61
HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED PAVER BLOCK FLOORING MUNICIPAL LIBRARY AT SUBHANPURA OFFICE OF THE EXECUTIVE ENGINEER, HOUSING-BUILDING DEPARTMENT V.M.S.S. VADODARA

VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

  • Upload
    vutram

  • View
    244

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1

INVITEE SIGNATURE BIDDER

VADODARA MAHANAGAR SEVA SADAN

TENDER

RUBBER MOULDED PAVER BLOCK FLOORING MUNICIPAL LIBRARY AT SUBHANPURA

OFFICE OF

THE EXECUTIVE ENGINEER,

HOUSING-BUILDING DEPARTMENT

V.M.S.S. VADODARA

Page 2: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 2

INVITEE SIGNATURE BIDDER

VOLUME I

PRE-QUALIFICATION-BID

NAME OF WORK :-

RUBBER MOULDED PAVER BLOCK FLOORING AT SUBHANPURA MUNICIPAL LIBRARY

Page 3: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 3

INVITEE SIGNATURE BIDDER

વડોદરા મહાનગર સવા સદનવડોદરા મહાનગર સવા સદનવડોદરા મહાનગર સવા સદનવડોદરા મહાનગર સવા સદન

1.www.vmcegov.com 2.www.vmcegov.org 3.www.vmcgujarat.org 4.wwwvmcgujarat.com

વડોદરા મહાનગર સવાસદનના યો�ય િવભાગ તમજ યો� ય �ણીમા ન�ધાયલ ઇ�રદારો પાસથી તથા સરકારી

/અધ#સરકારી સ $ થાના ન�ધાયલ અનભવી ઇ�રદારો પાસથી નીચ જણાવલ કામો માટ મહોરબધ ભાવપ+ો ( બ

ભાગમા -ી-કવોલીફીકશન અન -ાઇઝબીડ) ર3.પો$ ટ એડી/$ પીડ પો$ ટથી મગાવવામા આવ છ.

8દા3 રકમ 9. બાનાની

રકમ 9.

ટ: ડર ફી

ર.

ટ: ડર

િવતરણની

છ< લી

તારીખ

ટ: ડર

$ વીકારવાની

છ< લી તારીખ

વધ માહીતી

માટ

િવભાગ

પી.આર. ઓ

નબર

૧. કામન નામ : નવીન Bયિનિસપલ લાયDરી,સભાનપરા ખાત રબર મો<ડડ કલર પવર Hલોકથી

IલોરJગ કરવાન કામ.

૪,૩૬,૭૬૫/- ૮૭૫૦/- ૧૦૦૦/- ૦૨-૦૬-૨૦૧૨ ૦૮-૦૬-૨૦૧૨ કા.ઇ

(હાઉસJગ)

ન�ધ: (૧) ઇ�રદાર મળ ભાવ૫+ રજ કરતી વખત -ી-કવોલીફીકશન બીડ સાથ મની રીસીW ટ અન ટ: ડર $ લી૫

બીડવાની રહશ. (ર) ઇ�રદાર પી.એફ સટXફીકટ/બાહધરી પ+ રજ કરવાન રહશ. (૩) ટ: ડર $ વીકારવાની તારીખ

જ ટ: ડર સાY ૫-૦૦ કલાક ખોલવામા આવશ (૪) -ાઇઝબીડમા કોઇ૫ણ -કારની શરત $ વીકારવામા આવશ નહી.

(૫) સદર ભાવપ+ ર3.પો$ ટ/$ પીડ પો$ ટથી રકોડ# શાખા,ખડરાવ માકZટ,વડોદરાન મળી જવાનો સમય બપોરના ૪-

૦૦ કલાક સધીનો રહશ. કોઇપણ ભાવપ+ મજર/ ના મજર કરવાની અબાધીત સતા B ય.િન.કિમ[ નર�ીન રહશ.

પી. આર.ઓ ન/ / ૧૧-૧૨ જનસપક# િવભાગ \ વારા -કાશીત

-િત,

જનસપક# અધીકારી�ી,

જનસપક# િવભાગ,

,વડોદરા મહાનગર સવાસદન

સદર �હરાત દિનક સમાચારપ+ોમા તથા વબસાઇટ પર -િસ^ ા કરવા િવનતી છ .

કાય#પાલક ઇજનર

)હાઉસJગ -બી<ડJગ(

Page 4: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 4

INVITEE SIGNATURE BIDDER

Tender

P.R.O. No.

Department Details

Issue of Tender Last Date for receipt of

Tender Document

by post

Start Date End Date

Executive Engineer (Housing / Building)

1. RUBBER MOULDED PAVER BLOCK FLOORING AT SUBHANPURA MUNICIPAL LIBRARY.

24-05-2012 02-06-2012 08-06-2012

Page 5: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 5

INVITEE SIGNATURE BIDDER

વડોદરા મહાનગર સવાસદન

-ી-કવોલીફીકશન બીડ

કામન નામકામન નામકામન નામકામન નામ: : : : સભાનપરા ખાતની B યસભાનપરા ખાતની B યસભાનપરા ખાતની B યસભાનપરા ખાતની B યિનિસિનિસિનિસિનિસ૫૫૫૫લ લાયDરી પાસ લ લાયDરી પાસ લ લાયDરી પાસ લ લાયDરી પાસ

પવર H લોપવર H લોપવર H લોપવર H લોક ફલોરJગ કરવાન કામક ફલોરJગ કરવાન કામક ફલોરJગ કરવાન કામક ફલોરJગ કરવાન કામ

8દા3 રકમ નટ 9ા. ૪,૩૬,૭૬૫/-

-ી-કવોલીફીકશન દ$ તાવજો-પ+ો

ભાવ૫+ આ૫વાની તારીખ: ૦૨-૦૬-૨૦૧૨.

ભાવ૫+ જમા કરવાની તારીખ: ૦૮-૦૬-૨૦૧૨.

ભાવપ+ મળવનાર ઇ�રદાર: ----------------------------

કાય#પાલક ઇજનર

(હાઉસJગ-િબ< ડJગ)

વડોદરા મહાનગર સવાસદન

Page 6: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 6

INVITEE SIGNATURE BIDDER

વડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદન

ખાત ખાત ખાત ખાત////શાખા શાખા શાખા શાખા : : : : હાઉસJગહાઉસJગહાઉસJગહાઉસJગ----િબ< ડJિબ< ડJિબ< ડJિબ< ડJગગગગ

(૧) ટ: ડર aમાક:

(ર) ટ: ડર ફી રીસીW ટ aમાક :

કામન નામ:. સભાનપરા ખાતની B યિનિસ૫લ લાયDરી પાસ પવર H લોક ફલોરJગ

કરવાન કામ.

ખાતાની -ત ખાતાની -ત ખાતાની -ત ખાતાની -ત કલાક#કલાક#કલાક#કલાક#

શાખા હાઉસJગશાખા હાઉસJગશાખા હાઉસJગશાખા હાઉસJગ////િબ< ડJિબ< ડJિબ< ડJિબ< ડJગગગગ

વડોદરા મહાનગર સવાસદવડોદરા મહાનગર સવાસદવડોદરા મહાનગર સવાસદવડોદરા મહાનગર સવાસદનનનન

----------------------------------------------------------------------

વડોદરા મહાનગર સવાસદન

ખાત/શાખા: હાઉસJગ-િબ< ડJગ

(૧) ટ: ડર aમાક:

(ર) ટ: ડર ફી રીસીW ટ aમાક :

કામન નામ: સભાનપરા ખાતની B યિનિસ૫લ લાયDરી પાસ પવર H લોક ફલોરJગ

કરવાન કામ.

((((ઇ�રદારઇ�રદારઇ�રદારઇ�રદાર////અરજદારની -તઅરજદારની -તઅરજદારની -તઅરજદારની -ત) ) ) )

-ી-ી-ી-ી----કવોલીફીકશન બીડ સાથ સામલ રાખી મોકલવી કવોલીફીકશન બીડ સાથ સામલ રાખી મોકલવી કવોલીફીકશન બીડ સાથ સામલ રાખી મોકલવી કવોલીફીકશન બીડ સાથ સામલ રાખી મોકલવી

કલાક#કલાક#કલાક#કલાક#

શાખાશાખાશાખાશાખા::::હાઉસJગહાઉસJગહાઉસJગહાઉસJગ////િબ< ડJિબ< ડJિબ< ડJિબ< ડJગગગગ

વડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદન

Page 7: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 7

INVITEE SIGNATURE BIDDER

DECLARATION FORM / UNDERTAKING

1. I / We agree that the decision of the VMSS in selection of the applicants /

contractors, phasing of works at any other projects related matter, will be final

and bidding to me/us.

2. All the information and date finished herewith are correct to my / our best of

knowledge.

3. I/We agree that we have no objection if inquired are made about our works, its

related areas and any other inquiry regarding all details, projects and works listed

by us in the pre-qualification document.

4. I/We also understand that finishing of wrong information or hiding any information

shall be a cause for disqualification.

5. I/We accept VMSS reserved the rights to reject any or all application / tenders

without assigning any reasons.

Date : Signature with seal of the company

Page 8: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 8

INVITEE SIGNATURE BIDDER

DECLARATION FORM

1) I / We hereby declare that I / We have visited the site and fully acquainted myself / ourselves with site where this project is to be executed, Local situation regarding materials, labour and other factors pertaining to successful completion of the project work before submitting this tender.

2) I / We hereby declare that I / We have carefully studied the conditions of contract; specifications and other documents of this work and agree to execute the same accordingly.

3) (a) I/We certify that I/WE am /are partner(s) not blacklisted or connected with firm blacklisted in state, semi govt,Municipal Corporation, or any government undertaking institute or any autonomous corporate bodies.

(b) We, The partners of this firm hereby give an undertaking that we are jointly and

severally responsible to meet all liabilities over and above the business of this firm and make good any the above financial loss sustained by the vadodara Mahanagar Sewa Sadan, Vadodara as a result of our abandoning the work or works, entrusted to us i.e. this firm I/We herby undertake and submit in the bid along with supporting documents, are true which are correct and valid throughout the contract period

4) I/We hereby agree to abide by and full fill the terms and provisions of conditions of contract annexed here to so far as applicable and in default thereof to forfeit the earnest money mentioned in the said condition.

(1) Receipt No. _______________ dated ________________from the -__________________________

(2) Signature of Contractor (Before Submission of tender)

(3) Name of the Tenderer:___________________________________________________

(4) Address____________________________________________________

(5) Dated the __________________________________day of ________________2012.

(6) (Witness)___________________________________________________

(7) (Address)___________________________________________________

(8) (Occupation)_________________________________________________

Date : Signature with seal of the company

Page 9: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 9

INVITEE SIGNATURE BIDDER

વડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદન

-ી-ી-ી-ી----કવોલીફીકશન બીડ સાથ સામલ દ$ તાકવોલીફીકશન બીડ સાથ સામલ દ$ તાકવોલીફીકશન બીડ સાથ સામલ દ$ તાકવોલીફીકશન બીડ સાથ સામલ દ$ તાવજ પ+ોવજ પ+ોવજ પ+ોવજ પ+ો

તમામ ભાવપ+ો છ< લામા છ< લા મા: ય દ$ તાવજ પ+ો સાથ મોકલવા

(૧) વડોદરા મહાનગર સવાસદનમા યો� ય �ણી અન વગ#મા ર3$ bશન ધરાવતા

ઇ�રદારો માટ

(અ) કામ માટ જ9રી ર ટકા ઇ.એમ.ડી નો ડીમા: ડ cાફટ \ વારા મોકલવાની છ.

(બ) વડોદરા મહાનગર સવાસદનમા યો� ય �ણી અન ર3$ bશનના સટXફીકટની

-માણીત નકલ

(ર) વડોદરા મહાનગર સવાસદનમા મા: ય ઇ�રદાર તરીક ર3$ bશન નહી

ધરાવતા ઇ�રદારો તરફથી નીચના પ+ોની -માણીત નકલો રજ

કરવાની રહશ.

(અ) સરકારી અધ#/સરકારી સ$ થાન મા: ય ઇ�રદાર તરીક ર3$ bશન

સટXફીકટની -માણીત નકલ

(બ)કામ માટ જરરી ૨ ટકા મની ઇ.એમ.ડી નો ડીમા:ડ cાફટ રજ

કરવો.

(ક) છ< લામા છ< લ ઇ: કમટe ા સટXફીકટની -માણીત નકલ.

(ડ) લબર એકટ હઠળ મળવલ સટXફીકટની -માણીત નકલ.

(ઇ) છ< લા +ણ વષ#મા ઇ�રદાર કરલા કામોના કપલીશન સટXફીકટની

-માણીત નકલો અન હાથ ઉપરના કામોની િવગતોના જરરી પ+ો

(ઇ) જરરી રકમની બhક સોલવ: સી સટXફીકટની -માણીત નકલ.

ઉપરોકત તમામ દ$ તાવજો Ðપ+ો -ી-કવોલીફીકશન બીડ સાથ અચક સામલ રાખવા .

ઇ�રદાર ભાવપ+ો- -ી-કવોલીફીકશન બીડ અન -ાઇસબીડ મળ ભાવપ+ સાથ અલગ

સીલ કવરમા,કવર ઉ૫ર -ી-કવોલીફીકશન બીડ અન -ાઇસ બીડ લખી જદા રાખી

k યારબાદ એક સJગલ કવરમા સીલ કરી મોકલવાના રહશ.

-ી-કવોલીફીકશન બીડ ભાવપ+ ખોલવાની તારીખ/સમય ખોલવાના છ. Y -ી-

કવોલીફીકશન બીડની ચકાસણી કરી, મા: ય -ી-કવોલીફીકશન બીડ વાળા ઇ�રદારના જ

-ાઇસબીડ સlમ અધીકારી�ીની પવ# મજરી મળવી ખોલવાના છ

ન�ધ:- અમા: ય -ી-કવોલીફીકશન બીડના ઇ�રદારોના -ાઇસબીડ ખોલવાના નથી.

વડોદરા મહાનગર સવાસદનન તમામ ભાવપ+ો અમા: ય કરવાના અબાધીત અધીકાર

રહશ. તના માટ કોઇ કારણ આ૫વામા આવશ નહી.

ઇ�રદારની સહી : શાખા/ખાતાઅધીકારી

વડોદરા મહાનગર સવાસદન

વડોદરા

Page 10: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 10

INVITEE SIGNATURE BIDDER

પી.એફ.ર3$ bશન 8ગન બાહધરીપ+

૧. ઇ�રદારન નામ :

૨. સરનામ :

૩. ર3$ bશન વગ# :

૪. ખાતાન નામ :

૫. કામન નામ :

૬. ટ: ડરની રકમ :

આથી હ ઇ�રદાર -------------------------------------------- બાહધરી

આપ o ક વડોદરા મહાનગર સવાસદનમા હ ઇ�રદાર તરીક કામ કર o/

કરવા માગ છ. હાલ મન પી.એફ એકટની જોગવાઇ અનસાર પી.એફ ર3$ bશનની

જરર ન હોઇ હાલ મન ત લાગ પડત નથી.

મહાનગર સવાસદન સાથના મારા ર3$ bકશનના સમયગાળા દરB યાન અગર ત

ર3$ bશન હઠળ મળવલ ટ: ડરની કામગીરી પણ# થવાના સમયગાળા દરB યાન EPF

એકટમા નમદ કરલ ર3$ bશનની િનિદr ટ સs યા કરતા ઓo માનવબળ રાખવાના

છ અન જો ત સs યા વધશ તો EPF કરાવી લવામા આવશ અન તની નકલ વડોદરા

મહાનગરપાિલકાન આ૫વામા આવશ તમછતા EPF એકટ અ:વયની કોઇ૫ણ

જવાબદારી ઉભી થશ તો તની સઘળી જવાબદારી હમારી રહશ તની અમો બાહધરી

આપીએ છીએ.

ઇ�રદારની સહી. -----------------------------------

Page 11: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 11

INVITEE SIGNATURE BIDDER

કામન નામકામન નામકામન નામકામન નામ: : : : સભાનપરા ખાતની B યસભાનપરા ખાતની B યસભાનપરા ખાતની B યસભાનપરા ખાતની B યિનિસિનિસિનિસિનિસ૫૫૫૫લલલલ લાયDરી પાસ પવર H લોલાયDરી પાસ પવર H લોલાયDરી પાસ પવર H લોલાયDરી પાસ પવર H લોક ફલોરJગ કરવાન ક ફલોરJગ કરવાન ક ફલોરJગ કરવાન ક ફલોરJગ કરવાન

કામકામકામકામ

વડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદન

શાખાશાખાશાખાશાખા: : : : હાઉસJગહાઉસJગહાઉસJગહાઉસJગ----િબ< ડJિબ< ડJિબ< ડJિબ< ડJગગગગ

આઇટમઆઇટમઆઇટમઆઇટમરટ ભાવરટ ભાવરટ ભાવરટ ભાવ૫૫૫૫+ + + +

ભાવ૫+ ભરનારન નામ: હ/અમ લખલ કામ uકડામા________ટકા

શH દોમા____________

8દાજ૫+કમા દાખલ કરલા ભાવ કરતા ઓછા / વધ ભાવ ભરવા ખશી o/છીએ.

કામન વણ#ન કામન વણ#ન કામન વણ#ન કામન વણ#ન

કામનો કામનો કામનો કામનો

અનaમ અનaમ અનaમ અનaમ

નબરનબરનબરનબર

કામન નામકામન નામકામન નામકામન નામ

8દાજપ+કની રકમ 8દાજપ+કની રકમ 8દાજપ+કની રકમ 8દાજપ+કની રકમ

દખરખ આકાર તથા દખરખ આકાર તથા દખરખ આકાર તથા દખરખ આકાર તથા

અણધાયા# ખચ#ની રકમ અણધાયા# ખચ#ની રકમ અણધાયા# ખચ#ની રકમ અણધાયા# ખચ#ની રકમ

િસવાયિસવાયિસવાયિસવાય

કામ પર કામ પર કામ પર કામ પર

કરવાની કરવાની કરવાની કરવાની

મદતમદતમદતમદત

નોટો રોકડ નોટો રોકડ નોટો રોકડ નોટો રોકડ

ઇk યાઇk યાઇk યાઇk યાદી રકમ દી રકમ દી રકમ દી રકમ

બાનાની ભરલીબાનાની ભરલીબાનાની ભરલીબાનાની ભરલી

અનામત તરીક અનામત તરીક અનામત તરીક અનામત તરીક

તની તતની તતની તતની ત૫૫૫૫સીલ સીલ સીલ સીલ

રકમરકમરકમરકમ

૧. સભાનપરા ખાતની B યસભાનપરા ખાતની B યસભાનપરા ખાતની B યસભાનપરા ખાતની B યિનિસિનિસિનિસિનિસ૫૫૫૫લ લ લ લ

લાયDરી પાસ પવર H લોલાયDરી પાસ પવર H લોલાયDરી પાસ પવર H લોલાયDરી પાસ પવર H લોક ક ક ક

ફલોરJગ કરવાનફલોરJગ કરવાનફલોરJગ કરવાનફલોરJગ કરવાન કામકામકામકામ....

૪,૩૬,૭૬૫/-

િદન Ð ૩૦

૮૭૫૦/-

જો સદરહ ભાવપ+ $ વીકારવામા આવ તો હ/અમો ઉપરોકત તથા સામલ રાખલી

કરારની તમામ શરતો -માણ વત#વા બધાઉ o /છીએ અન ત -માણ વત#વામા ચકીએ

તો શીlા તરીક કરારમા જણાવલી રકમ અગર દડ વડોદરા મહાનગરપાલીકામા ભરીશ

આ સાથ અનામત 9ા. રકમ મોકલી છ ત રકમ હ/અમો 8દાજની રકમ ઉપર પ

ટકા અનામત ન ભરીએ અગર બીલમાથી ૧૦ ટકા કપાત કરવા ન દઇએ તો મારી માગણી

મજર થય સોબતના કરારની કલમ-૧ -માણ મહાનગર સવાસદન જW ત કરી પાક ખાત

જમા કર ત મન /અમોન કબલ મજર છ.

તા. / / ૨૦૧૨.

ભાવ૫+ ભરનારની સહી. સરનામ

Page 12: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 12

INVITEE SIGNATURE BIDDER

બાધકામબાધકામબાધકામબાધકામ---- ૫૦૦૦૫૦૦૦૫૦૦૦૫૦૦૦----૪૨૦૦૧૪૨૦૦૧૪૨૦૦૧૪૨૦૦૧----એએએએ////૮૪ ૮૪ ૮૪ ૮૪

વડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદનવડોદરા મહાનગર સવાસદન

( બાધકામ બાધકામ બાધકામ બાધકામ )

* શરતોશરતોશરતોશરતો *

૧. ટ: ડર ર3$ ટર પો$ ટથી મોકલવાની છ< લી તા.૦૮-૦૬-૨૦૧૨ સમય-૧૬-૦૦ કલાકનો છ.

૨. ઇ�રદાર ભરલા ટ: ડરની દરક આઇટમનો જદો સરવાળો તમજ બધી જ આઇટમોનો

સરવાળો uકડા અન શH દોમા અચક જણાવવા.

૩. દરક આઇટમના ભાવ,શH દ અન uકડામા બનમા જણાવવા.

૪. ટ: ડર ભરતી વખત સીલબધ કવર ઉપર કામન નામ પરપર જણાવવ.

૫. ડીમા: ડ cાફટ સામલ છ તમ દશા#વી ડીમા: ડ cાફટની િવગત આ૫વી.

૬. ટ: ડર ભરવામા બોલપનનો ઉ૫યોગ કરવાની મનાઇ છ. આ સચનાન ઉ< લઘન કરવામા

આવ તો ટ: ડર ના મજર કરવાનો અધીકાર મહાનગર સવાસદનનો છ.

૭. અિનવાય# સજોગોમા ર3$ ટર પો$ ટથી રજ કરલ ટ: ડર $ વીકારવાનો

ઉ૫ર દશા#વલ તારીખ અન સમય ૧૬-૦૦ કલાકનો છ તપહલા ટ: ડર૫+ મળી શકશ તો

જ ટન ડર $ વીકારવામા આવશ પો$ ટથી નીયત સમય પછીનો ટ: ડર $ વીકારવામા આવશ

નહી. અન તની જવાબદારી મહાનગર સવાસદનની રહતી નથી.

૮. બાનાની રકમ ડીમા: ડ cાફટથી $ વીકારવામા આવશ. રોકડા ફીકસ ડીપોઝીટ બાજના

$ } રપમા $ વીકારવામા આવશ નહી.

૯. ર3$ ટર પો$ ટથી ટ: ડરના નીચના સરનામ મોકલવ.

રકોડ# શાખા

વડોદરા મહાનગર સવાસદન ખડરાવ માકZટ િબ< ડJગ

વડોદરા- ૩૯૦ ૦૦૧

ઇ�રદારની સહી.

કાય#પાલક ઇજનર (મકાનો)

વડોદરા મહાનગર સવાસદન

Page 13: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 13

INVITEE SIGNATURE BIDDER

કામનકામનકામનકામન નામનામનામનામ :સભાનપરા ખાતનીસભાનપરા ખાતનીસભાનપરા ખાતનીસભાનપરા ખાતની B યB યB યB યિનિસિનિસિનિસિનિસ૫૫૫૫લ લાયDરી પાસ પવર H લોલ લાયDરી પાસ પવર H લોલ લાયDરી પાસ પવર H લોલ લાયDરી પાસ પવર H લોક ફલોરJગ કરવાન કામક ફલોરJગ કરવાન કામક ફલોરJગ કરવાન કામક ફલોરJગ કરવાન કામ....

ÈÛ¦øÛéùù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û ÉÛÛ”ÛÛ :: ÐüÛŠÍÛá•Û-ܼÛŦøá•Û આઇટમરટઆઇટમરટઆઇટમરટઆઇટમરટø ભાવપ+ભાવપ+ભાવપ+ભાવપ+

ÍÛÛ¾ÛÛ¶¿Û ÍÛæ Û¶ÛÛ…Ûé

½ÛÛÈÛ5ªÛકકકકõ ©Û¬ÛÛ ©Ûé¶Ûà ÉÛÁõ©Û †›÷ÛÁ−ÛÁõ¶Ûà ›÷Û¨Û ¾ÛÛ¤éø ÍÛÛ¾ÛÛ¶¿Û ܶۿ۾ÛÛé ©Û¬ÛÛ ÍÛæ Û¶ÛÛ

કકકકÁõÛÁõ¶Ûà ÉÛÁõ©ÛÛé

1) ›÷é †›÷ÛÁ−ùõùùÛÁõ¶Ûä× ½ÛÛÈÛ5ªÛøક ¾Û×›ä÷Áõ કÁõÈÛÛ¾ÛÛ× …ÛÈ¿Ûä× ÐüÛé¿Û ©Ûé Ûé ½ÛÛÈÛ5ªÛ ¾Û×›ä÷Áõ કõ¿ÛÛÙ¶Ûà ”Û¼ÛÁõ …Û¸¿ÛÛ¶Ûà

©ÛÛÁõà”Û¬Ûà …éકõ …¥øÈÛÛ¦øà¿ÛÛ¶ÛÛ ¾Ûäù−ù©Û¾ÛÛ× ›÷Ûé ¾ÛÐüÛ¶Û•ÛÁõ¸ÛÛÜÅÛકõÛ¶Ûé ›÷ÂúÁõ ÅÛÛ•Ûé ©ÛÛé …Û ÉÛÁõ©ÛÛé 5Áõ ¿ÛÛé•¿Û Í¤éø¾¸Û ÅÛ•ÛÛ¦øà ÍÛÐüà કõÁõà …Û5ÈÛà ›÷Ûé†…é …¶Ûé ©Ûé કõÁõÛÁõ ©ÛÁõàકéõ •Û¨ÛÛÉÛé ©Ûé¾Û›÷ ©Ûé¶Ûà કõÁõÛÁõ¶Ûà ÉÛÁõ©ÛÛé

¸ÛäÁéõ¸ÛäÁõà ¸ÛÛÇÈÛÛ¶Ûà ›÷Û¾Ûà¶Û•ÛàÁõà ©ÛÁõàકéõ ÁõÛéકõ¦ø Áõકõ¾Û કõÛ¾Û¶Ûà …×−ùÛœ÷©Û Ýકõ¾Û©Û ક¾Û×›ä÷Áõ ½ÛÛÈÛ¸ÛªÛ ¶Ûà Áõકõ¾Û ¼Ûé

¾ÛÛ¬Ûà ›÷é ÈÛµÛä ÐüÛé¿Û ©Ûé Áõકõ¾Û¶ÛÛ ¸ÛÛ× Û ¤øકõÛ ÍÛäµÛà¶Ûà (¼ÛÛ¶ÛÛ ©ÛÁõàકéõ …ÛÈÛéÅÛÛ ¼Ûé ¤øકõÛ ÍÛÛ¬Ûé) …¶ÛÛ¾Û©Û ½ÛÁõà −ù-

éùÈÛà ›÷Ûé†…é …•ÛÁõ કõÛ¾Û¶ÛÛ ˜ÛÛÅÛä −éùÈÛÛ¿ÛÛ−ùà…Ûé (¼ÛàÅÛÛé) ¾ÛÛ׬Ûà −ùùÍÛ ¤øકõÛ Áકõ¾Û કõÛ¸Ûà …¶ÛÛ¾Û©Û …Û5ÈÛà

5¦øÉÛé. Š5Áõ −ùùÉÛÛÙÈÛéÅÛà ¾Ûä−ùù©Û¾ÛÛ× …Û ¸Ûó¾ÛÛ¨Ûé કÁõÈÛÛ¾ÛÛ× ¶ÛÐüá …ÛÈÛé ©ÛÛé ½ÛÛÈÛ5ªÛ ÍÛÛ¬Ûé Áõ›ä÷ કõÁéõÅÛà ¼Ûé ¤øકõÛ¶Ûà …¶ÛÛ¾Û©Û ›÷¸©Û ¬ÛÈÛÛ¶Ûé ¸ÛÛªÛ ¬ÛÉÛé ©Ûé¾Û›÷ †›÷ÛÁõù−ùÛÁõÛé¶Ûä× Áõœ÷ͤÖéøÉÛ¶Û ¶ÛÛ¾ÛÛé¶Ûà ¿ÛÛù−ùà¾ÛÛ׬Ûà ÍÛù−ùÁõÐä×ü †›÷ÛÁõù−ùÛÁõ¶Ûä× ¶ÛÛ¾Û øક¾Ûà ¬ÛÈÛÛ¶Ûé ¸ÛÛªÛ ¬ÛÉÛé.

2) ½ÛÛÈÛ5ªÛ¾ÛÛ× કõÛ¾Û ¸ÛäÂú કõÁõÈÛÛ¶Ûà ù−ùÉÛÛÙÈÛéÅÛà ¾Ûäù−ù©Û¾ÛÛ× †›÷ÛÁ−ùõùÛÁéõ ˜ÛÛéકõકõÍÛ5¨Ûé કõÛ¾Û ¸ÛäÂú કõÁõÈÛä× ›÷Ûé†…é …¶Ûé ¥øÁéõÅÛà ¾Ûä−ù©Û¾ÛÛ× કõÛ¾Û ¸ÛäÂú કõÁõÈÛÛ¶Ûà ¥øÁéõÅÛà ©ÛÛÁõà”Û 5™öà ›÷é¤øÅÛÛé ÍÛ¾Û¿Û ÈÛµÛä ¬ÛÛ¿Û ©Ûé¤øÅÛÛ ÍÛ¾Û¿Û¶ÛÛ …éકõ …¥øÈÛÛ¦øà¿ÛÛ કéõ ©Ûé¶ÛÛ ½ÛÛ•Û −ùà¥ø 1/2% ¸ÛÁ×õ©Ûä ÈÛµÛä¾ÛÛ× ÈÛµÛä 10% ÍÛäµÛà¶ÛÛé ½ÛÛÈÛ¸ÛªÛ¶Ûà Áõકõ¾Û¶ÛÛé ૧૦% સધીનો

−×ù¦ø (ÅÛàકõÈÛà¦øà¤øà ¦éø¾Ûé›÷ ©ÛÁõàક éõ) ઇ�રદાર કોપ�રશનન ચકવવાનો રહશ. Y ÈÛકÙõ …Ûé¦ÙøÁõ …Û¸¿ÛÛ ©ÛÛÁõà”Û¶ÛÛ

Ü−ù¶Û-7 ¬Ûà •Û¨ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. 2-(1) ½ÛÛÈÛ5ªÛ¾ÛÛ× ›÷¨ÛÛÈÛéÅÛä× કõÛ¾Û ÉÛÂú કõ¿ÛÛÙ¶Ûä× ›÷é ©Ûé ©ÛÛÁõà”Û¬Ûà †›÷ÛÁõù−ùÛÁéõ Ü−ùù¶Û - 4 ¾ÛÛ× ÅÛé”Ûàત ›÷ÛÐéüÁõ કõÁõÈÛä×

5¦øÉÛé. ©Ûé ¸Ûó¾ÛÛ¨Ûé ¶ÛÐüá ¬Û¿ÛéÅÛÛ¶Ûä× ›÷¨ÛÛ¿Ûé ¬Ûà ¶Ûà˜Ûé ¾Ûä›÷¼Û −×ù¦ø ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛÉÛé.(©ÛÛ.1-4-09¬Ûà …¾ÛÅÛ−ù¾ÛÛ×) -¾Û×›ä÷Áõ ¬Û¿ÛéÅÛ −ùÁõÛé ¶Ûà˜Ûé ¸Ûó¾ÛÛ¨Ûé ™öé.

1 ¬Ûà 7 -Ü−ùÈÛÍÛ - Äõ. 150/- 8 ¬Ûà 15-Ü−ùÈÛÍÛ- Äõ. 300/- 16 ¬Ûà 30 Ü−ùÈÛÍÛ-Äõ. 600/- 30 Ü−ùÈÛÍÛ¬Ûà ÈÛµÛä- Äõ. 2000/-

કõÁõÛÁõ¶Ûà ÉÛÁõ©Û ¶Û×.3 ¶Ûà ¸Ûó¬Û¾Û ÅÛà¤øà¾ÛÛ× ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûé ÉÛ¼−ùùÛé¶ÛÛ ¼Ûù−ùÅÛé ÍÛ×¼Û×µÛકõ©ÛÛÙ ¼ÛÛ×µÛકõÛ¾Û ÉÛÛ”ÛÛ¶ÛÛ …ܵÛકõÛÁõà¶Ûé ›÷é¾Û¶Ûé ÐüÈÛé 5™öà ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà કõÐéüÈÛÛÉÛé.

3) ˜ÛÛÅÛä કõÛ¾Û¾ÛÛ× ›÷Ûé ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûé …é¾Û ÅÛÛ•Ûé કéõ †›÷ÛÁõ−ùùÛÁõ

ܶÛÁõ¬ÛÙકõ કõÛ¾Û ÅÛ×¼ÛÛÈ¿ÛÛ કõÁéõ ™öé …•ÛÁõ ©Ûé ¥øÁéõÅÛà ¾Ûäù−ù©Û¾ÛÛ× …¬ÛÈÛÛ ›÷é ¸Ûó¾ÛÛ¨Ûé કõÛ¾Û ¶ÛÐüà કõÁõà ÉÛકéõ …éÈÛÛé ÍÛ×½ÛÈÛ ™öé, ©ÛÛé ”ÛÛ©ÛÛ¶ÛÛé કõÁõÛÁõ Áõ−ùù કõÁõÈÛÛ¶ÛÛé …•ÛÁõ કõÁõÛÁõ−ùÛÁõ¶Ûé ÍÛæ Û¶ÛÛ …Û¸¿ÛÛ ÜÍÛÈÛÛ¿Û કõÁõÛÁõù−ùÛÁõ¶Ûé ”Û˜Ûë …¶Ûé ›÷Ûé”Û¾Ûé ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ÜÐü©Û …¶Ûé ÍÛ•ÛÈÛ¦ø¶Ûà ®ùṲ̈ø…é કõÛ¾Û ¸ÛäÂú કõÁõÛÈÛà ÅÛéÈÛÛ¶ÛÛé …ÜµÛકõÛÁõ ÁõÐéüÉÛé …¶Ûé કõÁõÛÁõ−ùùÛÁõ¶Ûé ÍÛù−ùÁõÐä×ü કõÛ¾Û …וÛé ͬÛÇ 5Áõ ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û …éકõªÛ કõ¿ÛÛë ÐüÛé¿Û …•ÛÁõ ¼Ûà›÷Û કõÛé† ›÷Û©Û¶Ûà ›÷ÈÛÛ¼Û−ùùÛÁõà ¾ÛÛ¬Ûé ÅÛàµÛà ÐüÛé¿Û ©Ûé¾ÛÛ׬Ûà Š©¸Û·Û ¬Û©Ûà ”ÛÛé¤ø ¾ÛÛ¤éø ¶ÛäકõÉÛÛ¶Ûà ¾ÛÛ•ÛÈÛÛ¶ÛÛé Ðüકõકõ ÁõÐéüÉÛé ¶ÛÐüá …¶Ûé …ÛÈÛÛ ¸ÛóÍÛוÛé …é¤øÅÛé કõÛ¾Û ¼Ûàœ÷ Áõà©Ûé ¸ÛäÂú કõÁõÈÛÛ¶Ûä× ÐüÛé¿Û ©¿ÛÛÁéõ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶Ûé કõÛ¾Û ¸ÛäÂú કõÁõ©ÛÛ× ›÷é ÜÈÛÉÛéÌÛ ”Û˜ÛÙ ¬ÛÛ¿Û ©Ûé¾ÛÛ׬Ûà કõÛ¸Ûà ÅÛéÈÛÛ¶Ûà ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û¶Ûé ÍÛ«ÛÛ ÁõÐéüÉÛé …¶Ûé -−ùùÉÛÛÙÈ¿ÛÛ ¸Ûó¾ÛÛ¨Ûé કõÁõÛÁõ Á−ùõù કõÁõÈÛÛ¾ÛÛ× …ÛÈÛé ©Ûé ¸ÛóÍÛוÛé ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û

…ܵÛકõÛÁõà¬Ûà કéõ¤øÅÛä …¶Ûé કéõ¤øÅÛà Ýકõ¾Û©Û¶Ûä× કõÛ¾Û ¬Û¿Ûä× ™öé ©Ûé ÍÛ×¼Û×µÛà ¸Ûó¾ÛÛ¨Û5ªÛ ¶Û …Û¸Ûé ©¿ÛÛ× ÍÛäµÛà કõÁõÛÁ−ùùÛÁõ¶Ûé

કõÛé† Áõકõ¾Û ÈÛÍÛäÅÛ કõÁõÈÛÛ¶ÛÛé Ðüકõકõ ÁõÐéüÉÛé ¶ÛÐüá. …•ÛÁõ ©Ûé ÍÛ×¼Û×µÛà ¶ÛÛ¨ÛÛ× …ù−ùÛ કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé ¶ÛÐüá …¶Ûé

›÷¿ÛÛÁéõ કõÁéõÅÛÛ કõÛ¾Û¶Ûà Ýકõ¾Û©Û …Û5ÈÛÛ¾ÛÛ× …ÛÈÛé ©¿ÛÛÁéõ ¾ÛÐüÛ¶Û•ÛÁ ÍÛéÈÛÛÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà…é …Û¸ÛéÅÛÛ ¸Ûó¾ÛÛ¨Û5ªÛ¾ÛÛ× −ùùÉÛÛÙÈÛéÅÛà Áõકõ¾Û ¶Û …−ùÛ ¬ÛÈÛÛ¶Ûé ¸ÛÛªÛ ¬ÛÉÛé.

