To know the present traffic pattern

(B) To understand the efficiency of existing road.

(C) To determine growth rate of traffic flow, based on traffic data available over

the past year (From R&B Dept.)

(D) To determine the volume of traffic that enters into city and exit from city.

(E) To determine the solution of stagnation of traffic flow.

Page 15: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

14

Methodology :

Data collection: The traffic survey was conducted at count post at Dumad junction. Traffic Census for this road was conducted by "Manual method". The survey was conducted for seven days twice in a year from 4/2/2013 to 10/2/2013, 25/11/2013 to 1/12/2013 and 19/11/2014 to 25/11/2014 round the clock. For the purpose of counts a day was divided in three shifts of 8 hours each and separate enumerators were posted for each direction of travel. The manual recording of hourly flows was recorded in plate I (Field Data Sheet) as described in IRC :9-1972. Analysis of Data: Traffic data of Plate I was compiled in Plate II (Daily Traffic Summary) as described in IRC :9-1972. The highest peak hour traffic in the day was highlighted in the summary sheet. The information collected in daily summary sheet was transferred to the weekly traffic summary form as shown in Plate III as described in IRC :9-1972. The average daily traffic for the week was determined. Moreover, following analysis was carried out. 1. Heavy Commercial Vehicle per day (HCV) i.e. bus and truck 2. Light Commercial Vehicle per day (LCV) i.e. Car, jeep, tempo, rickshaw,

motorcycle etc. 3. Slow Moving Vehicle (SMV) i.e. cycle, animal drawn cart 4. Passenger Car Unit per day (PCU) 5. Commercial Vehicle per day (CVD) 6. Peak Hour traffic volume in PCUs.

Recommendations: Interchange is required at this junction to handle the volume of traffic resulting in serious congestion and frequent choking of the intersection The work of Interchange – Bridge has been started by NHAI Authority. Position: Analysis is completed. Report writing under progress.

(2) Road Safety Audit Study on Vadodara-Savli road. (S.H.-158) Km. 9/6 to

32/0

Scope & Objectives: The main objective is to identify the black spots on study stretch and to suggest the remedial measures and ensure safety. The short term low cost remedial measures to minimize the number of accidents will be prepared for smooth movement of traffic. Methodology: Data collection: The traffic accident data for seven years i.e. from 2008 to 2014 was collected from Police Stations under jurisdiction of Vadodara Taluka & Savli Taluka. As recommended by IRC, road accident was collected in Road Accident form A-1 in order to have correct information for the purpose of analysis. The data so collected was compiled according to form 4. Data Analysis: The data will be analysed as per primary causes, types of collision, km. wise accidents to find out Accident Prone Locations (APL) etc.

Study of APL: The accident prone locations shall be studied & evaluated and remedial measures for their improvement will be suggested. Position: Data collection was completed. Analysis under progress.

Page 16: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

15

(3) Road Safety Audit Study on Vadodara-Dabhoi road. (S.H.11) Km. 8/3 to

31/0

Scope & Objectives: The main objective is to identify the black spots on study stretch and to suggest the remedial measures and ensure safety. The short term low cost remedial measures to minimize the number of accidents will be prepared for smooth movement of traffic.

Methodology: Data collection: The traffic accident data for seven years i.e. from 2008 to 2014 was collected from Police Stations under jurisdiction of Vadodara Taluka & Dabhoi Taluka. As recommended by IRC, road accident was collected in Road Accident form A-1 in order to have correct information for the purpose of analysis. The data so collected was compiled according to form 4. Data Analysis: The data will be analysed as per primary causes, types of collision, km. wise accidents to find out Accident Prone Locations (APL) etc. Study of APL: The accident prone locations shall be studied & evaluated and remedial measures for their improvement will be suggested. Position: Analysis was completed. Report writing under progress.

(B) Abstract of completed state sponsored research scheme. NIL

2.8 Deputy Director's Office: Submission of Annual Report 2014-15 of GERI to get approval from office of the Joint Director (Irrigation), GERI, Vadodara. After getting approval the same was uploaded on GERI website.

2.9 SOILS, DRAINAGE AND RECLAMATION CIRCLE

DETAILS ABOUT SOILS , DRAINAGE & RECLAMATION CIRCLE

This circle is engaged in different types of soil survey in irrigation command areas for major and medium irrigation project of the state. Pre-irrigation surveys are needed at project appraisal stage. Post-irrigation investigations are carried out after execution of the project. At present 44 major and medium irrigation schemes are under observation for sub soil water table and quality, twice in a year i.e. pre & post monsoon, covering 17.20 lakhs ha. G.C.A. During the year 2015-16 this circle has carried out soil survey and sub soil water table observations work in different irrigation projects and its details are as under:

(A) Pre/ Post Irrigation Soil Survey ( D.S.S / Reco. S.S etc. )

Sr.No

Name of project Type of Work Total area in ha. Work done during the Year 2015-16

(Area in ha.) 1. 2. 3. 3. 3.

1. Setrunji Soil Monitoring 64,651 -- 2 Und-I Soil Monitoring 17,800 -- 3. Vartu-II Soil Monitoring 15,485 -- 4. Khodiyar Soil Monitoring 11,607 -- 5. Phophal-I Soil Monitoring 7,021 -- 6. Hathmati D.S.S. 49,580 --

Page 17: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

16

(B) Sub Soil Water Table Observations:-

Twice in a year i.e. Pre & Post Monsoon (2015-16)

Sr. No

Name of project

Type of Work Total area in ha. Work done during the

Year 2015-16 (Area in ha)

1. 2. 3. 3. 3. (1) Bhadar S.S.W.T. 36842 36842 (2) Machhu " 18211 18211 (3) Brahmani " 17600 17600 (4) Demi-II " 4765 4765 (5) Aji - II " 3150 3150 (6) Vartu " 3500 3500 (7) Ghee " 2833 2833 (8) Sasoi " 5250 5250 (9) Moj " 12146 12146

(10) Shetrunji " 64651 64651 (11) Machhundri " 8095 8095 (12) Kalubhar " 6050 6050 (13) Damanganga " 77935 77935 (14) Juj " 8950 8950 (15) Kelia " 5599 5599 (16) Ukai L.B.C " 116918 116918 (17) Kakarapar " 302783 302783 (18) Lakhigam " 1061 1061 (19) Ukai R.B.C " 85873 85873 (20) Karjan " 79724 79724 (21) Pigut " 2227 2227 (22) Ver-II " 7590 7590 (23) Mahi R.B.C " 272610 272610 (24) Rani " 2150 2150 (25) Fatewadi " 129555 129555 (26) Hathmati " 49530 49530 (27) Kharikat " 24282 24282 (28) Meswo " 12788 12788 (29) Waidy " 2820 2820 (30) Sabarmati " 97424 97424 (31) Watrak " 25910 25910 (32) Mazam " 8000 8000 (33) Dantiwada " 81000 81000 (34) Mukteshwar " 11302 11302 (35) Sipu " 17937 17937 (36) Lakaroda " 3600 3600 (37) Panam " 58273 58273 (38) K.L.B.C " 15500 15500 (39) Bhadar(p) " 15500 15500 (40) Huduf " 8772 8772 (41) Machhnala " 3944 3944 (42) Umaria " 4148 4148 (43) Kabutari " 2230 2230 (44) Edalwada " 1612 1612

Total........ 17,20,140

Page 18: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

17

2.10 DAM SAFETY ORGANISATION The Dam safety Organization, GERI deals with the inspection of all 802 dams, which include 14 Major, 193 Medium dams and 595 large dams under Panchayat & in state for determining the status of safety in respect of Civil, Mechanical and Electrical aspects and suggesting remedial measures to improve them, assessing hazard potential and determining priority for repairs. As per CWC criteria if height of the dam is more than 15 m (From deepest foundation RL to crest RL) it will be considered as large and shall be inspected by DSO. If the height of a dam is between 10 to 15 m and if any of the criteria (i) length500m or more, (ii) capacity more than 1Mm3 (iii) Spillway discharge more than 2000 cumecs are satisfied, it will also be considered as a large dam.

1. The details of large dams inspected during 2015.

Sr. No.

Type of Dams Nos of Dams Inspected by respective wing during year 2015 By Civil Wing By Mech.& Elect.

Wing gated dams) 1. Large Dams

(As per CWC guideline) 56 51

1.1 The joint inspection of buckets of Sukhi Dam and Harnav-II dam have also been carried out with S.E. CDO (Dams), Gandhinagar during the year 2015.