Page 14: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 14

INVITEE SIGNATURE BIDDER

4) Š5Áõ કõÛéÅÛ¾Û¾ÛÛ× −ùùÉÛÛÙÈÛéÅÛÛé …ÜµÛકõÛÁõ …Û5ÈÛÛ¶ÛÛ ¸ÛóÍÛוÛé ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûé ›÷ÂúÁõ ÅÛÛ•Ûé ©ÛÛé કõÛ¾Û કõÁõÈÛÛ¶ÛÛ Í¬ÛÇé …•ÛÁõ ©Ûé¶Ûà …Û›ä÷¼ÛÛ›ä÷¶Ûà ›÷¾Ûà¶Û 5Áõ 5¦éøÅÛÛé ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ÐüܬۿÛÛÁõ ÜÈÛ•ÛéÁéõ ¸ÛäÁéõ¸ÛäÁõÛé …•ÛÁõ …×ÉÛ©Û: ¸ÛÛé©ÛÛ¶Ûé કõ¼Û›÷é ÅÛ† કõÁõÛÁõ¾ÛÛ× −ùùÉÛÛÙÈÛéÅÛ ½ÛÛÈÛ ¾Ûä›÷¼Û …•ÛÁõ ©Ûé¶ÛÛ ½ÛÛÈÛé ˜ÛÛÅÛä ¼Û›÷ÛÁõ ½ÛÛÈÛ ¸Ûó¾ÛÛ¨Ûé ©Ûé¶ÛÛ ¶ÛÛ¨ÛÛ× …−ùùÛ કõÁõà ÉÛકõÉÛé. …•ÛÁõ ÜÐüÍÛÛ¼Û¾ÛÛ× ¾Û›÷Áéõ …Û¸Ûà ÉÛકõÉÛé ©Ûé ¸Ûó¾ÛÛ¨Ûé ›÷ÂúÁõ ¶Û ÅÛÛ•Ûé ©ÛÛé †›÷ÛÁõù−ùÛÁéõ …ÛÈÛÛé ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ÐüܬۿÛÛÁõ ÜÈÛ•ÛéÁéõ ͬÛÇ 5Áõ¬Ûà ”ÛÍÛé¦øÈÛÛ ›÷Ûé†…é …¶Ûé ©Ûé ¸Ûó¾ÛÛ¨Ûé ”ÛÍÛé¦øÈÛÛ¾ÛÛ× ¶Û …ÛÈÛé ©ÛÛé ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà †›÷ÛÁõù−ùÛÁõ¶ÛÛ ”Û˜Ûë ”ÛÍÛé¦øà ÉÛકõÛÉÛé. …•ÛÁõ ÐüÁõÛœ÷¬Ûà ©Ûé¶Ûä× ÈÛé ÛÛ¨Û કõÁõà ©Ûé¶Ûä× Š©¸Û·Û †›÷ÛÁõù−ùÛÁõ¶Ûé ¾Û›÷Áéõ …Û5ÉÛé …¬ÛÈÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà …ÛÈÛÛé ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û¶ÛÛé ©Ûé¶ÛÛé ક×õ†કõ ½ÛÛ•Û¶ÛÛé …•ÛÁõ ›÷Û¾Ûà¶Û•ÛàÁõà¶ÛÛé …•ÛÁõ …¶ÛÛ¾Û©Û ÁõÛ”ÛéÅÛÛ ¸ÛíÍÛÛ¶ÛÛé …•ÛÁõ †›÷ÛÁ−ùõùÛÁõ¶Ûé …−ùÛ ¸ÛÛªÛ ¬Û¿ÛéÅÛà …•ÛÁõ ¬Û¶ÛÛÁõà કõÛé† Áõકõ¾Û¶ÛÛé ¸ÛäÁéõ¸ÛäÁõÛé …•ÛÁõ ›÷ÂúÁõ ÅÛÛ•Ûé ©Ûé¤øÅÛÛé Š5¿ÛÛé•Û †›÷ÛÁõ−ùùÛÁõ¶Ûé કõÁéõÅÛÛ ”ÛÁõÛ¼Û …¬ÛÈÛÛ ¾Û¶ÛÍÈÛà Áõà©Ûé કõÁéõÅÛÛ કõÛ¾Û¶Ûé ÍÛäµÛÛÁõÈÛÛ ¸ÛÛé©ÛÛ¶Ûé ¿ÛÛé•¿Û ÅÛÛ•Ûé …éÈÛà Áõà©Ûé કõÁõà ÉÛકõÉÛé.

5) ˆ›÷ÛÁõ−ùùùÛÁõ¶Ûé ˜ÛÛÅÛä કõÛ¾Û¾ÛÛ× …éÈÛà ÐüÁõકõ©Û ¶Û¦éø કéõ કõÛ¾Û ¸ÛäÂú કõÁõÈÛÛ¾ÛÛ× ÜÈÛÉÛéÌÛ ÍÛ¾Û¿Û¶Ûà …¸Ûé“ÛÛ ÁõÐéü ©ÛÛé ÐüÁõકõ©Û¶Ûà ©ÛÛÁõà”Û¬Ûà …éકõ ¾ÛÛÍÛ¶Ûà ¾Ûä−ùù©Û¾ÛÛ× ©Ûé Ûé ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ©ÛÁõºõ …Áõœ÷ કõÁõÈÛà ›÷Ûé†…é …¶Ûé ›÷Ûé ©Ûé¾Û¨Ûé ÍÛ¼Û¼Û કõÛÁõ¨ÛÛé ÅÛÛ•Ûé ©ÛÛé ¿ÛÛé•¿Û ÈÛµÛä ¾Ûä−ùù©Û …Û¸Ûà ÉÛકõÉÛé 5Á×õ©Ûä …Û ¸Ûó¾ÛÛ¨Ûé¶Ûà ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ©ÛÁõºõ¬Ûà ¾ÛÇéÅÛà ÅÛéÜ”Û©Û Ðäકõ¾Û ÜÍÛÈÛÛ¿Û †›÷ÛÁõù−ùÛÁõ¶ÛÛ કõÁõÛÁõ¶Ûà ÉÛÁõ©ÛÛé¶Ûà કõÅÛ¾Û - Áõ ¾Ûä›÷¼Û ›÷Ûé ¥øÁéõÅÛà ¾Ûä-ù−ù©Û¾ÛÛ× ¸ÛäÂ×ú ¶Û ¬ÛÛ¿Û ©ÛÛé ÈÛµÛä ¾Ûäù−ù©Û ¾ÛÛ¤éø ×ù−ù¦ø¶Ûé ¸ÛÛªÛ ¬Û©Ûà Áõકõ¾Û ½ÛÁõÈÛÛ¶ÛÛ ›÷ÈÛÛ¼Û−ùùÛÁõà¾ÛÛ׬Ûà ¾Ûäકõ©Û ¬Û† ÉÛકõÉÛé ¶ÛÐüá.

6) ›÷¿ÛÛ× †›÷ÛÁõùù−ùÛÁéõ ¸ÛÛÅÛ”Û, ÈÛµÛÛÁõÛ¶ÛÛé કõ˜ÛÁõÛé ©Ûé¾Û›÷ ™öÛÂú ÜÈÛ•ÛéÁéõ −äùÁõ કõ¿ÛÛÙ ¶Û ÐüÛé¿Û ©Ûé¾Û›÷ ¾ÛકõÛ¶Û¶Ûé −ùäùÁõÍ©Ûà કõÁõÈÛÛ¶Û×ä કõÛ¾Û …•ÛÁõ …éÈÛä ¼Ûà›ä÷ કõÛ¾Û ÍÛä Ûó©Û કõ¿ÛäÙ ÐüÛé¿Û ©Ûé¾ÛÛ× ÅÛÛકõ¦øÛ કõÛ¾Û ¼ÛÛÁõ¨ÛÛ…Ûé, ¼ÛÛÁõà…Ûé, Ü−ùùÈÛÛÅÛ, ¾ÛÛÅÛ¶ÛÛ ¶ÛÜÇ¿ÛÛ׶Ûà ºõÁõÍÛ¼Û×µÛ¶ÛÛ …•ÛÁõ ¾ÛકõÛ¶Û¶ÛÛ કõÛé†5¨Û ½ÛÛ•Û 5Áõ ¦øÛ–Û¦äø–Û ÍÛÛºõ કõÁéõ ¶ÛÐüá ©¿ÛÛ× ÍÛäµÛà કõÛé†5¨Û કõÛ¾Û ¸ÛäÂ×ú ¬Û¿Ûä× ™öé …éÈÛä× ¾ÛÛ¶Ûà ÉÛકõÉÛé ¶ÛÐüá . ›÷Ûé †›÷ÛÁ−ùõùÛÁõ¶Ûé ”Û˜Ûë ¸Ûó¾ÛÛ¨Ûé કõÛ¾Û ¸ÛäÂ×ú કõÁõà ÍÛä Ûó©Û કõÁõ©ÛÛ× ¸ÛæÈÛÙ ˜ÛÛé””Ûä કõÁõÈÛÛ¾ÛÛ× કõÍÛäÁõ કõÁõÉÛé ©ÛÛé ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà †›÷ÛÁõùÛÁõ¶Ûé ”Û˜Ûë …Û ¸Ûó¾ÛÛ¨Ûé કõÁõÛÈÛà ÉÛકõÉÛé.

7) ÄÛ.500/- ÄõܸۿÛÛ ¸ÛÛ× ÛÍÛÛé ÍÛäµÛà¶ÛÛ કõÛ¾Û¶ÛÛ ”Û˜ÛÙ¶Ûà Áõકõ¾Û કõÛ¾ÛÛé ¸ÛäÁõÛ ¬Û† 5ÍÛ×−ù ¬Û¿ÛÛ ÜÍÛÈÛÛ¿Û …−ùÛ ¬Û† ÉÛકõÉÛé ¶ÛÐüá …¶Ûé ÄÛ.500/- ÄõܸۿÛÛ ¸ÛÛ× ÛÍÛÛé¬Ûà …ÜµÛકõ …×ù−ùÛ›÷ÈÛÛÇÛ કõÛ¾ÛÛé¾ÛÛ× ¬Û¿ÛéÅÛÛ કõÛ¾Û ¸ÛäÁõ©ÛÛ ©Ûé¾Û›÷ †›÷ÛÁ−ùõùÛÁõ¶Ûé ”ÛÛ©ÛÛ¶Ûé ›÷é …¾ÛÅÛù−ùÛÁõ¶Ûà ÍÛä Ûó©Û¾ÛÛ× કõÛ¾Û ÐüÉÛé ©ÛéÈÛÛ …¾ÛÅÛù−ùÛÁéõ …Û¸ÛéÅÛÛ ¾ÛÛ5 ¾Ûä›÷¼Û ¾ÛÛÍÛàકõ −ùéùÈÛÛ¿ÛÛ−ùùà ¼Û¶ÛÛÈÛà Áõકõ¾Û …ùÛ ¬Û† ÉÛકõÉÛé 5Á×õ©Ûä …ÛÈÛà ˜ÛÛÅÛä કõÛ¾Û¾ÛÛ× …−ùùÛ ¬Û¿ÛéÅÛ Áõકõ¾ÛÛé કõÛ¾Û ”ÛÁéõ”ÛÁõà Áõà©Ûé ¸ÛäÂ×ú ¬Û¿Ûä× …é ÜÐüÍÛÛ¼Ûé …Û5ÈÛÛ¾ÛÛ× …ÛÈÛà ™öé ©Ûé ¸Ûó¾ÛÛ¨Ûé ¶Û •Û¨Û©ÛÛ× ¾ÛÛªÛ ™öéÈÛ¤ø ÜÐüÍÛÛ¼Û¶Ûà ÉÛÁõ©Ûé …ùÛ ¬Û† ™öé. (Payment on Account) …é ¸Ûó¾ÛÛ¨Ûé •Û¨ÛÈÛÛ¾ÛÛ …ÛÈÛÉÛé …¶Ûé ™öéÈÛ¤ø¶Ûà −ùéùÈÛÛ¿ÛÛ−ùùà …ÛકõÛÁ¾ÛÛ× ©Ûé¶ÛÛé ÍÛ¾ÛÛÈÛéÉÛ કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé.

8) કõÛé†5¨Û કõÛ¾Û¶ÛÛ ¶ÛÛ¨ÛÛ× ©Ûé કõÛ¾Û ÍÛ× Ûæ ÛÙ Áõà©Ûé ÍÛÛÂ×ú …¶Ûé ÈÛ¨ÛÙ¶Û ¸Ûó¾ÛÛ¨Ûé ÐüÛé¿ÛÛ ÈÛ•ÛÁõ …ù−ùÛ કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé

¶ÛÐüá. …é કõ−ùÛ˜Û ÉÛÁõ©Û˜Ûäકõ¬Ûà ”ÛÁõÛ¼Û કõÛ¾Û 5ÍÛ×−ùù કõÁõÈÛÛ¾ÛÛ× …ÛÈÛà ¶ÛÛ¨ÛÛ× …Û5ÈÛÛ¾ÛÛ× …ÛÈÛéÅÛ ÐüÛé¿Û ©ÛÛé ©Ûé¶Ûé ½ÛÜÈÛÌ¿Û¾ÛÛ× કõÛé†5¨Û ÜÐüÍÛÛ¼Û¾ÛÛ׬Ûà ¼ÛÛ©ÛÅÛ કõÁõà ©Ûé¶ÛÛ …ùÛ ¬Û¿ÛéÅÛÛ ¶ÛÛ¨ÛÛ× ™öéÈÛ¤ø¶ÛÛé −ùÛ”ÛÅÛÛé …Û5©Ûà ÈÛ”Û©Ûé …•ÛÁõ ©Ûé 5ÐéüÅÛÛ કõÛé†5¨Û ÈÛ”Û©Ûé ÈÛÍÛäÅÛ કõÁõÈÛÛ Ðäüકõ¾Û કõÁõÈÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûé ÍÛ× Ûæ Û …ܵÛકõÛÁõ ™öé.

9) ›÷¿ÛÛÁéõ કõÛé†5¨Û …×ù−ùÛ›÷5ªÛ¾ÛÛ× …•ÛÁõ ÉÛÁõ©Û 5ªÛકõ¾ÛÛ× (͸ÛéÍÛàºõàકéõÉÛ¶Û¾ÛÛ×) ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶Ûà ÈÛ”ÛÛÁõ¾ÛÛ׬Ûà …¾Ûäકõ ›÷Û©Û¶ÛÛé ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û …Û5ÈÛÛ¾ÛÛ× …ÛÈÛÉÛé, …•ÛÁõ †›÷ÛÁõ−ùùÛÁéõ ÈÛ¦øÛé−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û ©ÛÁõºõ¬Ûà …Û5ÈÛÛ¾ÛÛ× …ÛÈÛ¶ÛÛÁõ ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ÈÛÛ5ÁõÈÛÛé ›÷Ûé†…é …éÈÛä× ¥øÁéõÅÛä× ÐüÛé¿Û ©¿ÛÛÁéõ ©Ûé …×ù−ùÛ›÷5ªÛકõ ÍÛÛ¬Ûé …Û5ÈÛÛ¾ÛÛ× …ÛÈÛ¶ÛÛÁõ ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û¶ÛÛ ©Û5ÍÛàÅÛ¶ÛÛé ½ÛÛÈÛ ©Û¬ÛÛ …Û5ÈÛÛ¶ÛÛé ›÷•ÛÛé ÜÈÛ•ÛéÁéõ¶Ûà ÜÈÛ•Û©ÛÍÛÐü¶Ûä× 5ªÛકõ ÍÛÛ¾ÛéÅÛ ÁõÛ”ÛÈÛä× ›÷Ûé†…é …¶Ûé †›÷ÛÁõù−ùÛÁõ¶Ûé ÈÛ”Û©ÛÛé ÈÛ”Û©Û ›÷ÂúÁõ ¸Ûó¾ÛÛ¨Ûé ¾ÛÛÅÛ …Û5ÈÛÛé ›÷Ûé†…é …¶Ûé …éક×õù−ùÁéõ …Û¸ÛéÅÛÛ ¾ÛÛÅÛ¶Ûà Ýકõ¾Û©Û¶ÛÛ ¶ÛÛ¨ÛÛ× †›÷ÛÁõ−ùÛÁéõ …−ùùÛ ¬ÛÈÛÛ¶ÛÛ ¶ÛÛ¨ÛÛ׶Ûà −éùùÈÛÛ¿ÛÛù−ùà¾ÛÛ׬Ûà …•ÛÁõ ÅÛÐéü¨ÛÛ×¾ÛÛ׬Ûà …×−ùùÛ›÷5ªÛ¾ÛÛ׬Ûà −ùÉÛÛÙÈÛéÅÛ ù−ùÁ¶Ûéõ ¸Ûó¾ÛÛ¨Ûé …•ÛÁõ …−ù×ùÛ›÷5ªÛકõ¶ÛÛ …½ÛÛÈÛé †›÷ÛÁõ−ùÛÁéõ ÍÛÐüà કõÁéõÅÛÛ 5ªÛકõ¾ÛÛ׶ÛÛ −ùùÁõ¶Ûé µÛÛéÁõ¨Ûé ÈÛÍÛäÅÛ ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. †›÷ÛÁõù−ùÛÁõ¶Ûé …Û5ÈÛÛ¾ÛÛ× …ÛÈÛéÅÛ ©Û¾ÛÛ¾Û ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ¾ÛÐüÛ¶Û•ÛÁõ¸ÛÛÜÅÛકõÛ¶Ûà ܾÛÅÛકõ©Û •Û¨ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé …¶Ûé ©Ûé કõÛé†5¨Û કõÛÁõ¨Ûé કõÛ¾Û Š5Áõ¬Ûà ÅÛ† ›÷† ÉÛકõÉÛé ¶ÛÐüá. ©Ûé¾Û›÷ ¾ÛÐüÛ¶Û•ÛÁõ¸ÛÛÜÅÛકõÛ¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà •Û¾Ûé ©Ûé ÈÛ”Û©Ûé ©Û¸ÛÛÍÛà ÉÛકõÉÛé. …ÛÈÛà Áõà©Ûé …Û¸ÛéÅÛÛ ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ¸Ûíકõà કõÛ¾Û ¸ÛäÂ×ú ¬Û¿Ûé …•ÛÁõ †›÷ÛÁõÛé Á−ùõù કõÁõÈÛÛ¶ÛÛ ¸ÛóÍÛוÛé ›÷é ક×õ† ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ÈÛµÛé ©Ûé ¼ÛÛ×µÛકõÛ¾Û

Page 15: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 15

INVITEE SIGNATURE BIDDER

…ܵÛકõÛÁõà ›÷ÂúÁõ ›÷¨ÛÛ¿Û ÈÛ”ÛÛÁõ¾ÛÛ× ¸ÛÛ™öÛé ÅÛéÈÛÛ¾ÛÛ× †©ÛÁõ ¸ÛóÍÛוÛé ÈÛµÛéÅÛÛé ÍÛÛ¾ÛÛ¶Û †›÷ÛÁù−ùõùÛÁõ 5Áõ©Û કõÁõà ÉÛકõÉÛé ¶ÛÐüá …•ÛÁõ ©Ûé¶ÛÛ …וÛé કõÛé†5¨Û ›÷Û©Û¶Ûà ¶ÛäકõÉÛÛ¶Ûà ¾ÛÛוÛà ÉÛકõÉÛé ¶ÛÐüá.

9/1) ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û ©ÛÁõºõ¬Ûà †›÷ÛÁõÛ¬Ûà …Û5ÈÛÛ¾ÛÛ× …ÛÈÛ©ÛÛ× કõÛ¾ÛÛé કõÁõÈÛÛ ›÷Ûé કõÛé†5¨Û ¸ÛóકõÛÁõ¶ÛÛé

¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û કõÛ鶤ÖøÛકõ¤øÁõ¶Ûé …Û5ÈÛÛ¾ÛÛ× …ÛÈÛé ©Ûé ©Û¾ÛÛ¾Û ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ¼Ûù−ùÅÛà¶Ûà ÍÛÐüà ©Ûé…Ûé …•ÛÁõ ©Ûé…Ûé ¶Ûà¾Ûé ©Ûé ¸ÛóÜ©ÛܶÛܵۅé Áõœ÷ͤøÁõ¾ÛÛ× કõÁõà …Û5ÈÛÛ¶Ûà ÁõÐüÉÛé. (ͤéø.કõ.¥ø.¶Û×.807/©ÛÛ.29.11.1973)

9/2) ÍÛùÁ−ùõÐä×ü ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ÍÛÛ˜ÛÈÛÈÛÈÛÛ¶Ûà ©Ûé¾Û›÷ •ÛéÁõŠ5¿ÛÛé•Û ¶Û ¬ÛÛ¿Û ©Ûé ¼ÛÛ¼Û©Û¶Ûà ©Û¾ÛÛ¾Û ¸ÛóકõÛÁõ¶Ûà ›÷ÈÛÛ¼Ûù−ùÛÁõà

કõÛ鶤ÖøÛકõ¤ø¶ÛÛ ÉÛàÁéõ ÁõÐéüÉÛé. ¾ÛÛÅÛ¾ÛÛ× કõÛé†5¨Û ¸ÛóકõÛÁõ¶Ûà ˜ÛÛéÁõà …•ÛÁõ ܶÛÌકõÛÇœ÷¶ÛÛ 5ÜÁõ¨ÛÛ¾Ûé –Û¤ø …ÛÈÛÉÛé …¬ÛÈÛÛ ¾ÛÛÅÛ¶Ûä× ¶ÛäકõÉÛÛ¶Û ¬ÛÉÛé ©Ûé¶Ûà ›÷ÈÛÛ¼Û−ùÛÁõà કõÛ鶤ÖøÛકõ¤øÁõ¶Ûà ™öé …¶Ûé Áõકõ¾Û કõÛ鶤ÖøÛકõ¤øÁéõ ¸ÛÛé©ÛÛ¶ÛÛ 5−ùùÁõ¶Ûà …Û5ÈÛÛ¶Ûà ÁõÐéüÉÛé ©Ûé¾Û›÷ ¼ÛàÅÛ¾ÛÛ׬Ûà ©Ûé કõ¸ÛÛ©Û કõÁõà ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. (ͤéø.કõ.¥ø.…×.807/©ÛÛ.29.11.1973 ¬Ûà ¾Û×›ä÷Áõ)

10) †›÷ÛÁùõù−ùÛÁéõ ©Û¾ÛÛ¾Û કõÛ¾Û ÍÛוÛà¶Û ÍÛÛÁõà કõÛ¾Û•ÛàÁõà¬Ûà કõÁõÈÛä× ›÷Ûé†…é …¶Ûé ÉÛÁõ©Û5ªÛ¾ÛÛ× ›÷¨ÛÛÈÛéÅÛ ÈÛ¨ÛÙ¶Û ¸Ûó¾ÛÛ¨Ûé ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ÈÛÛ5ÁõÈÛÛé ›÷Ûé†…é ©Ûé¾Û›÷ †›÷ÛÁõ−ùùÛÁõ¶Ûé ›÷Û¨ÛÈÛÛ ¾ÛÛ¤éø ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶ÛÛ ÍÛÐüà¬Ûà ÁõÛ”ÛéÅÛÛ કõÛ¾Û¶Ûé ÅÛ•Û©ÛÛ ¶ÛકõÉÛÛ…Ûé, ÍÛæ Û¶ÛÛ…Ûé¶ÛÛé ˜ÛäÍ©Û Áõà©Ûé …¾ÛÅÛ કõÁõÈÛÛé ›÷Û醅é.

›÷¿ÛÛÁéõ ¶ÛકõÉÛÛ, …×−ùùÛ›÷ …¶Ûé ͸ÛéÍÛàºõàકéõÉÛ¶Û¾ÛÛ× ¾ÛÛ¸ÛÛé ›÷¬¬ÛÛ¶Ûà ÜÈÛÍÛוÛÜ©Û ÐüÛé¿Û ©¿ÛÛÁéõ ¶ÛકõÉÛÛ, …−ù×ùÛ›÷ …¶Ûé

͸ÛéÍÛàºõàકéõÉÛ¶Û¶ÛÛ …¶Ûä’õ¾Û ¸Ûó¾ÛÛ¨Ûé કõÛ¾Û કõÁõÈÛÛ¶Ûä× ™öé. 5Á×õ©Ûä ¾ÛÛ¸ÛÛé …¶Ûé ›÷¬¬ÛÛ¾ÛÛ× ½ÛæÅÛ ¬Û¿ÛéÅÛà ¶ÛÛ ÐüÛé¿Û …¶Ûé ÈÛ¨ÛÙ¶Û¶Ûà ÜÈÛÍÛוÛÜ©Û ÐüÛé¿Û ©ÛÛé …×−ùÛ›÷, ¶ÛકõÉÛÛ …¶Ûé ͸ÛéÍÛàºõàકéõÉÛ¶Û¶ÛÛ …¶Ûä’õ¾Û ¸Ûó¾ÛÛ¨Ûé કõÛ¾Û કõÁõÈÛÛ¶Ûä× ™öé. ÈÛ¨ÛÙ¶Û ”ÛÛ¾ÛàÈÛÛÇä× …¬ÛÈÛÛ …͸Ṳ̂ø ÐüÛé¿Û ©¿ÛÛÁéõ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà…é કéõÈÛà Áõà©Ûé કõÛ¾Û કõÁõÈÛä× ©Ûé ¼ÛÛ¼Û©Û¶Ûà ÍÛÛí¬Ûà Š«Û¾Û ¸Ûó¬ÛÛ µ¿ÛÛ¶Û¾ÛÛ× ÁõÛ”Ûà¶Ûé ÍÛæ Û¶ÛÛ …Û¸Ûà …¶Ûé †›÷ÛÁõ−ùùÛÁéõ ©Ûé ¸Ûó¾ÛÛ¨Ûé કõÛ¾Û કõÁõÈÛä× ›÷Û醅é, ¶ÛકõÉÛÛé …¶Ûé ͸ÛéÍÛàºõàકéõÉÛ¶Û¾ÛÛ× −ùéù”ÛÛ©Ûà ½ÛæÅÛÛé “ÛÜ©Û…Ûé ÐüÛé¿Û ©ÛÛé કõÁõÛÁõ µ¿Ûé¿Û¶Ûé ÅÛ“Û¾ÛÛ× ÁõÛ”Ûà ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà …Û ½ÛæÅÛÛé …¶Ûé “ÛÜ©Û…Ûé ÍÛäµÛÛÁõà ÉÛકõÉÛé. ¶ÛકõÉÛÛ …×−ùùÛ›÷ …¶Ûé ͸ÛéÍÛàºõàકéõÉÛ¶Û¾ÛÛ× ¾ÛÛ¸ÛÛé, ›÷¬¬ÛÛé …¶Ûé ÈÛ¨ÛÙ¶Û¶Ûà ÜÈÛÍÛוÛÜ©Û ÜÍÛÈÛÛ¿Û¶Ûà ”ÛÛ¾ÛàÈÛÛÇä× ÈÛ¨ÛÙ¶Û …¶Ûé ͸Ṳ̂ø©ÛÛ…Ûé ¾ÛÛ¤éø ÍÛà¤øà …é¶œ÷¶Ûà¿ÛÁõ¶ÛÛé ܶۨÛÙ¿Û ™öéÈÛ¤ø¶ÛÛé •Û¨ÛÛÉÛé …¶Ûé †›÷ÛÁõ−ùùÛÁõ¶Ûé ©ÛéÈÛÛ ¸Ûó¾ÛÛ¨Ûé કõÁõÈÛä× 5¦øÉÛé.

11) …×−ùùùÛ›÷5ªÛ¾ÛÛ× ¼Û©ÛÛÈÛéÅÛÛ ¾ÛÛ¸ÛÛé ºõકõ©Û …×ù−ùÛ›÷ ÐüÛé¿Û ©Ûé¾ÛÛ× કõÛ¾Û¶Ûà ›÷ÂúÁõà¿ÛÛ©Û ¸Ûó¾ÛÛ¨Ûé ÈÛµÛ–Û¤ø ¬ÛÈÛÛ¶Ûé ¸ÛÛªÛ ™öé.

12) ¿ÛÛé•¿Û …ܵÛકõÛÁõà¶ÛÛ Ðäüકõ¾Û¬Ûà ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûé કõÛ¾Û¶ÛÛ ¶ÛકõÉÛÛ ¾ÛæÇ ”Û©Û5ªÛ ͸ÛéÍÛàºõàકéõÉÛ¶Û ÜÈÛ•ÛéÁéõ¾ÛÛ× ›÷ÂúÁõà ©Ûé ºéõÁõºõÛÁõ ©Ûé¾Û›÷ ÍÛäµÛÛÁõÛé ÈÛµÛÛÁõÛé કõÁõÈÛÛ¶ÛÛé ˜ÛÛÅÛä કõÛ¾Û¾ÛÛ× …ܵÛકõÛÁõ ™öé ©Ûé¾Û›÷ કõÛ¾Û¶Ûà ÜͬÛÜ©Û¶Ûé …¶ÛäÍÛÁõà¶Ûé ÍÛæ Û¶ÛÛ ÜÈÛ•ÛéÁéõ …Û¸Ûà ÉÛકõÉÛé. …¶Ûé …ÛÈÛà Áõà©Ûé ÅÛéÜ”Û©Û …Û¸ÛéÅÛà ÍÛæ Û¶ÛÛ ¸Ûó¾ÛÛ¨Ûé કõÛ¾Û કõÁõÈÛÛ †›÷ÛÁ−ùùÛÁõ ¼Û×µÛÛ¿ÛéÅÛÛ ™öé, …ÛÈÛÛ ºéõÁõºõÛÁõ¬Ûà ¾ÛæÇ કõÁõÛÁõ Á−ùõù ¬Û¿ÛéÅÛ •Û¨ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé ¶ÛÐüá …ÛÈÛà Áõà©Ûé ½ÛÛÈÛ5©Ûકõ¾ÛÛ× ùÉÛÛÙÈÛéÅÛÛ ¾ÛÛ5¶ÛÛ કõÁõ©ÛÛ× ÈÛµÛä કõÛ¾Û•ÛàÁõà …•ÛÁõ ¶ÛÐüá ù−ùÛ”ÛÅÛ કõÁõÅÛ Áõકõ¾Û¶Ûä× કõÛé†5¨Û કõÛ¾Û (Extra Item) કõÛ¾Û¶ÛÛ ½ÛÛ•Û ©ÛÁõàકéõ †›÷ÛÁõ−ùùÛÁõ¶Ûé ÍÛä Ûó©Û કõÁõÈÛÛ¾ÛÛ …ÛÈÛé ©Ûé કõÛ¾Û ©Ûé¾Û¨Ûé ¾ÛæÇ કõÛ¾Û ¾ÛÛ¤éø ¾ÛäકõÁõÁõ ¬Û¿ÛéÅÛà ©Û¾ÛÛ¾Û ÉÛÁõ©ÛÛé¶Ûé …¶ÛäÍÛÁõà¶Ûé ©Û¬ÛÛ ½ÛÛÈÛ5ªÛ¾ÛÛ× ¶Û¾Ûä−ùù કõÁéõÅÛÛ ½ÛÛÈÛ¬Ûà કõÁõÈÛÛ 5¦øÉÛé …¶Ûé કõÛ¾Û ¸ÛäÂú કõÁõÈÛÛ¶Ûà ¾Ûäù−ù©Û ÈÛµÛä …Û¸ÛéÅÛÛ કõÛ¾Û¶ÛÛ ¾ÛæÇ કõÛ¾Û ÍÛÛ¬Ûé¶ÛÛ ¸Ûó¾ÛÛ¨ÛÛé¶ÛäÍÛÛÁõ ÈÛµÛÛÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé …¶Ûé …Û ¸Ûó¾ÛÛ¨Ûé ¾ÛÛ¤éø ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ›÷é ù−ùÛ”ÛÅÛÛé …Û¸Ûé ©Ûé ¼Û×µÛ¶Ûકõ©ÛÛÙ •Û¨ÛÛÉÛé. કõÁõÛÁõ¶ÛÛ ¼ÛÐüÛÁõ¶Ûà Áõકõ¾Û¶Ûä× ÈÛµÛÛÁõÛ¶Ûä× કõÛ¾Û ¸Ûó¾ÛÛ¨Û½Ûæ©Û ½ÛÛÈÛ5ªÛકõ (Schedule Rates) ¾ÛÛ× −ùùÛ”ÛÅÛ કõÁéõÅÛÛ ½ÛÛÈÛÛé ¸Ûó¾ÛÛ¨Ûé કõÁõÈÛä× 5¦øÉÛé …¶Ûé ©Ûé¾ÛÛ׬Ûà કõÁõÛÁõ ¸Ûó¾ÛÛ¨Ûé ¾ÛæÇ કõÛ¾Û¶ÛÛ ½ÛÛÈÛ ¾ÛÛ¤éø ›÷é ¤øકõÛ ¼ÛÛ−ùù કõÁõÈÛÛ¶ÛÛ ¥øÁéõÅÛÛ ÐüÛé¿Û ©Ûé¤øÅÛÛ ¤øકõÛ ¼ÛÛ−ùù કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé …¶Ûé …ÛÈÛÛ ¸Ûó¾ÛÛ¨Û½Ûæ©Û ½ÛÛÈÛ5ªÛકõ¾ÛÛ× ›÷ ¤øકõÛ Áõકõ¾Û (Item) −ùùÛ”ÛÅÛ ¶Û ¬Û¿ÛéÅÛà ÐüÛé¿Û ©Ûé¶ÛÛ ½ÛÛÈÛ ¿ÛÛé•¿Û …ܵÛકõÛÁõà ©ÛÁõºõ¬Ûà ¾Û×›ä÷Áõ ¬ÛÛ¿Û ©Ûé ›÷Ûé †›÷ÛÁ−ùõùÛÁõ …Û¬Ûà ÈÛµÛÛÁõÛ¶Ûà Áõકõ¾Û¶Ûä× કõÛ¾Û કõÁõÈÛÛ કõ¼ÛæÅÛ ÐüÛé¿Û ©Ûé †›÷ÛÁõ−ùùÛÁéõ ÍÈÛàકõÛÁõÈÛä× ›÷Û醅é. …ÛÈÛÛ ½ÛÛÈÛ ¤øકõÛ¶Ûà કõ¸ÛÛ©ÛÛé ÛÛªÛ ¶ÛÐüá …éÈÛà Áõà©Ûé ܶÛÈÛÇ ¾Û×›ä÷Áõ કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé …¶Ûé ›÷Ûé †›÷ÛÁ−ùõùÛÁõ ¸Ûó¾ÛÛ¨Û½Ûæ©Û ½ÛÛÈÛ5ªÛÛé¾ÛÛ× ›÷é¶ÛÛé ÍÛ¾ÛÛÈÛéÉÛ કõÁéõÅÛÛé ¶Û ÐüÛé¿Û ©Ûé¶Ûä× ÈÛµÛÛÁõÛ¶Ûä× કõÛ¾Û કõÁõÈÛÛ ”ÛäÉÛà ¶Û ÐüÛé¿Û ©ÛÛé ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà …ÛÈÛÛ ¼ÛÛ×µÛકõÛ¾Û ¾ÛÛ¤éø Ü¶Û¿Û¾Û ¸Ûó¾ÛÛ¨Ûé ¿ÛÛé•¿Û ©Û›÷ÈÛà›÷ કõÁõà ÉÛકõÉÛé.