2. The proposal for carrying out the pre-monsoon inspection of Ajwa-Pratp-pura & feeder channel for the year 2015 was received from VMSS. The inspection has been carried out on 21.04.2015 by DSO (Civil & Mechanical wings) and the inspection notes were furnished separately for Civil & Mechanical observations before monsoon to VMSS.

3.0 Special creditable works if any during 2015-2016 RRD-1.

The Ministry of Rural Development, Govt. of India has sanctioned 124.00 lacs to Govt. of Gujarat for executing PMGSY road project for procurement of survey and laboratory equipments for their institutional strengthening form funds available under TA component of World Bank Project. In continuation to this, CEO, GSRRDA has authorized Director, Gujarat Engineering Research Institute, Vadodara for procurement of these Quality Control Laboratory Equipments.

As suggested by, The Director, Gujarat Engineering Research Institute, Vadodara, and Joint Director (Roads) GERI, Vadodara, this office has carried out all procedure like preparation of Estimates, specification of equipments, DTP, evaluation of tender etc. for procurements of above said equipments.

Page 19: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

18

SECTION-B

1.1Tests conducted on various materials are as under.

Sr.No Materials / Test Total No. of test conducted during the year 2014-2015

SM Dn. MT Dn GM Dn RRD-1 RRD-4 SGRD Surat NGRD G'nagar SRD, Rajkot SDR, Circle

1 2 3 4 5 6 7 8 9 10 11

1 Admixture - - - - - - - - -

2 Aggregate/coarse aggregate - 2 - - 463 5543 15363 - -

3 Asphalt - - - - - - 781 - -

4 Asphalt Mix Design - - - - - 45 - - -

5 Bentonite - - - - - - - - -

6 Binder content - - - - 170 7 40 - -

7 Bitumen - - - - 20 299 - 480 -

8 Bitumen Mix - - - - - - - - -

9 Bitumen Mix Design - - - - - - - 114 -

10 Brazilian Tensile Strength - - - - - - - -

11 Bricks/Air Bricks - 238 - - - 422 2071 596 -

12 Building Stone - 11 - - - - -

13 C.C.Block - - - - - 38 - 430 -

14 C. C. Cube - 2881 - - - 12374 35157 23633 -

15 C.M. Cube - - - - - - 4 422 -

Page 20: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

19

Sr.No Materials / Test Total No. of test conducted during the year 2014-2015

16 Casting and testing - - - - - - - - -

17 CBR test - - - - - - - - -

18 Cement mortar - - - - - 2 - - -

19 Cement mortar compression - - - - - - - - -

20 Cement(chemical) - - - - - - - - -

21 Cement(physical) - 590 - - - 1429 4048 3654 -

22 Chemical analysis of Sand/Fine Aggregate

- 441 - - - - - - -

23 Chemical analysis of Coarse Aggregate

- 615 - - - - - - -

24 Chemical analysis of Soil. - - - - - - - -

25 Cocrete core Testing - 36 - - - - - - -

26 Concrete mix design - 20 - - - 133 - 399 -

27 Concrete Rebound Hammer Test - - - - - - - - -

28 Core sample/ Core density & B.C. - - - - - 174 31 - -

29 Curing compound - 8 - - - - 35 - -

30 Density & Porosity - - - - - - - - -

31 Emulsion - - - 6 - - - - -

32 Epoxy material - 1 - - - - - - -

33 Epoxy mortar - - - - - - - - -

Page 21: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

20

Sr.No Materials / Test Total No. of test conducted during the year 2014-2015

34 FDD/FMC @ Lab.(Proctor) - - - - - - - - -

35 Fine aggregate - - - - - 1750 - - -

36 Flyash - - - - - - - - -

37 Flush door - - - - - 13 - - -

38 Geo Synthetic - - - - - - - - -

39 GSBM design - - - - - 50 - - -

40 Harden concrete - - - - - - - - -

41 Impact - - - - - - - - -

42 Masonary mortar - - - - - - - - -

43 Metal - - - - - - - 11298 -

44 Misc./lime - - - - - - - - -

45 Mix design (Asphalt) - - - - - - 26 - -

46 Mix design (Concrete) - - - - - - 191 - -

47 Marshal Mould - - - - - 404 613 - -

48 Modified Bitumen/Industrial Bitumen - - - 3 - - - - -

49 Over size B.T. metal - - - - - - - - -

50 Permeability - 1 - - - - - - -

51 Physical properties - - 135 - - - - - -

52 Plastic Concrete mix design - - - - - - - - -

53 Point load index test - - - - - - - - -

Page 22: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

21

Sr.No Materials / Test Total No. of test conducted during the year 2014-2015

54 Point load test - - - - - - - - -

55 Paint - 1 - - - - - - -

56 Pressure gauge - - - - - - - - -

57 Proving ring - - - - - - - - -

58 Retroreflective Sigbboard - - - - - - - - -

59 Rock/ Core - - - - - - - 15 -

60 Rock core cutting - - 32 - - - - - -

61 Rock core drilling - - 29 - - - - - -

62 Rock core polishing - - 32 - - - - - -

63 Rock Durability - - - - - - - - -

64 Roller compact conc mix design - - - - - - - - -

65 Rubble - - - - - 62 - - -

66 Sand - 3 - - - - 4586 3085 -

67 Soil 2027 - - 75 160 822 261 - 429

68 Soil Road (Murrum) - - - - - - 1086 1710 -

69 Soil (Chemical) - 48 - - - - - 35 -

70 Slake Durability - - - - - - - - -

71 Steel - 1541 - - - - 3173 2637 -

72 Stone / Rubble - - - - - - 127 230 -

73 Testing of bentonite - - - - - - - - -

Page 23: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

22

Sr.No Materials / Test Total No. of test conducted during the year 2014-2015

74 Tiles - 47 - - - - - 105 -

75 Timber - 20 4 - - 50 153 - -

76 True Specific gravity - - - - - - - - -

77 Ultrasonic - - - - - - - - -

78 Unconfined comp. strength test - - 32 - - - - - -

79 Water - 117 - - - 150 271 - 13435

80 Water / Hydrology water sample - 355 - - - - - - -

81 Water Absorption - - - - - - - - -

82 Waterproofing material - - - - - - - - -

83 WMM design - - - - - 47 - - -

84 Wood - - - - - - - 115 -

Total 2027 6976 264 84 813 23814 68017 48958 13864

Grand Total 164817

Page 24: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

23

1.2 Field tests conducted by various divisions

Sr. No.

Field tests Soil Mech

Dn

Material Testing

Dn

Geo Mech Dn

Road Research

Dn 1

Road Research

Dn4

N.G.R.D. G'nagar

S.G.R.DSurat

SRD, Rajkot

S.D.R Circle

1 2 3 4 5 6 7 8 9 10 11

1 Core cutter

2 Field test on soil 3

3 Field test on rock (Anchor pull test) 15

4 Field test on road/bridge aggregate 73

5 Drilling work including supervision on existing structure/Bridge

425 mt.

6 Drilling work including supervision on building

7 Drilling work including super vision on check dam

53 mt.

8 Benkelmen Beam Deflection test 63.50 km

9 Drilling Work including supervision on soil

10 Drilling Work including supervision on Bridge

11 UDC by core cutter on soil shelby

12 UDC by core cutter on building 2

13 Rebound hammer

14 FMC test

15 Hand Augering on Check Dam

16 Hand Augering on Road

17 Hand Augering on Building 3 mt.

18 Investigation of Roads

Page 25: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

24

Sr. No.

Field tests Soil Mech

Dn

Material Testing

Dn

Geo Mech Dn

Road Research

Dn 1

Road Research

Dn4

N.G.R.D. G'nagar

S.G.R.DSurat

SRD, Rajkot

S.D.R Circle

1 2 3 4 5 6 7 8 9 10 11

19 Performance evaluation of road

20 Undisturbed (U/D) by core cutter check dam

21 Undisturbed (U/D) by shelby on Bridge

22 Undisturbed (U/D) by shelby on Building

23 Undisturbed (U/D) by shelby on Existing structure 350

24 Undisturbed (U/D) by shelby on Check Dam 33

25 Standard Penetration Test (SPT) on Check Dam 21

26 Standard Penetration Test (SPT) on Bridge

27 Standard Penetration Test (SPT) on Building

28 Standard Penetration Test (SPT) on Existing structure

198

29 B.I.testing 38.40 km

30 Retro Reflectometer 20 sample

31 Traffic census & other survey 3 survey

32 Ultrasonic Concrete Testing Non destructive test

33 Water replacement

34 Disturbed sample

35 CBR

1.3 Petrological Laboratory Unit

Sr.N Name of test No.of sample tested

1 Rock Megascopic & Microscopic examination 115

2 Petrographic analysis of crushed fine Aggregates 35

Page 26: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

25

1.4

Engineering Geology unit

Sr. No.