13) ÉÛÁõ©Û પ+ ¸Ûó¾ÛÛ¨Ûé ¥øÁéõÅÛÛ કõÛ¾ÛÛé ¸Ûíકõà કõÛ醶ÛÛ ¾ÛÛ5 …•ÛÁõ ͬÛǶÛà ÜͬÛÜ©Û¾ÛÛ× ºéõÁõºõÛÁõ કõÁõÈÛÛ¶ÛÛé ©Ûé ¸Ûíકõà કõÛ醶ÛÛ કõÛ¾Û …•ÛÁõ ©Ûé¶ÛÛé ½ÛÛ•Û કõ¾Ûà કõÁõÈÛÛ¶ÛÛé …•ÛÁõ કõÁõÛÁõù−ùÛÁõ ¸ÛÛÍÛé¬Ûà ¼Û−ùÅÛÛ¾ÛÛ× ¼Ûà›ä×÷ …Û¸Ûà¶Ûé …Û¸¿ÛÛ ÈÛ•ÛÁõ કõÛ§øà¶Ûé ÅÛéÈÛÛ¶ÛÛé …¬ÛÈÛÛ કõÛé† ¸ÛäÂ×ú …•ÛÁõ …×ÉÛ©Û: કõÁéõÅÛä× કõÛ¾Û કõÛ§øà ¶ÛÛ×”ÛÈÛÛ¶ÛÛé …•ÛÁõ ©Ûé¾ÛÛ× ºéõÁõºõÛÁõ કõÁõÈÛÛ ¾ÛÐüÛ¶Û•ÛÁ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûé …ÜµÛકõÛÁõ ™öé. કõÛ¾Û¶ÛÛé કõÛé† ½ÛÛ•Û કõÁõÛÁ−ùõùÛÁõ ¸ÛÛÍÛé¬Ûà

Page 16: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 16

INVITEE SIGNATURE BIDDER

કõÛ§øà ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛé ©Ûé ¸ÛóÍÛוÛé ©Ûé¤øÅÛä× કõÛ¾Û ¶Û કõÁõÈÛÛ¶ÛÛ …•ÛÁõ કõÛ§øà ÅÛéÈÛÛ¶ÛÛ ÍÛ¼Ûકõ¬Ûà કõÛé†5¨Û ›÷Û©Û¶Ûà ¶ÛäકõÉÛÛ¶Ûà ¾ÛÛוÛà ÉÛકõÉÛé ¶ÛÐüá.

14) ›÷Ûé ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ÍÛÛÐéü¼Ûé …•ÛÁõ ©ÛÛé ©Ûé¾Û¶ÛÛ ¶ÛÛ¿Û¼Û¶Ûé કõÛ¾Û ¼Û−ùùÅÛ …µÛäÂ×ú …•ÛÁõ ¼Ûà¶Û ÍÛºõÛ†ÈÛÛÇà કõÛ¾Û•ÛàÁõà¬Ûà કõÁéõÅÛÛ¶Ûä× ›÷¨ÛÛ¿Û …•ÛÁõ ÐüÅÛકõà ›÷Û©Û¶ÛÛé ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ÈÛÛ5ÁõÈÛÛ¶Ûä× ›÷ÛéÈÛÛ¾ÛÛ× …•ÛÁõ ©ÛÛé ©Û¾ÛÛ¾Û કõÛ¾Û …•ÛÁõ ©Ûé¶ÛÛé ½ÛÛ•Û †›÷ÛÁ−ùõùÛÁõ¶Ûé કõÛ¾Û¶Ûà ›÷ÂúÁõà¿ÛÛ©Û ¸Ûó¾ÛÛ¨Ûé −äùÁõÍ©Û કõÁõÈÛÛ, કõÛ§øà ¶ÛÛ×”ÛÈÛÛ …•ÛÁõ ºõÁõà¬Ûà કõÁõÈÛÛ ÅÛé”Ûà ÍÛæ Û¶ÛÛ …Û¸Ûà ©Ûé Š5Áõ¬Ûà †›÷ÛÁõùÛÁéõ ©Ûé ¸Ûó¾ÛÛ¨Ûé ¸ÛÛé©ÛÛ¶ÛÛ ”Û˜Ûë કõÁõÈÛä× ›÷Ûé†…é …¶Ûé …ÛÈÛà Áõà©Ûé ¼ÛÛ×µÛકõÛ¾Û …ÛܵÛકõÛÁõà …•ÛÁõ ©Ûé¾Û¶ÛÛ ¶ÛÛ¿Û¼Ûé …Û¸ÛéÅÛà ¾Û−ùù©Û …×ù−ùÁõ ›÷Ûé †›÷ÛÁõù−ùÛÁõ ”Û˜ÛÙ કõÁõÈÛÛ †¶કõÛÁõ કõÁéõ …•ÛÁõ કõÛ¾Û¶Ûà ͬÛÇ ÍÛà¾ÛÛ Š5Áõ¬Ûà કõÛé†5¨Û ›÷Û©Û¶ÛÛé ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ©Û¬ÛÛ ›÷¨ÛÍÛÛé ›÷é ÐüÅÛકõà ”ÛÁõÛ¼Û (¼Ûà¶Û ¾Û›÷¼Ûä©Û ©Û¬ÛÛ †›÷ÛÁõÛ¶Ûà ÉÛÁõ©ÛÛé ÜÈÛÂúµµÛ) ÐüÛé¿Û …éÈÛà …Û¸ÛéÅÛà ¾Ûäù−ù©Û …×ù−ùÁõ −æùÁõ કõÁõÈÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ¸Ûä©ÛÙ©ÛÛ કõÁõà ÅÛ† ©Ûé¶ÛÛ ”Û˜ÛÙ¶Ûà Áõકõ¾Û †›÷ÛÁõ−ùùÛÁõ¶Ûà કõÛé†5¨Û ¸ÛóકõÛÁõ¶Ûà ÅÐéü¨Ûà Áõકõ¾ÛÛé ÈÛÍÛæÅÛ કõÁõà ÉÛકõÉÛé.

15) ›÷Ûé ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûé ¬Û¿ÛéÅÛä× કõÛ¾Û …éકõù¾Û ÉÛÁõ©Û5ªÛ (Specification) ¸Ûó¾ÛÛ¨Ûé ¬Û¿ÛéÅÛä× ¶Û¬Ûà 5Á×õ©Ûä ©Ûé કõÛ¾Û ˜ÛÛÅÛÈÛÛ é−ùùÈÛä× …éÈÛä× ÅÛÛ•Û ©Ûé ¾ÛÛ¤éø ©Ûé¾Û¶Ûé ¿ÛÛé•¿Û ÅÛÛ•Ûé ©Ûé ½ÛÛÈÛ કõÛ¸Ûà ¶ÛÛ¨ÛÛ× …ù−ùÛ કõÁõÈÛÛ ©Ûé¾Û¶Ûé …ÜµÛકõÛÁõ ™öé. 5¨Û …ÛÈÛà Áõà©Ûé કõÁõÈÛä× કéõ ¶Û કõÁõÈÛä× ©Ûé¾Û¶Ûà ¾ÛÁõœ÷ Š5Áõ ™öé.

16) †›÷ÛÁõ−ùùÛÁõ¬Ûà …Û¸ÛéÅÛÛ ©Û¾ÛÛ¾Û ˜ÛÛÅÛ©ÛÛ કõÛ¾ÛÛé ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ©Û¬ÛÛ

©Ûé¾Û¶ÛÛ ¶ÛÛ¿Û¼ÛÛé éù−ù”ÛÁéõ”Û ÁõÛ”Ûà ©Û¸ÛÛÍÛà ÉÛકõÉÛé. †›÷ÛÁõ−ùùÛÁéõ Ð×ü¾ÛéÉÛÛ ›÷¿ÛÛÁéõ કõÛ¾Û 5Áõ ¸ÛÛé©Ûé ÐüÛ›÷Áõ ÁõÐüà ÉÛકéõ ©Ûé¾Û ¶Û ÐüÛé¿Û ©¿ÛÛÁéõ ¸ÛÛé©ÛÛ¶ÛÛ ›÷ÈÛÛ¼Ûù−ùÛÁõ ¸ÛóÜ©ÛܶÛܵ۶Ûé કõÛ¾Û¶Ûà Ð×ü¾ÛéÉÛ¶Ûà ÈÛ”Û©Ûé …¶Ûé ›÷¿ÛÛÁéõ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ©ÛÁõºõ¬Ûà …•ÛÁõ ©Ûé¾Û¶ÛÛ ¶ÛÛ¿Û¼Û …ܵÛકõÛÁõà ©ÛÁõºõ¬Ûà ÍÛæ Û¶ÛÛ ¾ÛÇé ©Ûé¾Û¶Ûà ÍÛæ Û¶ÛÛ…Ûé ©Û¬ÛÛ Ðäüકõ¾Û ÅÛéÈÛÛ ù−ùÁéõકõ ÈÛ”Û©Ûé ÐüÛ›÷Áõ ÁõÛ”ÛÈÛÛ ›÷Ûé†…é …¶Ûé …ÛÈÛà Áõà©Ûé Áõ”ÛÛ¿ÛéÅÛÛ ¸ÛóÜ©ÛܶÛܵ۶Ûé ›÷é કõÛ׆ Ðäüકõ¾ÛÛé …Û5ÈÛÛ¾ÛÛ× …ÛÈÛé ©Ûé ”Ûæ−ùù ¾ÛæÇ કõÛ鶤ÖøÛકõ¤øÁõ¶Ûé …Û5ÈÛÛ¾ÛÛ× …ÛÈÛéÅÛÛ Ðäüકõ¾ÛÛé ¸Ûó¾ÛÛ¨Ûé ›÷ ¼Û×µÛ¶ÛકõÛÁõકõ •Û¨ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé.

17) ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ©ÛÁõºõ¬Ûà ›÷¨ÛÛÈÛÈÛÛ¾ÛÛ× …ÛÈÛé ©Ûé ÈÛ”Û©Ûé કõÛ¾Û¶Ûà

©Û¸ÛÛÍÛ¨Ûà …×•Ûé ›÷Û醩ÛÛ ÐüܬۿÛÛÁõÛé ¾Û›ä÷ÁõÛé ÜÈÛ•ÛéÁéõ ©Û¾ÛÛ¾Û †›÷ÛÁ−ùõùÛÁõ ©ÛÁõºõ¬Ûà ¸ÛÛé©ÛÛ¶ÛÛ ”Û˜Ûë …Û5ÈÛÛ¾ÛÛ× …ÛÈÛÉÛé …¶Ûé ›÷Ûé …ÛÈÛà Áõà©Ûé †›÷ÛÁõù−ùÛÁõ …Û5ÈÛÛ¾ÛÛ× ˜Ûæકéõ ©ÛÛé †›÷ÛÁõ−ùùÛÁõ¶ÛÛ ”Û˜Ûë કõÁõà ÅÛéÈÛÛ …¶Ûé ¬Û¿ÛéÅÛÛé ”Û˜ÛÙ ©Ûé¶ÛÛ …−ùÛ ¬ÛÈÛÛ¶Ûà ¶ÛÛ¨ÛÛ׶Ûà éù−ùÈÛÛ¿ÛÛ−ùùà¾ÛÛ׬Ûà ÈÛÍÛæÅÛ ¬Û† ÉÛકõÉÛé.

18) ›÷¿ÛÛÁéõ કõÛ¾Û¶ÛÛé કõÛé†5¨Û ½ÛÛ•Û §×øકõÛ† ›÷ÈÛÛ¶ÛÛé ÐüÛé¿Û …¶Ûé ›÷Ûé ©Ûé¶ÛÛ ¾ÛÛ5 ÅÛ† ÉÛકõÛ¿Û …éÈÛà ÜͬÛÜ©Û ¼ÛÐüÛÁõ

›÷©ÛÛ× ÐüÛé¿Û ©¿ÛÛÁéõ કõÛ¾Û §×øકõÛ† ›÷©ÛÛ× 5ÐéüÅÛÛ ©Ûé¶ÛÛ ”ÛÁõÛ ¾ÛÛ¸ÛÛé ÅÛ† ÉÛકõÛ¿Û ©Ûé …¬ÛÙ …ÛÈÛÛ કõÛ¾ÛÛé §×øકõÛ©ÛÛ 5ÐüÅÛÛ †›÷ÛÁõ−ùÛÁéõ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà …•ÛÁõ ©Ûé¾Û¶ÛÛ ¶ÛÛ¿Û¼Û¶Ûé ܶÛ−ùùÛ¶Û ÍÛÛ©Û Üù−ùÈÛÍÛ¶Ûà ÅÛéÜ”Û©Û ÍÛæ Û¶ÛÛ …Û5ÈÛà ›÷Ûé†…é …¶Ûé ¬Û¿ÛéÅÛä× કõÛ¾Û §øÛ×કõà ©Ûé¾Û¶Ûà ÅÛéÜ”Û©Û 5ÁõÈÛÛ¶Û•Ûà ¾ÛéÇÈÛÈÛà ›÷Û醅é. ›÷Ûé Š5Áõ ¸Ûó¾ÛÛ¨Ûé ÈÛ©ÛÙ¶Û કõÁõÈÛÛ¾ÛÛ× ˜Ûæકéõ ©ÛÛé ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûé ¿ÛÛé•¿Û ÅÛÛ•Ûé ©ÛÛé §øÛ×કéõÅÛÛ ½ÛÛ•Û †›÷ÛÁù−ùÛÁõ ”Û˜Ûë Š–Û¦øõÛÈÛà ÉÛકõÉÛé …•ÛÁõ ©Ûé¶ÛÛ ”Û˜Ûë …éÈÛÛ કõÛ¾Û ©Û¬ÛÛ ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ¼Ûù−ùÅÛ ¶ÛÛ¨ÛÛ× …−ùùÛ કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé ¶ÛÐüá.

19) ›÷Ûé કõÛé† †›÷ÛÁõ−ùùÛÁõ …•ÛÁõ ©Ûé¶ÛÛ કõÛ¾Û Š5Áõ¶ÛÛ ¾ÛÛ¨ÛÍÛÛé ›÷é કõÛ¾Û Š5Áõ ©Ûé કõÛ¾Û કõÁõ©ÛÛ× ÐüÛé¿Û ©Ûé ¾ÛકõÛ¶Û¶ÛÛ

કõÛé†5¨Û ½ÛÛ•Û¾ÛÛ× …¬ÛÈÛÛ ¾ÛકõÛ¶Û¶Ûé, ÁõÍ©ÛÛ¶Ûé ¼Û×µÛ¶Û …•ÛÁõ –ÛÛÍÛ Š•ÛééÅÛà ›÷¾Ûà¶Û¶Ûé …•ÛÁõ ÈÛÛÈÛé©ÛÁõ કõÁéõÅÛà ›÷¾Ûà¶Û¶Ûé ©ÛÛé¦éø, ¼Û•ÛÛ¦éø …•ÛÁõ ¶ÛäકõÉÛÛ¶Û 5ÐüÛê ÛÛ¦éø …•ÛÁõ કõÛ¾Û ˜ÛÛÅÛä ÐüÛé¿Û ©Ûé ÈÛ”Û©Ûé કõÛé†5¨Û કõÛÁõ¨Û¬Ûà ©Ûé કõÛ¾Û¶Ûé ક×õ† ¶ÛäકõÉÛÛ¶Û 5ÐüÛê Ûé …•ÛÁõ ©ÛÛé કõÛ¾Û ¸ÛäÂú ¬ÛÈÛÛ¶Ûà ©ÛÛÁõà”Û¬Ûà …éકõ ÈÛÌÛÙ¶Ûà …×ùÁõ ”ÛüÛ¾Ûà ›÷ ÛÛ† …ÛÈÛé ©ÛÛé ©Ûé Ûé ¸ÛÛé©ÛÛ¶ÛÛ ”Û˜Ûë äù−ùÁõÍ©Û કõÁõà …Û5ÈÛà 5¦øÉÛé ¶ÛÐüá ©ÛÛé ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ, ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ¼Ûà›÷Û કõÛÁõà•ÛÁõÛé ¸ÛÛÍÛé¬Ûà −ùäùÁõÍ©Û કõÁõÛÈÛà ÅÛéÉÛé …¶Ûé ¬Û¿ÛéÅÛÛé ”Û˜ÛÙ †›÷ÛÁõù−ùÛÁõ¶Ûà ÅÐéü¨Ûà ¶ÛàકõÇ©Ûà ÐüÛé¿Û …•ÛÁõ ¾ÛÐüÛ¶Û•ÛÁõ¸ÛÛÜÅÛકõÛ ©¿ÛÛÁõ 5™öà¬Ûà ¬ÛÛ¿Û ©Ûé Áõકõ¾Û¾ÛÛ׬Ûà ÈÛÍÛäÅÛ કõÁõà ÉÛકõÉÛé.

20) †›÷ÛÁõù−ùÛÁéõ ¸ÛÛé©ÛÛ¶ÛÛ ”Û˜Ûë ÁõÛ”ÛéÅÛä× કõÛ¾Û ¸ÛäÂú કõÁõÈÛÛ ¾ÛÛ¤éø ›÷Û醩ÛÛ ÍÛÈÛÙ ÐüܬۿÛÛÁõÛé, ÍÛÛµÛ¶ÛÛé, ܶÛÉÛÛ¶Ûà…Ûé, -−ùùÛéÁõ¦øà…Ûé, ¸ÛÛÅÛ”Û ÜÈÛ•ÛéÁéõ ¸ÛäÁõÛ ¸ÛÛ¦øÈÛÛ …¶Ûé ÅÛÛÈÛÈÛÛ ÅÛ† ›÷ÈÛÛ ¾ÛÛ¤éø¶ÛÛé ”Û˜ÛÙ 5¨Û ¸ÛÛé©Ûé ÈÛé¥øÈÛÛé ›÷Û醅é, ©Ûé¾Û›÷ ©Ûé Ûé કõÛ¾Û¶Ûä× ¾ÛÛ5 …•ÛÁõ ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û¶Ûä× ¾ÛÛ5 ÅÛéÈÛÛ ÈÛ›÷¶Û કõÁõÈÛÛ …•ÛÁõ કõÛ¾Û¶ÛÛ …ÛÅÛé”Û¶Ûé (Linecut) કõÁõÈÛÛ¾ÛÛ× ›÷é ÍÛÛµÛ¶Û¶Ûà ›÷ÂúÁõ 5¦éø ©Ûé ક×õ† 5¨Û ”Û˜ÛÙ ÅÛàµÛÛ ÈÛ•ÛÁõ …Û5ÈÛà ›÷Û醅é. કõÛ醶ÛÛ ›÷Û¶Û¾ÛÛÅÛ¶Ûé ¶ÛäકõÉÛÛ¶Û ¶Û 5ÐüÛê Ûé ©Ûé ÍÛÛÂú ›÷Û醩Ûà ÈÛÛ¦ø …¶Ûé ¼Û«Ûà…Ûé¶Ûà •ÛÛé¥øÈÛ¨Û કõÁõÈÛà 5¦øÉÛé. ÍÛ•ÛÈÛ¦øÛé ¶ÛÐüá ÁõÛ”ÛÈÛÛ ¼Û−ùÅÛ ù−ùÁéõકõ ”ÛÛ¾Ûà ù−ùà¥ø ÁõÛé›÷¶ÛÛ ÄÛ.2/- ¬Ûà ÄÛ.5/- ÍÛäµÛà¶ÛÛé −ù×ù¦ø કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé, ”ÛÛ¾Ûà

Page 17: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 17

INVITEE SIGNATURE BIDDER

¼Û−ùùÅÛ¶Ûà ÍÛæ Û¶ÛÛ …Û¸¿ÛÛ ÜÍÛÈÛÛ¿Û 5¨Û ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û ©ÛÁõºõ¬Ûà ©Ûé ¼ÛùÅÛ¶Ûà È¿ÛÈÛͬÛÛ કõÁõà ©Ûé¶ÛÛé ”Û˜ÛÙ કõÛ鶤ÖøÛકõ¤øÁõ¶ÛÛ ¼ÛàÅÛ¾ÛÛ׬Ûà ÈÛÍÛæÅÛ કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. (ͤéø.કõ.¥ø.¶Û×. 807/©ÛÛ.29-11-63 ¬Ûà ¾Û×›ä÷Áõ) ©Ûé¾Û›÷ કõÛ¾Û Š5Áõ é−ùù”ÛÁéõ”Û ÁõÛ”Û¶ÛÛÁõ ¾ÛÐüÛ¶Û•ÛÁõ¸ÛÛÜÅÛકõÛ¶ÛÛ ¾ÛÐéüકõ¾Û …•ÛÁõ કõÛ¾Û કõÁõ¶ÛÛÁõ ¾Û›ä÷ÁõÛé ¸Ûíકõà કõÛ醶Ûé 5¨Û ¾ÛÉÛà¶Û¬Ûà …•ÛÁõ †©ÛÁõ કõÛé†5¨Û ¸ÛóકõÛÁéõ …કõ;ÛÛ©Û ¬Û† ¶ÛäકõÉÛÛ¶Û ¬ÛÉÛé ©ÛÛé ©Ûé¶Ûà ©Û¾ÛÛ¾Û ›÷ÈÛÛ¼Û−ùùÛÁõà †›÷ÛÁõ-−ùùÛÁõ¶Ûé ÉÛàÁéõ ÁõÐéüÉÛé. …ÛÈÛÛ ¸ÛóÍÛוÛé –−ùùÛÈÛÛé …•ÛÁõ ºõÜÁõ¿ÛÛù ¬ÛÉÛé ©ÛÛé ©Ûé¶ÛÛé ¼Û˜ÛÛÈÛ કõÁõÈÛÛ¾ÛÛ …•ÛÁõ ¶¿ÛÛ¿Û¶Ûà …-ù−ùÛÅÛ©Û¾ÛÛ× ÅÛ¦øÈÛÛ ¾ÛÛ¤éø ”Û˜ÛÙ ©Ûé ©Ûé Ûé ÍÛÛêÍÛÈÛÛé 5¦øÉÛé …¶Ûé ©Ûé ¾ÛÛ¤éø ¶ÛäકõÉÛÛ¶Ûà …•ÛÁõ ”Û˜ÛÙ …Û5ÈÛÛ Ðäüકõ¾Û ¬ÛÛ¿Û ©Ûé …Û5ÈÛÛé 5¦øÉÛé.

21) ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûà ÅÛéÜ”Û©Û ÍÛ×¾ÛÜ«Û ÈÛ•ÛÁõ ¼Ûà›÷Û ¶ÛÛ¾ÛÛé¾ÛÛ× ¼Û−ùùÅÛÛé કõÁõà ÉÛકõÛ¿Û

¶ÛÐüá …•ÛÁõ ¼Ûà›÷Û †›÷ÛÁõ−ùùÛÁõ¶Ûé ¸Ûé¤øÛ †›÷ÛÁõÛé …Û¸Ûà ÉÛકõÛ¿Û ¶ÛÐüá. …Û ¸Ûó¾ÛÛ¨Ûé ÍÛ×¾ÛÜ«Û કõÁõà ÅÛàµÛÛ ÈÛ•ÛÁõ†›÷ÛÁ−ùõùÛÁõ ¾ÛÛê ¼ÛùÅÛà કõÁéõ …•ÛÁõ ¸Ûé¤øÛ †›÷ÛÁõÛé …Û¸Ûé ©ÛÛé ©Ûé Ûé †›÷ÛÁõù−ùÛÁõ¶Ûà ÉÛÁõ©Û¶ÛÛé ½Û×•Û કõÁéõÅÛÛé •Û¨ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé …¶Ûé ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ©Ûé Š5Áõ¬Ûà †›÷ÛÁõÛé Á−ùõÕù કõÁõà ÉÛકõÉÛé …¶Ûé †›÷ÛÁõù−ùÛÁéõ ½ÛÁéõÅÛà ©ÛÛÁõ¨Û ¸Ûé¤éø Áõ›ä÷ કõÁéõÅÛÛ …¶ÛÛ¾Û©Û ¾ÛÐüÛ¶Û•ÛÁõ¸ÛÛÜÅÛકõÛ¾ÛÛ× ›÷¾Ûé ¬ÛÈÛÛ ¸ÛÛªÛ ¬ÛÉÛé …¶Ûé ©Ûé ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶Ûé ÍÈÛÛµÛà¶Û ÁõÐéüÉÛé …¶Ûé †›÷ÛÁõù−ùÛÁéõ …éકõ¥øÛ કõÁéõÅÛ ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û¬Ûà …•ÛÁõ ©Ûé ¾ÛÛ¤éø ¾ÛÛ¬Ûé ÅÛàµÛéÅÛà ›÷ÈÛÛ¼Ûù−ùÛÁõà †›÷Ûù−ùÛÁõ¶Ûé ¶ÛäકõÉÛÛ¶Û ¬ÛÛ¿Û ©Ûé ¾ÛÛ¤éø ÈÛÇ©ÛÁõ ¾ÛÛוÛÈÛÛ¶Ûà Ðüકõકõ ©Ûé¶Ûé ÁõÐéüÉÛé ¶ÛÐüá.

22) ½ÛÛÈÛ5ªÛÛé Š5Áõ ›÷é †ÍÛ¾ÛÛé ÍÛÐüà કõÁéõ ©Ûé¾Û¶Ûà ›÷ÈÛÛ¼Ûù−ùÛÁõà¬Ûà ¾ÛצøǶÛÛ ½ÛÛ•ÛàùÛÁõÛé¾ÛÛ× ºéõÁõºõÛÁõ ¬ÛÈÛÛ¬Ûà ¶Ṳ̂ø

¬Û©Ûà ¶Û¬Ûà …ÛÈÛÛ ºéõÁõºõÛÁõ ¼ÛÛ¼Û©Û †›÷ÛÁõ−ùùÛÁéõ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûé ÅÛéÜ”Û©Û ”Û¼ÛÁõ …Û5ÈÛà ›÷Û醅é. 23) કõÛ¾Û ¸ÛäÂ×ú કõÁõÈÛÛ ¾ÛÛ¤éø ©ÛÛÁõ¨Û કõÁõÈÛÛ ¾ÛäકéõÅÛà …¶ÛÛ¾Û©Û¶Ûà Áõકõ¾Û …é¤øÅÛé કéõ 2% ¾Ûä›÷¼Û¶Ûà …¶ÛÛ¾Û©Û કõÛ¾Û ¸ÛäÂ×ú

¬Û¿ÛÛ 5™öà ™öéÈÛ¤ø¶ÛÛé ÜÐüÍÛÛ¼Û ¬Û† કõÛ¾Û ¸ÛäÂ×ú ¬ÛÈÛÛ¶ÛÛé −ùùÛ”ÛÅÛÛé ¾ÛÆ¿ÛÛ 5™öà 5Áõ©Û કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. ¶ÛÜÈÛ¶Û કõÛ¾ÛÛé ¾ÛÛ¤éø કõÛ¾Û ¸ÛäÂú ¬Û¿ÛÛ 5™öà …éકõ ÈÛÌÛÙ ÍÛäµÛà કõÛ¾Û¶Ûà ¼Ûé ¤øકõÛ¶Ûà …¶ÛÛ¾Û©Û ¾ÛÐüÛ¶Û•ÛÁ ÍÛéÈÛÛ ÍÛ−ù¶Û ©ÛÁõºõ ÁõÛ”Ûà ¾ÛäકõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. …Û ÉÛÁõ©ÛÛé ”ÛÛÍÛ ÍÛ× Ûæ ÛÙ −ùùäÁõÍ©Ûà¶ÛÛ કõÛ¾ÛÛé¶Ûé ÅÛÛ•Ûä કõÁõÈÛà ¶ÛÐüá ©Ûé ¼Ûù−ùÅÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà ¾Ûä”Û©¿ÛÛÁõ ™öé.

24) ›÷Ûé કõÛ¾Û ¸ÛäÂú ¬Û¿ÛÛ¶Ûà ©ÛÛÁõà”Û¬Ûà …éકõ ÈÛÌÛÙ ¾Ûäù−ù©Û −ùÁõ¾¿ÛÛ¶Û ¬Û¿ÛéÅÛ કõÛ¾Û¾ÛÛ× †›÷ÛÁõ−ùùÛÁõ ÍÛ«ÛÛ ¼ÛÐÛÁõ¶ÛÛ કõÛÁõ¨ÛÛé¶Ûé ÅÛ†¶Ûé ¶ÛÐüá 5Áõ©Ûä કéõÈÛÇ ©Ûé¶Ûà કõÍÛæÁõ ”ÛùÁõÛ¼Û કõÛ¾Û•ÛàÁõà …¬ÛÈÛÛ ”ÛÁõÛ¼Û õ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û¶ÛÛé Š5¿ÛÛé•Û કõ¿ÛÛÙ¶ÛÛé ÍÛ¼Û¼Û¬Ûà ક×õ† ”ÛÛ¾Ûà ›÷¨ÛÛ† …ÛÈÛé ©ÛÛé †›÷ÛÁ−ùùÛÁõ¶Ûé ”Û˜Ûë …¶Ûé ›÷Ûé”Û¾Ûé −ùäùÁõÍ©Û કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé …¶Ûé ¬Û¿ÛéÅÛÛé ”Û˜ÛÙ †›÷ÛÁ−ùõùÛÁõ¶Ûé ›÷é Áõકõ¾Û …−ùùÛ ¬ÛÈÛÛ¶Ûé ¸ÛÛªÛ ¬Û† ÐüÛé¿Û ©Ûé¾ÛÛ׬Ûà ÈÛÍÛæÅÛ કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé.

25) †›÷ÛÁõÛ¬Ûà ¬Û©ÛÛ× કõÛ¾ÛÛé¶Ûé ©Ûé ¾Ûäù−ù©Û −ùÁõ¾¿ÛÛ¶Û ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ ¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶Ûà Ðüકäõ¾Û©Û ¶Ûà˜Ûé

•Û¨ÛÛÉÛé …¶Ûé ¶ÛäકõÉÛÛ¶Ûà ÉÛÁõ©ÛÛé …¶Ûé કõÛ¾Û•ÛàÁõà …¶Ûé ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û¶ÛÛ •Ûä Ûù−ùÛéÌÛ¶Ûà ¼ÛÛ¼Û©Û¾ÛÛ× ©Ûé¾Û¶ÛÛé ܶۨÛÙ¿Û ™öéÈÛ¤ø¶ÛÛé …¶Ûé ¼Û×µÛ¶ÛકõÛÁõકõ •Û¨ÛÛÉÛé.

26)›÷é કõÛ¾Û¶Ûà ¼ÛÛ¼Û©Û¾ÛÛ× ÉÛÁõ©ÛÛé ¾ÛäકõÁõÁõ કõÁõÈÛÛ¾ÛÛ× …ÛÈÛéÅÛà ¶Û ÐüÛé¿Û ©Ûé કõÛ¾ÛÛé ÍÛ× Ûæ ÛÙ Áõà©Ûé ¾ÛÐüÛ¶Û•ÛÁõ¸ÛÛÜÅÛકõÛ¶ÛÛ

¼ÛÛ×µÛકõÛ¾Û …ܵÛકõÛÁõà¶ÛÛ ›÷ÂúÁõà¿ÛÛ©Û …¶Ûé ÍÛæ Û¶ÛÛ ¸Ûó¾ÛÛ¨Ûé કõÁõÈÛä× 5¦øÉÛé.

27)”ÛÛ¨ÛÛé¶Ûà ÍÛÈÛÙ ÅÛÛ•Û©Û, ÁõÛé¿ÛŤøà ›÷કõÛ©Û …¶Ûé …éÈÛÛé ¼Ûà›÷Ûé ”Û˜ÛÙ ©Ûé ¼ÛÛ¼Û©Û ”ÛÛÍÛ ŠÅÅÛé”Û કõÁéõÅÛÛé ¶Û ÐüÛé¿Û ©ÛÛé ©Ûé

†›÷ÛÁõ−ùùÛÁéõ ÈÛé¥øÈÛÛé 5¦øÉÛé. સરકાર�ીના વખતોવખતના લાગ પડતા તમામ ટl Yવા ક ઇ:કમ ટl/

સ<સ ટl/ વટ / સસ ભરવાની જવાબદારી ઇ�રદારની રહશ અન કોપ�રશન �યાર આવા ટl

ભયા#ની પાવતી માગ kયાર રજ કરવાની રહશ, ત 8ગ કામગીરી પણ# થયા બાદ કોઇ ટl બાકી

િનકળશ તો ઇ�રદાર આ ટl ભરવાનો રહશ, અ:યથા તઓની ભરલ અનામતો પોતાના નામ અ:ય

કામગીરી કરવામા આવતા કોપ�રશનના િવભાગો , કોઇ પણ સરકારી , અધ#સરકારી ક ખાનગી

કપનીઓ પાસથી વસલાત કરવાની કાય#વાહી કરી શકાશ. 28)…Û કõÛ¾Û•ÛàÁõà ÍÛ×¼Û×µÛà કõÛé†5¨Û ¸ÛóકõÛÁõ¶Ûà ©ÛકõÁõÛÁõ ÐüÉÛé ©ÛÛé ºõÛ¿Û¶ÛÅÛ ¼ÛàÅÛ/™öéÅÅÛä ¸ÛÛ¤Ùø ¼ÛàÅÛ ¾ÛÆ¿ÛÛ ©ÛÛÁõà”Û¬Ûà

3 ¾ÛÜÐü¶ÛÛ …×−ùÁõ …¾Ûé ¿ÛÛé•¿Û †ÅÛÛ›÷ ÅÛ†ÉÛä×. …Û ¾Ûäù−ù©Û ÜÈÛ©¿ÛÛ ¼ÛÛ−ùù …Û ÍÛ×¼Û×µÛà કõÛé†5¨Û ¸ÛóકõÛÁõ¶ÛÛé ù−ùÛÈÛÛé ˜ÛÛÅÛÉÛé ¶ÛÐüá.

29)†›÷ÛÁõ−ùÛÁõ Ðäüકõ¾Û …Û¸¿ÛÛ ©ÛÛÁõà”Û¬Ûà ™ö ¾ÛÛÍÛ¶Ûà …×−ùÁõ ÍÛ× Ûæ ÛÙ કõÛ¾Û•ÛàÁõà ¸Ûíકõà¶ÛÛ કõÛé†¸Û¨Û ¸ÛÛ¤Ùø ½ÛÛ•Û¶Ûà

કõÛ¾Û•ÛàÁõà કõÁõÈÛÛ¶Ûà ÍÛÛ†¤ø …Û¸ÛÈÛÛ¾ÛÛ× ¶Û ¾ÛÇé ©ÛÛé †›÷ÛÁõ−ùÛÁõ કõÁõÛÁõ¾ÛÛ׬Ûà ¾Ûäકõ©Û ¬ÛÈÛÛ¶Ûà ¾ÛÛוۨÛà કõÁéõ …¶Ûé ©Ûé ¸Ûó¾ÛÛ¨Ûé †›÷ÛÁõ−ùÛÁéõ ÅÛé”Ûà©Û ¾ÛÛוۨÛà કõÁéõ¬Ûà ©Ûé …×•Ûé ÍÛ“Û¾Û …ܵÛકõÛÁõà ¾ÛÛוۨÛà¶Ûà ¿ÛÛé•¿Û©ÛÛ ›÷¨ÛÛ¿Û ©ÛÛé

Page 18: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 18

INVITEE SIGNATURE BIDDER

½ÛÁéõÅÛ …¶ÛÛ¾Û©Û¶Ûà Áõકõ¾Û ¸ÛÁõ©Û કõÁõà કõÁõÛÁõ¾ÛÛ׬Ûà ¾Ûäકõù©Û કõÁõà ÉÛકõÛÉÛé …ÛÈÛÛ ÜકõÍÍÛÛ¾ÛÛ× †›÷ÛÁõ−ùÛÁéõ કõÁéõÅÛ ”Û˜ÛÛÙ…Ûé¶Ûä× ÈÛÇ©ÛÁõ ¾ÛÛוÛà ÉÛકõÉÛé ¶ÛÐüá.

30)†›÷ÛÁõ−ùÛÁéõ ÈÛ¸ÛÁõÛÉÛ¾ÛÛ× ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛ©ÛÛ ©Û¾ÛÛ¾Û ¾Û¤øàÁõà¿ÛÅÛ¶Ûà ½ÛÛÈÛ¸ÛªÛ ¾Ûä›÷¼Û ¤éøͤøá•Û કõÁõÛÈÛà ÅÛéÈÛÛ¶Ûà

›÷ÈÛÛ¼Û−ùÛÁõà ©Ûé…Ûé¶Ûà ÁõÐéüÉÛé ›÷Ûé ¤éøͤøá•Û કõÁõÛÈÛÈÛÛ¾ÛÛ× ¶Û …ÛÈ¿Ûä× Ðü¿Û ©ÛÛé ÍÛ“Û¾Û …ܵÛકõÛÁõà ¶Ûકõકõà કõÁéõ ©Ûé ¾Ûä›÷¼Û કõÛ¾Û•ÛàÁõà ¬Û¿ÛÛ ¸Û™öà¶ÛÛ ¤éøͤøá•Û …¶Ûé …éÈÛà કõÛ¾Û•ÛàÁõà¶Ûé ¿Û¬ÛÛÈÛ©Û ÜͬÛÜ©Û¾ÛÛ× ÅÛÛÈÛÈÛÛ¶Ûà ›÷ÈÛÛ¼Û−ùÛÁõà †›÷ÛÁõ−ùÛÁõ¶Ûà ÁõÐéüÉÛé …¶Ûé ©Ûé¶ÛÛé ”Û˜ÛÙ ¸Û¨Û ©Ûé…Ûé…é ½ÛÛé•ÛÈÛÈÛÛ¶ÛÛé ÁõÐéüÉÛé …¬ÛÈÛÛ ÍÛ“Û¾Û …ܵÛકõÛÁõà ¤éøͤøá•Û ÈÛ•ÛÁõ કõÁéõÅÛ કõÛ¾Û•ÛàÁõà¶Ûä× કõÛé†¸Û¨Û ˜ÛäકõÈÛ¨Ûä× ¶Û કõÁõÈÛÛ Ü¶Û¨ÛÙ¿Û કõÁõà ÉÛકõÉÛé.

3૧) કõÁéõÅÛ કõÛ¾Û•ÛàÁõà¶Ûä× ˜ÛäકõÈÛ¨Ûä× કõÁõÈÛÛ ¾ÛÛ¤é ÍÛÛ¾ÛéÅÛ ¸ÛªÛકõ/¼ÛàÅÛ ¾Ûä›÷¼Û †›÷ÛÁõ−ùÛÁõ¶Ûà ¼ÛàÅÛ¶Ûä× ˜ÛäકõÈÛ¨Ûä×

કõÁõÈÛÛ¶Ûà ¾ÛÛוۨÛà …ÛÈ¿ÛÛ ¼ÛÛ−ù ›÷ ¼ÛàÅÛ¶Ûà ˜ÛäકõÈÛ¨Ûà¶Ûà કõÛ¿ÛÙÈÛÛÐüà કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé.

3૨) …Û Š¸ÛÁõÛ×©Û †›÷ÛÁõ−ùÛÁéõ ÍÛÛ¾ÛéÅÛ ¶Û¾Ûä¶ÛÛé ¾Ûä›÷¼Û¶ÛÛé કõÁõÛÁõ કõÁõÈÛÛ¶ÛÛé ÁõÐéüÉÛé.

3૩) †›÷ÛÁõ−ùÛÁéõ કõÛ¾Û•ÛàÁõà¶Ûà ›÷é¤øÅÛà ÍÛÛ†¦ø ”ÛäÅÅÛà ÐüÛé¿Û …é¤øÅÛé કéõ −ù¼ÛÛ¨Û /ÍÛ× ÛÛ−ù¶Û ક éõ …¶¿Û કõÛé† ÍÛÜÈÛÙÍÛ

ÅÛÛ†¶Û¶Ûà ¶Û¦ø©ÛÁõÄõ¸Û કõÛ¾Û•ÛàÁõà ÜÍÛÈÛÛ¿Û કõÛé† …¦ø˜Û¨Û ¶Û ÐüÛé¿Û ©ÛéÈÛä× ©Û¾ÛÛ¾Û કõÛ¾Û Ü¶ÛÜÊ˜Û©Û ÍÛ¾Û¿Û

¾Û¿ÛÛÙ−ùÛ¾ÛÛ×›÷ ¸Ûä ÛÙ કõÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé.

34) ˆ›÷ÛÁõ−ùÛÁõ µÈÛÛÁõÛ કõÛ¾Û•ÛàÁõà¶ÛÛé ÈÛÙકõ …Ûé¦Áõ …Û¸¿ÛÛ ¼ÛÛ−ù કéõ કõÁõÛÁõ કõ¿ÛÛÙ ¼ÛÛ−ù ક éõ ͬÛÇé કõÛ¾Û•ÛàÁõà ÉÛÂú કõ¿ÛÛÙ

¼ÛÛ−ù- ( …Û ªÛ¨Ûé ¸Ûíકõà ›÷é ¸Ûó¬Û¾Û ¬ÛÛ¿Û) ½ÛÁéõÅÛ ½ÛÛÈÛ¸ÛªÛ ¶Ûà ÉÛÁõ©ÛÛééõ ક કõÁõÛÁõ¶Ûà ÉÛÁõ©ÛÛé ક ¸ÛªÛÛé µÈÛÛÁõÛ

…Û¸ÛéÅÛ ÍÛ×¾Û©Ûà…Ûé ¶ÛÛé ½Û×•Û ¬ÛÛ¿Û ©ÛÛé ÍÛ“Û¾Û …ܵÛકõÛÁõà ક éõ ©Ûé¶ÛÛ ¸Ûó©Ûà¶ÛàµÛà ³ùÛÁõÛ ¸ÛóÛ¬ÛܾÛકõ …éકõ …¶Ûé

ÈÛµÛÛÁéõ¾ÛÛ ÈÛµÛÛÁéõ ªÛ¨Û ÍÛä Û¶ÛÛ …Û¸Û¿ÛÛ ¼ÛÛ−ù, ÍÛä Û¶ÛÛ ¶ÛÛé …¾ÛÅÛ ¶Û ¬ÛÛ¿Û ©Ûé ÍÛ×›÷Ûé•ÛÛé¾ÛÛ ˆ›÷ÛÁõ−ùÛÁõ¶Ûé કõÁéõÅÛÛ

કõÛ¾Û ¶Ûä ¿ÛÛé•¿Û ›÷¨ÛÛ¿Û ©Ûé¤øÅÛä …Ûé™äö ˜ÛäકõÈÛ¨Ûä ક કõÛé ¸Û¨Û ˜ÛäકõÈÛ¨Ûä ¶Û કõÁõÈÛÛ¶Ûä કéõ ˆ›÷ÛÁõ−ùÛÁéõ ½ÛÁéõÅÛ ©Û¾ÛÛ¾Û

…¶ÛÛ¾Û©ÛÛé ›÷¸©Û કõÁõÈÛÛ¶Ûä કéõ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û¶ÛÛ કõÛé ¸Û¨Û કõÛõ¾ÛÛé¾ÛÛ¬Ûà …ÛÈÛà ÈÛÍÛäÅÛÛ©Û ˆ›÷ÛÁõ−ùÛÁõ

¸ÛÛÍÛé¬Ûà કÁõà ÉÛકõÉÛé …¶Ûé …Û Š¸ÛÁõÛ×©Û ˆ›÷ÛÁõ−ùÛÁõ¶Ûé કõÛÇà ¿ÛÛ−ùà ¾ÛÛ ¾Ûäકõà ÉÛકõÉÛé. કõÛÇà ¿ÛÛ−ùùà¾ÛÛ× ¾Ûäકõà¶Ûé

ÍÛÁõકõÛÁõËÛà, …µÛÙ ÍÛÁõકõÛÁõà ÍÛ×ͬÛÛ¾ÛÛ× ©Ûé¾Û›÷ કéõ¶®ù ÍÛÁõકõÛÁõ¶Ûà કõ˜ÛéÁõà¾ÛÛ× ›÷Û¨Û કõÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. કõÛ¿Ûù−ùÛકõà¿Û

¸Û•ÛÅÛÛ…Ûé¾ÛÛ× ºõÛé›÷ù−ùÛÁõà કõÛ¿ÛÙÈÛÛÐüà¶ÛÛé ¸Û¨Û ÍÛ¾ÛÛÈÛéÉÛ ¬ÛÛ¿Û ™öé.

૩૫ વડોદરા મહાનગર સવા સદનમા ર3$bશન ન ધરાવતા ઇ�રદાર વક# ઓડ#ર મ�ય િદન-૩૦ મા

વડોદરા મહાનગર સવા સદનન ર3$bશન મળવી લવાન/રી:ય કરાવી લવાન રહશ.

૩૬ ઇ�રદાર સદર કામ બાધકામની િવગતો તથા $પસીફીકશન દશા#વતા બોડ# કામના $થળ $વખચ�

મકવાના રહશ.

½ÛÛÈÛ5ªÛ õભભભભÁõ¶ÛÛÁõ †›÷ÛÁõù−ùÛÁõ …•ÛÁõ ½ÛÛ•Ûà−ùùÛÁõÛé¶Ûà ÍÛÐüà

¾Û©Ûä õકકકકÁõ¶ÛÛÁõ †›÷ÛÁ−ùõùÛÁõ ½ÛÛ•Ûà−ùùÛÁõÛé¶ÛÛ ÍÛÛ¬Ûà−ùùÛÁõÛé¶Ûà ÍÛÐüà Âú¼ÛÂú

¾¿ÛäܶÛÜÍÛ5ÅÛ કકકકõܾÛɶÛÁõ ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛé ÜÍÛ�ો�ો�ો�ો

ÈÛ¦øÛéù−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛé સી�ોસી�ોસી�ોસી�ો

Page 19: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 19

INVITEE SIGNATURE BIDDER

VADODARA MAHANAGAR SEVA SADAN

INSTRUCTION TO TENDERERS

1. The Tenderers are advised to inspect the site of works and be fully acquainted with the

site conditions which may be necessary for the purpose of submitting the tender and for

executing the work. If requested in advance and in writing department will arrange to

visit the site of work.

2. In the event of the tender being submitted by the firm, it must be signed by all the

partners or by any partner who has been specifically authorize under the Partnership

deed to sign and execute contracts on behalf of the firm or by any person holding a

Power of Attorney authorized him to sign and execute the contract on behalf of the firm.

[The Authority letter is required to be enclosed along with the Tender].

3. Receipts for payments made on account of any work, when executed by a firm, can be

signed by any of the partners of the firm or any other person authorized by the firm

under a Power of Attorney of give effectual receipt for and on behalf of the firm.

4. The tender shall be filled in strictly according to columns prescribed in the tender stating

the rates at which tenderers are willing to undertake each time of work. Any

modifications or additions in the item of works or in any other part of the tender made by

the Tenderer will not be accepted.

5. The VMC shall have the right to reject all or any of the tenders without assigning any

reason for such rejection.

6. Measurements for all the works shall be taken by standard measures available with the

VMC and practice and rules framed by the VMC from time to time.

7. The tenderers are required to quote only firm rates and any condition attached to the

rates quoted by them is likely to disqualify the tender for evaluation and consideration for

award of the work.

8. The tenderers are advised to send their tender by Registered / Speed post so that

tender reaches to VMC on or before the due date. Any tender received after due date

shall not be considered.

9. Tender not accompanied by Earnest Money in the manner provided in the tender notice

shall not be considered. Amount of earnest money shall not bear any interest and will

be refundable to the Tenderer, if tender is not accepted.

10. Tender shall be filled in and signed only by the duly authorized person or persons of the

Tenderer. If at any item during security and finalisation of the tenders, it is found that

Page 20: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 20

INVITEE SIGNATURE BIDDER

any tender or tenders are signed by the persons who are not duly authorized then the

earnest money received with such tender shall stand forfeited.

11. Tenderer shall have to pay Security Deposit in the time and manner prescribed under

Clause 1 of the General Conditions of Contract.

12. Successful Tenderer shall keep all documents ready for signing “Agreement with the

VMC”. Tenderer will have to make himself/itself available at fifteen days notice for

executing such Agreement. The tenderers are advised to carefully study the various

conditions of he contract, work specification, site conditions, VMC’s rules and regulations

with regards to safety and security, etc.

13. The prices in tender shall be filled in English with neat handwriting and all the figures

and words shall be legible. No overwriting shall be done. In case any cancellation or

correction is required, the figure or word shall be wholly crossed and re-written and

authenticated under with initial/s of the Tenderer. Rate shall be written for each item and

the total amount for each item shall be properly calculated and clearly mentioned in the

relevant columns. All such amounts shall be signed by the Tenderer.

14. Tenderer shall submit along with the tender a list of equipment which he proposes to use

for this work.

15. Tendered rates shall include all the material, taxes, labour and requirements of plants,

machinery, equipment, supervision, handling, cleaning, testing etc. (whether mentioned

in the item or specifications etc. or not) which is required and necessary to complete the

item.

16. The tenderers are advised to read together with the specifications including materials

and drawings, as specifications are complimentary part of the item. Items for which

details are not given or are given inadequately reference will be taken from ISI

specifications or MORTH or PWD handbook. Such details shall be deemed to have

been included in the item and the rates quoted shall be all inclusive. Whether mentioned

in the item or not material test as may be required by the Additional City Engineer of

VMC shall be provided and no extra payment will be made for that purpose.

17. Specifications are given for certain numbers of items only. However, the items for which

the specifications are not prescribed but which are relevant to these specifications shall

also be executed in accordance with such specifications.

18. Suitable number of photographs and negatives shall be supplied free of cost to the VMC

every month for the progress of various stages of the works.

19. Tenders are required to quote separate prices of different items of work exactly as per

price schedule given in volume of tender document. No change in format is acceptable.

Quoting for all items is also mandatory.

20. Validity of tenderer’s proposal shall be 120 days from the date of opening of price bid or

last negotiation date if at all allowed.

21. ALL PAGES TO BE INITIALED

All signature in Tender documents shall be dated as well as pages of all sections of

Tender documents shall be initialed at the lower right hand corner or signed wherever

required in the Tender papers by the Tenderer or by any person holding power of

Attorney authorizing him to sign on behalf of the Tenderer before submission of Tender.

22. Clause Deleted.

23. EVALUATION OF TENDER’S PRICE BID

Page 21: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 21

INVITEE SIGNATURE BIDDER

Any error in quantity or amount in Price bid of tender form showing items of works to be

carried out shall be adjusted in accordance with the following rules :

i) In the event of a discrepancy between description in words and figures quoted by a Tenderer in the rates column, the description in word shall prevail.

ii) In the event of an error occurring in the amount column of the Schedule B of Tender Form showing items of work as a result of wrong multiplication of the rate and quantity, the unit shall be regarded, as firm and multiplication shall be amended on the rate.

iii) All errors in totally in the amount and carrying forward totals shall be corrected.

iv) Any rounding off of amounts against items or in totals shall be ignored.

v) For any item in price bid, the bidder has not quoted the rates (or left blank), it is treated as ‘zero rate’ and all such item shall be considered as executed free of cost.

The tendered sum so altered shall, for the purpose of the tenders be submitted for the

sum originally tendered and considered for acceptance.

24. CORRECTIONS AND ERASURES

All corrections and Alterations in the entries of tender papers will be signed in full by the

Tenderer with date. No erasures or over writings are permissible.

25. SIGNATURE OF TENDERER

The tenderer shall contain the name, residence and place of business of person or

persons making the Tender and shall be signed by the Tenderer with his usual

signature. Partnership firms shall furnish the full names of all the partners in the Tender.

It should be signed in the Partnership’s name by all partners or, by duly authorized

representative followed by the name and designation of the person signing. Tender by a

firm shall be signed by an authorized representatives and a power of Attorney in that

behalf shall accompany, the Tender. A copy of the constitution of the firm with names of

all partners shall be furnished.

26. WITNESS

Witness and sureties shall be persons of status and property and their names,

occupations and address shall be stated below their signature.

27. DETAILS OF EXPERIENCE

The Tenderer should enclose documents to show that he has previous experience in

having successfully completed in the recent past work of this nature together with the

name of Owner’s location of sites and value of contract.

28. ENGINEER OF CONTRACTOR

The contractor, on or after award of the work, shall name and depute a qualified

Engineer having sufficient experience in carrying out works of similar nature, to whom

the equipments, materials, if any shall be issued and instructions for

construction/execution shall be given.

29. TRANSFER OF TENDER DOCUMENTS

Transfer of Tender documents purchased by one intending tenderer to another is not

permissible.

30. EARNEST MONEY DEPOSIT

Page 22: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 22

INVITEE SIGNATURE BIDDER

The tenderer must pay earnest money as given in the notice inviting Tenders and attach

the official receipt, if paid in cash with the Tender, failing which the tender is liable to be

rejected. The earnest money can be paid in the form of Bank Guarantee for a full period

of a work or Demand draft of any nationalizes Bank at Vadodara and shall be in favour

of Municipal Commissioner, Khanderao Market, Vadodara. EMD shall be attached with

the Tender.

NOTE : No interest shall be allowed on the earnest money deposit by Tenderer.

The earnest money of the unsuccessful tender will be refundable within a

reasonable period of the time without any interest.

The earnest money deposit by successful Tenderer will be retained towards the

Security Deposit for the fulfillment of the contract, but shall be forfeited, if the Tenderer

fails to execute the agreement within 15 days after the letter of acceptance of Tender.

31. VALIDITY

Tenders submitted by Tenderers shall remain valid for acceptance for a period of 120

days from the date of opening of price bid or last negotiation date if at all allowed. Any of

the Tenderers shall not be entitled during the said period of 120 days, without the

consent of writing of the owner to revoke or cancel his tender or to vary the tender given

or any terms thereof. In case of tenderer revoking or canceling his tender of revoking

the same or vary any terms in regar to thereof without the consent of owner in writing,

the owner shall forfeit earnest money paid by him along with the Tender.

32. TIME LIMIT – PERIOD OF COMPLETION

The period of completion shall be calculated from the date of issue of any notice to

proceed with the work i.e. issue of work order. Any extension of time limit demanded by

contractor for their reason, shall not entitle for any price escalation/delay compensation

or liquidity damages.

33. ADDENDA

Addenda to the Tender documents may be issued prior to the date of opening of

Tenders to clarify documents or to reflect modifications in the design or contract terms.

Each addendum issued by the Engineer in charge will be distributed in duplicate to each

person or organization to whom a set of Tender documents has been issued.

Each recipient will retain one copy of each addendum for submission along with his

tender and return one singed copy to the Engineer-in-charge shall become part of

Tender documents.

34. RIGHT OF OWNER TO ACCEPT OR REJECT TENDER

The acceptance of Tender will rest with the Owner. The Owner however, does not bind

itself to accept the lowest tender and reserves to itself the authority to reject any or all

the Tenders received without assigning any reason whatsoever. The whole work may

be split up between two or more contractors or accepted in part and not entirely, if

considered expedient.

Tender in which any of the particulars and prescribed informations are missing or are

incomplete in any respect and/or the prescribed conditions are not fulfilled are liable to

be rejected.

Canvassing in connection with tender is strictly prohibited and tenders submitted

by the tenderers, who resort to canvassing will be liable to rejection.

35. Security Deposit

Page 23: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 23

INVITEE SIGNATURE BIDDER

The person / persons whose tender may be accepted (hereafter called the

contractor) shall within 7 days of receipt by him of the notification of the

acceptance of the tender or issuance of workorder, shall submit the security

deposit on the accepted value of the Tender to the Vadodara Municipal

Corporation.

36 The successful Tender shall be required to execute an agreement 7 days from the date

of issue of the notice of acceptance of tender. In the event of failure on the part of the

successful tenderers to sign the agreement within the above stipulated period, the

earnest money or his initial security deposit shall be forfeited and the acceptance of the

tender shall be considered as cancelled.

37 In the event of progress of work by the contractor, without executing the contract

agreement, the responsibility with all risk and cost shall be of contractor.

38 The successful Tenderer will be required to sign the contract agreement on a stamp

paper of the value as per prevailing norms of VMC. Alternatively, if the Tenderer wishes

to sign the agreement, the same be adjudicated by the State Level Authority competent

to do so.

39 It is responsibility of tenderer to get authorized copy of tender documents, map etc so

that during the time of execution of work contractor can proceed with work and all time

the details of work is known to the contractor.

40 The bidder shall have to submit resource/activity chart of whole work divided in minimum

10 activities justifying the timely completion of work. In case the bidder do not submit

the schedule of work progress, it is mandatory to follow the progress of work as decided

by VMC during execution.

41 The bidder must engage minimum one graduate engineer who will remain present at all

time during progress of work & he has to specify the engineer’s name on their payroll,

who will remain available during execution of work on same site.

Page 24: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 24

INVITEE SIGNATURE BIDDER

VADODARA MAHANAGAR SEVA SADAN

General Conditions Of Contract

DEFINITION OF TERMS :-

In the Contract documents as hereinafter defined the following words & expression shall

have the meanings hereby assigned to them except where the context otherwise requires:-

1. “The Owner or Employer”, means the Municipal

Commissioner Vadodara Municipal Corporation, Vadodara which may abbreviated as

“VMSS” and includes the Owner’s or Municipal Commissioner, VMSS’s authorized

representatives or successors.

2. The abbreviation VMSS wherever used in contract shall mean Vadodara Municipal

Corporation and term shall be used to in place of authorized person or persons who will

be operating this contract as VMSS’s representative and will include namely Municipal

Commissioner, Additional City Engineer and Executive Engineer or their authorized

representatives.

3. The “Additional City Engineer”, shall means the Additional City Engineer of Vadodara

Municipal Corporation and shall include those who are expressly authorized by him to

act on his behalf.

4. The “Executive Engineer”, shall means the Executive Engineer of Vadodara Municipal

Corporation, who is incharge of the project and shall include those who are expressly

authorized him to act for and on his behalf.

Page 25: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 25

INVITEE SIGNATURE BIDDER

5. The “Engineer in charge”, shall means the Deputy Executive Engineer of Vadodara

Municipal Corporation, who is incharge of the project and shall include those who are

expressly authorized him to act for and on his behalf.

6. “The Contractor”, means the person or persons, firm or Company whose tender has

been accepted by the Owner and include the Contractor’s legal representatives, his

successor and permitted assignees.

7. The term “Work or Works” of the contract shall mean all of the various classes of

works to be executed in accordance with the contract, whether temporary or permanent,

and include all labour and material, machinery, instruments, construction equipment,

plant, plant operation and maintenance, all tools and all other items required for the

completion of the construction. It shall also mean the place of working, where the

context so includes.

8. “Contract”, shall mean the Agreement between the VMSS and the contractor for the

execution of works including therein all contract documents like Condition of Contract,

Specification, Drawings, Prices Bill, Schedule of quantities, Schedule of rates and prices

(if any), work order and all tender .

9. The “Contract Price”, means the sum named in the Tender subject to such additional

there to or deduction there from as may be under the provisions hereinafter the

contained.

10. “Construction Plant”, means all machinery, tools, appliances or thing of whatsoever

nature required for the execution, completion or maintenance of the works or temporary

works (as hereinafter defined) but does not include materials or other things form or

forming part to the permanent work.

11. “Temporary Works”, means all temporary works of every kind required in or about the

execution, completion or maintenance of the works. The cost of such work associated

with tender is included .

12. “Drawings”, means the drawings referred to in the Specification and any modification

such drawings approved in writing by the Additional City Engineer / Executive Engineer,

Consultant and such other drawings, diagrams, or sketches as may from time to time be

furnished or approved in writing by the Additional City Engineer / Executive Engineer.

13. “Site”, means the land and other places on under in or through which the permanent

works are to be executed or carried out & any other land or places provided by the

Owner for purpose of the contract.

14. Words importing the singular number only also include the plural and vice versa where

the context requires.

15. ”Contract Documents”, means collectively the Tender documents, Designs, Drawings,

Specifications agreed variations if any, contract such other documents constituting the

Tender and acceptances thereof.

Page 26: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 26

INVITEE SIGNATURE BIDDER

16. “The Specification”, shall mean the various technical specifications attached and

referred to in the Tender documents. It shall also include the latest edition of relevant

Indian Standard Specification published before entering into contract. Further in

absence of any specific reference in I.S.S. the standards and specifications of

P.W.D.H.B. or GWSSB as the case may be will be followed as per the consent of

Additional City Engineer.

17. The “Tender”, means the tender submitted by the contractor for acceptances by the

Owner.

18. The “Alternation Order”, means the order given in writing by the Engineer-in-charge to

effect to or deleting from and alternations in the works.

19. The “Completion Certificates”, shall mean the certificate to be issued by the Additional

City Engineer, when the works have been completed to his satisfaction.

CLAUSE 1 SECURITY DEPOSIT

Successful Tender whose proposal will be accepted by the VMSS and who will be referred to as

“Contractor” thereafter will have to deposit an amount equal to five percent of the contract price

as contractual obligation in the mode and schedule as given below :

Amount of Security Deposit payable by the contractor will be 5% of the contract value OR

estimated amount which ever is more and which may include 2% security deposit converted and

remaining 3% may be deducted from running bill.

All compensation and other sum of money payable by the contractor to the V.M.C. under the

terms of this contract may be deducted from or paid by sale of whole or part of security deposit

along with deduction from other payments which may be due or which becomes due to be

payable to the

contractor. Whenever the amount of Security Deposit gets reduced lower than the amount

equal to 5% of contract value the contractor shall make it up equal to 5% of the contract price by

depositing money within 5 days. If the amount of Security Deposit to be paid in lump sum within

the period of 10 days as specified above is not paid tender/contract already accepted shall be

considered as cancelled and legal steps taken against the contractor recovery of the amounts.

The security lodged by a contractor shall be refundable after the final bill & also after providing

performance bank guarantee bond as per clause 40.

CLAUSE 2 : COMPENSATION OF DELAY AND PENALTY DELAY

The time allowed for carrying out the work as entered in the tender shall be strictly observed by

the contractor and shall be reckoned from the date of which the order to commence work is

given to the contractor. The work shall throughout the stipulated period of the contract be

proceeded with, with all due diligence (time being deemed to be of the essence of the contract

on the part of the contract) and the contractor shall pay as compensation and or penalty for

delay. Further contractor shall to ensure good progress during the execution of the work. The

work shall be completed stage wise as per the schedule given at the time of tender submission

Page 27: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 27

INVITEE SIGNATURE BIDDER

(Refer qualification criteria) before award of the job to contractor, and which will form the part of

the contract, failing which intermediate compensation shall be levied. In case contractor have

not submitted it is confirmation the schedule of work progress, on part of contractor follow the

schedule of work decided by VMSS.

In the event of the contractor failing to comply with these conditions of Contract is liable to be

terminated at any stage and / or an amount equal to one half percent of contract amount of

whole work over stipulated time limit shall be levied as a penalty for every week that the delay or

penalty provided always that the total amount of compensation to be paid under the provision of

this clause shall not exceed 10% of the contract value of the work.

The decision of MUNICIPAL COMMISSIONER will be final for all such delay compensation.

CLAUSE 3: ACTION WHEN WHOLE OF SECURITYDEPOSIT IS FORFEITED

In any case in which under any clause of this contract, the contractor shall have

rendered himself liable to pay compensation amounting to the whole of his Security

Deposit (Whether paid in one sum or deducted by installment) or in the case of

abandonment of the work owing to serious illness or death of the contractor or any other

cause, the Additional City Engineer, on behalf of VMSS shall have power to adopt any of

the following courses as man, deemed best suited to the interest of VMSS.

a) To rescinded the contract (of which recession notice in writing to the contractor under

the hand of the executive Engineer shall be conclusive evidence) and in that case, the

Security deposit of the contractor shall stand forfeited and be absolutely at the disposal

of the VMSS.

b) To employ labour paid the VMSS and to supply materials to carry out the work, or any

part of the works, debiting the contractor with the cost of the labour and price of

materials as to the correctness of which cost and price the certificate of the Additional

City Engineer shall be final and conclusive against Contractor and crediting him with the

value of the work done, in all respect in the manner and at the same rate as if it had

been carried out by the contractor under the terms of this contract and in that case the

certificates of the Executive Engineer as to the value of the work done shall be final and

conclusive against the contractor.

c) To order that the work of the contractor be measured up and to take such part thereof as

shall be unexecuted out of his hands, and to give it to another contractor to complete, in

which case, any expenses which may be incurred in excess of the sum which would

have been executed by him (as to the amount of which expenses the certificate in writing

of the Additional City Engineer shall be final and conclusive) shall be borne and paid by

the original contractor and shall be deducted from any money due to him by the VMSS

under the contractor or otherwise or from his security deposit or the proceeds of sale

thereof, of a sufficient part thereof. In the event of any of the above courses being

adopted by the Additional City Engineer the contractor shall have no claim to

compensation for any loss sustained by him by reason of his having purchased, or

prepared any materials, or entered into any engagements, or made any advances on

account of or with a view to execution of the work or the performance of the contract.

And in case of the contract shall be rescinded under the provision aforesaid, the

contractor shall not be entitled to recover or be paid any sum, for any work therefore

actually performed by him under this contract unless and until the Executive Engineer

Page 28: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 28

INVITEE SIGNATURE BIDDER

shall have certified in writing the performance of such work and the amount payable to

him in respect thereof and he shall only be entitled to be paid the amount so certified.

CLAUSE 4 : ACTION WHEN THE PROGRESS OF ANY PARTICULAR PORTION

OF THE WORK IS UNSATISFACTORY

If the progress of any particular portion of the work is unsatisfactory the Additional City

Engineer / Executive Engineer shall, not withstanding that the general progress of the

work is satisfactory in accordance with Clause 2, be entitled to take action under clause

3(b) after giving the contractor 10 days notice in writing and the contractor shall have no

claim for compensation for any loss sustained by him owing to such action.

CLAUSE 5: CONTRACTOR REMAINS LIABLE TO PAY COMPENSATION, IF ACTION NOT

TAKEN UNDER CLAUSE 3 POWER TO TAKE POSSESSION OF OR REQUIRE

OF OR SELL CONTRACTOR PLANT AND MATERIAL

In any case in which any of powers conferred upon the Additional City Engineer by

Clause 3 and 4 hereof shall have become exercisable and the same not have been

exercised, the non-exercise thereof and such powers shall not constitute a waiver of any

of the conditions thereof and such powers shall not withstanding be exercisable in any

future case of default by the contractor for which by any clause or clauses thereof he is

declared liable to pay compensation amounting to the whole of his security deposit and

the liability of the contractor for past and future compensation shall remain unaffected.

In the event of the Additional City Engineer taking action under sub clause (a) or (c) of

Clause 3, he may, if he so desires, take possessions of all or any tools, plant, materials

and stores in upon the works or the site thereof of belonging to the contractor or

procured by him and intended to be used for the execution of the work or any part

thereof paying or allowing for the same in the account of the contract rates or in the case

of contract rates not beings applicable at current market rates, to be certified by the

Executive Engineer whose certificates thereof shall be final. In the alternative the

Additional City Engineer may be notice in writing to the contractor of his works foreman

or other authorized agent require him to remove such tools plants, materials or stores

from his premises within a time to be specified in such notice and in the event of the

contractor failing to comply with any such requisition, the Additional City Engineer may

remove them at the contractor’s expense or sell them by auction or private sale at the

risk and cost of the contractor in all respect, and the certificate of the Executive Engineer

as to the expense of any such removal, and the amount of the proceeds and expenses

of any such sale shall be final and conclusive against the contractor.

CLAUSE 6: FINAL CERTIFICATE

On completion of the work the contractor shall be furnished with a certificate by the

Additional City Engineer of such completion but no such certificate shall be given or

considered to be complete until the contractor shall have removed from the premises on

which the work shall have been executed all scaffolding, surplus materials and rubbish

and shall have cleaned off the dirt from site or any rubies or such other parts, etc.

CLAUSE 7 : PAYMENT ON INTERMEDIATE CERTIFICATE [RUNNING ACCOUNT] TO BE

REGARDED AS ADVANCES

Page 29: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 29

INVITEE SIGNATURE BIDDER

No advances or payments shall be made for any work, estimated to cost/less than

rupees equal to 10% of contract value, till after the whole work shall have been

completed and a certificate of completion is given. But in the case of works estimated to

the cost more than rupees 10% of the contract value the contractor shall on submitting a

monthly bill therefore, be entitled to receive payment proportionate to the part of the

work then approved and passed by the Executive Engineer whose certificate of such

approval and passing of the sum so payable shall be final and conclusive against the

contractor. All such intermediate payment, shall be regarded as payments by way of

advance against the final payments only and not as payments, for work actually done

and completed, and shall not preclude the Additional City Engineer / Executive Engineer

from requiring bad, unsound, imperfect or unskilled work to be removed and taken away

and reconstructed or re erected, nor shall any such payments be considered as an

admission of the due performance of the contract or any part thereof in any respect or

the accruing of any claim nor shall it conclude determine or affect in any way the powers

of the Additional City Engineer as to the final settlement and adjustment of the accounts

or otherwise, or in any way the powers of the accounts or otherwise, or in any other way

very or affect the contract.

The final bill shall be submitted by the contractor within one month of the date fixed for

the completion of the work, otherwise the Executive Engineer’s certificate of the

measurement and of total amount payable for the work shall be final and binding on all

parties.

Rates of items paid in running bills are for the purpose of advance payment only and

may be revised [reduced or increased] in the final bill after final evaluation of the quantity

of each item.

CLAUSE 8 : PAYMENT OF REDUCED RATES ON ACCOUNT OF ITEMS OF WORKS NOT

ACCEPTED AS COMPLETED TO BE AT THE DISCRETION OF THE

EXECUTIVE ENGINEER.

The rates for several items of works estimated to cost more that Rs. 1,000/- agreed to

within, shall be valid only when the item concerned is accepted as having been

completed fully in accordance with the sanctioned specifications. In cases where the

items of work are not accepted as so completed the Executive Engineer may make

payments on account of such items at such reduced rates as he may consider

reasonable in the preparation of final or on account bills.

CLAUSE 9 : BILLS TO BE ON PRESCRIBED FORM

The contractor shall submit all bills on the prescribed forms to engineer in charge. The

charges to be made in the bills shall always be entered at the rates specified in the

tender or in the case of any extra work ordered in pursuance of these conditions, and not

mentioned or provided for in the tender, at the rates herein after proved for such work.

CLAUSE 10: WORKS TO BE EXECUTED IN ACCORDANCE WITH SPECIFICATIONS,

DRAWINGS, ORDERS, ETC.

The contract shall execute the whole and every part of the work in the most substantial

and workman like manner, and both as regards materials and in every other respect in

strict accordance with the specifications. The contractor shall also confirm exactly full

and faithfully to the designs, and instructions in writing relating to work signed by the

Executive Engineer

Page 30: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 30

INVITEE SIGNATURE BIDDER

And lodge in his office and to which the contractor shall be entitled to have access for

the purpose of inspection of such office or on the site of the work during the office hours

and the contractors shall if he so requires, be entitled at his own expenses to make or

cause to be made copies of the specifications and of all such designs, drawings or

instruction aforesaid.

CLAUSE 11 : ALTERATIONS IN SPECIFICATIONS AND DESIGNS NOT TO BE

INVALIDATE CONTRACTS. RATES FOR WOKS NOT ENTERED OR

SCHEDULE RATE.

The Additional City Engineer shall have power to make any alteration in or addition to

the original specifications, drawings and instructions that may appear to him to be

necessary or advisable during the progress of the work and the contractor shall be

bound to carry out the work in accordance with any instruction in this connection which

may be given to him in writing signed by the Additional City Engineer / Executive

Engineer and such alteration shall not invalidate contract. Any additional work which the

contractor may be directed to do in the manner above specified as part of the work shall

be carried out by the contractor on the same conditions in all respect on which he

agreed to do the main work, and at the same rates as are specified in the tender for the

main work. And if the additional and altered in the tender for the work, and if the

additional and altered work includes any class of works for which no rate is specified in

this contract, then such class of works shall be carried out at the rates entered in the

Scheduled Rates or at the calculated rates whichever are lower. If the additional or

altered work for which no rate is entered in the Schedule of Rates in ordered to be

carried out before the rates are agreed upon then contractors shall within seven days of

the date of receipt by him of the order to carry out the work, inform the Executive

Engineer of the rate which he is intention to charge for such class of work, and to

arrange to carry out in such manner as he may consider advisable provided always that

if the contractor shall commence work or incurred any expenditure in regard there to

before the rates shall have been determined as lastly here in before mentioned then in

such cases, he shall only be entitled to be paid in respect of the work carried out or

expenditure incurred by him prior to such date of the determination of the rate as

aforesaid according to such rates as shall be fixed by the Executive Engineer, in the

event of a dispute, the decision of the Additional City Engineer will be final. Where

however, the work is to be executed according the designs, drawings and specifications

recommended by the contractor and accepted by VMSS, the alteration above referred

shall be within the scope of such design, drawings and specifications appended to the

tender. The time limit for completion of works shall be extended in the proportion that

the increase in cost occasioned by alterations or additions bears to the cost of the

original contract work, and the certificate of the Executive Engineer as such proportion

shall be conclusive.