Name of the project Taluka district Work done

1 2 3 4

A PANAM PROJECT CIRCLE, GODHRA.

I PRE-CONSTRUCTION STAGE

Godhra

1 Syphon @ CH. 1843m on LBMC of PHLC

Panchmahal Logging of 2 drill holes, of 23.20 running metres is carried out. On this basis , stat-ment is submitted to Ex. Engg., Panam project Dn. Godhara is submitted vide This Office Letter No. 41 Dt: 30/01/2016

2

Dhamnod Weir

Shehara Logging of 4 drill holes, of 41 running metres and logging of 4 trial pits of 11.10 running metres is carried out.

Panchmahal Interim report based on 4 drill holes and 4 trial pits is submitted to EX. Engg. Panam Project Dn Godhra and to SE, (G), CDO, G' nagar vide This Office Letter No. 517 Dt: 05/10/2015.

One drill hole is yet to be drilled.

3 Kasanpur Weir

Morva (H) Logging of 7 drill holes, of 76 running meters logging of 5 trial pits of 11.30 running meters is carried out. Based on 7 nos. of drill holes.

4 Dahikot Weir Devgadh- Out of 6 recommended drill holes, 4 drill holes of 46.50m running meters is drilled and logged. 5 trial pits are recommended. Progressive log sheets and L- section is being made.

Baria

Panchmahal

5 Mendra Weir Devgadh- Preliminary geological investigation is done. 4 drill holes and 3 trial pits are recommended for subsurface investigation Baria

Panchmahal

6 Kakalpur Weir Devgadh- Preliminary geological investigation is done.4 drill holes and 2 trial pits are recommended for subsurface investigation. Panchmahal

Page 27: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

26

Sr. No.

Name of the project Taluka district Work done

1 2 3 4

B. GERI, VADODARA.

1 Study of sliding of big chunks

Danta A note with observation and recommendation is issued to the trustees of Ambaji Temple.Vide CE & Director, GERI, OL No. 2 04/02/2016

of rocks at Gabbar, Ambaji.

Banaskantha

C. VADODARA IRRIGATION CIRCLE, VADODARA.

NIL

D. KADANA PROJECT

CIRCLE, DIVDA COLONY.

NIL

Page 28: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

27

SECTION C

1. Details @ consultancy services offered by GERI.

(i) Within the state : RRD-4 Dn.

(a) Report about classified volume count of non-tolled vehicle at R.O.B.

Chhayapuri for four spells

1. 15th June-2015 to 21st June-2015 was submitted to G.S.R.D.C.,

Gandhinagar.

2. 7th September-2015 to 13th September-2015 was submitted to

G.S.R.D.C., Gandhinagar.

3. 16th December-2015 to 22nd December-2015 was submitted to

G.S.R.D.C., Gandhinagar.

(ii) Outside the state : Nil 2. Technical Papers.

(A) Presented paper in Conference on ’Issues related to Ground Water

Management in Gujarat’ organized by Central Ground Water Board, Ahmedabad on 30.3.2016

Topic : “Remedial Measures for Ground Water Management in Gujarat“.

(B) A special volume on “Seismology” was published which includes two papers from Seismology Unit.

(i) “Seismic studies around Kalpasar Project” authored by

• Sanjay Srivastava &

• Abdul Hameed

(ii) “Background Noise survey for selection of sites for seismic network

around Multipurpose Kalpasar Project “authored by

• Sanjay Srivastava

• Abdul Hameed

• Dr S. C. Gupta, IIT Roorkee &

• Dr A. K. Jindal, IIT, Roorkee

(C) Presented paper At Institution of Engineers , Ahmadabad

Topic : Inspection of Building and Remedial Measures. Case study of

Renovation of Gujarat

• Smt.P.S.Chari, Research Officer, M.T.Dn. GERI

(D) Presented paper At GCCT-2015, Allahabad

Topic : Assessing Effective Flood Protection work for Lakroda Barrage on Sabarmati River (Gujarat) by Hydraulic Performance on Physical Model.

• Smt.P.S.Chari RO, Research Officer, M.T.Dn. GERI

• Shri M. Khan A. E. N.Hyd.Dn. GERI, Gotri

Page 29: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

28

SECTION –D 1.0 Investigation and testing reports: 1. Testing of soil sample for leveling and Gardening area of Unit-8 WTPS,

Wanakbori 2. Testing of soil sample for construction of Bhutdizapa Police Station for Women

and D.B.C at Vadodara 3. Testing of soil sample for construction of 15 MLD eater supply scheme at

Industrial Area Halol. 4. Testing of soil sample for Construction of Saputara Reservoir Project Ahwa,

DANG 5. Testing of soil sample for construction of Remoulding and Development of

Matariya Tank. Bharuch 6. Testing of soil sample for Flood protection work on river Kaveri and Kharera

Ta.Gandevi 7. Testing of soil sample for construction of providing slope lining on KRBMC Surat

ch.47950 to 54764 mt. (Pkg-1) 8. Testing of soil sample for construction of providing slope lining on Hajira branch

Canal from ch. 0.0 to 2755 mt. (Pkg-3) 9. Soil Samples from survey no – 60 Village Bhesali Ta. Vagara Dist. Bharuch 10. Testing of soil sample for Flood protection work on both bank of river Purna

Dist. Navsari. 11. Testing of soil sample for Filling of Soil in Bharat petrol Pump area @ Amodar,

Waghodia 12. Testing of soil sample for Protection work on L.B. of Narmada , Dhantura

Ta. Ankleswar. 13. Testing of soil sample for Underground Drainage project Ta. Savli Dist.

Vadodara 14. Testing of soil sample for proficiency

15. Testing of soil samples for constructing Additional Escape structure @ ch.75.330 km on I.p side of N.M.C

16. Testing of soil samples for the work of strengthening of venerable high banking of N. M. C. between ch.74.400km to 95.800 km.

17. Testing of soil samples for the work of c.c. lining in slope @ch.81.970 km (RHS) of N.M.C reach ch 67.153 to 105.344 Km.

18. Renovation to Dagoriya sadaiya Falia vilage tank Jal Jalod.

19. Construction of New Check Dam at village Katol

20. Construction of New Tank at Mundha ta. Zalod

21. Construction of New V.R.B at ch 158400 ft of Main canal in place of exiting V.R.B

22. Construction of New Village Tank @Sagadapura. Ta.Fatepura 23. Construction of Flat type Highrise building cum commercial unit at Gorva 24. Constructing Weir on Panam River at village Dhamnod. 25. Testing of soil for Specific gravity and Proctor test for survey no:1624 @ village Jhanor. Ta. Bharuch 26. Construction of New M.D.R.B @ ch.150100 ft of Main canal in place of exiting

V.R.B. 27. Construction of New V.R.B at ch 165035 ft of Main canal in place of exiting

V.R.B 28. Construction of New M.D.R.B @ ch.15424 ft of Petlad branch canal in place of Exiting V.R.B.

Page 30: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

29

29. Construction of New S.H.R.B @ ch 12600 ft of Petlad branch canal in place of exiting M.D.R.B. 30. Const. of Modification of slab V.R.B to Rcc box Culvert on Lawal Main Drain at ch 9448m. Nadiad. 31. Const of providing slope lining on KRBMC from ch. 54764 to 60980

(package.2) 32. Const of providing slope lining on KRBMC from ch. 47950 to 54764

(package.2) 33. Const of providing slope lining on KRBMC from ch. 47674 to 60980 34. Const. of New S.H.R.B at ch. 211085 ft of main canal in place of exiting

M.D.R.B 35. Testing of soil samples collected from over burden material for rock fill Dam of Garudeshvar Weir. 36. Testing of soil samples for Khajuri road Falia tank work. Ta.Dhanpur 37. Testing of soil samples for safe stage to Munavani (Vadkunda) viilage tank Ta. Limkheda 38. Testing of soi samples for FDR to khajuri Nichvas Falia village Tank

Ta.Dhanpur 39. Testing of Borrow Area samples for New village tank @Pavdi Ta. Zalod 40. Remolding the Damage slab VRB to Rcc Box Culvert on Chanor Hadeva Main Drain at ch 700m 41. Testing of Soil Sample for constructing of Urben Police station at Kisanwadi

Vadodara 42. Construction of Samras Kumar chhatralay @ Bhuj

43. Construction of Kanya chhatralay @ Bhuj

44. Testing of Borrow Area Soil samples for Suthar vas Village Tank (Zalod)

45. Testing of Borrow Area Soil samples for construction of New Village Tank at Chhasiya (Zalod) 46. Construction of check Dam A/c Bhukhi Khadi near village Amleshwar Dist. Bharuch 47. Testing of Soil sample for Renovation to Chatka Village Tank Ta. Zalod

48. Flood protection Work on River Purna Dist.Navsari

49. Testing of Soil samples for ERM to Dhammi Feeder canal of Waghas M.I Tank Ta. Kapadvanj. 50. Construction of syphone @ ch.1843m of 8/R distry of L.B Main canal of Panam high level canal. 51. Construction of Psq cat B 40 units at akota policeline vadodara.