CLAUSE 12 : NO COMPENSATION FOR ALTERATION OR RESTRICTION OF

WORK.

If at any time after execution of the contract documents, the Additional City Engineer

shall, for any reason what so ever, require the whole or any part of the work, as specified

in the tender, to be stopped for any period or shall not require the whole or part of the

work to be carried out at all or to be carried out by the contractor, he shall give notice in

Page 31: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 31

INVITEE SIGNATURE BIDDER

writing of the fact to the contractor, who shall there upon suspend or stop the work totally

or partially, as the case may be. In any such case, except as provided here under, the

contractor shall have no claim to any payment or compensation what so ever on account

of any profit or advantage which he might have derived from the execution of the work in

full but which he did not so derive in consequence of the full amount of the work not

having been carried out, or on account of any loss that he may be put on account of

materials purchased or agreed to be purchased, or for unemployment of labour recruited

by him. He shall not have also any claim for compensation by reason of any alteration

having been made in the original specifications, drawings, designs and instructions

which may involve any curtailment of the work as originally contemplated. Where

however, materials have already been purchased or agreed to be purchased by the

contractor before receipt by him of the said notice, the contractor shall be paid for such

materials at the rates determined by the Executive Engineer provided they are not in

excess of requirements and are of approved quality and / or shall be compensated for

the loss if any, that he may be put to, in respect of materials agreed to be purchased by

him, the amount of such compensation to be determined by the Executive Engineer

whose decision shall be final. If the contractor suffers any loss on account of his having

to pay labour charges during the period during which the stoppage of work has been

ordered under this clause, the contractor shall, on application be entitled to any

compensation on account of labour charge as the Executive Engineer, whose decision

shall be final may consider reasonable. Provided that the contractor shall not be entitled

to any compensation on account of labour charges if, in the opinion of Executive

Engineer, the labour could have been employed by the contractor elsewhere for the

whole or part of the period during which the stoppage of the work has been ordered as

aforesaid.

CLAUSE 13 : NO CLAIM TO COMPENSATION ON ACCOUNT OF LOSS DUE TO DELAY IN

SUPPLY OF MATERIALS BY THE VMSS OR PROCUREMENT OF MATERIAL

FROM MARKET.

The contractor shall not be entitled to claim any compensation from the VMSS for the

loss suffered by him on account of delay by the VMSS in the supply of materials or

entered in the Schedule A, or procurement of material from market by contractor where

such delay is caused by

1. Force Majeure

2. Act of God

3. Act of enemies of the State or any other reasonable cause beyond the control of

VMSS.

CLAUSE 14 : ACTION AND COMPENSATION PAYABLE IN CASE OF BAD WORK

If at any time before the security deposit is refunded to the contractor, it shall appear to

the Additional City Engineer or his subordinate in charge of the work that any work has

been executed with unsound, imperfect or unskilled workmanship or with materials of

inferior quality, or that any materials or articles provided by him for the execution of the

work are unsound or of a quality inferior to that contracted for, or are otherwise not in

accordance with the contract, it shall be lawful for the Additional City Engineer to

intimate this fact in writing to the contractor and then not with standing the fact that the

work materials or articles complained of may have been inadvertently passed, certified

and paid for the contractor shall be bound forthwith to rectify or remove and reconstruct

Page 32: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 32

INVITEE SIGNATURE BIDDER

the work so specified in whole of or in part as the case may require, or if he is required,

shall remove the material or articles so specified and provided other proper and suitable

materials or articles at his own charge and cost; and in the event of his failing to do so

within a period to be specified by the Additional City Engineer in the written intimation

aforesaid the contractor shall be liable to pay compensation at the rate of one per cent

on the amount of the contract sum for every day not exceeding ten days, during which

the failure so continues, and in the event of any such failure as aforesaid the Additional

City Engineer may rectify or remove and re-execute the work or remove and replace the

materials or articles as complained of as the case may be at the risk and expense in all

respect of the contractor. If the Additional City Engineer consider that any such inferior

work or materials as described above may be accepted or made use of, it shall be within

his discretion to accept the same at such reduced rates as he may fix here fore.

CLAUSE – 15: WORKS TO BE OPEN TO INSPECTION. CONTRACTOR OR REASONABLE

AGENT TO BE PRESENT

All works under or in course of execution in pursuance of the contract shall at all times

be open to the inspection and supervision of the Additional City Engineer and his

subordinates or agents appointed by VMSS and the contractor shall at all times during

the usual working hours and at all other times at which reasonable notice of the intention

of the Additional City Engineer or his subordinate or agents appointed by VMSS to visit

the works shall have been given to include. In the specification or other documents

forming part of the contract referred to in these conditions or not and which may be

necessary for the purpose of satisfying or complying with the requirements of the

Additional City Engineer as to any matter on which under these conditions he is entitled

to be satisfied or which he is entitles require together with carriage, therefore, to and for

the work.

The contractor shall also supply without charge the requisite number of persons with the

means and materials necessary for the purpose of setting out works, and counting,

weighing and assisting in the measurement or examination at any time of the work or

materials, failing this the same may be provided by the Executive Engineer at the

expense of the contractor and the expense may be deducted from any money due to the

contractor under the contract or from his Security Deposit. The contractor shall provide

all necessary fencing and lights required to protect the public from accident and shall

also be bound to bear the expense of defence of every suit, action or other legal

proceedings, at law, that may be brought by any person for injury sustained owing to

neglect of the above precautions, and to pay any damages and costs which may be

awarded in any such suit, action or proceedings to any such persons or which may be

with the consent of the contractor be paid in compromising any claim by any such

person.

Clause-16 Deleted.

CLAUSE 17 : HOISTING APPLIANCES ETC.

The contractor shall comply with the following regulations as regards the Hoisting

Appliances to be used by him :

a. Hoisting machines and tackle : including their attachments, anchorages and

supports, shall

(I) be of good mechanical construction, sound material and adequate

strength and free patent defect; and

(II) be kept in good repair and in good working order.

Page 33: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 33

INVITEE SIGNATURE BIDDER

b. Every rope used in hoisting or lowering materials or as a means or suspension

shall be of suitable quality and adequate strength and free from patent defect.

c. Hoisting machines and tackle shall be examined and adequately tested after

erection on the site and be reexamined in position at intervals to be prescribed by

VMSS.

d. Every chain, ring, hook, shackle, swing and pulley block used in hoisting or

lowering materials or as means of suspension shall be periodically examined.

e. Every crane driver or hoisting appliance operator shall be properly qualified.

f. No person who is below the age of 20 years shall be in control of any hoisting

machine including any winch or give signals to the operator.

g. In the case of every hoisting machine and of every chain, ring, hook, shackle,

swivel and pulley used in hoisting or lowering or as a means of suspension the

safe working load shall be ascertained by adequate means.

h. Every hoisting machine and all gear referred to in the preceding regulation be

plainly marked with the safe working load.

i. In the case of hoisting machine having a variable safe working load each safe

working load and the conditions under which it is applicable shall be clearly

indicated.

j. No part of any hoisting machine or any gear referred to in regulation above shall

be loaded beyond the safe working load except of the purpose of testing.

k. Motors, gearings, transmissions, electric wiring and other dangerous parts of

hoisting appliances shall be provided with efficient safeguards.

l. Hoisting appliances shall be provided with such means as will reduce to a

minimum the risk of the accident descent of the load.

m. Adequate precautions shall be taken to reduce to a minimum risk of any part of a

suspended load becoming accidentally displaced.

CLAUSE 18 : MEASURES FOR PREVENTION OF FIRE

The Contractors shall not set fire to any standing jungle, trees brushwood or grass

without a written permit from the Additional City Engineer. When such permit is given

and also in all cases when destroying out of a dug up trees, brushwood, grass etc. by

fire, the contractor shall take necessary measures to prevent such fire spreading to or

other wise damaging surrounding property.

CLAUSE 19 : LIABILITY OF CONTRACTOR FOR ANY DAMAGE DONE IN OR OUTSIDE

WORK AREA

Compensation for all damage done intentionally or unintentionally by contractor’s laborer

whether in or beyond the limits of the work site including any damages caused by the

spreading of Fire mentioned in clause 18 shall be estimated by the Executive Engineer

or such other officer as the VMSS may appoint and the estimates of the VMSS shall be

final and the contractor shall have to pay the amount of the assessed compensation on

demand failing which the same will be recovered from the contractor as damages in the

manner prescribed in clause 1 or deducted

By the Additional City Engineer from any sums that may be due to or become due from

the VMSS to the contractor under this contract or otherwise. The contractor shall bear

the expenses of defending any action or other legal proceedings that may be brought by

Page 34: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 34

INVITEE SIGNATURE BIDDER

any person for injury sustained by him owing to neglect of precautions to prevent the

spread of Fire and shall be also pay any damage and cost that may be the court in

consequence. However in any case VMSS can not be suit under any circumstances.

CLAUSE 20 : WORKS NOT TO BE SUBLET

The contractor shall not be assigned or subleted without approval of the Additional City

Engineer and if the contractor shall assign or sublet his contract or attempt to do so or

become insolvent or commence any proceedings to the adjudicated an insolvent or

make any compensation with his creditors or attempt to do so, the Additional City

Engineer may by notice in writing, rescind the contract. Also if any bribe, gratuity, gift,

loan, prerequisite reward or advantage pecuniary or otherwise shall either directly or

indirectly be given, promised or offered by the contractor or any of his servants or agents

to any public officer or person in the employment of or authorized by the VMSS in any

way relating to his office or employment, if any such officer or person shall become in

any directly or indirectly interested in the contract, the VMSS may, by notice in writing

rescind the contract.

In the event of a contract being rescinded, the Security Deposit of the contractor shall

thereupon stand forfeited and be absolutely at, the disposal of the VMSS and the same

consequence shall ensure as if the contract had been rescinded under clause 3 hereof

and in addition the contractor shall not be entitled to recover or be paid for any work

therefore actually performed under the contract.

CLAUSE 21: SUM PAYABLE BY WAY OF COMPENSATION TO BE CONSIDERED AS

REASONABLE COMPENSATION WITHOUT REFERENCE TO ACTUAL LOSS.

All sums payable by contractor by way of compensation under any of these conditions

shall be considered as reasonable compensation on be applied to the use of the VMSS

without any reference to be actual loss or damage sustained and whether any damages

had not been sustained.

CLAUSE 22 : EXECUTION OF WORKS

All works to be executed under the direction and subject to the approval in all respect of

the Executive Engineer for the time being, who shall be entitled to direct at what point or

points and in what manner they are to be commenced and from time to time carried on.

CLAUSE 23 : DECISION OF THE VMSS TO BE FINAL

Except where otherwise specified in the contract and subject to the powers delegated to

the Engineer-in-charge by the VMSS, the decision of the Additional City Engineer for the

time being shall be final conclusive and binding on all parties to the contract upon all

question relating to the meaning of the specifications, designs, drawings and instruction

herein before mentioned and as to the quality of workmanship or material used on the

work or as to any other question, claim, right, matter or thing whatsoever, in anyway

arising out of or relating to the contract designs, drawings, specifications estimates,

instructions, orders or these conditions or otherwise concerning the works or the

execution of failure to execute the same, whether arising during the progress of the work

or after completion of abandonment thereof.

CLAUSE 24 : WORK ON SUNDAY

No work shall be done on Sunday or Holiday without written permission of Executive

Engineer.

CLAUSE 25 : LUMP SUMS IN TENDER

Page 35: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 35

INVITEE SIGNATURE BIDDER

When the estimate on which a tender is made includes lump sums in respect of parts of

the work, the contractor shall be entitled to payment in respect of the items of work

involved or the part of the work in question is not in the opinion of the Executive

Engineer capable of measurement, the Executive Engineer may at his discretion pay the

lump sum amount entered in the contract and the certificate in writing of the Executive

Engineer shall be final and conclusive against the contract with regard to any sum or

sums payable to him under the provisions of this clause.

CLAUSE 26 : ACTION WHERE NO SPECIFICATIONS ARE AVAILABLE

In the case of work for which there is no such specification, work shall be carried out in

accordance with the P.W.D. or I.S.I. specifications and in the event of there being no

P.W.D. or I.S.I. specifications the work shall be carried out in all respects in accordance

with the instructions and requirements of the Executive Engineer.

CLAUSE 27 : DEFINITION OF WORK

The expressions “Work” or “Works” whenever used in these conditions shall unless,

there be something in the subject or context repugnant to such construction be

constructed to mean the work or the works contracted to the executed under or by virtue

of the contract, where temporary or permanent and whether original altered substituted

or additions.

CLAUE 28 : QUERRY FEES AND ROYALTIES, ETC.

All query fee, royalties, octroi dues and ground rent for stacking materials, if any should

be paid by the contractor.

CLAUSE 29 {A}: ACCIDENT OR INJURY TO WORKMAN

1. The contractor to Indemnify the VMSS :

The VMSS shall not be liable for or in respect of any damages or compensation

payable by law in respect or in consequence of any accident of injury to any

workman or other person in the employment of the contractor or his any sub-

contractor and contractor shall indemnify the VMSS against such damages and

compensation and against all claims, demands, proceedings, costs, charges,

expenses whatsoever in respect thereof or in relation thereto.

2. Payments of Claims and Damages :

VMSS have to pay any money in respect of such claims or demands as aforesaid

the amount so paid and the costs incurred by the VMSS shall be charged to and

paid by the contractor and the contractor shall not be at liberty to dispute or

question the right of the VMSS to make such payments not with standing the

same may have been made without his consent or authority or in law or

otherwise to the contrary.

CLAUSE 29 {B} COMPENSATION UNDER WORKMAN’S COMPENSATION ACT.

The contractor shall be responsible for and shall pay any compensation to his

workers payable under the Workman’s compensation Act 1923, VII of 1923.

hereinafter called the said Act for injuries caused to the workers. If such

compensation is paid by the VMSS as principle under sub – section (I) of section

12 of the said Act on behalf of the contractor, it shall be recoverable by the

VMSS from the contractor under sub – section (2) of the section. Such

compensation shall be recovered in the manner laid down in the Clause I above.

CLAUSE 30 : MEDICAL AID TO LABOUR

Page 36: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 36

INVITEE SIGNATURE BIDDER

The contractor shall be responsible for and shall pay the expenses of providing medical

aid to any workman who may suffer a bodily injury as a result of an accident. If such

expenses are incurred by the VMSS the same shall be recoverable from the contractor

forthwith and be deducted without prejudiced to any other remedy of the VMSS from any

amount due or that may become due to the contractor.

CLAUSE 31 : SAFETY MEASURES

The contractor shall provide all necessary personal safety equipment and first aid

apparatus available for the use of the persons employed on the site, shall maintain the

following regulations in connection therewith.

a. The workers shall be required to use the equipment so provided by the contractor

and the contractor shall take adequate steps to ensure proper use of the equipment

by those concerned.

b. When work is carried on in proximity to any place where there is a risk of drawing all

necessary equipment shall be provided and kept ready for use and all necessary

steps shall be taken for the prompt rescue of any person in danger.

c. Adequate provision shall be made for prompt first aid treatment of all injuries likely to

be sustained during the course of the work.

CLAUSE 32 : CLAIM FOR QUANTITIES OF WORK ENTERED IN THE TENDER

Quantity shown in the tender are approximate and no claim shall be entertained for

quantity of work executed being either more or less than those entered in the tender or

estimate.

CLAUSE 33 : NO CLAIM FOR COMPENSATION FOR DELAY IN STARTING THE WORK

No compensation shall be allowed for any delay caused in the starting of the work on

account of any problem related to acquisition of land delay in administrative clearance of

work. And for any delay in according sanction to estimates.

CLAUSE 34 : CLAIM FOR COMPENSATION FOR DELAYING THE EXECUTION OF WORK

No compensation shall be allowed for any delay in execution of the work on account of

water standing in borrows pits or compartments. The rates ate inclusive for hard or

cracked soil excavation in mud sub-soil water, or water standing in borrow pits and no

claim for an extra rate shall be entertained unless otherwise specified.

CLAUSE 35 : ENTERING UPON OR COMMENCING ANY PORTION OF WORK

The contractor shall not enter upon or commence any portion of work except with the

written authority and instruction of the Executive Engineer or of his sub ordinate in

charge of the work. Failing such authority the contractor shall have no claim to ask

measurements or payment for work.

CLAUSE 36 : LABOUR LAWS AND SAFETY REGULATIONS

i. No contractors shall employ any person who is under the age of 12 years.

ii. No contractor shall employ donkeys or other animals with breaching of string or thin

rope. The breaching must be at least three inches wide and should be of tape (Nawar).

iii. No animal suffering from soves, lameness or emaciation or which immature shall be

employed on the work.

iv. The Executive Engineer or his agent is authorized to remove any person or animal found

working which does not satisfy those conditions and no responsibility shall be accepted

by the VMSS for any delay caused in the completion of the work by such removal.

Page 37: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 37

INVITEE SIGNATURE BIDDER

v. The contractor shall pay fair and reasonable wages to the workmen employed by him in

the contract undertaken by him. In the event of any dispute arising between the

contractor and his workmen on the grounds that the wages paid are not fair and

reasonable the dispute shall be referred without delay to the Executive Engineer, who

shall decide the same. The decision of the Executive Engineer shall be conclusive and

binding on the contractor, but such decision shall not in any way affect the condition in

the contract regarding the payment to be made by the VMSS at the sanctioned tender

rates.

CLAUSE 37 : ACCEPTANCE OF CONDITIONS BEFORE TENDERING THE WORK

Any contractor who does not accept these conditions shall not be allowed to tender for

works.

CLAUSE 38 : ACTS FOR CONTROLLED PRICE

The price quoted by the contractor shall not in any case exceed the control price if any

fixed by government or reasonable price. Which it is permissible for him to charge a

private purchase for the same class and description of goods under the provisions of

Hoarding or Profiteering prevention ordinance 1943 as amended from time to time if the

price quoted exceed the controlled price permissible under Hoarding and profiteering

prevention ordinance the contractor shall specifically mention this fact in his tender along

with the reasons for quoting such higher price. The purchase at his discretion will in

such case exercise the right of revising the price at any stage so as to confirm with the

controlled price of the permissible under the Hoarding and Profiteering Prevention

ordinance. This discretion will be exercise with out prejudice to any other action that

may be taken against the contractor. This condition applies to all rules or act for

controlled price.

CLAUSE 39 : Taxes, Duties, etc.

The rates to be quoted by the contractor must be inclusive of excise, sales tax and all

other taxes, etc. present & future taxes be included. No extra payments on this account

will be made to the contractor.

CLAUSE 40 : Defect Liability Period

The defect liability period shall be from the date of final completion and acceptance of

work by VMSS. Contractor shall submit performance guarantee bond of 5% amount of

total work for period as prescribed format by VMSS. The bank guarantee of

Nationalized bank shall be given for full defect liability period at a time. During defect

liability period, contractor shall make good any defect whatsoever nature observed in

different works ,equipment, or in part of work,plant or equipment by

modifying/replacing/repairing of such defective units or parts there at his own cost within

a period of three days on hearing from owner about such defect during liability period. In

case VMSS may feel fit to repair/rectify/modify such work without intimation incase of

emergency/ importance of circumstances, the contractor is liable to pay all expenses

incurred by VMSS . In case if contractor’s failure to do so, it will be got done by owner

and entire cost shall be recovered from contractor’s performance guarantee bond in the

form of bank guarantee or other dues with the company.

CLAUSE 41 : ERRORS AND OMMISSIONS

The contractor should take no advantage of any apparent error or omission in drawings

or specifications and the Additional City Engineer should be permitted to make such

corrections and interpretations as necessary to fulfill the intent of the plans and

specifications. Alterations, omissions or correction in the drawings, diagrams or

Page 38: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 38

INVITEE SIGNATURE BIDDER

sketches or specifications shall not constitute a case for a claim of extra payment or

extension of time by the contractor.

CLAUSE 42: INSURANCE AGAINST ACCIDENT ETC. TO WORKMEN

The contractor shall at his own expense carry and maintain insurance with reputable

Insurance Companies to his satisfaction but in no case VMSS will be responsible for any

claim arise due to inadequate amount and or improper provisions of insurance by the

contractor under the Employees State Insurance Act, 1949. Workmen’s compensation

and Employer’s liability insurance, Contractor’s protective liability insurance and any

other insurance required under law or regulations from time to time for this contract.

CLAUSE 43 : ADDITIONAL SAFETY CODE

The contractor shall provide all necessary safety provisions as indicated in safety code

given along with this tender.

CLAUSE 44 : FOSSILS ETC.

All fossils, coins, articles or value of antiquity and structure and other remains or things

of geological or archeological interest discovered on the site shall as between the VMSS

and the contractor be deemed to be absolute property of the VMSS.

CLAUSE 45 : PROGRAMME

The time allowed for execution of works shall be the essence of the contract. The

contract period shall commence from date of notice of intimation to proceed. The

tenderer at the time of submitting his tender shall indicate to the construction schedule

his program of execution of work commensurate with the total time specified. The

contractor shall provide the Engineer-in-charge a detailed program of the time schedule

for execution of the works in accordance with the specifications and the completion date,

the entire program to be finalized by the contractor, has to confirm the execution period

mentioned along with the bill of quantities in the tender documents. The Engineer-in-

charge upon scrutiny of such submitted program by contractor, shall examine suitability

of it to the requirement of contract and suggest modifications, if found necessary.

CLAUSE 46 : ALTERATION IN SPECIFICATION AND DESIGN AND EXTRA WORK

A) The Executive Engineer-in-charge shall have power to make any alteration in,

omission from, addition to, substitution for, the schedule of rates, the original

specifications, drawings, designs and instructions that may appear to him to be

necessary or advisable during the progress of work and the contractor shall be bound to

carry out such altered/extra/new items of work in accordance with any instructions which

may be given to him in writing signed by Executive Engineer-in-charge and such

alteration omission, additions or substitution shall not invalidate contract and any

altered, addition or substituted work shall be carried out by the contractor on the same

conditions of contract. The time for completion may be extended by Executive Engineer-

in-charge as may be considered just and reasonable by him. The rates for such

addition, altered or substituted work shall be worked out as under.

a) If the rates for addition, altered or substituted work are specified in the contract for work,

the contractor is bound to carry out such work at the same rates as specified in the

contract.

b) If the rates for additional, altered or substituted work are not specifically provided in the

contract for the work, the rates will be derived from the rates of similar items or works in

the contract of work. The opinion of Executive Engineer-in-charge as to whether the

rates can be reasonably so derived from the item of contract will be final and binding to

the contractor.

Page 39: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 39

INVITEE SIGNATURE BIDDER

c) If the rates of altered, addition or substituted work can not be determined as specified in

(a) or (b) above, the rates shall be paid as per S.O.R. of VMSS/PWD in the same of

order preference. In absence of S.O.R., rate analysis approved by the Additional City

Engineer shall be final.

d) If the rates of altered, addition or substituted work can not be determined as specified in

(a) or (b) or (c) above, the contractor shall within seven days of the receipt of order to

carry out the work inform the Engineer-in-charge of the rate which he intends to charge

for

such work supported by rate analysis and the Executive Engineer-in-charge will

determine the rate on the basis of prevailing market rates of materials, labour cost at

schedule of labour plus 10% thereon as contractor’s supervision overhead and profits.

The opinion of Executive Engineer-in-charge as to market rate of materials and the

quantity of labour involved per unit of measurement will be final and binding on

contractor.

But under no circumstances, the contractor suspends work on the plea of non settlement

of items falling under this clause.

CLAUSE 47 : TESTS FOR QUALITY OF WORK

1. The contractor shall be required to give satisfactory tests wherever required and shall

rectify the defects, if any free of cost. The necessary water, power, labour etc. required

for the h tests shall also be arranged by the contractor at his own cost.

2. All workmanship shall be of the best kind described in the contract documents and in

accordance with the instructions of Engineer-in-charge and shall be subjected from time

to time to such tests at contractor cost as the Engineer-in-charge may direct at the place

of manufacture or fabrication or on the site or at any such place. Contractor shall

provide assistance, instruments, labour and materials as are normally required for

examining, measuring and testing of any work or workmanship as may be selected and

required by Engineer-in-charge.

3. All tests necessary in connection with the execution of work as decided by Engineer-in-

charge shall be carried out at an approval laboratory at contractor’s cost.

4. Contractor shall furnish the Engineer-in-charge for approval when requested or if

required by the specification, adequate samples of all materials and furnished goods to

be used in work sufficiently in advance to permit tests and examination thereof. All

materials furnished and finished goods applied in work shall be exactly as per approved

samples.

CLAUSE 48 : PROCEDURE FOR MEASUREMENT OF WORK IN PROGRESS

1. All measurements shall be in metric system. All the work in progress will be jointly

measured by the representative of Engineer-in-charge ( AE/AAE/PMC) and contractor’s

authorized agent. Such arrangements will be got

recorder in the measurements book by the Engineer-in-charge or his authorized (

AE/AAE/PMC) representative and signed by the contractor or his authorized

representative and signed by the contractor or his authorized agent in token of

acceptance. If the contractor or his authorized agent fails to be present whenever

required by the Engineer-in-charge for taking measurements for any reasons

whatsoever, the measurement will be taken by the Engineer-in-charge or his authorized

representative not withstanding the absence of contractor and these measurements will

be deemed to be correct and binding on the contractor.

2. Contractor will submit a bill in approved proforma in duplicate to the Engineer-in-charge

of the work giving abstract and detail measurements of various items executed during a

Page 40: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 40

INVITEE SIGNATURE BIDDER

months as mutually agreed. The Engineer-in-charge shall verify the bill and the claim,

as far as admissible.

CLAUSE 49 : TAXES, DUTIES ETC.

1. Contractor agrees to and does hereby accept full and exclusive liability for the payment

of any and all taxes including sales-tax, duties, octroi or entry tax etc. not or herein after

imposed, increased or modified from time to time in respect of work and materials and all

contributions and taxes for unemployment, compensation, insurance and old age

pension or annuities now or hereinafter imposed by the central or State Government

authorities with respect to or covered by the wages, salaries or other compensation paid

to the persons employed by contractor.

2. Contractor shall be responsible for compliance with all obligations and restrictions

imposed by the labors law or any other law affecting employed-employee relationship.

3. Contractor further agree to comply and to secure the compliance of all sub-contractor

with applicable central, state, municipal and local laws and regulations and requirement.

Contractor also agrees to depend indemnify and hold harmless the owner from any

liability or penalty which may be imposed by central, state or local authority by reasons

any violation by contractor or subcontractor of such laws, regulations or requirements

and also from all claims, suits or proceedings that may be brought against owner

arising under growing out of or by reasons of work provided for by this contract by

third parties or by central or State Government authority or any administrative sub-

division thereof.

4. At present there is no sales tax on work contract. Even if at later stage same is imposed

by Govt. the sales tax on work contract shall be borne by contractor.

5. The contractor shall pay royalty tax as per the rate decided by Government.

6. The contractor shall pay all taxes like sales, income tax, VAT, Service tax or any other

tax which are in force time to time. VMSS may not be any way hold responsible for any

such taxes. However VMSS can ask to produce the tax payment on the request from

detail concern departments of Govt. or VMSS.

SAFETY CODE :

(A) In respect of all labour, directly or indirectly employed in the work for the performance of

contractor’s part of this agreement, the contractor shall at his own expense arrange for

all the safety provision as per safety code of P.W.D. and hand book on construction

safety practice SP-70-2001 and building & other construction workers.

(Regulation of Employment & Condition of Services) Act 1996. The contractor shall

serve and abide by all fire and safety security rules and regulations of the VMSS.

(B) First Aid and Injuries

1. Contractor shall maintain first aid facilities to his employees and those of his sub-

contractors.

2. Contractor shall make outside arrangement for ambulance service and for the treatment

of injuries. Names of those providing these services shall be furnished to VMSS prior to

start of construction and their telephone numbers shall be prominently displayed in

contractor’s field office.

3. All critical injuries shall be reported promptly to VMSS and copy of contractors report

covering each personal injury requiring the attention of a physician shall be furnished to

VMSS.

B) Scaffolding

Page 41: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 41

INVITEE SIGNATURE BIDDER

The contractor shall provide suitable scaffolds and working platforms, gangways and

stairways as per required.

All necessary personal safety equipments as considered adequate by the Executive

Engineer should be kept available for the use of persons employed on the site and

maintained in a condition suitable for immediate use and the contractor should take

adequate steps to ensure proper use of equipment by those concerned as per the

clause (30) of General Conditions of the Contract. To ensure effectively enforcement of

the rules and regulations relating to safety precautions, the arrangements made by the

contractor shall be opened to inspection by the welfare officer, Safety Engineer or

Executive Engineer of the VMSS or their representatives.

Page 42: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 42

INVITEE SIGNATURE BIDDER

VADODARA MAHANAGAR SEVA SADAN

Special Conditions of Contract

GENERAL

(A) Special conditions of contract shall be read in conjunction with General Conditions of

Contract Material and job Specifications, Drawings and other documents forming part of

this contract.

(B) Now withstanding the sub-division of the documents into the separate sections and

volumes every part of each shall be deemed to be supplementary to the complementary

of every other part and shall be read and into the contract so far as it may be practicable

to do so.

1. All the materials required for the contract should be brought and well preserved

well in advance. Samples of the same should be shown and got approved in the

very beginning. As soon as material are brought they should be examined, if

material is not as per specifications it should be removed from site.

2. EXTRA ITEMS : This specified in clause no. (14) of General Conditions of

Contract :

No extra items be paid within the present scope of work with drawings or details,.

If however, the tenderer feels that there is any extra item, he may write in his

forwarding letter each item, its quantities and cost. For the purpose of

comparison and evaluation, this will be considered and award of work may be

made or not made considering these. Later on if any change is required by the

VMC before executing the items, a claim be made by the contractor before

execution of such extra item pointing out the exact extra item as desired by them,

Page 43: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 43

INVITEE SIGNATURE BIDDER

total quantity and amount. This item be executed only after written sanction of

the VMC, if the contractor still claims it as extra item in absence of any such

written claims before execution of that item or if such claim is rejected, it will be

deemed to be contained in regular items of tender and not an extra one. Rate of

extra item, if any, will be settled on the basis of rates tendered by the contractor

and VMC schedule of rates in force in the current year at the time of execution of

item. Rate analysis will be prepared and if require after inquiry of labour and

materials, the rate shall be decided. This calculated rate will be arrived after due

rate analysis by considering market rates of the labour and material with

contractor’s profit added to such cost thus arrived at. Contractor shall have to

produce vouchers/ bill of payment to support the rate analysis.

3. Every tender should be accompanied with a time schedule of progress of work at

various stages. In case these stages are not followed up, actions as stated in the

contract will have to be taken to bring the progress of work as scheduled.

4. The tendered shall have to work as per the time schedule enclosed in the tender.

The progress of work will be required every month against target set in time

schedule. If it is found inadequate or falling behind, contract shall take all the

necessary actions as suggested by the “Executive Engineer” to accelerate the

speed of work and again back the lost time. In case of contractor not complying

suggestions and instructions of Executive Engineer to speed up the work, the

VMC will have a right to take action as per General Conditions of Contract

Clause (2) and (3).

5. SUB-LETTING:

(1) No sub-letting of work

i) No part of the contract nor any share of interest there in shall in any manner or degree

be transferred, assigned or sub-let by the contract directly or indirectly to any person,

firm or corporation whomsoever except as provided for in the succeeding sub-clause

without the consent in writing of the Additional City Engineer.

ii) Sub-contract for Temporary Works Etc.

The Additional City Engineer may give written consent to sub-contract for the execution

of any part of the works at the site, being entered into by the contractor provided each

individual sub contract is submitted to the Additional City Engineer or his subordinates

before being entered into and approved by him.

iii) List of sub-contractors to be supplied::

At the commencement of every month the contractor shall supply to the Executive

Engineer list of sub-contractors or other persons or firms engaged by the contractor and

working at the site during the previous month with particulars of the general nature of the

sub-contracts of works.

iv) Contractor’s Liability not Limited by Sub- Contractors :

Not withstanding any sub-letting with such approval as aforesaid and not withstanding

that the Executive Engineer shall have received copies of any sub-contracts, the

contractor shall be and shall remain solely responsible for the quality and proper and

expeditious execution of the works and the performance of all the conditions of the

contract in all respect as if such sub-letting had not taken place and as if such work had

been done directly by the contractor.

v) VMC may terminate sub-contracts :

If any sub-contractor engaged upon the works at the site executes any work which in the

opinion of the Executive Engineer is not in accordance with the contract documents, the

VMC may be written notice to the contractor require him to terminate such sub-contract

Page 44: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 44

INVITEE SIGNATURE BIDDER

and the contractor upon the receipt of such notice shall terminate such sub-contract and

dismiss the sub-contractors sub the letters shall forthwith leave the works., failing which

the VMC shall have the right to remove such sub-contractors from the site.

vi) No remedy for action taken under this clause :

No action taken by the VMC under the clause shall receive the contractor or any of his

liabilities under the contractor or give rise to any right to compensation, extension of time

or otherwise, failing which the owner shall have the right to remove such sub-contactors

from the site.

6. Inconvenience to the Public :

The contractor shall not deposit materials on any site which will cause seriously

inconvenience to the public. The Executive Engineer may require the contractor to

remove any material which are considered by him to be a danger or inconvenience to

the public or cause them to be removed at the Contractor’s cost.

7. Approach Roads :

Contractors will be permitted to use the existing roads in the areas for the purpose of

transporting labourers and materials etc. The VMC, however, will not undertake to

provide any approach road to the site of works. It shall be entirely the responsibility of

the contractor to provide and maintain such temporary roads at his own cost for the

purpose of movement of men, materials, and equipment. Layout of such approach

roads shall be submitted to the Executive Engineer for his approval before undertaking

the construction of the same.

8. Supply of Materials :

The contractor is required to keep himself in touch with the Deputy Executive Engineer for the

day-to-day position of supply of materials to be supplied by owner, so as to adjust the

program of work accordingly in advance to avoid his labour remaining idle on account of

non-receipt of materials. No claim of extra payment due to or arising form delay in

supplying the materials by the Owner shall be entertained, but a reasonable extension of

period of contractor may be considered if found justified. This is specified in clause no.

(14) of General Conditions.

9. Water Supply to Contractors:

The contractors shall make his own arrangement of water required for construction, site office

and labour camp. Contractor shall make arrangement for receiving, storage and

distribution of water as per established norms and practice. VMC shall not entertain any

claim of contractor for delays resulting on account of inadequate or irregular water

supply.

Certified plumbers should be employed by the contractor on the work for all the temporary

sanitary and plumbing works.

10. Contractors Stores and Site Office :

Suitable area near the site of work shall be allocated free of rent to the contractor for storing his

equipment plant, materials, etc. and for his site office. If suitable site near site of work is

not available, the contractor should prepare its site office away from the site of the work

as per the direction of the Executive Engineer.

11. Rates to Include Everything :

The rates quoted in the tender should include all charges for hired, if necessary, of any tools,

and plant, temporary plumbing, water connection, maintenance of sanitary and water

connection, supply of water, cost of cisterns, overhead storage tanks, sheds for

materials, his labour and plant office and staff, charges for getting electric connections

Page 45: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 45

INVITEE SIGNATURE BIDDER

and maintaining the same, clearing the site, watering rolling etc. as specified. The rates

shall be inclusive of octroi duty and any other duties and / or levied, by the Government

or public body or body corporate.

12. Supply of Plant and Equipment Materials and Labour

The contractor shall make his own arrangements to produce all construction plant and

equipment for his work. He shall also forward along with tender a list of type and

number of the equipment with their capacities in good working condition which he will

use at site to ensure completion of the work in specified time.

All materials, construction plants and equipments, etc. once brought by the contractor on the

site are not to be removed from there without the written authority from the Executive

Engineer. Also, the contractor shall have adequate stock of spare parts for the

equipment on the site and work shall not be delayed on this account. Similarly all

enabling work built by the contractor for the main construction undertaken by him are not

be dismantled and removed without the written authority from the Executive Engineer.

Thus contractor shall at his own expenses supply and provide all the construction plant,

temporary works materials both for temporary and for permanent works, labour

(including the supervision thereof), transport to or from the site and in and about the

works and other things of every kind required for the construction, completion and

maintenance of the works.

13. Rubbish and Clearance of Site :

The contractor shall clean away all rubbish, vegetation, roots, sods etc. and dump them in the

area indicated by the Executive Engineer and to his satisfaction. No separate rate shall

be allowed for the above. After the work is completed and a group of structures handed

over, the contractor shall clear the area surrounding the work of all hutments, temporary

structure and excess stores and remnants of building materials such as brickbats, sand,

kapachi, timber, steel etc. at no extra cost the VMC and land brought to its original

conditions.

14. Bench Marks

The contractor shall protect surveyor’s bench marks line marks and base line marks from

damage of movement during the work.

15. Inspection

The contractors shall inspect the site of work and ascertain site conditions and the nature of soil

to be excavated.

16. Execution of Works :

The contractor is responsible for the correct execution of his work in accordance with the

drawings provided to him and for all mistakes due to working to wrong levels or center

lines. When levels, center lines and bench marks of reference have been once given to

him by the Deputy Executive Engineer in writing, it is his responsibility to record, protect

and maintain the said marks, and to work to the same, and no complains can afterwards

be attended to for excess work done inconsequence of such levels not having been kept

up and maintained by the Contractor.

17. The contractor shall obtain the permission of the Executive Engineer before

installation of fixed construction machineries, connections from pipelines, locations of

temporary buildings including labour camps and storage materials, points of tapping

electricity supply of connection. Also the contractor shall not energize any approval of

the Executive Engineer.

Page 46: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 46

INVITEE SIGNATURE BIDDER

18. The work shall be carried out in such a manner as not to interfere with or affect,

retard or disturb the progress of other works being executes by other agencies.

19. The contractor shall submit to the Executive Engineer periodically as required,

information regarding the progress of work being carried out by him.

20. The contractor shall provide at his own cost adequate closets and sanitary

accommodation for all his workman employed on the site. These shall be in accordance

with the rules and regulations of the owner. The lavatories and sanitary accommodation

shall be maintained in good sanitary, working and disinfected conditions.

21. The contractor shall not allow any visitors on the works except with the

approval of the owner.

22. If the headquarters of the tenderer are elsewhere than in Baroda, he shall have

a duly authorized agent at site from the commencement of work until completion of the

building work as specified. Such agent shall be authorized to act on behalf of the

contractor, to accept services of notices under the contract and agree to extra,

omissions and varied items of work and rates for the same. Such agent shall maintain

on his staff a qualified engineer and such other personnel as may be required for the

efficient execution of the work. Any notice under the contract shall be deemed to have

been serviced on the contractor is served upon such agent. The contractor to carry out

any rectification under the terms of the contractor after the work is completed. The

contractor shall have the same or another duly authorized are using carried out. This is

specified in clause no. (15) of General Conditions.

23. The successful tenderer shall send a duly authorized competent representative

at his expenses to meet the Additional City Engineer at his office whenever called upon

in writing to do so by the Additional City Engineer and any instructions, directions or

explanations given by the Additional City Engineer to such representatives shall be held

to have been given to the successful tenderer.

24. The contractor shall afford facilities to the Executive Engineer for a physical

check of such materials in stock in his godowns or at the site of work, as and when

desired by doing so the Executive Engineer.

25. During the progress of the construction work, if in the drawings, diagrams and

the sketches issued if any to the contractor for the purpose of execution of work any

omissions or inaccuracies are found by the contractor, he shall bring the same forthwith

to the notice of the Executive Engineer and get them clarified immediately.

26. Metal,Brick bats,Sand,Yellow earth,stone dust, cement, steel, water,

machine/equipment man-power and any other material required for construction shall be

produced by contractor from open market. Contractor shall identify potential sources of

material and shall make arrangements for adequate and time bound supply of these

items. Contractor shall have to get the supply sources and material approved by Deputy

Executive Engineer before bringing material to site. No extension of time shall be

granted for completion of work on account of delays resulting due to non-availability of

material, work, electricity etc. at site.

27. Use of animals is prohibited.

Page 47: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 47

INVITEE SIGNATURE BIDDER

28. Construction must keep on competent and experienced and qualified Civil

Engineer with experience or as directed by the Additional City Engineer to get best

workmanship and day-to-day progress.

29. All the materials and the workmanship shall be the respective kind described in

the contract and in accordance with the Executive Engineer instructions and shall be

subjected from time to time, such tests as the Executive Engineer may direct. The costs

of such tests shall be borne by the contractor. No extra claim will be entertained for the

materials, transport, labour, curing, preservation and supply of test samples of interests

and size and shape as directed by the Executive Engineer.

30. The contractor shall maintain an uptodate record register of the materials

issued to him, if any. One other register may also be kept showing the quantum of work

executed day-to-day together with materials particularly cement used against each item.

31. A work order register which will also be called site instruction book will be kept

and maintained at site by contractor wherein the day-to-day instruction may be noted

down by the Dy.Executive Engineer or his subordinate in charge of work. The violation

of the instructions written by the Dy. Executive Engineer or his subordinate in charge of

the work will be severely viewed. The obedience and strictly followed up of the

instructions will be obligatory on the part of the contractor.

32. The VMC shall also deduct from running bills submitted by the contractor an

amount equivalent as applicable from time to time of the total amount of each of such

running bills towards income tax at source under the relevant provisions of Income Tax

Act.

33. The contractor shall indemnify the VMC and every member and officer and

employees of the VMC against all the actions, claims, demands, costs and expenses

whatsoever arising out of or in connection with the matter referred to in the above

clause. The contractor shall be liable to reimburse the VMC and keep indemnify the

employer in respect of all actions, claims, procedures, demands, cost expenses which

the VMC may have to incure on account of default of the contractor under the above

clause.

34. The VMC will be entitled to deduct from the bills to be paid to the contractor

any sum or sums payable by the contractors and which sum the VMC in required to pay

as a principle employer on account of default of the contractor in respect of all liabilities

referred to in above clause.

35. Force Majure

If the performance of the agreement arising out of the acceptance of the tenderer, quotation of

the tenderer by the VMC, is prevented or delayed or interfered with by any act of nature,

wars, act of enemy, blockades, embargo, insurrections, riots, political or commotions,

strikes, lockouts, acts of Government or other industrial disturbance, explosions or any

other cause whether enumerated or otherwise not within the reasonable control of the

tenderer or VMC, all of which by the exercise of due diligence is unable to foresee or

overcome the Tenderer or the VMC shall not be held responsible for the non-

performance of such agreement or prevention, delay interference or suspension in the

performance of such agreement any thereof should bone or both the parties to such

agreement be prevented from fulfilling the contractual obligation by a state of force.

Page 48: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 48

INVITEE SIGNATURE BIDDER

Majeure lasting continuously for a period of three months, both the parties shall consult with

other regarding the future implementation of such agreement.

For the force Majeure that lasts for less than three months, the agreement shall remain as it is

and suitable period equipment to time of force Majeure shall be added in to total time

limit for performance of the contract.

37. Sole Arbitrator

Municipal Commissioner, VMC shall be the sole Arbitrator. For any disputes & differences of

any kind arising out of or in connection with the contractor or the carrying out of the

works during the progress of the works or after their completion shall be referred to &

settled by Municipal Commissioner, VMC. The decision of the Municipal Commissioner

shall be final & binding to both parties.

38. Insurance

The contractor shall take full responsibility for loss damages and the care plant and works until it

is delivered to site, erected, commissioned and taken over by the owner. Without

limiting such responsibility, the contractor shall, in the joint names of the contractor and

the owner, to protect himself and the interest of the owner, insure the plant and each

part thereof for their full value until they have been taken over. The contractor alone has

to bear the premium / other expenditure for such insurance. Such insurance shall cover

the equipment against loss, damages or destruction by fire, lighting, earthquake, thefts,

perils of the sea of by any cause whatsoever, throughout the duration of the contract.

The contractor shall deposit the policy or policies and receipts for the premium paid with

the owner. All money received under any policy shall be applied in or towards the

replacement and repair of the loss or damage. The insurance must include provision for

payment of foreign currency as may be necessary in respect of any claim.

The work specified in the Tender for works expires taking into consideration the extension of

time, if any, for completion of the work, granted under the relevant clause of the

conditions of the contract in cases other than those where such extension as

necessitated on account of default of the contractor. The decision of the Additional City

Engineer as regards the Operative period of the contract, shall be final and binding on

the contractor.

Page 49: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 49

INVITEE SIGNATURE BIDDER

ANNEXURE - A :: કકકકõÁõÛÁõ¶ÛÛé ¶Û¾Ûä¶ÛÛé ::

:: કકકકõÁõÛÁõ ::

…¾ÛÛé ¸Û“ÛકÛÁõÛé:: 1. ÈÛ¦øÛé−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û ¥éø.”ÛצéøÁõÛÈÛ ¾ÛÛકëõ¤ø ÈÛ©Ûà ¾¿ÛäܶÛÜÍÛ¸ÛÅÛ કõܾÛɶÛÁõËÛà

ÈÛ¦øÛé−ùÁõÛ ›÷é¶ÛÛé ÐüÈÛé ¸Û™öà '¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û' ©ÛÁõàકéõ ŠÅÅÛé”Û કõÁõÛÉÛé ( …¶Ûé ©Ûé¾Û¶ÛÛ

ÍÛકÍÛéÍÛÍÛÙ …é¦ø¾Ûà¶ÛàͤÖéø¤øÁõËÛà¶ÛÛé ÍÛ¾ÛÛÈÛéÉÛ ¬ÛÛ¿Û ™öé) ©Û¬ÛÛ ¼Ûà›÷Û ¸Û“Û¶ÛÛ .............................

2. ............................. …é ¶ÛÛ¾Ûé µÛ×µÛÛé કÁõ©Ûà ¾ÛÛÅÛàકõà ¸Ûé§øà ›÷é¶Ûä ¾Ûä”¿Û ¾Û¬Ûકõ

............................. ¶ÛÛ ¾ÛÛÅÛàકõ ËÛà ............................. .............................

›÷é¶ÛÛé ÐüÈÛé ¸Û™öà ˆ›÷ÛÁõ−ùÛÁõ ©ÛÁõàક éõ ŠÅÅÛé”Û કõÁõÛÉÛé ©Ûé¾ÛÛ× ©Ûé¾Û¶ÛÛ કõÛ¿Û−éùÍÛÁõ¶ÛÛ ÈÛÛÁõÍÛÛé

¤ÖøÛ¶ÍÛºõÁõà¡ö …éÍÛÛˆ¶Ûà¡ö éõ …éકõ¡öàકõ¿Ûä¤øÍÛÙ ©Û¾ÛÛ¾Û¶ÛÛé ÍÛ¾ÛÛÈÛéÉÛ ¬ÛÛ¿Û ™öé. ¾ÛÐüÛ¶Û•ÛÁõ

ÍÛéÈÛÛÍÛ−ù¶Û …¶Ûé ˆ›÷ÛÁõ−ùÛÁõ ÈÛ˜˜Ûé ¶Ûà˜Ûé¶Ûà ÜÈÛ•Û©ÛÛé …¶Ûé ÉÛ©ÛÛë …×•Ûé/કõÁõÛÁõ કõÁõÈÛÛ¾ÛÛ× …ÛÈÛé ™öé.

ÈÛ¦øÛé−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û¶ÛÛ ÉÛÛ”ÛÛ –ÈÛÛÁõÛ ............................. ............................. ¶ÛÛ કõÛ¾Ûé …Ûˆ¤ø¾Û Áéõ¤ø ½ÛÛÈÛ¸ÛªÛÛé ¾ÛוÛÛÈÛ©ÛÛ ક äõÅÛ ............................. ¶Ûä ›÷é …×−ùÛœ÷ ½ÛÛÈÛ¬Ûà

.............................% ÈÛµÛä/…Ûé™öÛ¶Ûä ½ÛÛÈÛ¸ÛªÛ Í¬ÛÛ.ÍÛ.¥ø.…×કõ ............................. ©ÛÛ.

............................. ¬Ûà ˆ›÷ÛÁõ−ùÛÁõ¶ÛÛ ¶ÛÛ¾Ûé ¾Û›ä÷Áõ ¬Û¿ÛéÅÛ ™öé. Š¸ÛÁõÛéકõ©Û ˆ›÷ÛÁõ−ùÛÁõ ÍÛÛ¬Ûé

½ÛÛÈÛ¸ÛªÛ,͸ÛéÉÛàºõàકéõÉÛ¶Û,ÈÛકÙõ…Ûé¦ÙøÁõ ÜÈÛ•ÛéÁéõ ÉÛÁõ©ÛÛé Š¸ÛÁõÛ×©Û ¶Ûà˜Ûé ›÷¨ÛÛÈÛéÅÛ ÉÛÁõ©ÛÛé …×•Ûé કõÁõÛÁõ કõÁõÈÛÛ¾ÛÛ× …ÛÈÛé ™öé.

1. ˆ›÷ÛÁõ−ùÛÁéõ ½ÛÁéõÅÛ ½ÛÛÈÛ¸ÛªÛ Í¸ÛéÉÛàºõàક éõÉÛ¶Û ©Û¬ÛÛ ÉÛÁõ©ÛÛé ©Û¬ÛÛ ÍÛ−ùÁõ ˆ›÷ÛÁõÛ ÍÛ¼Û×µÛà©Û …Û¶ÛäÍÛÛוÛàકõ

©Û¾ÛÛ¾Û ¸ÛªÛÛé કõÁõÛÁõ¶ÛÛ ½ÛÛÈÛ Âú¸Ûé ›÷ •Û¨ÛÛÉÛé.

2. …Û કõÛ¾Ûé ˆ›÷ÛÁõ−ùÛÁõ ©ÛÛ. ............................. ¬Ûà ÉÛÂú કõÁõà Ü−ù¶Û ................ ¾ÛÛ× ¸ÛäÂú કõÁõÈÛÛ¶Ûä

™öé. ½ÛÛÈÛ¸ÛªÛ¾ÛÛ× કõÛ¾Û ¸ÛäÂú કõÁõÈÛÛ¶Ûà −ùÉÛÛÙÈÛéÅÛ ¾Ûä−ù©Û¾ÛÛ× ˆ›÷ÛÁõ−ùÛÁéõ ˜ÛÛéકõકõÍÛ¸Û¨Ûé કõÛ¾Û ¸ÛäÂú કõÁõÈÛä

›÷Ûé …é …¶Ûé ¥øÁéõÅÛà ¾Ûä−ù©Û¾ÛÛ× કõÛ¾Û ¸ÛäÂú કõÁõÈÛÛ¶Ûà ¥øÁéõÅÛà ©ÛÛÁõà”Û ¸Û™öà ›÷é¤øÅÛÛé ÍÛ¾Û¿Û ÈÛµÛä ¬ÛÛ¿Û

©Ûé¤øÅÛÛ ÍÛ¾Û¿Û¶ÛÛ …éકõ …¥øÈÛÛ¦øà¿ÛÛ ક éõ ©Ûé¶ÛÛ ½ÛÛ•Û −ùà¥ø ½ÛÛÈÛ¸ÛªÛ¶Ûà Áõકõ¾Û¶ÛÛ 1/2% ¸ÛÁ×õ©Ûä ÈÛµÛä¾ÛÛ ÈÛµÛä

½ÛÛÈÛ¸ÛªÛ¶Ûà Áõકõ¾Û¶ÛÛ 10% ÍÛäµÛà¶Ûà −×ù¦ø (ÅÛàકõÈÛà¦øà¤øà ¦ø¾Ûé›÷) ˆ›÷ÛÁõ−ùÛÁéõ કõÛé ÛÛéÁéõÉÛ¶Û¶Ûé ˜ÛäકõÈÛÈÛÛ¶ÛÛé ÁõÐéüÉÛé.

3. કõÛ¾Û•ÛàÁõà¶ÛÛ ÈÛક Ùõ …Ûé¦ÙøÁõ¾ÛÛ× ›÷¨ÛÛÈ¿ÛÛ ¼ÛÛ−ù કõÛ¾Û ÉÛÂú કõ¿ÛÛÙ …וÛé ˆ›÷ÛÁõ−ùÛÁéõ Ü−ù¶Û-7 ¾ÛÛ ÅÛé”Ûà©Û ¾ÛÐüÛ¶Û•ÛÁõ

ÍÛéÈÛÛÍÛ−ù¶Û¶Ûé ›÷¨ÛÛÈÛÈÛä ¸Û¦øÉÛé ©Ûé ¸Ûó¾ÛÛ¨Ûé¶Ûä ¶ÛÐüà ¬Û¿Ûé ›÷¨ÛÛ¿Ûé¬Ûà ક éõ ©¿ÛÛÁõ¼ÛÛ−ù કõÛ¾Û ¼Û×µÛ/ ÉÛÂú કõÁõÈÛÛ …וÛé¶ÛÛé

ÅÛé”Ûà©Û Áõà¸ÛÛé¤Ùø ¶ÛÐüà કõÁõÈÛÛ¾ÛÛ× …ÛÈÛé ©ÛÛé ¶Ûà˜Ûé ¾Ûä›÷¼Û −×ù¦ø ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. ( ©ÛÛ.1-4-09 ¬Ûà …¾ÛÅÛ¾ÛÛ× ¾Û×›ä÷Áõ ¬Û¿ÛéÅÛÛ −ùÁõÛé ¶Ûà˜Ûé ¾Ûä›÷¼Û ™öé.) 1. 1 ¬Ûà 7 Ü−ùÈÛÍÛ ÄõÛ. 150/- 2. 8 ¬Ûà 15 Ü−ùÈÛÍÛ ÄõÛ. 300/- 3. 16 ¬Ûà 30 Ü−ùÈÛÍÛ ÄõÛ. 600/- 4. 30 ¬Ûà ÈÛµÛä Ü−ùÈÛÍÛ ÄõÛ. 2000/- …Û ¾Ûä›÷¼Û¶ÛÛé −×ù¦ø Áõ¶Ûá•Û ¼ÛàÅÛ¾ÛÛ׬Ûà ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. 4. ÍÛ−ùÁõ કõÛ¾Ûé ˆ›÷ÛÁõ−ùÛÁéõ ½ÛÁéõÅÛÛ ½ÛÛÈÛ¸ÛªÛ ©Ûé¾Û›÷ ÍÛ−ùÁõ કõÛ¾Û¶ÛÛ ÍÛ×−ù½ÛÙ કõÁéõÅÛ ¼Û·Ûé ¸Û“ÛÛé…é કõÁéõÅÛ ¸ÛªÛ

È¿ÛÈÛÐüÛÁõ/©Ûé¾Û›÷ ©Û¾ÛÛ¾Û −ùÍ©ÛÛÈÛéœ÷ ¸ÛªÛÛé …Û કõÁõÛÁõ¶ÛÛé ½ÛÛ•Û •Û¨ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé.

5.½ÛÁéõÅÛ ½ÛÛÈÛ¸ÛªÛ¶Ûà ›÷¨ÛÛÈÛéÅÛ ÉÛÁõ©ÛÛé …¶Ûé ͸ÛéÉÛàºõàક éõÉÛ¶Û ¾Ûä›÷¼Û કõÛ¾Û•ÛàÁõà કõÁõÈÛÛ¶Ûà ÍÛ× Ûä ÛÙ ›÷ÈÛÛ¼Û−ùÛÁõà ˆ›÷ÛÁõ−ùÛÁõ¶Ûà ÁõÐéüÉÛé.

Page 50: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 50

INVITEE SIGNATURE BIDDER

6. ÍÛ−ùÁõ ˆ›÷ÛÁõ−ùÛÁéõ …Û ˆ›÷ÛÁõÛ ÅÛ•Û©Ûà ©Ûé¾Û¶Ûé ÍÛÛê ÛÈÛÛ¾ÛÛ× …ÛÈÛéÅÛà કõÛ¾Û•ÛàÁõà ÍÈÛ©Û×ªÛ ˆ›÷ÛÁõ−ùÛÁõ ©ÛÁõàક éõ

(ˆ¶¦øà¸Û鶦ø¶¤ø કõÛ鶤ÖøÛકõ¤øÁõ) કõÁõÈÛÛ¶Ûà ™öé …¶Ûé ÍÛ−ùÁõ કõÛ¾Û•ÛàÁõà¶ÛÛ ÍÛ¾Û¿Û −ùÁõ¾¿ÛÛ¶Û કõÛ¾Û•ÛàÁõà કõÁõ©Ûà ÈÛ”Û©Ûé

કõÛé ¸Û¨Û ¸ÛóકõÛÁõ¶ÛÛ …કõ;ÛÛ©Û ક éõ ¶ÛíÍÛ•Ûâકõ (…કõ;ÛÛ©Û) ¶ÛÛ કõÛÁõ¨Ûé ¾ÛÐüÛ¶Û•ÛÁõ કéõ …¶¿Û ÍÛÁõકõÛÁõà/…µÛÙ ÍÛÁõકõÛÁõà

ક éõ ”ÛÛ¶Û•Ûà ›÷Û¶Û¾ÛÛÅÛ¶Ûé ¶ÛäકõÉÛÛ¶Û ¬ÛÛ¿Û ©ÛÛé …é …×•Ûé ¶ÛäકõÉÛÛ¶Û/ÈÛÇ©ÛÁõ ક éõ …¶¿Û ›÷ÈÛÛ¼Û−ùÛÁõà…Ûé/”Û˜ÛÙ ¼ÛÛ¼Û©Û¾ÛÛ×

કõÛé ¸Û¨Û −ùÛÈÛÛé Š¸ÛÜÍ¬Û©Û ¬ÛÉÛé ©ÛÛé ©Ûé …×•Ûé¶Ûà ÍÛ× Ûä ÛÙ ›÷ÈÛÛ¼Û−ùÛÁõà ˆ›÷ÛÁõ−ùÛÁõ¶Ûà ÁõÐéüÉÛé. …Û …וÛé ¾ÛÐüÛ¶Û•ÛÁõ

ÍÛéÈÛÛÍÛ−ù¶Û¶Ûà કõÛé ¸Û¨Û ›÷Û©Û¶Ûà ›÷ÈÛÛ¼Û−ùÛÁõà ÁõÐéüÉÛé ¶ÛÐüà. 7. …Û કõÁõÛÁõ ક éõ ©Ûé¶Ûà કõÛé ¸Û¨Û ÉÛÁõ©Û …וÛé ½ÛÜÈÛÌ¿Û¾ÛÛ× કõÛé ÜÈÛÈÛÛ−ù Š¸ÛÜÍ¬Û©Û ¬ÛÉÛé ©ÛÛé ©ÛéÈÛÛ ÜÈÛÈÛÛ−ù¶ÛÛ Šક éõÅÛ

¾¿ÛäܶÛÜÍÛ¸ÛÅÛ કõܾÛɶÛÁõ ÅÛÈÛÛ−ù ©ÛÁõàકéõ કõÁõÉÛé ©¿ÛÛÁõ¼ÛÛ−ù ›÷ ˆ¶¦øà¿Û¶Û …Û¼Ûâ¤ÖéøÉÛ¶Û …éકõ¤ø 1940 ¶Ûà ›÷Ûé•ÛÈÛÛˆ…Ûé ©Ûé¾Û›÷ ÈÛ”Û©ÛÛé ÈÛ”Û©Û ©Ûé¾ÛÛ× ¬Û¿ÛéÅÛÛ ÍÛäµÛÛÁõÛ Ðéü¥øǶÛà ›÷Ûé•ÛÈÛÛˆ…Ûé ¾Ûä›÷¼Û ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û ÍÛÛéÅÛ …Û¼Ûâ¤Öéø¤øÁõ ©ÛÁõàકéõ ¶Ûà¾ÛÉÛé …¶Û ©ÛéÈÛÛ ÜÈÛÈÛÛ−ù¶ÛÛé ›÷é ક×õˆ ܶۨÛÙ¿Û …ÛÈÛÉÛé ©Ûé …Û”ÛÁõà •Û¨ÛÛÉÛé …¶Ûé ¼Û׶Ûé ¸Û“ÛકõÛÁõÛé¶Ûé ¼Û×µÛ¶Ûકõ©ÛÛÙ ÁõÐéüÉÛé. 8. ¤éø¶¦øÁõ¶Ûà ›÷Ûé•ÛÈÛÛˆ ¸Ûó¾ÛÛ¨Ûé ¾Û¤øàÁõà¿ÛÅÛ¶Ûä ¤éøͤøá•Û કõÁõà Áõà¸ÛÛé¤Ùø Áõ›ä÷ કõÁõÈÛÛ¶Ûà ›÷ÈÛÛ¼Û−ùÛÁõà ˆ›÷ÛÁõ−ùÛÁõ¶Ûà ¸ÛÛé©ÛÛ¶Ûà ÁõÐéüÉÛé. 9. ˆ›÷ÛÁõ−ùÛÁéõ કõÛ鶤ÖøÛકõ¤ø ÅÛé¼ÛÁõ (ÁéõÅ¿Ûä…éÉÛ¶Û …¶Ûé …é¼ÛÛéÅÛéÉÛ¶Û) …éકõ¤ø ¸ÛóÛéÈÛà¦ø¶¤ø º×õ¦ø …éકõ¤ø¶Ûà ›÷Ûé•ÛÈÛÛˆ…Ûé¶Ûä

¸ÛÛÅÛ¶Û કõÁõÈÛÛ¶Ûä ÁõÐéüÉÛé. Minimum Wages Act, ÍÛéºõ¤øà …éકõ¤ø ક éõ ÈÛ”Û©ÛÛéÈÛ”Û©Û ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û, ક éõ

ÍÛÁõકõÛÁõ –ÈÛÛÁõÛ ÅÛÛ•Ûä કõÁõÈÛÛ¾ÛÛ× …ÛÈÛé ©ÛéÈÛÛ કõÛ¿Û−ùÛ…Ûé¶Ûä ¸ÛÛÅÛ¶Û કõÁõÈÛÛ¶Ûà ›÷ÈÛÛ¼Û−ùÛÁõà ˆ›÷ÛÁõ−ùÛÁõ¶Ûà ÁõÐéüÉÛé .

10 .…Û કõÁõÛÁõ ક éõ ©Ûé¶Ûà કõÛé ¸Û¨Û ÉÛÁõ©ÛÛé …×•Ûé કõÛé ÜÈÛÈÛÛ−ù Š¸ÛÜÍ¬Û©Û ¬ÛÉÛé ©ÛÛé ¾Ûä−ùÛ ¶Û×.6 ¾ÛÛ× ›÷¨ÛÛÈ¿ÛÛ ¼ÛÛ−ù

¶ÛÛ¾Û−ùÛÁõ ÈÛ¦øÛé−ùÁõÛ કõÛé¤Ùø¶Ûà Ðüક äõ¾Û©Û¶Ûé …ÛµÛà¶Û ÁõÐéüÉÛé. 11. ˆ›÷ÛÁõ−ùÛÁéõ ÍÛ−ùÁõ કõÛ¾Û ÅÛ•Û©Ûà કõÛ鶤ÖøÛકõ¤ø …ÛéÅÛ ÁõàકõÍÛ ¸ÛÛéÅÛàÍÛà ÅÛéÈÛÛ¶Ûà ÁõÐéüÉÛé. …¶Ûé©Ûé¾ÛÛ× ˜Ûäકõ કõ ÜÈÛÅÛ×¼Û ¬ÛÛ¿Û ©ÛÛé ©Ûé …×•Ûé¶Ûà ©Û¾ÛÛ¾Û ›÷ÈÛÛ¼Û−ùÛÁõà ˆ›÷ÛÁõ−ùÛÁõ¶Ûà ÁõÐéüÉÛé. 12.½ÛÛÈÛ¸ÛªÛ¾ÛÛ× ›÷¨ÛÛÈ¿ÛÛ ¾Ûä›÷¼Û ક éõ ˆ›÷ÛÁõ−ùÛÁõ ÍÛ−ùÁõ કõÁõÛÁõ¶Ûà ÉÛÁõ©ÛÛé¶ÛÛé ½Û×•Û કõÁõÉÛé ©ÛÛé ˆ›÷ÛÁõ−ùÛÁõ¶Ûé ¾Ûäકõ©Û

કõÁõÈÛÛ¶ÛÛ TERMINATE AND BLACKLIST ¸Û•ÛÅÛÛ× ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û ÅÛˆ ÉÛકõÉÛé. 13. ÍÛ−ùÁõ કõÛ¾Û ˆ›÷ÛÁõ−ùÛÁõ કõÛ é કõÛÁõ¨ÛÍÛÁõ ¸ÛäÂú કõÁõÈÛÛ¾ÛÛ× Ü¶Û̺õÇ ¶ÛàÈÛ¦éø ©ÛéÈÛÛ ¸ÛóÍÛוÛé કõÛé ÛÛëÁéõÉÛ¶Û ÍÛ−ùÁõ

કõÛ¾Û•ÛàÁõà …¶¿Û ˆ›÷ÛÁõ−ùÛÁõ …¬ÛÈÛÛ ÍÛ×ͬÛÛ ¸ÛÛÍÛé ÍÛ−ùÁõ કõÛ¾Û¶ÛÛ ˆ›÷ÛÁõ−ùÛÁõ¶ÛÛ ”Û˜Ûë …¶Ûé ›÷Ûé”Û¼Ûé કõÁõÛÈÛà ÅÛéÉÛé, ©Ûé

…וÛé ›÷é કõÛé ”Û˜ÛÙ ¬ÛÛ¿Û ©Ûé ÍÛ−ùÁõ ˆ›÷ÛÁõ−ùÛÁõ ¸ÛÛÍÛé¬Ûà ÈÛÍÛäÅÛ કõÁõÈÛÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û¶Ûé ©Û¾ÛÛ¾Û …ܵÛકõÛÁõ

ÁõÐéüÉÛé ©Û¬ÛÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û¶Ûé ¿ÛÛé•¿Û ›÷¨ÛÛ¿Ûé ©ÛÛé ˆ›÷ÛÁõ−ùÛÁõ –ÈÛÛÁõÛ ½ÛÁéõÅÛ ©Û¾ÛÛ¾Û …¶ÛÛ¾Û©ÛÛé ›÷¸©Û કõÁõà

ÉÛકõÉÛé. 14. ઇ�રદાર ભાવપ+કમા દશા#વલ કામગીરી $પસીફીકશન મજબ કરવાની રહશ તમા $પrટતા

ન હોય તો આઇ .એસ .$પસીફીકશન મજબ તથા તમા પણ જો $પrટતા ન હોય તો

પી.ડH<ય.ડી.મ:યઅલની જોગવાઇ -માણ કામગીરી કરવાની રહશ. 15. કõÛ¾Û•ÛàÁõà¶Ûà ¸Ûó•ÛÜ©Û ÍÛ¾Û¿Û ¾Û¿ÛÛÙ−ùÛ¶Ûé µ¿ÛÛ¶Ûé ÁõÛ”Ûà કõÁõÈÛÛ¶Ûà ÁõÐéüÉÛé ©Û¬ÛÛ કõÛ¾Û•ÛàÁõà ÍÛ¾Û¿Û ¾Û¿ÛÛÙ−ùÛ¾ÛÛ× ¸Ûä ÛÙ

કõÁõÈÛÛ¶Ûà ÁõÐéüÉÛé.

…Û કõÁõÛÁõ …¾ÛÛé ¼Û׶Ûé ¸Û“ÛકõÛÁõÛé…é ÈÛÛ× Ûà,ÍÛ¾Ûœ÷ ÍÛ½ÛÛ¶Û©ÛÛ¾ÛÛ× કõÁõà …Û¸Ûà ©Ûé …¾ÛÛé¶Ûé કõ¼ÛäÅÛ ¾Û×›ä÷Áõ ™öé. ©ÛÛÁõà”Û: / /૨૦૧૧. ͬÛÇ: ÈÛ¦øÛé−ùÁõÛ

Page 51: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 51

INVITEE SIGNATURE BIDDER

ˆ›÷ÛÁõ−ùÛÁõ¶Ûà ÍÛÐüà. ˆ›÷ÛÁõ−ùÛÁõ¶Ûà ÍÛ×ͬÛÛ¶Ûä ¶ÛÛ¾Û …¶Ûé ÍÛÁõ¶ÛÛ¾Ûä

ÍÛÛ“Ûà 1.¶ÛÛ¾Û ÍÛÐüà ÍÛÁõ¶ÛÛ¾Ûä:

Áõ. ¶ÛÛ¾Û ÍÛÐüà.

ÍÛÁõ¶ÛÛ¾Ûä: કõÛ¿ÛÙ ÛÛÅÛકõ ˆ›÷¶ÛéÁõ (ÐüÛŠÍÛá•Û) ÈÛ¦øÛé−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û ÈÛ©Ûà

Š¸ÛÁõ¶Ûä ÍÛàÅÛ …¾ÛÛÁõà Âú¼ÛÂú ÅÛ•ÛÛ¦øÈÛÛ¾ÛÛ× …ÛÈ¿Ûä ™öé. ÈÛ¦øÛé−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛÍÛ−ù¶Û ͬÛÛ¿Ûà ÍÛܾÛÜ©Û¶ÛÛ ÍÛ½ÛÛÍÛ−ùÛé 1. ¶ÛÛ¾Û: ÍÛÐüà: 2. ¶ÛÛ¾Û: ÍÛÐüà.

Page 52: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 52

INVITEE SIGNATURE BIDDER

ANNEXURE-B

(Ref. Clause of general condition of contract)

કકકકõÁéõÅÛ કકકકõõÛ¾Û•ÛàÁõà¶Ûä ˜Ûä×કકકકõõÈÛ¨Ûä× õકકકકõÁõÈÛÛ ¾ÛÛ¤éø ˆ›÷ÛÁõ−ùÛÁéõ Áõ›ä÷ õકકકકõÁõÈÛÛ¶Ûà ÜÈÛ•Û©Û

¾ÛäÇ ¤éø¶¦øÁõ ¾Ûä›÷¼Û …Ûˆ¤ø¾Û

¶Û×.

…Ûˆ¤ø¾Û¶Ûà ÜÈÛ•Û©Û ¶Û×¼ÛÁõ ÅÛ×¼ÛÛˆ ¸ÛÐüÛéÇÛˆ ‹¦øÛˆ ›÷¬¬ÛÛé ¾ÛÛוۨÛà õકકકકõÁéõÅÛ

¤éø¶¦øÁõ ¾Ûä›÷¼Û ½ÛÛÈÛ

Š¸ÛÁõ ¾Ûä›÷¼Û¶Ûà ÜÈÛ•Û©ÛÛé ¸Ûó¾ÛÛ¨Ûé¶Ûà õÛ¾Û•ÛàÁõà ¤éø¶¦øÁõ¶Ûà ›÷Ûé•ÛÈÛÛˆ…Ûé/͸ÛéÉÛàºõà éõÉÛ¶Û ¾Ûä›÷¼Û …¾ÛÛé…é ¸Ûä ÛÙ કõÁéõÅÛ ™öé …¶Ûé

©Ûé¶Ûä ચકવણ Áõ¶Ûá•Û¼ÛàÅÛ/ºõÛˆ¶ÛÅÛ¼ÛàÅÛ ©ÛÁõàક …Û¸ÛÈÛÛ ÜÈÛ¶ÛשÛà ™öé.

©ÛÛ. / /2012.

ˆ›÷ÛÁõ−ùÛÁõ¶Ûà ÍÛÐüà.

- ઉ૫રોકતન ૫+/બીલ મજબ ઇ�રદારની બીલ ચકવણ કરવાની માગણી આ} યા બાદ બીલના ચકવણાની કાય#વાહી

કરવામા આવશ.

Page 53: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 53

INVITEE SIGNATURE BIDDER

PRICE-BID

Name of Work :- WORK OF LAYING RUBBER MOULDED PAVER BLOCKS AT MUNICIPAL LIBRARY , SUBHANPURA

Dimensions of

Quantity Item

Rate Per Amount Rs. Ps.