52. Testing of borrowed soil sample for the work of earth filling area for wanakbori TPS extension unit 8 Gujatat Reg 53. Testing of soil sample for embankment for proposed Reservior at village Adiran

Ta wagodia. 54. Remolding the Damage slab VRB to Rcc Box Culvert on Chanor Hadeva Main Drain at ch 6096mt. 55. Renovation to Rupakheda irrigation Tank Jalod.

56. Testing of Soil Sample for constructing of SRP Barrack with kitchen and Dinning @ central jail Vadodara

57. Interim Report on Classification of either Baseline / Trend location March 2016

Page 31: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

30

(B) Investigation and testing under progress :

1. Flood protection work on both bank of river Purna , Dist. Navsari By S. D.R. Circle Investigation & Testing Reports.

2. Soil Survey Reports of the following Irrigation Project is published.

Sr.No. Name of Project Date of published -- Nil --

3. Sub Soil Water Table (S.S.W.T.) Reports of the following Irrigation Projects are published

Sr.No. Name of Project Report for the year Date of published 1 2 3 4

1 Bhadar-S 2013-14 07-05-2015 2 Machhu-I 2013-14 07-05-2015 3 Moj 2013-14 07-05-2015 4 Brahmani 2013-14 07-05-2015

5 Vartu-I 2013-14 07-05-2015 6 Machhundari 2013-14 07-05-2015 7 Shetrunji 2013-14 07-05-2015 8 Kalubhar 2013-14 07-05-2015 9 Aji-II 2013-14 07-05-2015 10 Demi-II 2013-14 07-05-2015

11 Ghee 2013-14 07-05-2015 12 Sasoi-I 2013-14 07-05-2015 13 Dantiwada 2013-14 30-05-15 14 Mukteshwar 2013-14 30-05-15 15 Damanganga 2013-14 30-09-15 16 Ukai RBC 2013-14 30-09-15 17 Kakrapar 2013-14 30-09-15

18 Mahi RBC 2013-14 30-09-15 19 Sipu 2014-15 14-03-16 20 Mazam 2014-15 14-03-16 21 Watrak 2014-15 14-03-16 22 Dantiwada 2014-15 14-03-16 23 Mukteshwar 2014-15 14-03-16

24 Lakroda 2014-15 14-03-16 25 Dharoi 2014-15 14-03-16 26 Rami 2011-12 17-03-16 27 Rami 2012-13 17-03-16 28 Rami 2013-14 17-03-16 29 Hathmati 2014-15 22-03-16

30 Meshwo 2014-15 22-03-16 31 Waidy 2014-15 22-03-16 32 Kharicut 2014-15 22-03-16 33 Fatewadi 2014-15 22-03-16 34 Bhadar-P 2014-15 22-03-16 35 Hadaf 2014-15 22-03-16 36 Panam 2014-15 22-03-16

37 Machhannala 2014-15 22-03-16 38 Edalwada 2014-15 22-03-16 39 Kabutari 2014-15 22-03-16 40 Umaria 2014-15 22-03-16

Page 32: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

31

4. Executive Summary (S.S.W.T.)

Sr.No. Name of Project Report for the year Date of published

1 2 3 4 1 Aji-II 2014-15 08-12-2015

2 Demi II 2014-15 08-12-2015 3 Brahmani I 2014-15 08-12-2015 4 Machhu I 2014-15 08-12-2015 5 Bhadar 2014-15 08-12-2015 6 Moj 2014-15 08-12-2015 7 Ghee 2014-15 08-12-2015 8 Vartu I 2014-15 08-12-2015

9 Sasoi -I 2014-15 08-12-2015 10 Machhunadri 2014-15 08-12-2015 11 Kalubhar 2014-15 08-12-2015 12 Shetrunji 2014-15 08-12-2015 13 Kakarapar 2014-15 02-01-2016 14 U.R.B.C 2014-15 02-01-2016

15 U.L.B.C. 2014-15 02-01-2016 16 M.R.B.C. 2014-15 02-01-2016 17 Damanganga 2014-15 02-01-2016 18 Karjan 2014-15 02-01-2016 19 Jhuj 2014-15 02-01-2016 20 Keliya 2014-15 02-01-2016

21 Ver -II 2014-15 02-01-2016 22 Pigut 2014-15 02-01-2016 23 Lakhigam 2014-15 02-01-2016 24 Rami 2014-15 02-01-2016 25 Panam 2014-15 03-12-2015 26 Machhnala 2014-15 03-12-2015 27 Edalwada 2014-15 03-12-2015

28 Bhadar-(P) 2014-15 03-12-2015 29 Umaria 2014-15 03-12-2015 30 K.L.B.C 2014-15 03-12-2015 31 Kabutari 2014-15 03-12-2015 32 Hadaf 2014-15 03-12-2015 33 Hatmati 2014-15 03-12-2015

34 Fatewadi 2014-15 03-12-2015 35 Meshwo 2014-15 03-12-2015 36 Waidy 2014-15 03-12-2015 37 Kharicut 2014-15 03-12-2015 38 Sabarmati 2014-15 03-12-2015 39 Watrak 2014-15 03-12-2015 40 Mazam 2014-15 03-12-2015

41 Dantiwada 2014-15 03-12-2015 42 Lakroda 2014-15 03-12-2015 43 Mukteshwar 2014-15 03-12-2015 44 Sipu 2014-15 03-12-2015

Page 33: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

32

(C) Crust design by CBR. RRD-1 Dn.

• R&B Panchayat Sub-Dn Savli

1. Samlaya-Tundav-Anjesar-Raniya road Km. 0/00 to 19/40

• VMSS Vadodara 1. Sama L&T circle to Jalaram Mandir to GIPCL circle

3.0 Deputation to Symposium/Conference/Seminar workshop/training etc.

attended by GERI Officer during year 2015-16

Sr. No.

Subject Place Name of officer who attended

Period

1 QC in civil Engg. Construction

NGRD,GERI, Gandhinagar

Chitra Chudasama AE Huma Siddiqui, AE

28th May 2015

2 MODULE-2, (ROADS)

STC, Gandhinagar

Huma Siddiqui, AE 2nd to 6th June 2015

3 QC in civil Engg. construction

GERI, vadodara Chitra Chudasama AE

15th June 2015

4 Workshop on Road Instrument

STC, Gandhinagar

P.B.Patel, JSA 17th July 2015

5 MODULE-3, (BRIDGE)

STC, Gandhinagar

Huma Siddiqui, AE

20th to 24th Sept.2015

6 Earth Quake Resistant designing practice & challenges

IIE, vadodara Chitra Chudasama AE Huma Siddeqiu, AE

1st Oct 2015

7 Computer security awareness

SPIPA, Vadodara

R.T.Rohit, RO K.H.Amin, AE

8th Dec 2015

8 Event Management SPIPA, Vadodara

K.H.Amin, AE 15th to 17th Dec 2015

9 Work Assistant Training

GERI, Vadodara

D.K.Padhiyar Karkoon M.M.Thakkar Karkoon

8th Feb to 7th April 2016

10 Stay Fit & Perform better

SPIPA, Vadodara

R.T.Rohit, RO K.H.Amin, AE

21st to 23rd March 2016

11 The Science of Living

Academy of Human Excellence Vadodara

B.D.Akbari (AE.CU) 26/10/2015 to 30/10/2015

12 Recent trends in pile and pile raft foundation

I G S, Vadodara Chapter

Shri U.C.Shukla (ARO.MT ) Shri R M Jain (A E)

4th Dec 2015

13 Emerging issues and Challenges in water pollution and waste water treatment.

Dept. of Civil Engg. Faculty of Tech. & Engg., MSU, Vadodara

B.D.Akbari (AE.CU) 30th & 31st Jan 2016

14 Module No. I ( Administration )

Staff Training College, Gandhinagar

Shri D. A. Rathod Research Officer Hydraulic Division

27 April to 1st May 2015

Page 34: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

33

Sr. No.