140.00

Item:1 Excavation of soil up to 1.5 m depth including sorting out and staking of useful material and disposing within 50 mtr Lead. (R & B SOR 2011-12, Page No - 81, It No. 8, Ch. No. 26)

Cum

140.00

Item:2 Carting of Excavated excess stuff and earth as per instruction given by Engineer Incharge within limits of municipal. ( R & B SOR 2011-12, Page No - 81, It No. 10(C), Ch. No. 26 ) Cum

40.00

Item:3 Providing and laying of good quality of yellow soil as per specification and instruction by site incharge. ( R & B SOR 2011-12, Page No - 80, It No. 1, Ch. No. 26 )

Cum

60.00

Item:4 Providing and laying of BBCC (Brick Bat Cement Concrete) of 1:5:10 (Cement:Sand:BrickBat) including ramming/rolling, watering, etc. complete as per specification and Instruction by Engineer incharge . ( R & B SOR 2011-12, Page No - 7, It No. 9, Ch. No. 5 )

Cum

380.00

Item:5 Providing, laying and fixing of 80mm thick(M 45 grade) RUBBER MOULDED interlocking coloured paver block as per design given by Engineer Incharge with 75mm thick sand bed layer, watering, compacting, paving. with compact by mechanical compacter etc. complete as per specification ( Approved Rate) Cum

Page 54: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 54

INVITEE SIGNATURE BIDDER

7.00

Item:6 Providing and supplying precast ordinary cement concrete M-200 for Standard size & Shape of divider stone, kerbs stone (for footpath & service track) incl formwork, curing , and finishing complete as per specification and Instruction by engineer incharge. ( R & B SOR 2011-12, Bridge Page No - 18,It No. 92(A))

Cum

80.00

Item:7 Fixing of precast divider stone in line, level and filling with the joint in 1:3 cement mortar and finish joint with cement slurry including curing etc complete. as per specification and instruction by site incharge. ( Approved rate)

Rmt

TOTAL Rs.

IN WORDS -

CONTRACTOR’S SIGN AND SEAL –

Page 55: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 55

INVITEE SIGNATURE BIDDER

DETAIL TECHNICAL

SPECIFICATIONS Name of Work :- WORK OF LAYING RUBBER MOULDED PAVER BLOCKS AT MUNICIPAL LIBRARY , SUBHANPURA.

…Û¿Û¤ø¾Û ¶Û×. ૧ ૧ ૧ ૧ , ૨૨૨૨ ¾ÛÛ¤øà ”ÛÛéùù−ùÛ¨Û õકકકકÁõÈÛÛ¶Ûä× કામ કામ કામ કામ અન ઉપાડવાન કામઅન ઉપાડવાન કામઅન ઉપાડવાન કામઅન ઉપાડવાન કામ :---- 1. ”ÛÛéù−ùùÛ¨Û õÛ¾Û õÛé†¸Û¨Û ¸Ûó õÛÁõ¶Ûà ¾ÛÛ¤øà, Áéõ©Ûà ¶ÛÁõ¾Û ¾ÛäÁõ¾Û¾ÛÛ× ÅÛÛ†¶Û, ÅÛéÈÛÅÛ éõ¾¼ÛÁõ ¾Ûä›÷¼Û õÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé. ”ÛÛé−ùùééùÅÛà ¾ÛÛ¤øà, Áõ¼ÛàÉÛ, ÜÈÛ•ÛéÁéõ …ªÛé¬Ûà ¼Û©ÛÛÈÛÈÛÛ¾ÛÛ× …ÛÈÛé ©Ûé ¾Ûä›÷¼Û ¸Û0 ¾Ûà¤øÁõ ÍÛäµÛà ÅÛà¦ø¾ÛÛ× ½Ûé•Ûà õÁõÈÛÛ¶Ûà, ÍÛä˜Û¶ÛÛ ¸Ûó¾ÛÛ¨Ûé ¸ÛÛ¬ÛÁõà …Û¸ÛÈÛÛ¶Ûà ©Û¬ÛÛ ÅÛà¦ø¶Ûà ¾Û¿ÛÛÙùù−ùÛ¾ÛÛ× ¸Ûä¶Û: ¼Û©ÛÛÈÛéÅÛ Í¬ÛÇé ½ÛÁõà …Û¸ÛÈÛÛ¶Ûà ÁõÐéüÉÛé. …¶Ûé 50 ¾Ûà¤øÁõ Š¸ÛÁõÛש۶Ûà ÅÛà¦ø ¾ÛÛ¤éø ºäõ¤ø¸ÛÛ¬Û, ¦øàÈÛÛ†¦øÁõ ©Û¬ÛÛ ÍÛÜÈÛÙÍÛ ¤Öéø õ õÁõÈÛÛ¶Ûà …Û†¤ø¾Û ¶Û×. 10 ¸Ûó¾ÛÛ¨Ûé ˜Ûä õÈÛ¨Ûä× õÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. 2. ”ÛÛéù−ùùÛ¨Û ¼ÛÛ−ùùù ÍÛ¼Û•Ûóé¦ …ªÛé¬Ûà ˜Ûé õ õÁõÛÈ¿ÛÛ ¼ÛÛ−ùùù ›÷ …Û•ÛǶÛà õÛ¾Û•ÛàÁõà õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. Š¸ÛÁõÛ×©Û ”ÛÛéùù−ùÛ¨Û õÁõ©ÛÛ× ¸ÛÐéüÅÛÛ Í¬ÛÇé Š•Ûà ¶Ûà õÇéÅÛ µÛÛÍÛ, ™öÛé¦ø, ÜÈÛ•ÛéÁéõ †›÷ÛÁùõù−ùÛÁéõ −æùÁõ õÁõà ÍÛÛ†¤ø ˜ÛÛé””Ûà õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. 3. ͬÛÇé õÛ¾Û ˜ÛÛÅÛä õÁõ©ÛÛ× ¸ÛÐéüÅÛÛ× ÈÛÛÐü¶Û È¿ÛÈÛÐüÛÁõ¶ÛÛ Ü¶Û¿Û¾Û¶Û ¾ÛÛ¤éø †›÷ÛÁõù−ùùÛÁéõ ‘ÁõÍ©ÛÛé ¼Û×µÛ ™öé’. ÜÈÛ•ÛéÁéõ −ùÉÛÛÙÈÛ©ÛÛ ¼ÛÛé¦Ùø, ÅÛÛÅÛ¼Û«Ûà, ˜ÛÛé õà−ùùùÛÁõ ÁõÛ”ÛÈÛÛ ÜÈÛ•ÛéÁéõ¶Ûà È¿ÛÈÛͬÛÛ ¸ÛÛé©ÛÛ¶ÛÛ ”Û˜Ûë ©Û¬ÛÛ ›÷Ûé”Û¾Ûé õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. ”ÛÛùéù−ùÛ¨Û õÛ¾Û ¾ÛÛ¤éø ÅÛÛ†¶Û ÅÛéÈÛÛ ¾ÛÛ¤éø¶ÛÛé ÍÛÛ¾ÛÛ¶Û ›÷éÈÛÛé éõ ù−ùùÛéÁõà, ˜Ûä¶ÛÛ¶Ûà ºõÛ× õ ”Ûä¤øà ÜÈÛ•ÛéÁéõ †›÷ÛÁùõ−ùùÛÁéõ ÍÈÛ”Û˜Ûë ÅÛÛÈÛÈÛÛ¶Ûà ÁõÐéüÉÛé. 4. ”ÛÛé−ùÛ¨Û¶Ûà õÛ¾Û•ÛàÁõà ÉÛÄõ õÁõ©ÛÛ× ¸ÛÐéüÅÛÛ× ¤ÖøÛ¿ÛÅÛ ¸Ûà¤ø ÅÛ† ÍÛÈÛâÍÛ ÅÛÛ†¶Û¶Ûà ”ÛÛªÛà õÁõà õÛ¾Û•ÛàÁõà õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. ”ÛÛé−ùÛ¨Û¾ÛÛ× …ÛÈÛ©ÛÛ ¸ÛÛ¨Ûà¶Ûà ÅÛÛ†¶Û, •Û¤øÁõ¶Ûà ÅÛÛ†¶Û ©Û¬ÛÛ •ÛéÍÛ ÅÛÛ†¶Û ©Û¬ÛÛ ›÷Ûé¦øÛ¨Û, †ÅÛé õ¤ÖøàÍÛà¤øà ©Û¬ÛÛ ¤éøÅÛàºõÛé¶Û ÜÈÛ•ÛéÁéõ¶Ûà ÅÛÛ†¶ÛÛé ©Û¬ÛÛ éõ¼ÛÅÛÛé¶Ûé, õÛé†¸Û¨Û ›÷Û©Û¶Ûä× ¶Ûä õÉÛÛ¶Û ¬ÛÉÛé ©ÛÛé ©Ûé¶Ûà ÍÛ× Ûä ÛÙ ›÷ÈÛÛ¼ÛùùÛÁõà †›÷ÛÁùõù−ùÛÁõ¶Ûà ÁõÐéüÉÛé …¶Ûé ©Ûé …×•Ûé ›÷ÄõÁõà −ùùäùÁõÍ©Ûà …¬ÛÈÛÛ ¶ÛÈÛà¶Û õÛ¾Û•ÛàÁõà †›÷ÛÁõ−ùùùÛÁéõ ¸ÛÛé©ÛÛ¶ÛÛ ”Û˜Ûë ÈÛÐéüÅÛà ©Û éõõ ÍÛשÛÛéÌÛ õÛÁõ õ Áõà©Ûé õÁõà …Û¸ÛÈÛÛ¶Ûà ÁõÐéüÉÛé. ›÷Ûé ©Ûé ¸Ûó¾ÛÛ¨Ûé¶Ûä −ùäùÁõÍ©Ûà …¬ÛÈÛÛ ¶ÛÈÛà¶Û õÛ¾Û•ÛàÁõà ©ÛÛ© õÛÅÛà õ õÁõà …Û¸ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé ¶ÛÐüà ©ÛÛé ©Ûé õÛ¾Û ¼Ûàœ÷ …é›÷¶ÍÛà …¬ÛÈÛÛ ¼Ûà›÷Û ”ÛÛ©ÛÛ ¾ÛÛÁõºõ©Ûé …ªÛé¬Ûà õÁõÛÈÛà ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. …¶Ûé ©Ûé¶Ûà −äùÁõÍ©Ûà …×•Ûé¶ÛÛé ©Û¾ÛÛ¾Û ”Û˜ÛÙ †›÷ÛÁ−ùõùÛÁõ¶ÛÛ ¼ÛàÅÛ¾ÛÛ׬Ûà …¬ÛÈÛÛ ¼Ûàœ÷ ÅÐéü¨Ûà Áõ õ¾Û¾ÛÛ׬Ûà ÈÛÍÛäÅÛ õÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. 5. ÍÛ−ùùùÁõ õÛ¾Û¶Ûä× ¾ÛÛ¸Û µÛ¶Û¾Ûà¤øÁõ¶ÛÛ µÛÛéÁõ¨Ûé …Û¸ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. …é¾ÛÛ õÛé ¸Û¨Û ¸Ûó õÛÁõ¶ÛÛé ¼ÛÅ éõ›÷-“Bulkage” …Û¸ÛÈÛÛ¾ÛÛ …ÛÈÛÉÛé ¶ÛÐüà.

૬. ”ÛÛéù−ùùÛ¨Û õÛ¾Û/ͬÛÇ ¸ÛÁõ¶Ûà ÈÛµÛÛÁõÛ¶Ûà ¾ÛÛ¤øà, ÁõÛé¦øÛ, Áõ¼ÛàÉÛ ÜÈÛ•ÛéÁéõ …ªÛé¶Ûà ÍÛæ Û¶ÛÛ ¾Ûä›÷¼Û Š¸ÛÛ¦øÈÛÛ¶Ûä×

ÁõÐéüÉÛé.

Page 56: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 56

INVITEE SIGNATURE BIDDER

૭. Š¸ÛÛ¦éøÅÛ ¾Û¤øàÁõà¿ÛÅÛ …ªÛé¶Ûà ÍÛæ Û¶ÛÛ ¾Ûä›÷¼Û ¾¿ÛäܶÛ.Ð−ùùüù¾ÛÛ× ¼Û©ÛÛÈ¿ÛÛ ¾Ûä›÷¼Û¶ÛÛ Í¬ÛÇé ”ÛÛÅÛà õÁõà

…Û¸ÛÈÛÛ¶Ûä×/¸ÛÛ¬ÛÁõà …Û¸ÛÈÛÛ¶Ûä× ÁõÐéüÉÛé.

૮. ÍÛùù−ùÁõ õÛ¾Û¶Ûä× ¾ÛÛ¸Û –Û.¾Ûà.¶ÛÛ µÛÛéÁõ¨Ûé …Û¸ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. …é¾ÛÛ õÛé ¸Û¨Û ¸Ûó õÛÁõ¶ÛÛé ¼ÛÅ éõ›÷ …Û¸ÛÈÛÛ¾ÛÛ

…ÛÈÛÉÛé ¶ÛÐüà.

…Û¿Û¤ø¾Û ¶Û×.૩૩૩૩ ÍÛÛÁõà ›÷Û©Û¶Ûà ¸ÛàÇà ¾ÛÛ¤øà ¸ÛäÁõÛ¨Û õÁõÈÛÛ¶Ûä× õÛ¾Û.

1. ¸ÛäÁõÛ¨Û õÁõ©ÛÛ× ¸ÛÐéüÅÛÛ× Í¬ÛÇé Š•Ûà ¶Ûà õÇéÅÛä× µÛÛÍÛ, ™öÛé¦ø, ÈÛÛ¦ø ÜÈÛ•ÛéÁéõ õÛ§øà¶Ûé ÍÛÛ†¤ø ˜ÛÛé””Ûà õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. …ªÛé¬Ûà ÍÛä ÛÈ¿ÛÛ ¾Ûä›÷¼Û ¼ÛÐüÛÁõ¬Ûà ¶Ûà˜Ûé −ùùÉÛÛÙÈÛéÅÛ •Ûä ÛÈÛ«ÛÛÈÛÛÇà ¾ÛÛ¤øà ÅÛÛÈÛà, ¸ÛÛÍÛ õÁõÛÈÛà ¼Û©ÛÛÈÛÈÛÛ¾ÛÛ× …ÛÈÛé ©Ûé ¸Ûó¾ÛÛ¨Ûé ÅÛÛ†¶Û ÅÛéÈÛÅÛ¾ÛÛ× ¸ÛäÁõÛ¨Û õÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé. 2. ¸ÛäÁõÛ¨Û¶Ûà ›÷Û¦øÛ† ÈÛµÛä¾ÛÛ× ÈÛµÛä 30 ÍÛé.¾Ûà.¶ÛÛ ¬ÛÁõ¾ÛÛ× ÁõÐéüÉÛé 3. ¼Ûà›÷Û ¬ÛÁõ¶Ûä× ¸ÛäÁõÛ¨Û õÁõ©ÛÛ× ¸ÛÐéüÅÛÛ× †›÷ÛÁùõ−ùùÛÁéõ ›÷ÄõÁõà ÈÛÛé¤øÁõá•Û/ Áéõ¾Ûá•Û ¶Ûà õÛ¾Û•ÛàÁõà ÍÛשÛÛéÌÛ õÛÁõ õ Áõà©Ûé ¸ÛäÁõà õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. 4. ¾ÛÛ¤øà ¸ÛäÁõÛ¨Û¾ÛÛ× §éøºõÛ× ÐüÉÛé ©ÛÛé ½ÛÛוÛà¶Ûé ÍÛÁõ”ÛÛ õÁõà ¸ÛäÁõÛ¨Û õÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé. …¬ÛÈÛÛ ¬Û¿ÛéÅÛÛ õÛ¾Û ¼ÛÛ−ùù ÈÛµÛÛÁõÛ¶Ûä× ¸ÛäÁõÛ¨Û õÁõÈÛÛ¶Ûä× ÐüÛé¿Û ©ÛÛé ù ÍÛ×›÷Ûé•ÛÛéÈÛÍÛÛ©Û Š•Ûà ¶Ûà õÇéÅÛä× –ÛÛÍÛ, ™öÛé¦ø ÜÈÛ•ÛéÁéõ ˆ›÷ÛÁõ−ùùùÛÁéõ −ùùäùÁõ õÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé. …¶Ûé ©Ûé ¾ÛÛ¤éø …ÅÛ•Û ˜Ûä õÈÛ¨Ûä× …Û¸ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé ¶ÛÐüá. 5. ÍÛ−ùùùÁõ õÛ¾Û¶Ûä× ¾ÛÛ¸Û –Û¶Û¾Ûà¤øÁõ¶ÛÛ µÛÛéÁõ¨Ûé …¬ÛÈÛÛ ÅÛéÈÛÅÛ¬Ûà …Û¸ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. …Û¿Û¤ø¾Û ¶Û×. 4 WORK OF DOING B.B.C.C. IN 1;5;10 õÁõÈÛÛ¶Ûä× õÛ¾Û : ¾Û¤øàÁõà¿ÛÅÛ :- 1. ÁõÛé¦øÛ ÍÛÛÁõà ¸Û õÈÛéÅÛà ÅÛÛÅÛ õÅÛÁõ¶Ûà ‡¤øÛé¶ÛÛ ¦øͤø ÈÛ•ÛÁõ¶ÛÛ ÅÛÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 2. Áéõ©Ûà …ÛéÁõÍÛו۶Ûà ÈÛÛ¸ÛÁõÈÛÛ¶Ûà ÁõÐüÉÛé.Áéõ©Ûà¾ÛÛ× ¾ÛÛ¤øà¶Ûä× ¸Ûó¾ÛÛ¨Û 3%¬Ûà ÈÛµÛä ˜ÛÛÅÛÉÛé ¶ÛÐüà. 3. ÁõÛé¦øÛ õÛê’õà¤ø 1:5:10 ¶ÛÛ ¸Ûó¾ÛÛ¨Ûé 1 ½ÛÛ•Û ÍÛà¾Û鶤ø, 5 ½ÛÛ•Û Áéõ©Ûà,10 ½ÛÛ•Û ÁõÛé¦øÛ¶ÛÛ ¸Ûó¾ÛÛ¨Ûé ¼Û¶ÛÛÈÛÈÛÛ¶Ûä× ÁõÐéüÉÛé. ¾Û›ä÷Áõà õÛ¾Û :-

…Û ¸Ûó¾ÛÛ¨Ûé¶ÛÛ ˜Û¤èøÛé ¸ÅÛé¤øºõÛé¾ÛÙ Š¸ÛÁõ õÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé …¶Ûé ¾ÛÛÅÛ ÍÛä õ õÛé ¼ÛÁõÛ¼ÛÁõ ¾Ûà õÍÛ õÁõà ¸ÛÛ¨Ûà

Áéõ¦ø¿ÛÛ ¼ÛÛ−ùù ¼ÛÁõÛ¼ÛÁõ ¾Ûà õÍÛ õÁõà …é õ ÍÛÁõ”ÛÛé …¶Ûé …é õ ÍÛÁõ”ÛÛ Á×õ•Û¶ÛÛé ¬ÛÛ¿Û ©¿ÛÛÁéõ ¸Û™öà ›÷ õÛê’õà¤ø ¾ÛÛ¤éø

ÅÛ† ›÷† ÉÛ õÛÉÛé …¶Ûé ©Ûé 23 ÍÛé.¾Ûà. õÁõ©ÛÛ× ÈÛµÛä ‹¦øÛ†¶ÛÛ ¬ÛÁõ¾ÛÛ× õÁõÈÛÛ −ùéùÈÛÛ¾ÛÛ× …ÛÈÛÉÛé ¶ÛÐüá. …¶Ûé ‹˜Ûé¬Ûà

ºéõ õÈÛÛ −ùéùÈÛÛ¾ÛÛ× …ÛÈÛÉÛé ¶ÛÐüá. …Û Áõà©Ûé ¬ÛÁõ¾ÛÛ× ¶ÛÛ×”ÛéÅÛÛ õÛê’éõ¤ø¶Ûé ¼ÛÁõÛ¼ÛÁõ ¤øà¸Ûà ÍÛ¸ÛÛ¤øà ¼ÛÁõÛ¼ÛÁõ ÍÛ¾Û©ÛÅÛ

õÁõÈÛà ¸Û¦øÉÛé. …¦µÛÛ õÅÛÛ õ¾ÛÛ× ÈÛ¸ÛÁõÛ† ›÷Û¿Û ©Ûé¤øÅÛÛé›÷ ¾ÛÛÅÛ ¸ÛÛ¨Ûà ¶ÛÛ×”Ûà õÛÅÛÈÛÈÛÛ éùÈÛ¾ÛÛ× …ÛÈÛÉÛé …¶Ûé

…¦øµÛÛ õÅÛÛ õ õÁõ©ÛÛ× ÈÛµÛä ÈÛ”Û©Ûé ¸Û¦éøÅÛÛé ½Ûà¶ÛÛé ¾ÛÛÅÛ ÈÛÛ¸ÛÁõÈÛÛ éùÈÛÛ¾ÛÛ× …ÛÈÛÉÛé ¶ÛÐüá ¸ÛÁ×õ©Ûä ºêõ õà éùÈÛÛé ¸Û¦øÉÛé.

…Û Áõà©Ûé ¬Û¿ÛéÅÛä× õÛê’õà¤ø õÛ¾Û ¸ÛÛ¨Ûà¬Ûà 15 Üù−ùÈÛÍÛ ¼ÛÁõÛ¼ÛÁõ õ¿ÛÛéÁõ õÁõÈÛä× ¸Û¦øÉÛé. ½ÛÛÈÛ¶ÛÛé −ùùÁ õ –

Û¶Û¾Ûà¤øÁõ¶ÛÛé ÁõÐéüÉÛé.

Page 57: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 57

INVITEE SIGNATURE BIDDER

…Û¿Û¤ø¾Û ¶Û×. 5: 80 …é¾Û.…é¾Û.õ›÷Û¦øÛ†¶ÛÛ× રબર મો<ડડ કલરરબર મો<ડડ કલરરબર મો<ડડ કલરરબર મો<ડડ કલર †¶¤øÁõÅÛÛé õá•Û ¸ÛéÈÛÁõ ¼ÅÛÛé õ ÅÛÛÈÛà

¼ÛéÍÛÛ¦øÈÛÛ¶Ûä× õÛ¾Û ¾Û¤øàÁõà¿ÛÅÛ-

1. રબર મો<ડડ કલર †¶¤øÁõÅÛÛé õá•Û ¸ÛéÈÛÁõ ¼ÅÛÛé õ …Û†.…éÍÛ.¾Ûä›÷¼Û ”ÛÛ©ÛÛ¶Ûà ›÷ÄõÁõà¿ÛÛ©Û ¾Ûä›÷¼Û

80.0 ¾Ûà.¾Ûà.›÷Û¦øÛ†¶ÛÛ M 45 •Ûóé¦ø¶ÛÛ ¦øà¡öÛ†¶Û¶ÛÛ ¼Û¶ÛÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé.›÷é¶Ûà õÛ龸ÛóéÉÛàÈÛ Í¤Öéø¶•¬Û ¶Ûà˜Ûé ›÷¨ÛÛÈ¿ÛÛ ¾Ûä›÷¼Û¶Ûà ÁõÐéüÉÛé.(AS PER DOC: CED5(6064)/November 2003 of Bureau of Indian Standards.

Compressive strength requirements of concrete paver blocks. (Clauses 6.2.5.2 and 9.1.4 of Ref. Doc.)

Sr.NO. Grade of Paver

Block Minimum Average

28 days Compressive

Strength (N/mm2)

Minimum Compressive Strength of Individual Paver Block (N/mm2)

i M-25 25 21 ii M-30 30 26 iii M-35 35 30 iv M-40 40 34 v M-45 45 38 vi M-50 50 43 vii M-55 55 47

2. †¶¤øÁõ ÅÛÛé õá•Û õÅÛÁõ ¸ÛéÈÛÁõ ¼ÅÛÛé õ¾ÛÛ× ©Ûæ¤éøÅÛà µÛÛÁõÛé ÈÛ•ÛÁõ¶ÛÛ Í¾ÛäµÛ ÍÛÁõºéõÉÛ ©Ûé¾Û›÷ ºõà¶ÛàÉÛá•ÛÈÛÛÇÛ ÁõÐéü ©Ûé ¾Ûä›÷¼Û¶ÛÛ ¼Û¶ÛÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 3. †¶¤øÁõÅÛÛé õá•Û õÅÛÁõ ¸ÛéÈÛÁõ ¼ÅÛÛé …ªÛé¶Ûà ÍÛä Û¶ÛÛ ¾Ûä›÷¼Û¶ÛÛ õÅÛÁõ¶ÛÛ ¼Û¶ÛÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 4. õÅÛÁõ ¸ÛéÈÛÁõ ¼ÅÛÛé õ¾ÛÛ× …é õ›÷ õÅÛÁõ¶ÛÛ ›÷¬¬ÛÛ¾ÛÛ× õÅÛÁõ …ÅÛ•Û …ÅÛ•Û ¶Û …ÛÈÛé ©Ûé ¾Ûä›÷¼Û¶Ûà õÛÇœ÷ ÁõÛ”ÛÈÛÛ¶Ûà ÁõÐéüÉÛé. 5. †¶¤øÁõÅÛÛé õá•Û ¸ÛéÈÛÁõ ¼ÅÛÛé õ …é õ›÷ ¦øà¡öÛ†¶Û¾ÛÛ× …é õ ÍÛÁõ”Ûà ¦øà¡öÛ†¶Û¾ÛÛ× …é õÍÛÁõ”Ûà ÍÛÛ†¡ö¶ÛÛ ›÷ ¼Û¶ÛÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 6. †¶¤øÁõ ÅÛÛé õá•Û ¸ÛéÈÛÁõ ¼ÅÛÛé õ …Û†.…éÍÛ.¸Ûó¾ÛÛ¨Ûé¶ÛÛ Í¸ÛéÍÛàºõà éõÉÛ¶Û ¾Ûä›÷¼Û ¼Û¶ÛÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. ›÷ÄõÁõ ¸Û¦éø ÍÛÁõ õÛÁõ ¾ÛÛ¶¿Û ÍÛ×ͬÛÛ/ ÍÛÁõ õÛÁõà ÍÛ×ͬÛÛ¾ÛÛ× …¬ÛÈÛÛ ÈÛ¦øÛé−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û È−ùÛÁõÛ ÍÛä˜ÛÈÛÈÛÛ¾ÛÛ× …ÛÈÛé ©ÛéÈÛà ÅÛé¼ÛÛéÁéõ¤øÁõà¾ÛÛ× õ¿Ûä¼Û ©Û¬ÛÛ †¶¤øÁõ ÅÛÛé õá•Û ¸ÛéÈÛÁõ ¼ÅÛÛé õ ¤éøͤø õÁõà …Û¸ÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. ¤éøͤøá•Û¶Ûä× ˜Û õÈÛ¨Ûä× †›÷ÛÁõùù−ùÛÁéõ õÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé. 7. ¤éøͤøá•Û¶Ûà õÛ¿ÛÙÈÛÛÐüà −ùÁõ 25000 ¶Û×•Û ¸ÛéÈÛÁõ ¼ÅÛÛé éõ 1 ¤éøͤø (3 ¶ÛוÛ) ¸Ûó¾ÛÛ¨Ûé õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé.(AS PER DOC: CED5(6064)/November 2003 of Bureau of Indian Standards.Clause8.2 & 8.5)

8.

Page 58: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 58

INVITEE SIGNATURE BIDDER

¾Û›æ÷Áõà õÛ¾Û. 1. †¶¤øÁõÅÛÛé õá•Û ¸ÛéÈÛÁõ ¼ÅÛÛé õ ͬÛÇ Š¸ÛÁõ …ªÛé ›÷Û¨Û õÁõà Š©ÛÛÁõÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 2. ¸ÛéÈÛÁõ ¼ÅÛÛé õ ¤ÖøÛºõà õ¶Ûé ©Ûé¾Û›÷ …ÈÛÁõ-›÷ÈÛÁõ¾ÛÛ× ¶Û¦ø©ÛÁõÄõ¸Û ¶Û ¬ÛÛ¿Û ©Ûé Áõà©Ûé õÛ¾Û¶ÛÛ Í¬ÛÇé Š©ÛÛÁõÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 3. ÍÛÜÈÛÙÍÛ ¤Öéø õ ¾ÛÛ¤éø¶ÛÛ 80 …é¾Û.…é¾Û.›÷Û¦øÛ†¶ÛÛ ¸ÛéÈÛÁõ ¼ÅÛÛé õ ¾ÛÛ¤éø 75 …é¾Û.…é¾Û. ›÷Û¦øÛ†¶Ûà Áéõ©Ûà¶Ûà •ÛÛ−ùà õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. ¸ÛéÈÛÁõ ¼ÅÛÛé õ¶Ûà ÈÛ˜˜Ûé¶ÛÛ ÍÛÛ×µÛÛ ˜ÛÛÇéÅÛà Áéõ©Ûà¬Ûà õÁõÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 4. †¶¤øÁõ ÅÛÛé õá•Û ¸ÛéÈÛÁõ ¼ÅÛÛé õ ¼ÛéÍÛÛ¦ø¿ÛÛ¼ÛÛù−ù …Û›ä÷¼ÛÛ›ä÷¶Ûà ›÷•¿ÛÛ¾ÛÛ× õ¼Ûâ•Û/µÛÛÁõÛé ÜÈÛ•ÛéÁéõ ©ÛÁõºõ¶ÛÛ ÍÛÛ×µÛÛ M20 •Ûóé¦ø õÛê’õà¤ø¾ÛÛ× ½ÛÁõà −éùÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 5. †¶¤øÁõ ÅÛÛé õá•Û ¸ÛéÈÛÁõ ¼ÅÛÛé ¬Ûà ¸ÛéÈÛá•Û õ¿ÛÛÙ ¼ÛÛ−ùù ¼ÛéÍÛà ›÷ÈÛÛ ¶Û ›÷Û醅é. õÛé†¸Û¨Û ÍÛ×›÷Ûé•ÛÛé¾ÛÛ× ¸ÛéÈÛÁõ ¼ÅÛÛé õ ¼ÛéÍÛà ›÷ÉÛé ©ÛÛé ©Ûé¶Ûé †›÷ÛÁõùÛÁéõ ¸ÛÛé©ÛÛ¶ÛÛ ”Û˜Ûë ºõÁõà¬Ûà ÅÛÛ†¶ÛÅÛéÈÛ¾ÛÛ× ¼ÛéÍÛÛ¦øà …Û¸ÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé ©Ûæ¤éøÅÛÛ ¼ÅÛÛé õ ¸ÛÛé©ÛÛ¶ÛÛ ”Û˜Ûë ÅÛÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 6. ¸ÛéÈÛÁõ ¼ÅÛÛé õ ¼ÛéÍÛÛ¦ø¿ÛÛ ¼ÛÛ−ùù ÈÛÛ¿Û¼Ûóé¤øá•Û ¾Ûà éõ¶Ûà õÅÛ õÛ龸Ûé õ¤øÁõ ¾ÛÉÛà¶Û ºéõÁõÈÛÈÛÛ¶Ûä ÁõÐéüÉÛé. ©Ûæ¤éøÅÛÛ, ”ÛÁõÛ¼Û ¬Û¿ÛéÅÛÛ ¸ÛéÈÛÁõ ×¼ÅÛÛé õ ¼Û−ùùÅÛà …Û¸ÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 7. ÈÛÛ¿Û¼Ûóé¤à•Û ¾Ûà éõ¶Ûà õÅÛ õÛ龸Ûé õ¤øÁõ ¾ÛÉÛà¶Û ¾ÛÛ¤éø ›÷ÂúÁõà ˆÅÛé õ¤Öøà õ ÍÛ¸ÅÛÛ¿Û/ ›÷¶ÛÁéõ¤øÁõ¶Ûà È¿ÛÈÛͬÛÛ ˆ›÷ÛÁõ−ùùÛÁéõ ÍÈÛ”Û˜Ûë õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. 8. ÉÛÁõ©ÛÛé¾ÛÛ× ›÷¨ÛÛÈ¿ÛÛ ¸Ûó¾ÛÛ¨Ûé ¸ÛÁõºõÛé¾Û¶ÍÛ ¼Ûê õ •ÛéÁ×õ¤øà¶Ûà È¿ÛÈÛͬÛÛ õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. …Û¿Û¤ø¾Û ¶Û×.6 ܸÛó õÛͤø ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û, ܸÛó õÛͤø õ¼Û٠ͤøÛé¶Û 1:2:4 ¶ÛÛ ¸Ûó¾ÛÛ¨Û¾ÛÛ× ¼Û¶ÛÛÈÛÈÛÛ¶Ûä× õÛ¾Û ::- 1. ܸÛó õÛͤø õ¼ÛÙͤøÛé¶Û, ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û, ¾ÛÛ¤éø õÛ鶒õà¤ø M 200 ( I.S: 456)•Ûóé¦ø¶ÛÛ Ü¸Ûó õÛͤø, õ¼ÛÙͤøÛé¶Û,¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û ¼Û¶ÛÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 2. ܸÛó õÛͤø õ¼ÛÙͤøÛé¶Û, ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û ©Ûæ¤éøøÅÛà µÛÛÁõÛé ÈÛ•ÛÁõ¶ÛÛ Í¾ÛäµÛ ÍÛÁõºéõÉÛ …¶Ûé ºõà¶ÛàÉÛá•ÛÈÛÛÇÛ ÁõÐéü ©Ûé ¾Ûä›÷¼Û¶ÛÛ ¼Û¶ÛÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 3. ܸÛó õÛͤø õ¼ÛÙͤøÛé¶Û, ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û¶Ûà õÛ龸ÛéÉÛàÈÛͤÖéø¶¬Û M 200 õÛ鶒õशÛÛ …Û†.…éÍÛ.456/1978 ¶ÛÛ µÛÛéÁõ¨ÛÛé ¾Ûä›÷¼Û ¶Ûà ÁõÐéüÈÛà ›÷Û醅é. 4. ܸÛó õÛͤø õ¼ÛÙͤøÛé¶Û, ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û …Û†.…éÍÛ.264-1978 ¸Ûó¾ÛÛ¨Ûé¶ÛÛ Í¸ÛéÍÛàºõà éõÉÛ¶Û ¾Ûä›÷¼Û ¼Û¶ÛÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. ›÷ÄõÁõ ¸Û¦éø ÍÛÁõ õÛÁõ ¾ÛÛ¶¿Û ÍÛ×ͬÛÛ/ ÍÛÁõ õÛÁõà ÍÛ×ͬÛÛ¾ÛÛ× …¬ÛÈÛÛ ÈÛ¦øÛé−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û ÍÛæ ÛÈÛé ©Ûé ÅÛé¼ÛÛéÁéõ¤øÁõà¾ÛÛ× õ¿Ûä¼Û ©Û¬ÛÛ Ü¸Ûó õÛͤø ͤøÛé¶Û ¤éøͤø õÁõà …Û¸ÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. ¤éøͤøá•Û¶Ûä× ˜Û õÈÛ¨Ûä× †›÷ÛÁõùÛÁéõ õÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé. 5. ܸÛó õÛͤø ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û, õ¼Û٠ͤøÛé¶Û õÛͤøá•Û õÁõÈÛÛ ¾ÛÛ¤éø¶ÛÛ ›÷¬¬ÛÛ¾ÛÛ׬Ûà ÈÛ¦øÛé−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶ÛÛ …鶜÷¶Ûà¿ÛÁõ †¶Û ˜ÛÛ›÷Ù¶Ûà ÐüÛ›÷Áõà¾ÛÛ× ÍÛä ÛÈ¿ÛÛ ¾Ûä›÷¼Û¶ÛÛ ›÷¬¬ÛÛ¾ÛÛ× õ¿Ûä¼Û ½ÛÁõÛÈÛà ¤éøͤøá•Û ¾ÛÛ¤éø ¾ÛÛé õÅÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. ¤éøͤøá•Û ¶Ûà¿Û©Û ¾Û¿ÛÛÙ−ùÛ¾ÛÛ× …ÛÈ¿Ûé¬Ûà †›÷ÛÁõ−ùÛÁéõ ܸÛó õÛͤø õ¼Û٠ͤøÛé¶Û ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û ͬÛÇ Š¸ÛÁõ Š©ÛÛÁõÈÛÛ¶ÛÛ ÁõÐéüÉÛé. ”ÛÛÍÛ Ü õÍÍÛÛ¾ÛÛ× (†¾ÛÁõ›÷¶ÍÛà¶ÛÛ ¸ÛóÍÛוÛé) †›÷ÛÁõ−ùÛÁõ È−ùÛÁõÛ ¤éøͤøá•Û¶ÛÛ ¸ÛÁõà¨ÛÛ¾Û …ÛÈ¿ÛÛ ¸ÛÐéüÅÛÛ× Ü¸Ûó õÛͤø ¦øàÈÛÛ†¦øÁõ …¶Ûé õ¼Û٠ͤøÛé¶Û Š©ÛÛÁõÈÛÛ¾ÛÛ× …ÛÈÛé/ÈÛÛ¸ÛÁõÈÛÛ¾ÛÛ× …ÛÈÛé …¶Ûé ¼ÛÛ−ù¾ÛÛ× ¸ÛÁõà¨ÛÛ¾Û Ü¶Û¿Û©Û ¾Û¿ÛÛÙ−ùÛ¾ÛÛ× (M 200 •Ûóé¦ø) ¸Ûó¾ÛÛ¨Ûé ¶Û …ÛÈÛé ©ÛÛé †›÷ÛÁõ−ùÛÁéõ ©Ûé…Ûé¶ÛÛ ”Û˜Ûë …¶Ûé ›÷Ûé”Û¾Ûé …Û ¸Û¬¬ÛÁõ ÍÛÛ†¤ø Š¸ÛÁõ¬Ûà −äùÁõ õÁõÈÛÛ¶ÛÛ ÁõÐéüÉÛé. ›÷é ©Ûé¾Û õÁõÈÛÛ¾ÛÛ× ¶ÛÐüà …ÛÈÛé ©ÛÛé ”ÛÛ©ÛÛ È−ùÛÁõÛ …Û õÛ¾Û•ÛàÁõà õÁõÛÈÛà ©Ûé¶ÛÛé ”Û˜ÛÙ †›÷ÛÁõ−ùÛÁõ ¸ÛÛÍÛé¬Ûà ÈÛÍÛäÅÛ ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛÉÛé.