Subject Place Name of officer who attended

Period

15 Quality Control in civil Engineering Construction

R.O., N.G.R.Dn. Gandhinagar

Shri D. A. Rathod Research Officer Hydraulic Division

28th May -2015

16 Remote sensing: An Overview for decision makers.

Indian Institute of Remote Sensing, Dehradun.

Shri D. A. Rathod Research Officer Hydraulic Division

15th to 18th June- 2015

17 SYMPOSIUM On“ Advance in Instrumental Geo Monitoring validation”.

Conference Hall, CBTP Building Maleha Marg, Chanakyapuri, New- Delhi.

Shri D. A. Rathod Research Officer , Hydraulic Division

23rd to 24th July- 2015

17 Event Management Regional Training Centre, Vadodara

Shri D. A. Rathod Research Officer Hydraulic Division

15th to 17th December-2015

18 Module No. III ( Canal )

Staff Training College, Gandhinagar

Shri D. A. Rathod Research Officer Hydraulic Division

4th to 8th January -2016

19 36th Meeting of National Committee Dam safety (NCDS)

J.P. Cetestial Bangluru (Karnataka)

Shri D. A. Rathod Research Officer Hydraulic Division

11th January -2016

20 Lessons learnt from ongoing Dam Rehabilitation & Improvement Project ( DRIP )

C.E. C.W. C. New-Delhi

Shri D. A. Rathod Research Officer Hydraulic Division

18th February -2016

21 Remote Sensing An overview for decision makers

Indian Institute of Remote Sensing Department ISRO, G.O.I. Dehradun

Shri S. P. Patel Assistant Research Officer , Sedimentation Survey Unit-2

15th to 18th June-2015

22 Regarding Information Act -2005

Regional Training Centre, Vadodara

Shri S. P. Patel, A.R.O. Sedimentation Survey Unit-2

29th to 30th June-2015

23 Lecture under the theme “Physical Numerical Modeling’.

Department of Civil Engineering, MNNIT, Allahabad (UP)

Shri M. Khan

A. R.O , Sedimentation

Survey Unit-1

9th to 11th October-2015

24 Irrigation Management & Canal Operation

WALMI, Anand

Shri M. Khan

A.R.O., Sedimentation

Survey Unit-1

29th September-2015

25 Training of Recent trends in Pile & Piled Raft Foundation

Held by (IGS – Chapter Vadodara ) @ Social science faculty MSU, Vadodara

Shri. A.V. Kaulgud. R.O. (I/C), S.M. Dn. Shri H.D.Rathwa A.R.O. Shri J.B.Makwana.A.E. Shri S.J Rajan. A.E. Shri I.M.Dukandar.

4th December-2015

Page 35: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

34

Sr. No.

Subject Place Name of officer who attended

Period

26 Training on

Irrigation Management & Canal Operation

WALMI Anand..

Shri H.D.Rathwa A.R.O. Shri. S. J. Rajan A.E.

30th-31st Dec-2015

27 Training on Irrigation Management & Canal Operation

WALMI Anand..

Smt K.R.Patel, A.E. Joint. Director.(Irri) (PB)

30th-31st Dec-2015

28 Training on Irrigation Management & Canal Operation

WALMI Anand..

MS. B. J. Patel, A.E. Deputy Director (PB)

30th-31st Dec-2015

29 Training on Irrigation Management & Canal Operation

WALMI Anand..

Shri U. C. Shukla A.R.O, M.T.Dn.

30th-31st Dec-2015

30 Training on Irrigation Management & Canal Operation

WALMI Anand..

Shri S.B.Pimplaskar A.E.G.M.Dn.

30th-31st Dec-2015

4.1 Workshop/ Seminars / Training / Organised by GERI during the year- 2015-16

Sr. No

Subject Date Organizes by

1 Material Testing & Mix Design of Concrete, Soil Investigation, Soil Classification & Testing.

18.05.2015

South Gujarat Research Division, Surat

2 Quality control in concrete works, 28-04-2015 Material Testing Division, GERI, Vadodara

3 Quality control in concrete works, 15-06-2015

Material Testing Division, GERI, Vadodara

4 Quality control in concrete works, 29-09-2015

Material Testing Division, GERI, Vadodara

5 Concrete Mix design 30-03-2016

Material Testing Division, GERI, Vadodara

6 Field test of Soil & Classification of soil

18-05-2015 South Gujarat Research Division, Surat

7 Field test of Soil 29/09/2015 HIPC Visnagar @Visnagar

8 Technical Training/ Demonstration of Rock Mechanics Laboratory Testing and Field Testing to, PPC,Godhra staff & MSU students

29/12/2015 Joint Director ( Irri) & Geomechanics Division, GERI, Vadodara

Page 36: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

35

4.2 One Day Workshops on “ Quality Control in Civil Engineering Construction pertains to Water Resources Field” Sr. No.

Topic Date Venue Lecture by

1. Seismology- An introduction

15.06.2015 Walmi Training Centre, Rajkot

Mr Sanjay Srivastava S.S.A.and Assistant Research Officer (I/C)

2. Seismology - An introduction

28.04.2015 Damanganga Project Circle Office, Valsad.

Shri D.N.Patel Jr. Geologist

3. Seismology – An introduction

18.05.2015 South Gujarat Research Division, Surat

Smt. D.Y.Mehta Geologist-II

4. Seismology – An introduction

28.05.2015 North Gujarat Research Division, Gandhinagar

Smt. D.Y.Mehta Geologist-II

5. Seismology – An introduction

28.09.2015 S.K. College Visnagar for Dharoi Project Dn. Visnagar

Shri D.N.Patel Jr. Geologist

5.0 Techanical Forum Organised by GERI

----NIL--- 6.0 Equipment procured during the year. -----NIL----- 7.0 Visit by Dignitaries to Field Hydraulic Laboratory, GERI, Gotri, Vadodara

During the 01/04/2014 to 31/03/2015

Date Visitors

01/04/2015 Visit of Engineering Students and staff from Vasad engineering collage. Vasad

22/04/2015 Visit of 50 Nos. work assistant for training purpose.

11/06/2015 Visit of Director shri kapadia sir, Joint Director(I) shri Fefar sir and shri S.R.Tole , Chairmen CWC New Delhi and others.

08/07/2015 Visit of Students and staff from Parul Institute, Limda and Vadodara.

10/08/2015 Opening of Balloon Barrage Section Model by Director of GERI shri Kapadia sir, Visit of 51 student and staff from HJD engineering collage Kera, Kutch -Bhuj

12/08/2015 103 students and staff of L.D.Enginbeering collage visit to GERI.

19/08/2015 Visit of 18 Students of M.E. (Civil) of L.D.R.P. Engg college, Gandhinagar.

Page 37: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

36

Date Visitors

02/09/2015 Shri D N Deshmukh , Consultant, Bhadbhut Model study and Visit of 80 Students K.J.I.T..Engg college, Savli.

18/09/2015 Visit of Students from and staff Parul Institute ,Limda, vadodara

28/09/2015 Visit of 40 Students and staff from Indus University ,Ahemedabad

29/09/2015 Visit of 56 Students and staff from Dahod .Engg college, Dahod.

12/10/2015 Visit of 30 Students and staff from Jivaraj Mehta Institute ,Mogar , Anand

10/12/2015 Visit of Director shri kapadia saheb and shri Anil Chaudhry Ex.Engr. NMC

19/02/2016 Officers of Kalpsar Department from Gandhinagar.

23/02/2016 Visit of 81 Students from Sarvajanik Engg college, surat

24/02/2016 Visit of Students from LCIT Engg. college, Bhandu

04/03/2016 For Bhadbhut 3D model Shri Kapadia sir, CE.Kalpsar . Shri A K Patel. (I/C) S. E. Shri Keshavani sir Director GERI and L & T Officials

09/03/2016 Visit of 25 Students from Hasmukh Goswami college of Engineering. Vehlal ,Gandhinagar.

14/03/2016 Shri Keshavani sir, Director GERI.

16/03/2016 Shri Keshavani sir , Director GERI and shri I K Vaghela sir, (CE) NMC & Team

29/03/2016 Visit of 37 Students from Gujarat Power Engg. Research college, Mahesana

8.0 Library publications

(a) Nos. of books procured 92 nos. Indian authors 66 nos. Foreign authors 26 nos.

(b) Nos. of journals / periodicals subscribed 07 nos. Indian authors 04 nos.

Foreign authors 03 nos. List of Indian Journals

List of foreign journals

1. Geosynthetics (Geotechnical Fabrics Report)

2. Roads & Transport Research

3. Traffic Engineering Control (c) Nos. of research film procured: Nil

(d) Nos. of technical film procured: Nil Indian- Nil Foreign – Nil

1 Civil Engineering & Construction Review 2 Indian journal of Power & River Valley Development 3 Science Reporter 4 Standards India

Page 38: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

37

9.0 Budget provision and expenditure for the year 2015-2016 (Rs. In lacs.)

Sr. No.

Head of Account FMG Expenditure Plan Non-Plan Plan Non-Plan

1. 4701 C.O. on Medium Irr. 800 Other Exp. 46 IRG-NHP With externally aid Plan

- - - -

2. 2701 Major & Medium Irr. 80 General 004 Research Plan

808.22 - 806.54 -

3. 2701 Major & Medium Irr. 001 Dir. & Adm. 01 Dir. Non Plan

- 1605.33 - 1602.83

4. 2701 Major & Medium Irr. 001 Dir. & Adm. 02 Adm. Non Plan (Sedimentation/Dam safety)

- 181.03 - 179.84

5. 5054 Co. on R & R 80 General 800 Other Expdr. Planning & Res. Plan

88.81 - 84.87 -

6. 3054 R & B 001 Dir & Adm. (02) Adm. Non Plan

- 1087.30 - 1016.18

7. 5054 Co. on R& B 03 State Highways 317 Road Work (11) Original Works CRF Non Plan

- - - -

8. Demand No.84 2059 P,W 053 M & E State Division W/C Salary (NP)

- 309.10 - 308.02

9. 2701 Medium Irr. 80 General 800 other expenditure 01 Information Technology 52 M & E

- - - -

Page 39: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

38

SECTION-E 1.0 Research Personnel. Following officers were working in GERI during 2015-2016 for the period shown against them. Name Designation Qualification Period Shri V. K. Kapadia Director & C. E. M. E. (civil) 1.4.15 to 15.1.16 Shri K. A. Keshvani Director & C. E. B. E. (civil) 16.1.16 to 29.3.16 Shri P. K. Nalvaya (I/C) Director & C. E. B. E. (civil) 30.3.16 to 31.3.16 Shri R. H. Fefar J.D.(Irrigation) B. E. (civil) 1.4.15 to 18.11.15 Shri P.B.Chaudhari (I/C) J.D.(Irrigation) B. E. (civil) 19.11.15 to 17.2.16 Shri R. H. Fefar J.D.(Irrigation) B. E. (civil) 18.2.16 Shri P.B.Chaudhari (I/C) J.D.(Irrigation) B. E. (civil) 19.2.16 to 31.3.16

Shri D. N. Chaudhari J.D. (Roads) B. E. (civil) 1.4.15 to 31.8.15 Shri A. K. Patel (I/C) J.D. (Roads) B. E.(civil) 1.9.15 to 20.10.15 Shri P. K. Nalvaya J.D. (Roads) B. E. (civil) 21.10.15 to 31.3.16 Shri H. L. Patel Dy. Director B. E. (civil) 1.4.15 to 27.7.15 Shri D. A. Rathod (I/C) Dy. Director A.M.I.E (civil) 28.7.15 to 10.8.15 Shri H. L. Patel Dy. Director B. E. (civil) 11.8.15 to 1.12.15

Shri D. A. Rathod (I/C) Dy. Director A.M.I.E (civil) 2.12.15 to 14.12.15 Shri H. L. Patel Dy. Director B. E. (civil) 15.12.15 to 5.2.16 Shri A. K. Patel Dy. Director B. E. (civil) 6.2.16 to 15.2.16 Shri H. L. Patel Dy. Director B. E. (civil) 16.2.16 to 31.3.16 Shri H. D. Vakil (I/C) A.R.O.(civil) B. E. (civil) 1.4.15 to 30.9.15 Shri U. R. Patel A.R.O.(civil) B. E. (civil) 1.10.15 to 14.10.15

Shri P. N. Nagpal A.R.O.(civil) B. E. (civil) 15.10.15 to 31.3.16 Material Testing Division

Smt. P.S.Chari R.O. B.E Civil 1.4.15 to 31.1.16 Shri V.H.Vyas A.R.O. B.E.Civil 1.4.15 to 31.3.16 Shri R.M.Jain A.R.O. (I/C) B.E.Civil 1.4.15 to 31.3.16 Shri U.C.Shukla A.R.O B.E.Civil 1.4.15 to 31.3.16 Geomechanics Division Smt. P.S Chari, Add. C R.O. B E (Civil) 1.4.15 to 18.10.15

Smt. N.S.Patel R.O. (I/C) B E (Civil) 19.10.15 to 31.3.16

Shri D.B.Galgale R.O. (I/C) B E (Civil) 1.2.16 to 30.3.16 Shri S.B.Pimplaskar A.R.O., (I/C)

R.M.Field subDn. M.E.(Civil) 1.4.15 to 7.6.15

Shri A.H.Joshi A.R.O R.M. Field sub Dn. (I/C)

B E (Civil) 8.6.15 to 18.10.15

Shri D.B.Galgale A.R.O R.M. Field sub Dn.

B E (Civil) 19.10.15 to 31.3.16

Soil Mechanics Division Shri B. H. Chaudhari R. O. B. E. (Civil) 1.4.15 to 10.05.15 Smt. P.S. Chari R. O. ( I/C ) B. E. (Civil) 11.05.15 to 20.5.15

Shri B. H. Chaudhari R. O. B. E. (Civil) 21.05.15 to 18.6.15 Shri. H. D. Rathwa R. O. ( I/C ) B. E. (Civil) 19.6.15 to 30.6.15 Shri B. H. Chaudhari R. O. B. E. (Civil) 1.7.15 to 17.08.15 Shri. A. V. Kaulgud R. O. ( I/C ) B. E. (Civil) 17.08.15 to 18.02.16 Shri M.C.Patel./ R. O. ( I/C ) BSc. (Chem) 19.02.16 to 26.02.16

Page 40: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

39

Name Designation Qualification Period Shri. A. V. Kaulgud R. O. ( I/C ) B. E. (Civil) 27.02.16 to 31.03.16 Smt. N. S. Patel A.R.O-I B. E. (Civil) 1.04.15 to 10.05.15

Shri. H. D. Rathwa A.R.O. - I (I/C) B. E. (Civil) 11.05.15 to 12.6.15 Smt. N. S. Patel A.R.O-I B. E. (Civil) 13.06.15 to 3.01.16 Shri. J. B. Makwana A.R.O. - I (I/C) B. E. (Civil) 4.01.16 to 14.1.16 Smt. N. S. Patel A.R.O-I B. E. (Civil) 15.01.16 to 31.01.16 Shri. J. B. Makwana A.R.O. - I (I/C) B. E. (Civil) 1.02.16 to 31.3.16 Shri. H. D. Rathwa A.R.O. - II B. E. (Civil) 1.4.15 to 9.08.15 Shri. J. B. Makwana A.R.O. -II (I/C) B. E. (Civil) 10.08.15 to 24.8.15

Shri. H. D. Rathwa A.R.O. – II B. E. (Civil) 25.8.15 to 19.01.16 Shri. J. B. Makwana A.R.O. - II (I/C) B. E. (Civil) 20.01.16 to 4.3.16 Shri. H. D. Rathwa A.R.O. – II B. E. (Civil) 5.3.16 to 31.03.16 Shri. A. V. Kaulgud A.R.O- III B. E. (Civil) 1.04.15 to 20.04.15 Shri. H. D. Rathwa A.R.O. – III (I/C) B. E. (Civil) 21.4.15 to 2.05.15 Shri. A. V. Kaulgud A.R.O- III B. E. (Civil) 3.05.15 to 7.06.15

Shri. H. D. Rathwa A.R.O. – III (I/C) B. E. (Civil) 8.6.15 to 23.06.15 Shri. A. V. Kaulgud A.R.O- III B. E. (Civil) 24.06.15 to 18.02.16 Shri. S. J. Rajan. A.R.O-II(I/C) B. E. (Civil) 19.02.16 to 26.02.16 Shri. A. V. Kaulgud A.R.O- III B. E. (Civil) 26.02.16 to 31.03.16 Engineering Geology Smt D Y Mehta (I/C) Geologist (Sr) M.Sc. (Geo.) 01.04.14 to 10.11.15

Smt P. Chari Add. C Geologist (Sr) B.E. (Civil) 11.11.15 to 31.12.15 Shri J.J.Shaikh (I/C) Geologist (Sr) M.Sc. (Geo.) 1.01.16 to 31.01.16 Shri V. H. Vyas (I/C) Geologist (Sr) B.E. (Civil) 1.02.16 to 16.03.16 Shri C.J.Dave (I/C) Geologist (Sr) M.Sc. (Geo.) 17.03.16 to 31.03.16 Shri Sanjay Srivastava A.R.O. (I/C) M.Sc.Tech.