Page 59: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 59

INVITEE SIGNATURE BIDDER

6. ܸÛó õÛͤø õ¼ÛÙͤøÛé¶Û, ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û ¶Ûé ͬÛÇ Š¸ÛÁõ ÈÛÛ¸ÛÁõ©ÛÛ ¸ÛÐéüÅÛÛ× …Ûé™öÛ¾ÛÛ× …Ûé™öÛ 28 Üù−ùÈÛÍÛ¾ÛÛ× ¸ÛÛ¨Ûà¾ÛÛ× ¦äø¼ÛÛ¦øà õ¿ÛÛéÁõá•Û õÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé. ›÷é ¾ÛÛ¤éø ¸ÛÛ¨Ûà¶ÛÛ ÍÛוÛóÐü¶Ûà È¿ÛÈÛͬÛÛ †›÷ÛÁõùÛÁéõ ¸ÛÛé©Ûé õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. 7. ¤éøͤøá•Û¶Ûà õÛ¿ÛÙÈÛÛÐüà …Û†.…éÍÛ. 456 ¸Ûó¾ÛÛ¨Ûé õÁõÈÛÛ¶Ûà ™öé. 8. ͬÛÇ Š¸ÛÁõ ¸Û¬¬ÛÁõ õÛ¤øã•Û õÁõ©ÛÛ ¸ÛÐéüÅÛÛ ›÷Û¨Û õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. 9. õ¼Û٠ͤøÛé¶Û, ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û ¤ÖøÛºõà õ¶Ûé ©Ûé¾Û›÷ …ÈÛÁõ-›÷ÈÛÁõ¾ÛÛ× ¶Û¦ø©ÛÁõÄõ¸Û ¶Û ¬ÛÛ¿Û ©Ûé Áõà©Ûé õÛ¾Û¶ÛÛ Í¬ÛÇé Š©ÛÛÁõÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 10. ܸÛó õÛͤø õ¼Ûã•Û ͤøÛé¶Û, ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û¶ÛÛ ÍÛæ Û¶ÛÛ ¾Ûä›÷¼Û ÅÛÛ†¶Û ÅÛéÈÛÅÛ¾ÛÛ× ¼ÛéÍÛÛ¦øà ÍÛÛ×µÛÛ 1:3 ¶ÛÛ ÍÛà¾Û鶤ø, Áéõ©Ûà¶ÛÛ ¾ÛÛé¤øÛÙÁõ¾ÛÛ× ½ÛÁõÈÛÛ¶ÛÛ ÁõÐéüÉÛé. õ¿ÛÛéÁõá•Û ÍÛÐü õ¼Ûâ•Û ×õ¸ÛÅÛà¤ø õÁõà …Û¸ÛÈÛÛ¶Ûà ÁõÐéüÉÛé. 11. ͬÛǸÛÁõ ›÷¿ÛÛÁéõ õÛ¾Û•ÛàÁõà ÐüÛ¬Û µÛÁõÈÛÛ¶ÛÛ ÐüÛé¿Û ©¿ÛÛÁéõ ›÷ÄõÁõà¿ÛÛ©Û ¾Ûä›÷¼Û¶ÛÛ Í¤øÛé¶Û ©Ûé¾Û›÷ …¶¿Û ¾Û¤øàÁõà¿ÛÅÛ Š©ÛÛÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé. 12. ÉÛÁõ©ÛÛé¾ÛÛ× ›÷¨ÛÛÈ¿ÛÛ ¸Ûó¾ÛÛ¨Ûé ¸ÛÁõºõÛë¾Û¶ÍÛ ¼Ûê õ •ÛéÁ×õ¤øà¶Ûà …Û¸ÛÈÛÛ¶Ûà ÁõÐéüÉÛé. ÍÛ龸ÛÅÛá•Û …¶Ûé ¤éøͤøá•Û :-(¸Ûóà õÛͤø ͤøÛé¶Û, õ¼Ûâ•Û ͤøÛé¶Û) ÍÛé¾¾ÛÅÛá•Û ©Û¬ÛÛ ¤éøͤøá•Û ¾ÛÛ¤éø …Û†.…éÍÛ.456-1978 ¾Ûä›÷¼Û …¶ÛäÍÛÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé. ¤éøͤøá•Û ¾ÛÛ¤éø 15 ÍÛé.¾Ûà.x 15 ÍÛé.¾Ûà.x 15 ÍÛé.¾Ûà.¶ÛÛ õ¿Ûä¼Û ¼Û¶ÛÛÈÛà 28 Üù−ùÈÛÍÛ¶ÛÛ õ¿ÛÛéÁõá•Û ÍÛ¾Û¿Û¼ÛÛ−ùù •ÛéÁõà/ ¿ÛäܶÛÈÛÙÍÛà¤øà /¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û ÍÛä Ûà©Û õÁéõ ©Ûéø ÅÛé¼ÛÛéÁéõ¤øÁõà¾ÛÛ× †›÷ÛÁ−ùõùÛÁõ¶ÛÛ ”Û˜Ûë ¤éøͤøá•Û õÁõà …Û¸ÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. ¤éøͤøá•Û ¾ÛÛ¤éø¶ÛÛ ÍÛ龸ÛÅÛ …ªÛé¬Ûà •Û¾Ûé ©¿ÛÛÁéõ ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. ¸Ûóà õÛͤø ͤøÛé¶Û, õ¼Ûâ•Û ͤøÛé¶Û¶ÛÛ õÛê’õà¤ø¶ÛÛ ¤éøͤøá•Û −ùÁõ 100 M3 …é õ ¤éøͤø(ªÛ¨Û õ¿Ûä¼Û) …¬ÛÈÛÛ ©Ûé¬Ûà …Ûé™öÛ ›÷¬¬ÛÛ ¾ÛÛ¤éø …Ûé™öÛ¾ÛÛ× …Ûé™ä×ö …é õ ¤éøͤø õÁõÛÈÛÈÛÛ¶ÛÛé ÁõÐéüÉÛé.

…Û¿Û¤ø¾Û ¶Û - 7 ÍÛÈÛâÍÛ ¤Öéø õ ¾ÛÛ¤éø¶ÛÛø ¸Ûóà õÛͤø õ¼Û٠ͤøÛé¶Û ÅÛÛ†¶Û ÅÛéÈÛÅÛ¾ÛÛ× •ÛÛé¥øÈÛà 1:3¶ÛÛ ÍÛà¾Û鶤ø

¾ÛÛé¤øÛÙÁõ¶ÛÛ ¸Ûó¾ÛÛ¨Û¾ÛÛ× ÍÛÛ×µÛÛ ½ÛÁõà ¼ÛéÍÛÛ¦øÈÛÛ¶Ûä× õÛ¾Û. : 1. ͬÛÇ Š¸ÛÁõ ¸Û¬¬ÛÁõ õÛ¤øâ•Û õÁõ©ÛÛ× ¸ÛÐéüÅÛÛ× …ªÛé ›÷Û¨Û õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé.

2. ¸Ûóà õÛͤø õ¼Û٠ͤøÛé¶Û ¤ÖøÛºõà õ¶Ûé …ÈÛÁõ-›÷ÈÛÁõ¾ÛÛ× ¶Û¦ø©ÛÁõÄõ¸Û ¶Û ¬ÛÛ¿Û ©Ûé Áõà©Ûé õÛ¾Û¶ÛÛ Í¬ÛÇé Š©ÛÛÁõÈÛÛ¶ÛÛ ÁõÐéüÉÛé.

3. ¦øàÈÛÛ†¦øÁõ ͤøÛé¶Û …é õ ‡˜Û ÍÛà¾Û鶤ø ¾ÛÛé¤øÛÙÁõ¶Ûà •ÛÛ−ùà (1:3 ¶ÛÛ ¸Ûó¾ÛÛ¨Û¾ÛÛ×) õÁõà ©Ûé¶Ûà Š¸ÛÁõ ÅÛÛ†¶Û ÅÛéÈÛÅÛ¾ÛÛ× ¼ÛéÍÛÛ¦øÈÛÛ¶ÛÛ ÁõÐéüÉÛé.

4. ¸Ûóà õÛͤø õ¼Û٠ͤøÛé¶Û¶ÛÛ ÈÛ˜˜Ûé¶ÛÛ ÍÛÛ×µÛÛ 1:3 ¶ÛÛ ¸Ûó¾ÛÛ¨Û¾ÛÛ× ÍÛà¾Û鶤ø, Áéõ©Ûà¶ÛÛ ¾ÛÛé¤øÛÙÁõ¬Ûà ½ÛÁõÈÛÛ¶ÛÛ ÁõÐéüÉÛé. 5. ÍÛà¾Û鶤ø, Áéõ©Ûà¶ÛÛ ¾ÛÛé¤øÛÙÁõ¬Ûà ½ÛÁéõÅÛ ÍÛÛ×µÛÛ Š¸ÛÁõ ÍÛà¾Û鶤ø ÍÅÛÁõà (©ÛÁõà) ÅÛ•ÛÛÈÛÈÛÛ¶Ûà ÁõÐéüÉÛé ©Û¬ÛÛ ÍÛÛ×µÛÛ ¸Û¤èø à õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. 6. ÍÛÛ×µÛÛ¶Ûä× ÍÛ©Û©Û õ¿ÛÛéÁõá•Û …é õ …¤øÈÛÛ¦øà¿ÛÛ ÍÛäµÛà ¬ÛÛ¿Û ©ÛéÈÛà È¿ÛÈÛͬÛÛ †›÷ÛÁõ−ùÛÁéõ …˜Ûæ õ õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé.

ડીવાઇડર $ટોનના કામ કરવાની સામા:ય શરતો ડીવાઇડર $ટોનના કામ કરવાની સામા:ય શરતો ડીવાઇડર $ટોનના કામ કરવાની સામા:ય શરતો ડીવાઇડર $ટોનના કામ કરવાની સામા:ય શરતો (1) †›÷ÛÁõù−ùÛÁéõ ÜÈÛÈÛÛ−ùù ¼ÛÛ¼Û©Ûé ©Ûé¶Ûà õÛé†¸Û¨Û ÉÛÁõ©Û …וÛé ½ÛÜÈÛÌ¿Û¾ÛÛ× ×õ† ÜÈÛÈÛÛ−ù Š¸ÛÜÍ¬Û©Û ¬ÛÉÛé ©ÛÛé ©Ûé ¸ÛóÍÛוÛé †¶¦øà¿Û¶Û …ÛÁõ¼Ûà¤ÖéøÉÛ¶Û …é õ¤ø-1940 ¶Ûà ›÷Ûé•ÛÈÛÛ†…Ûé ©Ûé¾Û›÷ ÈÛ”Û©ÛÛé ÈÛ”Û©Û

Page 60: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 60

INVITEE SIGNATURE BIDDER

©Ûé¾ÛÛ× ¬Û¿ÛéÅÛÛ ÍÛäµÛÛÁõÛ Ðéü¥øǶÛà ›÷Ûé•ÛÈÛÛ†…Ûé ¾Ûä›÷¼Û õÛé ÛÛëÁéõÉÛ¶Û ÍÛÛéÅÛ …ÛÁõ¼Ûà¤Öéø¤øÁõ ܶ۾ÛÉÛé …¶Ûé ©ÛéÈÛÛ ÜÈÛÈÛÛù−ù¶ÛÛ× ›÷é õÛ׆ ܶۨÛÙ¿Û …ÛÈÛÉÛé ©Ûé …Û”ÛÁõà •Û¨ÛÛÉÛé. …¶Ûé ¼Û·Ûé ¸Û“Û õÛÁõÛé¶Ûé ¼Û×µÛ¶Û õ©ÛÛÙ ÁõÐéüÉÛé. (2) ÍÛù−ùÁõ õÛ¾Û¶ÛÛ õÁõÛÁõ éõ ©Ûé¶Ûà õÛé†¸Û¨Û ÉÛ©ÛÛë …×•Ûé Ûé† ÜÈÛÈÛÛ−ùù Š¸ÛÜÍ¬Û©Û ¬ÛÉÛé ©ÛÛé ©Ûé ºõ õ©Û ¶ÛÛ¾Û−ùùÛÁõ ÈÛ¦øÛéù−ùÁõÛ¶ÛÛ× õÛé¤Ùø¶Ûà Ðäü äõ¾Û©Û¶Ûé …ÛµÛà¶Û ÁõÐéüÉÛé. (3) õÛé†¸Û¨Û …¬ÛÈÛÛ ¼ÛµÛÛ›÷ ½ÛÛÈÛ¸ÛªÛ õÛé õÛé†¸Û¨Û õÛÁõ¨Û ›÷¨ÛÛÈ¿ÛÛ ÈÛ•ÛÁõ ¾Û×›ä÷Áõ/¶ÛÛ¾Û×›ä÷Áõ õÁõÈÛÛ¶Ûà …¼ÛÛµÛà©Û ÍÛ«ÛÛ ¾¿ÛäܶÛ. õܾÛ.ËÛà¶Ûé ÁõÐéüÉÛé. (4) ÈÛ¦øÛéù−ùÁõÛ ¼ÛÐüÛÁõ¬Ûà ÅÛÛÈÛÈÛÛ¾ÛÛ× …ÛÈÛ©ÛÛ ÍÛÛ¾ÛÛ¶Û¶Ûà ÁõÛé¿ÛŤøà/…Ûé õ¤ÖøÛé¿Û¶Ûà ¸ÛÛÈÛ©Ûà Áõ›ä÷ õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. (5) ™öéÅÅÛÛ ªÛ¨Û ÈÛÌÛÙ¾ÛÛ× …Û ¸Ûó õÛÁõ¶ÛÛ õÁéõÅÛÛ õÛ¾ÛÛé ©Û¬ÛÛ ÐüÛ¬Û ¸ÛÁõ¶ÛÛ õÛ¾ÛÛé¶Ûà ¿ÛÛù−ùà Áõ›ä÷ õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. (6) †›÷ÛÁ−ùõùÛÁéõ ÍÛÁõ õÛÁõ/ÈÛà.…é¾Û.ÍÛà. ¾ÛÛ¶¿Û ÍÛ×ͬÛÛ …¬ÛÈÛÛ RITES/DGS&D/CEIL/TCS/ GERI ÜÈÛ•ÛéÁéõ¾ÛÛ׬Ûà õÛé†¸Û¨Û ÍÛ×ͬÛÛ µÈÛÛÁõÛ †›÷ÛÁõ−ùÛÁéõ õÁéõÅÛ õÛ¾Û Í¸ÛéÍÛàºõà éõÉÛ¶Û ¾Ûä›÷¼Û õÁéõÅÛ ™öé ©Ûé ¾ÛÛ¤éø õÁéõÅÛ õÛ¾Û¶Ûä× ¬Û¦Ùø ¸ÛÛ¤øâ †¶Í¸Ûé õÉÛ¶Û, ÈÛ¦øÛé−ùÁõÛ ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û õÁõÛÈÛà ÉÛ õÉÛé. ›÷é¶ÛÛé Áõà¸ÛÛé¤Ùø …ÛÈ¿ÛÛ ¼ÛÛ−ùù ›÷ ›÷é ©Ûé õÛ¾Û¶ÛÛ ›÷¬¬ÛÛ¶ÛÛ× ¼ÛàÅÛ¶Ûä× ˜Ûä õÈÛ¨Ûä× õÁõÈÛÛ¾ÛÛ× …ÛÈÛÉÛé. (7) õÛ¾Û¶ÛÛ Í¬ÛÇé¬Ûà ÅÛéÈÛÛ¾ÛÛ× …ÛÈÛéÅÛÛ× ¶Û¾Ûä¶ÛÛ ÍÛÁõ õÛÁõ ¾ÛÛ¶¿Û ¸Ûó¿ÛÛé•ÛÉÛÛÇÛ¾ÛÛ× /VMSS µÈÛÛÁõÛ ÍÛæ ÛÈÛÈÛÛ¾ÛÛ× …ÛÈÛé ©Ûé ¸Ûó¿ÛÛé•Û ÉÛÛÇÛ¾ÛÛ× ˜Û õÛÍÛ¨Ûà õÁõÛÈÛÈÛÛ¶ÛÛ ÁõÐéüÉÛé. ÍÛù−ùÁõÐä×ü ˜Û õÛÍÛ¨Ûà †›÷ÛÁ−ùõùÛÁõ¶ÛÛ ”Û˜Ûë õÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. ˜Û õÛÍÛ¨Ûà¶ÛÛ ¸ÛÁõà¨ÛÛ¾ÛÛé ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û¶ÛÛ Í¸ÛéÍÛàºõà éõÉÛ¶Û¾ÛÛ× ›÷¨ÛÛÈ¿ÛÛ ¾Ûä›÷¼Û¶ÛÛ ÐüÛéÈÛÛ ›÷Û醅é. ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û¶Ûà ˜Û õÛÍÛ¨Ûà ¶Ûà˜Ûé ù−ùÉÛÛÙÈÛéÅÛ ¤éø¼ÛÅÛ¾ÛÛ× ›÷¨ÛÛÈ¿ÛÛ ¾Ûä›÷¼Û õÁõÛÈÛÈÛÛ¶Ûà ÁõÐéüÉÛé. ….¶Û×. ¾Û¤øàÁõà¿ÛÅÛ¶Ûà ÜÈÛ•Û©Û ¤éøͤø¶Ûà ÜÈÛ•Û©Û ¤éøͤø¶Ûà ¾ÛÛªÛÛ¶Ûà ÜÈÛ•Û©Û

1. 90 ¬Ûà 45 ¾Ûà. ¾Ûà. ¾Ûé¤øÅÛ 63 ¬Ûà 45 ¾Ûà. ¾Ûà. ¾Ûé¤øÅÛ 53 ¬Ûà 22.4 ¾Ûà.¾Ûà. ¾Ûé¤øÅÛ

1. •Ûóé¦éøÉÛ¶Û ¤éøͤø 2. †¾¸Ûé õ¤ø ÈÛéÅ¿Ûä 3. ºõÅÛé õà¶ÛéÉÛ †¶¦éø“Û 4. ÈÛÛé¤øÁõ …é¼ÍÛÛé¼ÉÛÙ¶Û

100 µÛ.¾Ûà. -1 ¤éøͤø 200 –Û.¾Ûà.-1 ¤éøͤø 200 –Û.¾Ûà. - 1 ¤éøͤø ÉÛÂú…Û©Û¶ÛÛ −ùÁéõ õ ͪÛÛé©Û¶ÛÛ 3 ¶Û¾Ûä¶ÛÛ¶ÛÛ 1 ÍÛé¤ø ©Û¬ÛÛ ©¿ÛÛÁõ¼ÛÛ−ù¶ÛÛ ¾Ûé¤øÅÛ¶Ûà •Ûä ÛÈÛ«ÛÛ¾ÛÛ× ºéõÁõºõÛÁõù …¬ÛÈÛÛ …ªÛé¶Ûà ÍÛæ Û¶ÛÛ ¾Ûä›÷¼Û.

2. •Ûóà¤ø 1. •Ûóé¦éøÉÛ¶Û ¤éøͤø 2. ÈÛÛé¤øÁõ …é¼ÍÛÛé¼ÉÛÙ¶Û 3. ͸ÛéÍÛàºõà õ •ÛóéÈÛà¤øà

100 µÛ.¾Ûà. -1 ¤éøͤø 100 µÛ.¾Ûà. -1 ¤éøͤø 100 µÛ.¾Ûà. -1 ¤éøͤø ¶ÛÛêµÛ: 100 –Û.¾Ûà. õÁõ©ÛÛ …Ûé™öÛ

›÷¬¬ÛÛ ¾ÛÛ¤éø …Ûé™öÛ¾ÛÛ× …Ûé™öÛé …é õ ¤éøͤø.

3. …ÛͺõÛŤø (†›÷ÛÁõ−ùÛÁõ¶ÛÛé ¸ÛÛé©ÛÛ¶ÛÛé ¦øÛ¾ÛÁõ

ÈÛÛ¸ÛÁõÈÛÛ¶ÛÛé ÐüÛé¿Û ©ÛéÈÛÛ õàÍÍÛÛ¾ÛÛ×)

1. …é¼ÍÛÛéÅÛä¤ø ÈÛàÍ õÛéÍÛà¤øà. 2. õÛ†¶Ûé¾Ûé¤øà õ

ÈÛàÍ õÛéÍÛà¤øà. 3. ºõÅÛÉÛ ¸ÛÛ醶¤ø 4. ÍÛÛéÅ¿Ûä¼ÛàÅÛà¤øà †¶Û

¤ÖøÛ¿Û õÅÛÛ醬ÛÛ†ÅÛ ¸Ûóé¡ö¶ÍÛ

5. ¸Ûé¶Ûé¤ÖéøÉÛ¶Û 6. ÍÛÛéºõ¶Ûá•Û ¸ÛÛ醶¤ø 7. ¤éøͤø …Ûé¶Û ÁéõÍÛà¦ø¿Ûä

i. ÈÛàÍ õÛéÍÛà¤øà ÁéõÍÛà…Ûé.

ii. ¦ø õ¤øàÅÛà¤øà. As per IS :73:2006

IS:73:2006 ¾ÛÛ× −ùÉÛÛÙÈ¿ÛÛ ¾Ûä›÷¼Û ¶Ûà˜Ûé ›÷¨ÛÛÈ¿ÛÛ ¸Ûó¾ÛÛ¨Ûé ›÷¬¬ÛÛ¾ÛÛ× ¸ÛÁõà“Û¨Û õÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé. Frequency in MT.

No. of Test

Less than 75

1

75 to 150 2 151 to 300 3

301 to 750 4 751 to 1500

5

For every 750 MT. Excess add 1 test.

Ref : Govt. of Gujarat

(S.S.R. – 1099 IB (9) dt.

26/07/99)

(8) ©Û¾ÛÛ¾Û ¾Û¤øàÁõà¿ÛÅÛ ÍÛéÈÛÛÅÛà¿ÛÛ-¤øá¼ÛÛ ÜÈÛÍ©ÛÛÁõ¶Ûà õÈÛÛéÁõà¾ÛÛ׬Ûà ¼ÅÛé õ¤Öéø Û ¸Ûó õÛÁõ¶Ûä× ÅÛÛÈÛÈÛÛ¶Ûä× ÁõÐéüÉÛé. ›÷é ¾ÛÛ¤éø

¼ÛàÅÛ/˜ÛÅÛ¨Û/ õÈÛÛéÁõà¸ÛÛÍÛ ÜÈÛ•ÛéÁéõ …ªÛé Áõ›ä÷ õÁõà ÍÛÛܼÛÜ©Û …Û¸ÛÈÛÛ¶Ûà ÁõÐéüÉÛé. õÛ˜ÛÛ ¸ÛÛ õÛ¶Ûà õÛ¾Û•ÛàÁõà õÛ¾Û ÉÛÄõ

õÁõ©ÛÛ× ¸ÛÐéüÅÛÛ× ›÷é õÈÛÛéÁõà¾ÛÛ׬Ûà ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ÅÛÛÈÛÈÛÛ¶ÛÛé ÐüÛé¿Û ©Ûé¶Ûà ©Ûé¶ÛÛ ÍÛ龸ÛÅÛ …Û¸Ûà/¾ÛéÇÈÛà ¤éøͤøá•Û õ¿ÛÛÙ ¼ÛÛù−ù

Page 61: VADODARA MAHANAGAR SEVA SADAN - Vadodara ... -BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 1 INVITEE SIGNATURE BIDDER VADODARA MAHANAGAR SEVA SADAN TENDER RUBBER MOULDED

HOUSING-BUILDING OFFICE Vadodara Mahanagar Seva Sadan,Vadodara. Page 61

INVITEE SIGNATURE BIDDER

ÈÛ¸ÛÁõÛÉÛ¾ÛÛ× ÅÛéÈÛÛ¶ÛÛé ÁõÐéüÉÛé. …¬ÛÈÛÛ ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ¤éøͤøá•Û¾ÛÛ× …Û¸¿ÛÛ ¼ÛÛ−ù †›÷ÛÁõ−ùÛÁéõ ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û ÈÛ¸ÛÁõÛÉÛ¾ÛÛ× ÅÛéÈÛÛ¶ÛÛé

ÐüÉÛé ©ÛÛé, ©ÛéÈÛÛ õàÍÍÛÛ¾ÛÛ× ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û¶Ûä× ¤éøͤøá•Û,•Ûä ÛÈÛ«ÛÛ¶ÛÛ Ü¶Û¿Û©Û µÛÛéÁõ¨ÛÛé¾ÛÛ× ¶Û ÐüÛé¿Û ©ÛÛé ÈÛ¸ÛÁõÛÉÛ õÁéõÅÛÛé ÍÛ× Ûæ ÛÙ

¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û,¼ÛÛé“Û õ¤øá•Û¾ÛÛ׬Ûà ¼ÛÐüÛÁõ õÛ§øà ͬÛÇ Š¸ÛÁõ¬Ûà −äùÁõ õÁõÈÛÛ¶ÛÛé ÁõÐéüÉÛé …¶Ûé ©Ûé¶Ûä× õÛé† ˜Ûä ÈÛ¨Ûä× õÁõÈÛÛ¾ÛÛ×

…ÛÈÛÉÛé ¶ÛÐüàé ©¿ÛÛÁõ¼ÛÛ−ù›÷ ¶ÛÈÛà¶Û ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û Í¬ÛÇ Š¸ÛÁõ Š©ÛÛÁõÈÛÛ¶ÛÛé ÁõÐéüÉÛé. ¤éøͤøá•Û ¾ÛÛ¤éø ›÷é õÛé† ÅÛÛ•Û©Û

½ÛÁõÈÛÛ¶Ûà ¬ÛÉÛé ©Ûé †›÷ÛÁõ−ùùÛÁéõ ½ÛÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. ¾ÛÛÅÛÍÛ¾ÛÛ¶Û ”ÛÁõà−ùùà ¾ÛÛ¤éø ÍÛÁõ õÛÁõà ÅÛÛ•Û©Û ›÷éÈÛà éõ ÍÛéÅÛ¤éø“Û,ÁõÛé¿ÛŤøà,

ÜÈÛ•ÛéÁéõ †›÷ÛÁõ−ùùÛÁéõ ½ÛÁõÈÛÛ¶Ûà ÁõÐéüÉÛé. …¶Ûé ©Ûé¾ÛÛ× ¬Û©Ûà ÈÛµÛ–Û¤ø †›÷ÛÁ−ùÛÁéõ ½ÛÁõÈÛÛ¶Ûà ÁõÐéüÉÛé.

(9) †›÷ÛÁ−ùõùÛÁéõ ÍÛÛ¾ÛéÅÛ ¶Û¾Ûæ¶ÛÛ ¾Ûä›÷¼Û ¸Ûæ ÛÙ õÁéõÅÛ õÛ¾Û¶Ûà •Ûä ÛÈÛ«ÛÛ ¾ÛÛ¤éø ºõÛ†¶ÛÅÛ ¼ÛàÅÛ¶ÛÛ Áõ õ¾Û¶ÛÛ 5% Áõ õ¾Û¶Ûàö

ÁõṲ̂Öøà¿Û èõ©Û ¼Ûê õ¶Ûà ¸ÛÁõºõÛé¾ÛÙ¶ÍÛ ¼Ûê õ •ÛéÁõ¶¤øà …Û¸ÛÈÛÛ¶Ûà ÁõÐéüÉÛé. ›÷é¶Ûà ¾Ûä−ùù©Û 3 ÈÛÌÛÙ ¾ÛÛ¤éø¶Ûà ÁõÐéüÉÛé. ›÷é …é õ ÍÛÛ¬Ûé

ªÛ¨Û ÈÛÌÛÙ¶Ûà …Û¸ÛÈÛÛ¶Ûà ÁõÐéüÉÛé. …Û •ÛéÁéõ¶¤øà õÛ˜ÛÛé ÁõÍ©ÛÛé ¸ÛÛ õÛé õÁõÈÛÛ ©Û¬ÛÛ ¦øàÈÛÛ†¦øÁõ,ºäõ¤ø¸ÛÛ¬Û ©Û¬ÛÛ ÍÛÜÈÛÙÍÛ

¤Öéø õ¶ÛÛ õÛ¾Ûé …Û¸ÛÈÛÛ¶Ûà ÁõÐéüÉÛé.

(10) ÅÛé¼ÛÁõ ÅÛÛ¿ÛÍÛ¶ÍÛ †›÷ÛÁõù−ùÛÁéõ õÛ¾Û¶ÛÛé Ðäü õ¾Û ¾ÛÆ¿ÛÛ¼ÛÛ−ù ÈÛµÛä¾ÛÛ× ÈÛµÛä …é õ ¾ÛÛÍÛ¾ÛÛ× Áõ›ä÷ õÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé ©Ûé¾Û›÷ ÅÛé¼ÛÁõ

…é õ¤ø¶ÛÛ µÛÛéÁõ¨ÛÛé/ܶۿ۾ÛÛé µ¿ÛÛ¶Û¾ÛÛ× ÅÛ† õÛ¾Û ˜ÛÛÅÛä¬Ûà õÛ¾Û ¸ÛäÄ×õ õ¿ÛÛÙ¶ÛÛ ÍÛ¾Û¿Û•ÛÛÇÛ ù−ùÁõ¾¿ÛÛ¶Û †›÷ÛÁ−ùõùÛÁéõ ›÷é ºõÛé¾ÛÙ ÅÛé¼ÛÁõ

…ÛéºõàÍÛ¾ÛÛ× ½ÛÁõÈÛÛ¶ÛÛ ™öé ©Ûé ÍÛ¾Û¿ÛÍÛÁõ ½ÛÁõÈÛÛ¶ÛÛ ÁõÐéüÉÛé …¶Ûé ©Ûé¶Ûà …é õ ¶Û õÅÛ ”ÛÛ©ÛÛ¾ÛÛ× …Û¸ÛÈÛÛ¶Ûà ÁõÐéüÉÛé. ›÷Ûé ÅÛé¼ÛÁõ

ÅÛÛ¿ÛÍÛ¶ÍÛ †›÷ÛÁõ−ùÛÁéõ ÅÛàµÛéÅÛ ¶Û ÐüÛé¿Û ©ÛÛé †›÷ÛÁõ−ùÛÁõ¶Ûä× ¼ÛàÅÛ …Û¸ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé ¶ÛÐüá. ÅÛé¼ÛÁõ …é õ¤ø ¶Ûà ›÷Ûé•ÛÈÛÛ†…Ûé¶ÛÛé

…¾ÛÅÛ õÁõÈÛÛ¶Ûà ›÷ÈÛÛ¼Û−ùÛÁõà †›÷ÛÁõ−ùÛÁõ¶Ûà ÁõÐéüÉÛé. ©Ûé¶ÛÛé õÛé†¸Û¨Û ½Û×•Û ¬ÛÉÛé ©ÛÛé ©Ûé¶Ûà ÍÛ× Ûä ÛÙ ›÷ÈÛÛ¼Û−ùÛÁõà †›÷ÛÁõ−ùÛ¶Ûà ÁõÐéüÉÛé

…¶Ûé …Û ¼ÛÛ¼Û©Ûé ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û¶Ûé õÛé†¸Û¨Û ¸Ûó©¿Û“Û éõ ¸ÛÁõÛé“ÛÁõà©Ûé ›÷ÈÛÛ¼Û−ùÛÁõ •Û¨Ûà ÉÛ õÉÛé ¶ÛÐüà.

(11) …Û õÛ¾Û¶ÛÛ ½ÛÛÈÛ¸ÛªÛ ¾Û×›ä÷Áõ ¬Û¿ÛéÅÛ ½ÛÛÈÛ¾ÛÛ× ¾Ûäù−ù©Û −ùùÁõ¾¿ÛÛ¶Û õÛé†¸Û¨Û ÍÛ×›÷Ûé•ÛÛé¾ÛÛ× õÛé†¸Û¨Û ›÷Û©Û¶ÛÛé ¾ÛÛÅÛ-

ÍÛÛ¾ÛÛ¶Û, ¾Û›æ÷Áõà éõ õÛ¤øã•Û¾ÛÛ× ½ÛÛÈÛ ÈÛµÛÛÁõÛé ¬ÛÉÛé ©ÛÛé ¸Û¨Û ½ÛÛÈÛ ÈÛµÛÛÁõÛé …Û¸ÛÈÛÛ¾ÛÛ× …ÛÈÛÉÛé ¶ÛÐüá.

(12) †›÷ÛÁõ−ùÛÁéõ ›÷é õÛ¾Û¶ÛÛé ÈÛ Ùõ …Ûé¦ÙøÁõ …Û¸ÛéÅÛÛé ÐüÛé¿Û ©Ûé õÛ¾Û¶ÛÛ Í¤øÛé¶Û/¸ÛéÈÛÁõ ¼ÅÛÛé õ ¼Û¶ÛÛÈÛÈÛÛ ¾ÛÛ¤éø ›÷é ×õ¸Û¶Ûà¶Ûé õÛ¾Û

ÍÛÛé ÛéÅÛä× ÐüÛé¿Û ©Ûé ×õ¸Û¶Ûà¾ÛÛ× ¾ÛÛÅÛÍÛÛ¾ÛÛ¶Û¶Ûà •Ûä ÛÈÛ«ÛÛ ¾ÛÛ¤éø ¬Û¦Ùø ¸ÛÛ¤øâ ¤éøͤøá•Û RITES/DGS & D/CEIL

/GERI ¾ÛÐüÛ¶Û•ÛÁõ ÍÛéÈÛÛ ÍÛ−ù¶Û ÍÛä ÛÈÛé ©ÛéÈÛà ÍÛÁõ õÛÁõ ¾ÛÛ¶¿Û ÍÛ×ͬÛÛ ¸ÛÛÍÛé¬Ûà †›÷ÛÁõ−ùÛÁõ¶ÛÛ ”Û˜Ûë õÁõÛÈÛÈÛÛ¶Ûä× ÁõÐéüÉÛé.

…¶Ûé ©Ûé¶Ûä× ¤éøͤøá•Û ÍÛ¤øâºõà éõ¤ø …ªÛé Áõ›ä÷ õÁõÈÛÛ¶Ûä× ÁõÐéüÉÛé.

કાય#પાલક ઇજનર,

(હાઉસJગ-બી<ડJગ)

વડોદરા મહાનગર સવા સદન.