(Geophysics) 1.04.15 to 31.03.16

Road Research Division 1 Shri A.K.Patel R.O B.E. (Civil) 01.04.15 to 31.03.16 Shri S.V. Vanjara A R.O. B.E. (Civil) 01.04.15 to 20.06.15

Shri R. S. Vasava A.R.O.(I/C) D.C.E. 22.06.15 to 26.06.15 Shri S.V. Vanjara A R.O. B.E. (Civil) 29.06.15 to 31.03.16 Road Research Division 4 shri R.T. Rohit R. O. M.Tech. 1.04.15 to 31.03.16 Shri K.R.Shah A.R.O. B.E. (Civil) 1.04.15 to 31.05.15 Shri F.M.Hui A.R.O. B.E. (Civil) 1.04.15 to 31.03.16

Shri K.C.Patel A.R.O. B.E. (Civil) 9.03.16 to 31.03.16 Dam Safety Organisation Shri R.J.Rao Ex. Engr. (C) B. E. (civil) 1.4.15 to 14.08.15 Shri K.K.Sharma Ex. Engr. (C) I/C) B. E. (civil) 14.8.15 to 31.3.16 Shri R.J.Rao Ex. Engr. (M) B. E. (Mech.) 1.4.15 to 14.08.15 Smt. D.R.Rathod Ex. Engr (M)(I/C) B. E. (Elect) 14.8.15 to 31.3.16

Shri G.H. Adhvaryu Ex. Engr. (E)(I/C) B. E. (Elect) 14.8.15 to 31.3.16 Shri K.K.Sharma D. E. E. Unit-O B. E. (civil) 1.4.15 to 31.3.26 Shri K.K.Sharma DE.E Unit-N(A/C) B. E. (civil) 1.4.15 to 15.10.15 Shri P. N. Nagpal DEE.Unit-N (A/C) B. E. (civil) 15.10.15 to 5.3.2016 Shri K.K.Sharma D EEUnit-N(A/C) B. E. (civil) 6.3.16 to 31.3.16 Shri A.H.Joshi AEEEUnit-M(I/C) B E (Civil) 1.4.15 to 29.2.16 Shri U. R. patel AEEEUnit-M(I/C B E (Civil) 1.3.16 to 31.3.16

Page 41: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

40

Name Designation Qualification Period Hydraulics Division Shri D.A. Rathod R.O. A.M.I.E.(Civil) 01.04.15 to 26.04.15

Shri P.B. Chaudhari R.O. (I/C) B.E. (Civil) 27.04.15 to 01.05.15 Shri D.A. Rathod R.O. A.M.I.E.(Civil) 02.05.15 to 03.05.15 Shri P.B. Chaudhari R.O. (I/C) B.E. (Civil) 04.05.15 to 08.05.15 Shri D.A. Rathod R. O. A.M.I.E.(Civil) 09. 05.15 to12.06.15 Shri P.B. Chaudhari R.O. (I/C) B.E. (Civil) 13.06.15 to 20.06.15 Shri D.A. Rathod R. O. A.M.I.E.(Civil) 21.06.15 to 20.07.15 Shri S.P. Patel R.O. (I/C) B.E. (Civil) 21.07.15 to 26.07.15

Shri D.A. Rathod R. O. A.M.I.E.(Civil) 27 .07.15 to 27.12.15 Shri P.B. Chaudhari R.O. (I/C) B.E. (Civil) 28.12.15 to 02.01.16 Shri D.A. Rathod R. O. A.M.I.E.(Civil) 03.01.16 to 31.03.16 Shri R. S. Contractor A.R.O. Hyd. Sub.

Division (I/C) B.E. (Civil) 01.04.15 to 07.06.15

Shri S.P. Patel A.R.O. Hyd. Sub.

Division B.E. (Civil) 08.06.15 to 20.06.15

Shri R. S. Contractor A.R.O. Hyd. Sub.

Division (I/C) B.E. (Civil) 21.06.15 to 26.01.16

Shri S.P. Patel A.R.O. Hyd. Sub. Division

B.E. (Civil) 27.01.16 to 02.02.16

Shri R. S. Contractor A.R.O. Hyd. Sub. Division (I/C)

B.E. (Civil) 03.02.16 to 31.03.16

Shri S.P. Patel A.R.O. S.S.Unit-(II) (I/C)

B.E. (Civil) 01.04.15 to 24.05.15

Shri B.M. Khatri A.R.O. S.S.Unit-(II) (I/C)

B.E. (Civil) 25.05.15 to 06.06.15

Shri S.P. Patel A.R.O. S.S.Unit-(II) (I/C)

B.E. (Civil) 07.06.15 to 06.09.15

Shri R. S. Contractor A.R.O. S.S.Unit-(II) (I/C)

B.E. (Civil) 07.09.15 to 16.09.15

Shri S.P. Patel A.R.O. (I/C) S.S.Unit-(II)

B.E. (Civil) 17.09.15 to 31.03.16

Shri B.M. Khatri A.R.O. (I/C) S.S.Unit-(II)

B.E. (Civil) 01.04.15 to 30.04.15

Shri S.P. Patel A.R.O. (I/C) S.S.Unit-(II)

B.E. (Civil) 01.05.15 to 19.05.15

Shri B.M. Khatri A.R.O. (I/C) S.S.Unit-(II)

B.E. (Civil) 20.05.15 to 15.10.15

Shri M. Khan A.R.O. S.S.Unit-(I)

B.E. (Civil) 16.10.15 to 31.03.16

Narmada Hydraulic Division Shri P B Chaudhari R.O. B. E. (civil) 01.04.15 to 31.03.16 Shri S P Patel A.R.O-I (I/C) B. E. (civil) 01.04.15 to 31.03.16

Shri M.Khan A.R.O.-II (I/C) M. E. (civil) 01.04.15 to 31.03.16

Shri M C Patel A.R.O.-III (I/C) M.Sc.(Chem. 01.04.15 to 31.03.16

North Gujarat Research Division, Gandhinagar

Smt.J.M.Shroff R.O. M. Sc. 01.04.15 to 31.03.16

Shri M.R.Dave (I/C) A.R.O., S.S.D-1 Gandhinagar

D.C.E. 01.04.15 to 31.03.16

Page 42: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

41

Name Designation Qualification Period Shri K.P.Desai (I/C) A.R.O., S.S.D.-2

Gandhinagar B. Sc.(Maths) 01.04.15 to 31.03.16

Shri S.K.Verma (I/C) A.R.O., M.T. Sub Dn. G’nagar

B. E. (civil) 01.04.15 to 20.10.15

Shri S.A.Lala (I/C) A.R.O. M.T. Sub Dn. G’nagar

B. E. (civil) 21.10.15 to 31.03.16

Shri A.S.Thakkar (I/C) A.R.O.,R.R.S.D.8 Gandhinagar

B. E. (civil) 01.04.15 to 31.03.16

Shri B.A.Patel A.R.O. Dist. Lab Ahmedabad

D.C.E. 01.04.15 to 31.10.15

Smt. D.K.Amin (I/C) A.R.O. Dist. Lab Ahmedabad

B. Sc. Chem. 01.11.15 to 31.03.16

Shri H.B.Shah A.R.O. Dist. Lab Nadiad

B. E. (civil) 01.04.15 to 31.03.16

Shri S.N.Patel A.R.O. Dist. Lab Mehsana

B. E. (civil) 01.04.15 to 31.03.16

Shri G.D.Patel A.R.O. Dist. Lab Palanpur

B. E. (civil) 01.04.15 to 31.03.16

Shri S.N.Patel A.R.O. Dist. Lab Himmatnagar

B. E. (civil) 01.04.15 to 31.03.16

Shri. P.H.Digava (I/C) A.R.O. Dist. Lab Bhuj

B. Sc. 01.04.15 to 31.03.16

Shri. M.C.Patel A.R.O. Dist. Lab Godhara

B. E. (civil) 01.04.15 to 31.03.16

Shri. A.H.Patel (I/C) A.R.O. Hydrology Gandhinagar

M. Sc. 01.04.15 to 31.03.16

South Gujarat Research Division, Surat ShriB.H.Chaudhri R. O. (I/C) B. E. (civil) 01.04.15 to 08.05.15 ShriP.B.Chaudhri R. O. (I/C) B. E. (civil) 09.05.15 to 31.01.16

Shri D.I. Gandhi A.R.O., M.T. Sub Division Surat

B. E. (civil) 01.04.15 to 31.03.16

Shri D.I. Gandhi A.R.O. (I/C) R. R. Sub Dn. No.7 Surat

B. E. (civil) 01.04.15 to 31.03.16

Smt. G.N.Patel A.R.O. (I/C) Soil Mechanics Sub dn., Surat

D.C.E. 01.04.15 to 11.05.15

Shri P.V.Patel A.R.O. (I/C) Soil Mechanics Sub dn., Surat

D.C.E. 12.05.15 to 31.03.16

Smt. G.N.Patel A.R.O. (I/C) Soil (R&B) Sub Division Surat

D.C.E. 01.04.15 to 11.05.15

Shri D.P.Kantharia

A.R.O. (I/C) Soil (R&B) Sub Division Surat

B. E. (civil) 12.05.15 to 11.06.15

Shri J.C.Surti A.R.O. (I/C) Soil (R&B) Sub Division Surat

B. E. (civil) 12.06.15 to 31.03.16

Page 43: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

42

Name Designation Qualification Period ShriJ.C.Surti A.R.O. (I/C)

District Lab Bharuch

B. E. (civil) 01.04.15 to 02.05.15

Shri D.I. Gandhi A.R.O. (I/C) District Lab. Bharuch

B. E. (civil) 03.05.15 to 17.05.15

ShriJ.C.Surti District Lab. Bharuch

B. E. (civil) 18.05.15 to 31.03.16

Smt. G.N.Patel District Lab. Valsad

D.C.E. 01.04.15 to 11.05.15

Shri B.K. Ahir A.R.O. (I/C) District Lab. Valsad

B.Sc. 12.05.15 to 17.05.15

Smt. G.N.Patel District Lab. Valsad

D.C.E. 18.05.15 to 31.03.16

S.D. & R. Circle, Vadodara Shri R.H.Fefar S.E.(S.D.&R)

Adl.Charge B.E.Civil 01.04.15 to 03.07.15

Shri B.H.Chaudhari S.E.(S.D.&R) I/C B.E.Civil 04.07.15 to 19.07.15

Shri R.H.Fefar S.E.(S.D.&R) Adl.Charge

B.E.Civil 20.07.15 to 18.11.15

Shri P.B.Chaudhari S.E.(S.D.&R) I/C B.E.Civil 19.11.15 to 17.02.16 Shri R.H.Fefar S.E.(S.D.&R)

Adl.Charge B.E.Civil 18.02.16 to 18.02.16

Shri P.B.Chaudhari S.E.(S.D.&R) I/C B.E.Civil 19.02.16 to 31.03.16 Shri S.N.Panchal P.S. to S.E.

SDR & Dy.s.s.o. D.C.E. 01.04.15 to 06.05.15

Shri K.V.Sharma P.S. to SE. SDR & Dy.s.s.o.

D.C.E. 07.05.15 to 17.05.15

Shri S.N.Panchal P.S. to SE. SDR & Dy.s.s.o.

D.C.E. 18.05.15 to 31.03.16

SOIL SURVEY DIVISION SURAT Shri R.N.Rathod Soil Survey

Officer , I/C D.C.E. 01.04.15 to 31.03.16

SOIL SURVEY SUB DIVISION SURAT Shri P.D.Patel Dy.Soil Survey

Officer I/C D.C.E. 01.04.15 to 31.03.16

SOIL SURVEY SUB DIVISION VALSAD Shri.Y.A.Shaikh Dy.S.S.O.

(Look after) B.Sc. (Chem) 01.04.15 to 31.03.16

SOIL SURVEY SUB DIVISION BHARUCH Shri K.V.Sharma Dy.S.S.O. (I/C) D.C.E 01.04.15 to 31.03.16 SOIL SURVEY SUB DIVISION VADODARA Shri R.G.Shah Dy.S.S.O. (I/C) D.C.E. 01.04.15 to 05.05.15 Shri K.V.Sharma Dy.S.S.O.( I/C) D.C.E 06.05.15 to 27.10.15 Shri R.G.Shah Dy.S.S.O.(I/C) D.C.E. 28.10.15 to 31.03.16 SOIL SURVEY DIVISION RAJKOT Shri S.B.Chandarana Dy. S.S.O.

Add. Charge M.Sc. (Chem.)

01.04.15 to 31.03.16

Page 44: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

43

Name Designation Qualification Period SOIL SURVEY SUB DIVISION RAJKOT Shri M.J.Makadia Dy. Soil Survey

Officer B.E (C) 01.04.15 to 31.03.16

SOIL SURVEY SUB DIVISION JAMNAGAR Shri S.B.Chandarana Dy. Soil Survey

Officer M.Sc. (Chem)

01.04.15 to 31.03.16

SOIL SURVEY SUB DIVISION BHAVNAGAR Shri N.B.Patel Dy. Soil Survey

Officer I/C B.Sc. (Agri.) 01.04.15 to 31.07.15

Shri K.D.Bhalara Dy. Soil Survey Officer I/C

B.Sc. (Agri.) 01.08.15 to 08.09.15

Shri P.K.Patel Dy. Soil Survey Officer I/C

B.Sc. (Chem.)

09.09.15 to 31.03.16

SOIL SURVEY SUB DIVISION JUNAGDH

Shri A.H.Raijada Dy. S.S.O.(I/C) A.E (C) 01.04.15 to 19.10.15 Shri J.N.Chavada Dy. S.S.O.(I/C) B.Sc.

(Chem.) 20.10.15 to 31.03.16

SOIL SURVEY DIVISION GHANDHINAGAR Shri R.N.Rathod Soil Survey

Officer D.C.E. 01.04.15 to 31.03.16

SOIL SURVEY SUB DIVISION GHANDHINAGAR Shri I.H.Khokhar Dy.Soil Survey

Officer M.Sc. (Org.Chem)

01.04.15 to 31.03.16

SOIL SURVEY SUB DIVISION MAHESANA Shri M.P.Patel Dy.Soil Survey

Officer I/C D.C.E. 01.04.15 to 31.03.16

SOIL SURVEY DIVISION PALANPUR Shri V.M.Chauhan Dy.S.S.O.( I/C) B.E.Civil 01.04.15 to 31.03.16 SOIL SURVEY DIVISION GODHARA Shri D.J.Patel Dy.Soil Survey

Officer I/C D.C.E. 01.04.15 to 30.05.15

Shri I.H.Khokhar Dy.Soil Survey Officer

M.Sc. (Org.Chem)

30.05.15 to 31.03.16

Page 45: GUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 · PDF fileGUJARAT ENGINEERING RESEARCH INSTITUTE VADODARA - 390007 . 1 GERI ... Installation of BSNL lease line done at

44

2.0 ABBREVIATION USED IN THE REPORT

ADT Average Daily Traffic

APL Accident Prone Location

BSG Built up Spray Grout

CBIP Central Board of Irrigation & Power

CBR California Baring Ratio

CWC Central Water Commission

DBM Dense Bitumen Macadam

DOS Department Of Space

DST Department of Science and Technology

FCC False Colour Composite

FM Fineness Modules

GCA Gross Command Area

GERI Gujarat Engineering Research Institute

HDPE High Density Polyethylene

ICAR Indian Council of Agricultural Research

IMSD Integrated Mission for Sustainable Development

INCCMS Indian National Committee on Construction Material and

Structures

INCGE Indian National Committee on Geotechnical Engineering

INCRMTT Indian National Committee on Rock Mechanics and Tunneling

Technology

IRS-1 C Indian Remote sensing Satellite -1C

KLBMC Kakarpar Left Bank Main Canal

LDPE Low Density Polyethylene

MOST Ministry Of Surface Transport

NH-8 National Highly - 8

NMC Narmada Main Canal

NRSA National Remote Sensing Agency

PMT Pressure Meter Test

PP WAX Poly Propylene Wax

PVC Poly Vinyl Chloride

R & D Research and Development

RESECO Remote Sensing and Communication Center

SH-41 State Highway - 41

SSNNL Sardar Sarovar Narmada Nigam Limited.

TAP Traffic Aid Post

TBM Tinna overseas limited Bitumen Modifier (Brand Name).

WRI Water Resources Investigation